HomeMy WebLinkAboutPermit Building 1985-5-17
.. RESID~ .TIAL"
APPLICATION/PERMIT
225 North 5th Street
SpringfieZd, Oregon 97477
BuiZding Division
726-3753
'I II
Job Location: 4//5
"
l
Rcce-:.pt # f3
&4(OQ5
o~w
;sot( 5, f.,U, (p n/
p~ui, tar q 7;;2 of
(J,S, {]~
(j
Assessors Map #
Subdivision:
Otmer:
Addr>ess:
Ci ty :
NAUI
Addition
Remodel
Nobile Home
Date of Application
. s-/7-f'S-
Contractors
T= Lot #
Phone:
rrLj,- 'IffS'
Zip:
~~ f02'ly 90 II
() - .- ~ (Y///.~ ~
~ CAl- ~--- . ^V
VaZue
/</0. 60
Ad.d..~ess
~(Jt7~ L'e-rW-Ci--.fJ..dillc(Zu ~
/51a.12~ '::J- {YWu (0 re-vE.
GeneraZ
Plwnbing
Electrical
Mechar.ical
Construction Lender
,j)wL
· ldJ
?~>
Signed:
Date:
~ {J jd(;
,'5 -( 7 - f( ,e;/
Lisc.#
37'-/ (11"<..(J 0
Your City Desigr4ted Job Number Is:
D
INSULATION/VAPOR BARRIER INSPECTION:
To be made after all insulation ar4
required vapor barriers are in place
but before any lath, gypsum board or
wall covering is applied, and before
>any insulation is concealed.
Expires
7-) q-rf~c::;
Phone
'73QoV
C(-;L~ -fS
It is the responsibility of the permit holder to see that all inspections are made at the proper time, that each .:::.dd:ress is readabre
from the street, and that the permit card is located at the front of the property.
~BuiZding Divicior. approved plan shall remain on the Building Site at all times.
PROCEDURE FOR INSPECTION RE'QUEST:CALL 726-3769 (recorder) state yOUI' City designated job mo;;ber, job address, type of inspectien
requested and Ulhen you Ulill be ready for inspection, Contractors or OUJners name and phone nwnbcr. Requests received befere 7:00 an
"->ill be made the same day, requests made afte:t' 7: 00 am UJill be made the next :JOrking day.
g 5D;$. rr
Reouired InsDActions
O SITE INSPECTION: To be made after
excavation, but prior to set up of
forms.
O UNDERSLAB PLUMBING. ELECTRICAL &
MECHANICAL: To be made before any
work is covered.
o
FOOTING & FOUND,1TION: To be made
after trenches are excavated and
forms are erected, but prior to
pouring concrete.
UNDERGROUND PLUMBING. SEWER. WATER.
DRAINAGE: To be made prior to fil-
Zir.g trenches.
o
0,
UNDERFLOOR PLUMBING & MECHANICAL:
To be made prior to installation of
floor insulation or decking.
POST AND BEAM: To be made prior to
installation of floor insulation or
decking.
ROUGH PLUMBING. ELECTRICAL & MECH-
ANICAL: No work is to be covered
,until these inspections have been
made and approved.
FIREPLACE: Prior to placir.g facing
materials and before framing inspec-
tion.
O FRANINC: Must be requested after
approval of rough plwnbing, eZectri-
>cal & mechanical. All roofing
bracing & chimneys, etc. ~~st be
;: comp leted. No work is to be con-
. "~ccealed until this inspection has
~been made and approved.
D
o
o
DRYWALL INSPECTION: To be made
after aU dr>ywaU is in place,
but prior to any taping.
O ~SONRY: Steel location, bond
beams, grouting or verticals in
accordance with U.B.C. Section
2415.
D WOODSTOVE: After installation is
acmp leted.
D
D
CURB & APPROACH APRON: After forms
are erected but prior to pouring
concrete.
DENOLITION OR NOVED BUILDIiVGS
~ Sanitary s~~er capped at p~operty line
~ Septic tank pumped and filled with gra~el
I Final - f,'hen above items are completed
~ and when demolition is complete or struc-
ture moved and premises cleaned up.
Mobile Hemes
, i
~ Blocking and Set-up
~ Plumbing connections sewer and water
~ Electrical Connection - Blocking, set-up
~ and plumbing connections ~~st ce approved
before requesting electrical inspection
=:J Accessol""d Building
I Final - After porches, skirting, decks,
~ etc. are completed.
o
All projeot conditions, such as the installation of street trees, co~letion of the
required landscaping, etc., must be satisfied before the BUILDING FINAL can be requested.
o FINAL PLUMBING
o FINAL MECHANICAL
o FINAL ELECTRICAL
o
o
FINAL BUILDING: The Final Building Inspection must be requested after the Pinal Plumbing
Electrical, and Mechanical Inspections have been made and approved.
o
SIDEWALK & DRIVEWAY: For aU con-
crete paving within street right-
of-way, to be made after all exca-
vating complete & form work & sub-
base material in place.
~ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE, ADJUSTNENT TO BE M.1DE I1T NO COST TO CITY Pa.ge 1 of 2
o
FENCE: ...'hen complete -- Provide>
gates or movable sections through
P.U.E.
o
~. ') ..
rc.ge "
JOB No.S<50~11 SOLAR' ~CESS REQ.->
Type/Cor.st:
Bed:r>ooms:
Enerau Sources
Heat
Water Heater
Range
Fireplace
Woodstove
TUDe
Zone:
Occupanci./ GroUp:
LOTTYFE
Lot. Sq. Ftg.
% of lot Coverage
# of Stories
Total Height
Topography
lITEM
SQ.FTG
Main
Cm'aGe
I Carport
I Accessor2(
IS.D.C.
TOTAL VALUE
(vaZ,ue)
1.5x
. Building Permit.
State Surcharge
Total Cha.~ges
lITEM
I Fi.xtures>
IResidential (1 bath)
I Sanitary Sewer
NO.
WateI'
Plwnbing PeI'mit
State Surc;..a:r>ge
Total Charaes '
I ITEM
I Res. Sa. fta.
I New/Extend CiI'cui ts
I Temporary Service
NO.
ElectI'ical Permit
State Surcharqe
Total ChaI'"es
I ITEM NO. FEE
I Purnace ETU' S
I Exhaust Hood
Vent Fan I
Woodstove I
I >1
Permit Issuance
Mechanical Permit
State SurchaI'ae
Total Charaes
-- ENCROACHMENT --
SecrJ.rity Deposit
StoI'age
Maintenance
Permit
Total ChaI'qes
I CUI'bcut
I Sidewalk
I Feme
I Electrical Label
I Mobile Home
'TOTAL AMOUNT DUE: *
InterioI'
Corner
Panhandle
Cul-de-sac
x
Value
/OrOO
rlfD
! Dr '10 *
FEE
CHARGE
FEE
CHARGE
CHARGE
I
I
I
I
I Dr rfb
L:"'cod:t
I Lot Faces -
I Setbacks
I P. L. House Carage
INorth
East
South
IWest
~- Fees
I
I
Access. I
I
I
I
II
Building Value & Permit
This pe!'Tr1":t is gI'anted on the express condition that the said construction
shall, in all respects, conform to the Ordinance adopted by the City of
SpI'ingfield, including the Zoning Ordinance, regulating the construction
and use of buildings, and may be suspended OI' revoked at any time upon vio-
, lation of any pI'ovisions of said Ordir~nces.
'*
Plan Check Fee:
Date Paid:
Receipt #:
Signed:
Plumbing Permit
No person shall construct, instalZ, > alter OI' change any new cI'>existing
plwnbing or drainage syste~ in whole or in part, unless such person is the
legal possessor of a valid plwnber's license, except that a person may do
plwnbing WOI'k to pI'opeI'ty which is owned, leased OI' operated by the appli-
cant.
I *
Electrical Permit
Where State Law requires t;.~t the electrical work be done by an Electrical
ContractoI', the electrical portion of this permit shall not be valid until
the label has been signed by the Electrical Contractor.
*
I
I
I
I
I
I
I
Mechanical Permit
*
I
r
r-
r *
I
I
I
I
I
I
I
PZan Examiner
Vate
I HAVE CAREFULLY EXAMINED the completed application foI' permit, and do
hereby certify that all information hereon is true and correct, and I
further ceI'tify that any rir.d all WOI'k perfomzed shall be done in accoI'-
dance with the Ordinances of the City of Springfield, and the L~~s of the
State of Oregon pertaining to the work described herein, and that NO OCCU-
PANCY will be made of any structure without permission of the Building Di-
vision. I further certify that only contractors Wul enployees who are in
ca~pliance with ORS 701.055 will be used on this project
*
/$Auu. f ,~
Sign9d &..~
Date
s:- /?- p...j