HomeMy WebLinkAboutPermit Mechanical 1986-10-31
~~~~.:!:..~:ii~2[';,!-E?:;"bf..:.:~;<,,,-..-....,n""J;."lb."Mft~9lI~~:Mr~eyik..i..-.l.."h~).$l"~~1'~~:";?,;_.
~.~:~ r:.~':"-;-'::l""'-,(,"=,~,'-.
--;....;..:"'-'t.....~-a.,_'_ ..' .
Receipt #
d il? 953s-
P-" ,
.. RESIO_TIAL"
APPLICATION/PERMIT
225 North 5th Street
SpringfieZd, Oregon 9?4??
BuiZding Division
?26-3?53
r Job Location:
!
I Assessors Map #
4-/33 L~~j)A^ 0 _hillQ ,
I f{ 0 2 3;;) 3 5 Ta:c Lot #
I A )OM_
O;2tf!llo
1 ,/1 ~ ~ ~
CAmer: /~ f~ //I/t/~J
317 Wv /-!n~(j:"c1 4''05 b a ok,
i
I
i I Construction Lender
I It is the responsibility of the permit hoLder to see tha.t all inspections are made at the proper time, that each ~ess is reada.DZe
from the street, and that the permit card is located at the front of the property.
~ *Bui!ding Diviaion approved plan shan l'emain on tha Building Site at an times.
I PROCEDURE FOR INSPECTION REQUEST:CALL 726-3769 (recorder) state your City designnted job number, job address, type of inspec::icn
! requested ar.d when you will be ready for inspection, Contractors or OWners name and phone number. Requests received befcre 7:00 ~
...'ilZ be made the same day, requests made after 7:00 am will be made the n=t wrking day.
SUbdivision:
.::-
Address:
Ci ty :
NmJ
Addi tion
Remodel
Mobile Home
/Or3J-~h
Date of Application
Contractors
General
PZumbing
Electrical
Mechar.ic::J.7..
~
rVlAJ LU}(M Q .-
o
Reaui~ed Insvections
SITE INSPECTION: To be made after
excavation, but prior to set up of
forms.
UNDERSLAB PLUMBING. ELECTRICAL &
: NECHANICAL: To be made before any
work is covered.
to
I
10
o
FOOTING & FOUNDATION: To be made
after trenches are excavated and
forms are erected, but prior to
pouring concrete.
UNDERGROUND PLUMBING, SEWER, W.1TER.
DRAINAGE: To be made prior to fil-
_lil".IJ trenches.
o
D.
UNDERFLOOR PLUMBING & MECHANICAL:
To be made prior to installation of
fZoor insulation or decking.
POST AND BEAM: To be made prior to
installation of floor insulation or
decking.
ROUGH PLUMBING, ELECTRICAL & MECH-
ANICAL: No work is to be covered
,until these inspections have been
made and approved.
FIREPLACE: Prior to placir.g facing
materials and before framing inspec-
tion..
D F~1ING: MUst be requested after
approval of rough plumbing, electri-
caZ & mechanical. AU roofing
bracing & chimneys, etc. rrrvlst be
:" completed. No work is to be con-
.'~ cealed until this inspection has
~been made and approved.
o
D
D
Describe fior7<:
~/l()(t ~ J --'
f'A ~
~,'
<g' ~qq
VaZue
Address
Your City Desigro.ated Job Number Is:
D INSULATION/VAPOR BARRIER INSPECTION:
To be made after all insul~tion ~~
-. required vapor barriers are in place
. . but before any lath, gypsum board or
waU covering is applied, and before
'any insulation is concealed.
D DRYWALL INSPECTION: To be made
after an drywaU is in place,
but prior to any taping.
O MASONRY: Steel location, bond
beams, grouting or verticals in
~ccordance with U.B.C. Section
. 2415.
WOODSTOVE: After instaUation is
completed.
D
CURB & APPROACH APRON: After forms
are erected but prior to pouring
con:::rete.
SIDEWALK & DRIVEWAY: For aU con-
crete paving within street right-
pf-way, to be made after aU exca-
vating complete & form work & sub-
base material in place.
/jMUOIG
f\~
, '\
" "
(( /
--
-~... .,'\
/) )/'
,
, t".
:.':l.. \. \~.'"
J- \.'~
Signed:
Date:
cc
/O-31-f[h
D
D
I'ENCE: fo.'hen complete -- Provide
gates or movable sections through
P.U.E.
Lisc.#
Ex;:;ires
Phone
o
g>ce,{) ~ fJg~
DEMOLITION OR MOVED BUILDIHGS
:=J Sani tary sC'..Jer capped at p:..opc;rty line
~ Septic tank p~ed and filled with gravel
I Final - f>'hen above items are cempleted
~ and when demolition is complete or stru~-
ture moved and premises cleaned up.
I Mobile Hemes
~ Blocking and Set-up
~ Plumbing connections -- sGWer and water
~ Electrical Connection ~ Blocking, set-up
---l and plumbing connections rrrvlst ce approved
before requesting elec~rical inspection
:=J AccessoI"j Bui lding
I Final - After porches, skirting, decks,
~ etc. are completc;d.
D
All project conditions, such as the installation of street trees, co~letion of the
required landscaping, etc., rrmst be satisfied before the BUILDING FINAL can be requested.
=:J FINAL PLUMBING
~ PINAL MECHANICAL
:=J PINAL ELECTRICAL
~
o
FINAL BUILDING: The Final Building Inspection rrmst be requested after the Pinnl Plumbing
Electrical, and Mechanical Inspections have been made and approved.
-ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE, ADJUST!fENT TO BE MADE AT NO COST TO CITY.' I Page 1 of 2
........,. 'f'._. ".
-:-. .
'~:-J." -~--: ::_..:
Page 2
JOB NO. riot) 1~J..')SOLAR AI -ESS REQ.-
Zone:' ':.,,~/ Occu:pa.ncl{ GroUp:
Lot Sq. Ft{;. . .
% of lot Coverage
# of Stories
Tota"l Height
Topography.: '
I
lITEM SQ.FTG
lMain
I Garaae
I Carport
I Accessorl./
IS.b.c.
TOTAL VALUE
(value)
1.5 x
Bui"lding Permit
State SUI'charge
Total Charges
'ITEM
Fixtures
I Residential (1 bath)
I Sani tary SeweI'
I NO.' FEE
WateI'
Plumbing Per>rr:i t
State SUI'cr.arge
Total ChaI'C!es
ITEM
NO. FEE
Res. Sa. ftC!.
'New/Extend CiI'cuits
TempoI'ary Service
I
.1
I
EleatI'ical Permit
State SUI'charqe
Total Charr;es
ITEM
NO.
Furnace ETU' S
Exhaust Hood
Vent Fan
WQodstove
t/ lZJ
Permit Issuance
Meohanical PeI'rm t
Sta.te SUI'chaI'C!e
Tota.l Charaes
-- ENCROACHMENT --
SeC"'~ri ty Deposit
I Storage
I Maintena~e
I Permi t
I Tota"l ChaI'qes
Curbcu~
Sidewalk
I Peru:e
I ElectI'ical Labe"l
I Mobi le . Home
I TOTAL AMOUNT DUE:-
I
I
I
I
I
I
li(
IS-aD I
'rdVl
j IS ; t?D , ~
I
r
r
r
LOT TYPE
InteI'ioI'
ComeI'
Panhand"le
Cul-de-sac
x Value
CHARGE
CHARGE
FEE
CHARCE
IS. 0 '()
.&0
IS
I
I
(5, &D
"
.- L-CqG~
L;
Type/Cor.st:
Bedrooms:
I EneI'Cll./ SOUI'ces
I ,;teat
I WateI' HeateI'
I Range
I FiI'eplace
i Woodstove
I
T1./De
Lot Faces -
P.L.
NOI'th
East
South
West
Setbacks
House Garage
Access.
Fees
Building Value & Permit'
This pe:rmit is gI'anted on the erpI'ess condition that the said constr'Uation
shal"l, in all I'espeats, conform to the Ordinanae adopted by the City of
SpI'ingfield, including ~he Zoning CI'dinanae, I'egulating the aonstr'Uction
and use of buildings, and may be suspended OI' revoked at any time upon vio-
ration of any provisions of said Ordinances. .
-
-
Plan Check Fee:
Date Paid:
IReceipt #:
I Signed:
Plumbing Permit
No peI'son shaH const1'uct, instaU, aUer OI' . change. any new or e:::isting
p"lumbing oI'drainage system in whole or in part, un"less'suah person is the
"lega"l possessoI' of a valid plumber's license, except that.a person may do
plumbing WOI'k to pI'opeI'ty whiah is owned, leased OI' oper>ated by the appli-
eant.
~
Electrica I 'Perm it
Where State LCIlJ I'equires tr.c.t the e"lectI'ica"l WOI'k b'e done by an Eleatrical
Con tI'ac tor, the e"lectrical pOI'tion of ~his permit sha"ll not be valid until
the lahe"l has been signed by the E"leatriaal ContI'aatoI'.
~
M ec h an i c a I
Permit
"-
X.
Plan Examiner
uat;e
I HAVE CAREFULLY EXAMINED the aomp"leted appUaation foI' permit, and do
hereby aertify that aU information heI'eon is tr>ue and correct, and I
fUI'theI' ceI'tify that a.ny ar.d aU WOI'k performed shaH be done in acaor-
danae with the OI'dinanaes of the City of SpI'ingfie"ld, and thz. L~~s of the
~ State of Oregon pertaining to the work describcd herein, and ~ha~ NO OCCU-
PANCY wi"l"l be made of any str>uctUI'e without permission of the. Building Di-
vision. I fUI'theI' certify that only contI'actors ar.d e~"loyees who are in
compliance with ORS 701.055 will be used on this pI'oject
(
L:'Y~} .
.~~~~
Sigmd
fO-3( -g6
Date
-