Community Services Div, Building Safety
CITY OF SPRINGFIELD, OREGON
225 5th Street, Springfield, OR 97477 Ph. 726-3759
4
Subdivision Lot # J>-
Mountaingate Subdivision - Phases I & II
I Site InvestigatiOli Questionnaire for Consulting Design Professionals
SITE ADDRESS La '-flflo FORst tcJq~~r. CITY JOB #
Foundation: requirements - new struct~res on residential lots
This form may be used as a verification to allow construction to continue on the job
site until the stamped' AlfJ:ilUA VIT For Site Investigation Questionnaire' is
. submitted to the City. This form must be completed by a licensed design
professional (engineer or architect) or his/her authorized representative, and
submitted to the building inspector prior to requesting City inspections or placing
foundation concrete. It is important that all questions be answered completely for
the foundation site to be approved for construction.
Owner and/or COJ.ltractor
\.TGt-t-r~ C (l~I~U
, '.~ 0
A. Date(s) of the design professional's site evaluation?
\:f\t I t-D - W J ~! ) ?(\Ol.n.
B; Has the design professional reviewed a copy of the geotechnical information
that was prepared. for the subdivision relating to this site? Yes L./No_
If not, please contact this office for a copy of the report. The design professional
must be familiar with the geotechnical information before completing this form.
C. In which Geotechnical Investigation area is this site located?
(Level I sites are lots # 3-20, 43-49 & 49-71) Level I ~
(Level II sites are lots #1-2, 21-42 & 50-54) Level II
Note: Level II reauires a site-soecific I!eotechnical investil!ation & renort
- -
Were site conditions identified that would change the category? YES _ N 0 ~
(For criteria determining category, see the accompanying documenttitJed:
Geotechnical Requirements for Individual Building Lots Moul1taingate Subdivision - Phases 1 & 2)
If"yes", explain (use the reverse side of this sheet or an added sheet if necessary)
lof5
Community Services Div, Building Safety
CITY OF SPRINGFIELD, OREGON
225 5th Street, Springfield, OR 97477 Ph. 726-3759
Subdivision Lot # 9~
Was a geotechnical engineer involved at the site to verify that conditions are
suitable for construction of the pro~d building(s)? Yes VNo_
Name of geotechnical engineer fDVlAA--J 0.. S \ th((;:;. fro "'A.
D. What was the nature of the excavation and lor fill? ~A (\ Il.a ,( () f- ~6 ,.is
..:ir-> Je.h.i.L:e.,,J q..r-r. rJ p <;, ~ j P fa. c..~Vl.A ~ ft.:f- ~~," k""
pr-npt\'!- ,pA iJt-- i/.J....C t---{! re.... , __ '
Was exjsting non-structural fill or expansive soil encountered on the lot?
Yes~o_ If "yes", what types" depths and locations, and how doe, s it, affect
the building foundation? 'S~\ \()W rl~,Qi:h 9.1: I +---1 cJ,^-v.,
""I:.- + l.l. n.<;'" r1?rv...cn I~..A " (\
What measures were taken to remedy the soil condition (include type of
engineered fill used to stabilize the soil)? --2lR cJfk.U ~^t'l utL$.
r:.e~V\A..('\ \/ 1 A . ~ --
Is the site as prepared adequate ~dequate 0 to maintain constant moisture
content in the sub grade? Note: Verification ofmoisture stabilization in the sub
grade is a requirement for site preparation, and must be affirmed before
construction can continue.
If inadequate, what measures are to be taken to provide constant moisture content
in the sub grade?
Is the site, as prepared, adequaterB-lnadequateD to support the proposed
structure? An ajjirmative answer is requisite to proceeding with construction.
If inadequate, what additional work is needed to provide adequate
foundation support?
E. Did the design professional witness placement and compaction of the
engineered fill, or isthere a special inspection report forthcoming from a
qualified agency? I witnessed Placement 0 Special Insp/compaction report ~'
20f5
Community Services Div, BuileJing Safety
CITY OF SPRINGFIELD, OREGON
225 5th Street, Springfield, OR 97477 Ph. 726-3759
Subdivision Lot # 9 cj .
F. The design professional intends to use the following method for installation
of perforated perimeter footing drains:
The design on the attached drawing provided by the design professional. . .. 0
The method shown on the original construction drawings.. .. .. .. . . .. .. .. g--
The typical 'Foundation Drain' drawing attached to permit.. ........... ...... 0
Perforated perimeter drains are not required.............. ........ .. ..... .... 0
Comments:
Note: City inspectors will inspect installed drains prior to cover upon request...
Call: 726-3769 to schedule inspection.
G. Low-point crawl space drains are required to prevent the build-up of excess
moisture inside the foundations during (and after) construction. This drain
may be installed after foundation placement onlv with the express permission
of the desi{!n nrofessional.
a. The design professional has determined the following:
The crawl space drain is required when the foundation is installed... .. 0
The low-point drain can be installed after foundation placement without a
significant moisture build~up problem within the foundation... ... ... .... g:..---
(I'h, e low-point drain may be installed at the (1,& r:.r--Ol?c.t-/' a....t~stage
of construction) . post earn, rarnmg, roofmg, etc.
b. Has the design professional observed and approved the installation of the
required low point drain?.. ... ... ... ... ... ... ... '" ... ..... . Yes, No
if 'yes'~ where is the low point drain located under the building and
where does it terminate at this time? (Must be an approved location, i.e.
street gutter, storm sewer, sump pump and discharge line to the street,
etc.)
The design professional must determine whether the approved permit drawings have
adequate foundation steel. Is any additional foundation steel required that is not
shown on the found~n drawings for the building?
Yes No . ~ If 'yes ", describe additional steel required (or provide drawing).
30f5
Community Services Diy, Building Safety
CITY OF SPRINGFIELD, OREGON
225 5th Street, Springfield, OR 97477 Ph. 726.3759
Subdivision Lot # n
The individual doing the observations and providing direction for the excavation and site
preparation work on the property must sign the following statement.
The undersigned design professional (or authorized employee) attests that he/she
observed required moisture stability procedures on this site, and that such procedures
were accomplished before any changes occurred in the moisture content of the sub-
grade under and around the building (where expansive soils were encountered). The
undersignedfurther attests that the sub-grade, as prepared, is adequate to support the
building proposed for this site.
Additional comments:
(Note): A copy of this report shall be kept on site with the approved plans at all
times.
This report shall be followed by an affidavit, signed and stamped by the design
professional under whose auspices this report was completed, affirming the information
herein. The signed/stamped affidavit together with a copy of this report shall be
submitted to this office prior to requesting framing inspection for the building.
Signaturf-, R.,.M!.P..4J,., ~tr~
Name~AAe10... s., ~ UtJ.Ls1::rtl M.;. Title ~E-
Company 1-L.'1 1I;' (\". \p EII\ '?r' t'\ee..--rtll CI
Phone ~-(\(~'7 (J . ([
Licensee ~J^^P to. ~ t H-.'{ is. froY\./'-- ..
License # ~t.f-x'L?_ expires u:~(\ It)-;
The geotechnical report for the Mountain-gate Subdivision Phases I & II makes
recommendations for placement of building construction ,on each site. The report also
recommends that site preparation during wet weather conditions be avoided unless
special measures are taken to mitigate soft soil conditions and moisture collecting in or
around the foundation areas during and after the construction process. Positive site
drainage must be provided.
40f5
Community Services Div, Building Safety
CITY OF SPRINGFIELD, OREGON
225 5th Street, Springfield, OR 97477 Ph; 726-3759
Subdivision Lot # 9+
--
AFFIDAVIT
For Site Investigation Questionnaire
Foundation Sub-Grade Approval for
Residential Building Site in Mountaingate Subdivision
Phases 1 &2
The undersigned hereby affirms that the excavation, structural fill and moisture
stabilization methods for the building site at the address shown above were observed by
me or an authorized employee of my firm and that the, following is true:
1. The geotechnical information for the subdivision, specific to this site, was utilized
as part of the determination for foundation preparation and drainage requirements.
2. The foundation sub-grade is capable of supporting a minimum of 1500 psf, and is
adequate to support the building proposed for this site.
3. The moisture content of the excavation was adequately maintained during the site
preparation process and the site is adequately graded and drained for discharge to
an approved location in order to maintain stable moisture content throughout the
construction process and thereafter.
4. The accompanying report titled "Site Investigation Questionnaire for Consulting
Design Professionals" containing field observations and instructions made on
(date) ,Jv,J U-- 0-2(;)J ~\ Lt:f::in for this building site was completed either by
me or by an hLthorized repr~sentative under my supervision. To the best of my
knowledge, the information contained in that report is complete and accurate.
~
J --.,- "I ,,,. "
~ c(\nl1~~~~.~~9;:~~~:,~~.~1J