HomeMy WebLinkAboutPermit Building 2007-9-4
Status
Issued
CITY OF SPRINGFIELD'
Building/Combination Permit
PERMIT NO: COM2007-01346
ISSUED: 09/04/2007
APPLIED: 09/04/2007
EXPIRES: 03/04/2008
VALUE: $ 5,000.00
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
SITE ADDRESS: 6883 FORSYTHIA ST
ASSESSOR'S PARCEL NO.: 1802031101800
Springfield
TYPE OF WORK: Foundation
TYPE OF USE: Repair
Residential
PROJECT DESCRIPTION: Foundation repair
Owner: TOWERY JEFFREY R & DORIS G
Address: 6883 FORSYTHIA ST
SPRINGFIELD OR 97478
Phone Number: 541-726-3700
I CONTRACTOR INFORMATION I
Contractor Type
General
Contractor
SOLID GROUND
License
165804
BUILDING INFORMATION.
Expiration Date
07/27/2009
Phone
744-8998
# of Units:
Primary Occupancy Group:
Secondary Occupancy Group:
Primary Construction Type
Secondary Construction Type:
# of Bedrooms:
# of Stories:
Height of Structure:
Type of Heat:
Water Type:
Range Type:
Energy Path:
Sprinkled Building:
Lot Size:
Sq Ft 1st Floor:
Sq Ft 2nd Floor:
Sq Ft Basement:
Sq Ft Garage/Carport
Sq Ft Other:
Occupant Load:
n/a
Storm Sewer Available:
Special Instruction:
AI It:NTlON: Oregon faw requllt!!..'.lff>PMENT INFORMATION I
follow rules adopted by the OreaoR' UtilItY
lif'.Q~!i~n Center. Those rules are setlO .
F~ontyali '0; ''R'~-001-0010through OAR 952 ,frlay Dlst:
S~de 1 Se .: You may obtain caples of the rule reet ~rees Rqd:
Side 2 Set e '.ng the center. (Note: the telephoneaved Dnve Rqd:
Rearyard ~6Wtffitt:for the Oregon Utility Notiflcatloo of Lot Coverage:
Solar Setbacks: Center Is 1-800-332-2344).
~BLlC IMPROVEMENTS I K
.~ nee E\&JJjE,WOR
T~S PERMIT SHALL EX~~ PE~~ff~Nave:
AUTHOR\ZED UNDER THANDONW'fWAuts/Drains:
COMMENCED OR \5 AS
ANY 180 DAY PER'OD.
REQUIRED PARKING
Total:
Handicapped:
Compact:
Street Improvements:
Notes:
I Valuation Description I
Description
Type of Construction
$ Per Sq Ft
or multiplier
Square Footage
or Bid Amount
Value
Date Calculated
Pal!e 1 of 2
.......:..GP.A.,NGl!~lm.D "
,
Status
Issued
CITY OF SPRINGFIELD
Building/Combination Permit
PERMIT NO: COM2007-01346
ISSUED: 09/04/2007
APPLIED: 09/04/2007
EXPIRES: 03/04/2008
VALUE: $ 5,000.00
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
Total Value of Project
Fees Paid'
Fee Description
+ 10% Administrative Fee
+ 5% Technology Fee
+ 8% State Surcharge
Foundation Permit
Amount Paid
Date Paid
$7.57
$3.79
$6.06
$75.74
9/4/07
9/4/07
9/4/07
9/4/07
Receipt Number
1200700000000001154
1200700000000001154
1200700000000001154
1200700000000001154
Total Amount Paid
$93.16
I Plan Reviews I
Structural Review
09/04/2007
09/04/2007
APP DLM
To Request an inspection call the 24 hour recording at 726-3769. All inspections requested before 7:00
a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following
work day.
Reouired Insoections I
Footing: After trenches are excavated.
Final Building: After all required inspections have been requested and approved and the building is complete.
By signature, I state and agree, thatI have carefully examined the completed application and do hereby certify that all
information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with
the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and
that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety.
I further certify that only contractors and employees who are in compliance with ORS 701.005 will be used on this project. I
further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the
street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all
times during construction.
Ltt/\ ~~~
Owner nr c~rs Sign.tnr.
crM IDl-
I
Date
Pae:e 2 of2
225 Fifth Street .
Springfv~ld, Oregon 97477
541-726-3759 Phone
Job/Journal Number
COM2007-01346
COM2007-01346
COM2007-01346
COM2007-01346
Payments:
Type of Payment
Check
cReceint I
RECEIPT #:
Description
Foundation Permit
+ 5% Technology Fee
+ 8% State Surcharge
+ 10% Administrative Fee
Paid By
SOLID GROUND
City of Springfield Official Receipt
Development Services Department
Public Works Department
1200700000000001154
Date: 09/04/2007
Item Total:
Check Number Authorization
Received By Batch Number Number How Received
. llh
661
In Person
Payment Total:
Page 1 of 1
3:09:28PM
Amount Due
75.74
3.79
6.06
7.57
$93.16
Amount Paid
$93.16
$93.16
9/4/2007
,~. .J~.
-' ........... '~
'"
,"
~
"
,
c3
, K & A Engineering, Inc.
P.O. Box 23624, Eugene, OR 97402
521 Market St., Suite B, Eugene, OR 97402
(541) 684-9399 Voice
(541) 684-9358 FAX
pnginppring
February 8, 2007
Mr. Jeff Towery
6883 Forsythia Street
Springfield, OR 97478
Project: 223.06
~
~
SUbject: Foundation Investigation and Repair Plan
Single-family residence
6883 Forsythia St., Springfield, OR
cYtn2d07-0/~ ,
hlfIUP~ A-' SH<Pt'/J71!V
9/~7~/M-
~
{: PURPOSE AND SCOPE
As per our agreement, K & A Engineering, Inc. has completed an investigation of the foundation and foundation
i soils at the SUbject existing single-family residence. The purpose of our investigation was to determine the
I nature, extent, and cause of foundation settlement, and to make recommendations for repair.
, The scope of our services included necessary fieldwork, engineering analysis and design, and this written
, report.
INVESTIGATION AND FINDINGS
:-,.'"
Ii
'11'irI".,
' .
;~
General Surface Conditions
The project site is located in a residential subdivision in the moderately steep, north facing southeastern hills of
Springfield, Oregon. This area is bounded by alluvial valley deposits of the McKenzie River to the north and
Middle Fork of the Willamette River to the west. See the attached Vicinity Map. Natural slopes in the project
area range from 8 to 15%. '
g
: )~
~:'.;:
The geblogy1 of the general area consists of soft, highly weathered to decomposed ~ndifferentiated tuffaceous
sedimentary siltstone and sandstone (tuffs) covered with a moderately thin layer of residual and colluvial plastic
silts. Igneous intrusive rocks (basalt) underlie these soft sedimentary rocks and residual soils.
I>'
This geology, highly weathered tuffs with basalt intrusives, is typical for a large area ofthe west-facing foothills
of the cascade mountain range located in the direct vicinity of the project. The tuffs most likely consist of ash-
flow or air-flow volcanic deposits. These rocks typically weather to form residual or colluvial plastic silts having
a moderate to high plasticity and non-isotropic, low permeability. The mineralogy of these soils influences their
characteristic moderate to high degree of volume change with changes in water content.
..,
'1".',
1 Geologic Map of Oregon, George W. Walker and Norman'S. MacLeod, 1991.
...-
;
I~
~
~
.~
ftJ.,
t}'"
..'
..
I
~~~
r;';
~I?~
l;~.
"j'l
I
r.;:-
'1:",
:~:.~
;;,..
(..,(1
~
"",
~.;:
{"";'
f.:
.~~
~;;
,
- J
~
K & A Engineering, Inc.
We believe that this landform is consistent with huge air-born ashflow deposits that made dune-like land forms
that have severely weathered since their formation. We have observed similar'shapes and landforms southwest .
of the vicinity. '
Existing Structure and Foundation
GeneralConSlfucffon
The subject residence consists of a conventionally framed two-story home with a main floor area of
approximately" 1 ,200-square feet and an attached garage with an area of approximately 440-square feet.
,
The foundation system consists of a perimeter concrete strip footing (e~timated to be 8" x 24") supporting 8" . '
stem walls that vary in height from' 2-feet to 4-feet. Interior isolated footings in the crawlspace support a post~
'and-beam main floor system. Exterior walls and beams supported by exterior walls support the upper floor and
roof. The roof structure is a composite of manufactured roof trusses and conventional framing covered with a
composite aspha~shingle roofing material. The residence is located on a residential lot of approximately 5,700
square feet. See the attached Project Site Plan.
In general, the building elements including framing, concrete, and finishes appearto have been constructed in a
workmanship like manner, consistent with currently accepted standards for good quality residential
construction. We did not find decay or other significant structural deficiencies other than those discussed
below that are associated with the observed foundation subsidence.
Deficiencies
1. Floor Settlement. Our inspection revealed that there has been a significant amount of vertical
settlement of the perimeter and interior floor foundation. We surveyed the floor elevations of both the
main level of the house and at.the, tops of the exposed concrete stem walls in the garage. Our
measurements show that there is as much as 2.4-inches of difference in vertical floor elevation
measured from the highest point to the lowest point. See the attached Repair Plan drawing.These
drawings depict the actual floor surface shapes as of the date of our survey (November 2006). Major
contours are in 1.0-inch intervals, and minor contours are in 0.2-inch intervals. It appears that the
greatest settlement is along the south perimeter foundation for the residence and along the west
foundation wall for the garage.
2. Interior Finishes. There are numerous deficiencies in the interior and exterior finishes that, in our
, opinion, are the direct result of foundation subsidence. These include vertical and diagonal cracking on
interior drywall finishes. Interior and exterior doors and windows are not in alignment with openings
and some operate with difficulty. There is cracking at joints of the wood trim.
3. Exterior and structural components. The most notable deficiency and the most visible is the west
garage wall and garage concrete slab-on-grade. Th~ west wall has settled vertically and appears to
have moved laterally resulting in an out-of-plumb wall (as much as 0.6" in 2-feet), large gaps between
the interior slab-on-grade and the stem wall, and broken slab-on-grade.
4. There is a significant bulge in the drywall covering the lower edge of the interior framed south garage
wall. Upon further inspection from the crawlspace it was determined that this is due to tipping of the
cripple wall studs' supporting the structure on the strip footing. It appears that lateral movement of the
Project: 223.06
Client: Towery
6883 Forsythia St., Springfield, OR
Page 2 of 8
February 8, 2007
'.
. . - ....)
"
.
K & A Engineering, Inc.
west garage foundation has pulled away from the framed floor diaphragm of the house, tipping the
studs and deforming the finish. There was no structural sheathing attached to these cripple wall studs.
5. Drainage. Drainage of surface runoff is inadequate along the west portion of the south perimeter
foundation. We observed evidence of long-term pooling of water on the concrete slab around the
concrete patio steps at the master bedroom. We also noted groundwater in the boring that appears to
perch on the bedrock, saturating the organic clay.
;;".1
Subsurface Soil Conditions
Subsurface soils were investigated near the northwest comer of the garage foundation to determine the nature
and extent of soils underneath the settled portion of the house foundation.
~{
One boring was made using a hand auger, and one probe was made near the auger hole using adynamic cone
penetrometer. Soil in the boring consisted of approximately 4-feet of loose to moderately dense imported well-
. graded crushed aggregate (passing the 1 1h-inch sieve) over more than one foot of soft, saturated organic clay
over weathered to decomposed sandstone. A graphic log of the boring and of the dynamic cone penetrometer
probe is attached to this report.
~
r~
1~~
SUMMARY AND RECOMMENATIONS
)
Nature, Cause, and Extent of Subsidence and Settlement
Our opinion is that the observed settlement and resulting damage to the structure has been caused by
conso/Jdation of organic clays that extend underneath much of the foundation area. These soils are
compressing (decreasing in volume), in response to the loads of imported fill materials and dead and live
structural loads. It appears that the prepared subgrade underneath the foundation may have some slope
because of the lateral movement observed in the west garage wall. The saturated organic Clays have extremely
low residual shear strength and the vertical loading on the sloped surface may have caused the observed lateral
movement of the foundation and wall and the cripple wall (at the south garage wall).
!.:.:'
"-.',
.,
i7'
,.'
t.:;'.:.
I'
,.;r;~
~\
.
I,
~
Additionally, the loose state of the imported granular fills probably resulted in a small amount if immediate
settlement soon after completion of construction of the house.
ID1
'j:)"l
t, :'
We believe that the observed settlement could have been avoided by careful quality control during construction
of the foundation pad. It is apparent that the unsuitable soft organic clay, while easy to identify in the field, was
not thoroughly removed from the foundation area and that the well-graded granular fills were not adequately
compacted.
,,:~
Ground subsidence and foundation settlement appears to,be wide spread across the entire foundation. The
floor of the house has over 2.4-inches of differential settlement, with the lowest area along the south perimeter
foundation. The garage has settled most along the west and northwest sides. See the topographic contour
lines plotted on the Repair Plan indicating the observed floor surface elevations.
It is our opinion that, without underpinning the foundation, settlement will continue. However, foundation
settlementat the. perimeter foundation can be stopped and the structure brought to a level with an engineered
underpinning system.
r~
~;
p
~
L
~'.
Project: 223.06
Client: Towery
6883 Forsythia St., Springfield, OR
Page 3 of 8
February 8, 2007
'/.-
"
1,
,.'
,..'
r.~
~~.~
I
I
~
,....,
)~
..-
I~'.'
I
1'1'<
M
~
l.~
.. 'J
.
K & A Engineering, Inc.
Recommendations for Foundation Repair
We recommend that at least a portion of the existing perimeter foundation be repaired as shown on the attached
Repair Plan and referenced drawings. The recommended repair includes replacing the west garage foundation
with a cast-in-place concrete grade beam supported by steel helical piers and underpinning portions of the
remaining foundation using steel helical piers and pier brackets. , The helical piers extend through the existing
granular fill and organic clay to find adequate bearing in the underlying native decomposed sandstone.
tFurthermore we recommend installation of a new subsurface drainage system along the southwest and west
side of the foundation to collect groundwater and route this to the street storm drain system.
The foundation repair can be phased, and we recommend that the highest priority is repair of the west garage
foundation as shown on the drawings.
1.
We recommend that additional subsurface drainage be installed as shown on the attached Drainage Plan.
Optional underpinning shown on the Repair Plan consists of installing steel helical piers, pier brackets, and
structural steel channel at locations shown. This 'optional repair will require excavation at each pier location to
provide access and necessitates'removal and replacement of concrete slabs and other improvements.
SPECIFICATIONS
Materials
Steel Helical Piers
. The pier shaft shall consist of 2.875" 0.0. Schedul.e 80 ASTM A500 tubular steel pipe having a 0.25"
minimum wall thickness.
. Pier helices shall consist of ASTM hot-rolled ASTM A570 Grade 50 steel plate having a minimum
thickness of 0.50" formed on matching metal dies to a true helical configuration. .
. Couplings shall.consist of 3.50" 0.0. Schedule 80 ASTM A500 tubular steel pipe having a 0.30"
minimum wall thickness that is located and welded in place forming a con~istent strength equivalent
with the pier shaft.
. Fasteners shall consist of at least 2- 0.75" diameter ASTM A320 grade 5 or equivalent bolts.
. The lead section of the pier shaft shall have one 12-inch diameter helix at or near the tip and one 14-
inch diameter helix located approximately 2-feet up from the 12-inch diameter helix.
. The pier shafVhelixassembly shall have a minimum ultimate load capacity of 80-kips.
Pier Brackets
. Pier brackets for the new grade beam shall consist of a V2-inch thick x 2-inch x 6-inch steel plate (36-
ksi minimum yield strength) attached to the pier shaft end using a prefabricated coupling consisting of
a ASTM A500 steel sleeve having an inner diameter slightly large than the pier shaft o.d. s
. Pier brackets for piers supporting existing footings shall be an assembly specifically designed to attach
the specified pier shaft to a concrete foundation. The pier bracket shall be fabricated using ASTM A570
grade 50 hot-rolled steel plate and welded to provide uniform strength consistent with the plate
material. The pier bracket shall have a minimum ultimate capacity of 120-kips.
Project: 223.06
Glient: Towery
6883 Forsythia St., Springfield, OR
Page 4 of 8
February 8, 2007
'1'-
I
I
~
,
~~i
[I
lMJ
'it
t
~.
. I
K & A Engineering, Inc.
Concrete
. Concrete shall have a minimum of 550-pounds of portland cement per cubic yard of mix and a slump
in the range of 4 to 8-inches.
Structural Steel
. C-shapes shall be rolled sections conforming to shape designations on the plans and the designations
and dimensions specified in the Manual of Steel Construction, Allowable Stress Oesign, 9th ed.,
American Institute of Steel Construction.
. Structural steel material shall conform to ASTM A36 or an approved alternative structural rolled shape
having a minimum yield strength of 36-ksi.
. Fasteners to connect the steel channel to the foundation shall consist of 5/8" diameter Simpson
"Wedge-All" or equivalent expansive anchors. Expansive anchors shall have a minimum embedment
into the concrete or grout-filled CMU of 4-inches. K & A Engineering, Inc. should inspect and approved
of anchor installation.
. Threaded ASTM A307 bolts embedded into the concrete or CMU uSing epoxy adhesive is a suitable
altemative method of connection of the steel channel to the concrete or CMU stem. K & A Engineering,
Inc. should inspect and approve of anchor installation.
Select Granular Fill
Select granular fill should consist of clean, durable, well-graded material with a maximum particle size of 3-
inches and a maximum of 10% passing the no. 200 sieve. Select granular fill shall be placed in layers not to
exceed 12-inches (loose) and mechanically compacted to a dry density exceeding 95% of maximum as
determined by ASTM 0698 (Std. Proctor).
Drain Rock
Orain rock should consist of 1 1/2 to 3-inch clean, open-graded, and durable round river stone or angular quarry
stone.
Separation Geotextile
Separation geotextile should consist of a non-woven, needle-punched, polypropylene fabric meeting the
following specifications:
Table 1 . Separation Geotextile Specifications
Property Test Specification
Method
Grab Strength ASTM > 1.4 kN
04632
Tear Strength ASTM > 0.5 kN
04533
Puncture Strength ASTM > 0.5 kN
04833
Burst Strength ASTM > 3,500 kPa
03786
Permittivity ASTM > .02 sec.1
04491
Project: 223.06
Client: Towery
6883 Forsythia St., Springfield, OR
Page 5 of 8
February 8, 2007
F
~
>
i1-
1.
[
. I
K & A Engineering, Inc.
Property
Test
, Method
ASTM
04571
ASTM
04355
Specification
Apparent Opening Size (ADS)
< 0.6 mm
> 50% ret. After 500 hours
exposure
Ultraviolet Stability
A manufacturer's printed certification is acceptable as proof of compliance in lieu of laboratory testing. Fabrics
that meet this specification include Amoco Fabrics and Fibers Co. ProPex 4545.
Separation geotextile should be placed free of wrinkles or other discontinuities. Torn, punctured, or damaged
fabric should be replace. Separation geotextile should have a minimum lap at seams of 12-inches.
Drain Pipe
Drainpipe for foundation drain systems shall consist of rigid ADS3000 Triplewall pipe or schedule 40 PVC.
Perforations should be either prefabricated by the pipe supplier, or constructed by drilling 1h-inch diameter holes
spaced at 8" into solid pipe. Perforations should be placed down. K & A Engineering, Inc. should be contacted
to review and approve perforated drainpipe prior to installation.
Repair of West Garage Foundation
. Shore the west wall and north end of the garage portal frame. Extreme care should be taken to avoid
damage to the brick facia on the north garage wall.
. Care should be taken to locate all utilities and ensure that utilities are not damaged during excavation
and underpinning.
. Excavation underneath the existing foundation and removal of the existing foundation. The concrete
should be neatly sawcut from the west foundation that supports the living area (south of the garage)
and from the north garage portal frame.
. Sawcut and remove damage portions of the garage slab-an-grade.
· Install the helical piers. Piers should be placed so that the liT" brackets support the center of the grade
beam at locations shown on the plans. Pier materials and installation should conform to our
specifications below. We should be on-site during installation to inspect and approve of pier installation
prior to construction of the grade beam.
· Construct the specified reinforced concrete grade beam. Care should be taken to ensure that anchor
bolts are installed in the grade beam for connection of the wall plate to the beam. It may be necessary
to replace the wall plate. the ends of the grade beam should be connected to the remaining existing
concrete using 2 - #4 grade 40 steel deformed reinforcing bar spaced vertically a minimum of 12-
inches. The bars should be no closer than 3-inches to the edge or face of existing concrete and should
be centered in the new grade beam. The bars should be embedded into the existing concrete a
minimum depth of 6-inches and should be affixed with Simpson S.E.T. epoxy adhesive. Note that the
grade beam excavation may have to be lined with select granular fill to the desired grade.
Project: 223.06
Client: Towery
6883 Forsythia St., Springfield, OR
Page 6 of 8
February 8, 20'07
'I' -
I
. ,
K & A Engineering, Inc.
· The grade beam should cure for a minimum of 28-days prior to removal of temporary shoring. K & A
Engineering, Inc. may approve a shorter cure time if the contractor can provide unconfined shear
testing that indicates that a minimum compressive strength of 3,000-psi has been reached at the time
of loading of the grade beam.
· Install the pier and bracket at the center support of the north garage wall portal frame.
· Repair the cripple wall supporting the structure on the foundation along the south garage wall. Repair
includes replacement of studs (Douglas fir no. 2 or better) having the same dimensions as the original
studs. Sheath the new cripple wall USing V2-inch APA-rated sheathing (or COX plywood) nailing panel
edges using 8d common nails spaced at 6" o.c. Nail the field using 8d common nails spaced at 12"
o.C.
· Replace the removed portion of the concrete slab-on-grade. Prior to construction of the new slab-on-
grade the subgrade aggregate should be graded level and compacted. The slab-an-grade should be a
minimum of 4-inches in thickness and should be reinforce using #3 grade 40 bars spaced at 24" each
way. The bars should be centered in the slab. Sawcut or tool control joints in the new slab having a
'maximum spacing of 12-feet. Connection of the new slab-on-grade to either the foundation, grade
beam, or existing slab is not necessary.
· Repair interior finishes.
Placement of Underpinning at Existing Foundation
· The foundation should be reinforced with steel channel prior to underpinning.
· The existing footing shall be neatly notched the width of the pier bracket at pier locations. The notch
shall not be wider than the pier bracket with plus one-foot. The notch shall allow the pier bracket to be
installed so that the vertical bracket face is flush, and in good contact with, the face of the concrete
stem wall or the face of the concrete. The bracket shall be attached to the concrete using one 5/8"
diameter Simpson "Wedge-All" or equivalent expansive anchors.
· Piers shall be centered with the pier location and notch in the footing. Installation shall proceed until
driving pressure / torque results indicate the required minimum ultimate capacity (45-kips). K & A
Engineering, Inc. should inspect and approve of pier installation.
· Concrete slabs-on-grade that must be removed for pier installation should be sawcut to neat lines
parallel to perimeter foundations. Replacement slabs-an-grade should be supported on a minimum of
12-inches of select granular fill. Replacement slabs-on-grade should have a minimum thickness of 4-
inches and should be reinforced with #3 grade 40 reinforcing bar spaced at 24" o.c. each way.
· After pier placement, and installation of the new floor beam, the structure should be leveled. Care is
required to avoid excessive damage to interior finishes.
· Repair floors and finishes to be in a "like-new" condition.
Project: 223.06
Client: Towery
6883 Forsythia St., Springfield, OR
Page 7 of 8
February 8, 2007
. ,
K & A Engineering, Inc.
LIMITATIONS OF THIS REPORT
This report has been prepared for the exclusive use of Jeffrey Towers and his contractors for the subject
structure.
This geotechnical investigation, analysis, and recommendations'meet the standards of care of competent
geotechnical engineers providing similar services at the time these services were provided. We do not warrant
or guarantee these recommendations, site surface, or subsurface conditions. Exploration test holes indicate
soil conditions only at specific locations (i.e. the test hole locations) to the depths penetrated. They do not
necessarily reflect soil/rock materials or groundwater conditions that exist between or beyond exploration
locations or limits.
The scope of our services does not include construction safety precautions, techniques, sequences, or
procedures, except as specifically recommended in this report: Our services should not be interpreted as an
environmental assessment of site conditions.
Thank you for the opportunity to be of service. Please call us if you have questions or need further assistance.
Sincerely.
Michael Remboldt, P.E.
K & A Engineering! Inc.
(
Project: 223.06
Client: Towery
6883 Forsythia St., Springfield, OR
Page 8 of 8
February 8, 2007
Field-developed Cross Sections
6883 Forsythia St., Springfield, OR
From Vert. Horiz, To Cumm
Station Dist., Fl Dist., ft. Azimuth Station Ii. North Ii. East Ii. Elev. North East Elev., ft. Dist.
A10 A10 500.0 500.0 500.0 0.0
A10 -6.45 26.05 358 All 26.0 -0.9 -6.5 526.0 499.1 493.6 26.1
A10 -7.30 31.41 358 A12 31.4 -1.1 -7.3 531.4 498.9 492.7 31.4
A10 -7.81 68.42 358 A13 68.4 -2.4 -7.8 568.4 497.6 492.2 68.4
From Vert. Horiz. To Cumm
Station D ist., Ft. Dist., ft. Azimuth Station Ii. North Ii. East Ii. Elev. North East Elev., ft. Dist.
810 810 500.0 500.0 500.0 0.0
810 -0.7 15.21 268 811 -0.5 -15.2 -0.7 499.5 484.8 499.3 15.2
810 -1.11 19.03 268 812 -0.7 -19.0 -1.1 499.3 481.0 498.9 19.0
810 -3.85 19.17 268 813 . -0.7 -19.2 -3.9 499.3 480.8 496.2 19.2
810 -4.62 24.77 268 814 -0.9 '-24.8 -4.6 499.1 475.2 495.4 24.8
810 -6.70 58.90 268 815 -2.1 -58.9 -6.7 497.9 441.1 493.3 58.9
"
, ~ , Field Cross sectio...ns
Ie-~ 17.et?'I01:"(.' (cSr:,1
.
.
= / Nt-fl C'ul'tJVl;fll- ~ ~cr'QV" A" III rJn.rtf
_ G-A-.<l.A-c,... ~ .-
..; / /~~ ""~
~ 500 ~~- -.'~ " 2~f-1 . !:.i'~e~" ~~n
ell - .ylA.\,~ +
> . '~--I---- ---
-----. . ------...
I I
490 , ' ,
o 10 20 30 40 50
70
510
I
t FDXC A
- -II - FDXC B
...
..
60
Horizontal Dist., ft.
Client: Towrey
Project: 223.06
K & A Engineering, Inc.
Surveyed 11/14/2006
Date Excavated:
Equipment:
u
:I:
a..
<(el
0:0
el...J
~~~:~:;~~"~t:.~~
.-. .-
. a.. ..
.t.~
. ,~..
... .'
2 ... e.
.~,~
.. . .'
3 .... e.
~ ,~..
... .~
4 .... e.
!. ..~
~
..AA./VV.J
..AA./VV.J
- 5-~
:J:
I-~
0.0;
w w
0=
6
7.
....
o
1!!
N
l-
e
C>
,..:
o
Z
Z
Z
C>
<(
C>
o
, -'
-,
0..
C>
8
".
~
w
-'
o
:r
0::
w
Ik.a
g .n9In..,;n9
-'
LOG OF TEST PIT AH1
11/14/06
3.5-inch hand auger
MATERIAL DESCRIPTION
Logged by:
Surface Elevation(ft):
Concrete slab
Crushed aggregate fill- 3/4" and 1 1/2" (-) well-graded gravel from springfield
quarry. NOTE groundwater at 3.5'. .
/
MDR
w I-
W ~ 0:
...J ;:) Z to
a. Cl I- ;:) .e en
:2 z Z en >- I-
5~ ~ co en
<( <( w, :2~ 0: :5 w
en :J: a. 0 I-
Brown/black, soft, saturated, plastic, ORGANIC CLAY. Note roots and other woody
debris. Refusal (rock) at 5.3'.
K & A Engineering, Inc.
3327 Roanoke Ave.
Eugene, OR 97408
Phone: (541) 684-9399 Fax: (541) 684-9399
Towery Residence
68~3 Forsythia St., Springfield, Oregon
223.06
."
. .
kt1
rnainrrrina
K & A Engineering, Inc.
3327 Roanoke Ave.
Eugene, OR 97408
Telephone: (541) 684-9399
Fax: (541)684-9399
Project:
Location:
Client:
Project No.:
Coordinates:
Surface Elev.:
Towery Residence
6883 Forsythia St., Springfield, Oregon
Towery
223.06
"
!
Dynamic Cone Penetration
Test No: DCP1
Completion Depth:
Date Boring Started:
Date Boring Completed:
Logged By:
Drilling Contractor:
3.0
11/14/06
11/14/06
MMR
K&A
l!! Qi Cl
Q) 0
Qi ~ ...J
E DCP Raw Data Dynamic Cone SPT-N u Remarks
.c (blows/10 cm) Resistance, mPa (correlated) :c
.c' D. c.
D. Q) co
Q) 0 t5
0
10 20 30 2 4 6 8 10 12 10 20 30
-. 2 -
Fill - moderately dense to loose crushed aggregate.
Soft organic clay. Note rock at 1.5m.
-- 3 -
. 1 -
:'
)
!
:--S2<o
'-
~.
Native undisturbed decomposed sandstone.
- - 4 -
~
. , 19.71
The stratification lines represent approximate boundaries. The transition may be gradual.
-. 5 -
-- 6 -
- 2
. 7 -
- 8 -
- 9 -
- 3 -
....
~
I-
o
<.')
e>:
u
o.
~
..,
Q.
<.')
8
~
;:
Q.
U
o
<.')
o
-'
Q.
U
o
Test No: DCP1
"
.- k~ geotechnical/civil Project: 6883 Forsvthia St.
. . Client: Towrev
englneenng
Eugene, OR 97440 Job No: 223.06 Date: 2-8-07
541 684 9399 541 684 9358 fax Sheet: 1 of 6
engineering /
\
/
Oi..C:"NO.'4';-. T.17S.R2W.
":l-
- - - --
r'-1 -,~,.-Iitf'\"4'"L ~.3r -
7600
1.01!l JJ:,.
.u<n Q rr.
~~:1~'~~:~: ~
~'2' o1J,rYk. .' -
f fJ51lll-f1 ~-.'
l2~rYk .:~ i
--~ n. :)~:::: I
i-
..
1fE(. U(lHUI.IOlT :f.O?
SM"'S'.&'"t' ...
:l;.C(I'~c~R .;
'-... ,J
s.t'u....-r
,~~
: ~~ I
;p .:.... I I
.' ~l::I"'~'
'lP _
d,'i.
":€ I ;i~
:a ,,It
. ;~ I' ~!i
~: 1 I
-, I
: g I ~\t
, .'
; ~~ I
t l" ~
~,I ~ ~
tL' ~
l~
?~
8) ..:
~, ~,
~
\
~~
7900
~:'6rf~f.
.../..,....
"1.13.7.'
RU.11
st
..
b.
''''\\I<'fiu ';
I ' .
,j) , r
- f
,
,
<,:,...
.-~
~~
8000
0,93 AC.
_an.
PROJECT SrTE
6883 FORSYTHIA ST.
TAX LOT 01800
TAX MAP 18 02 0311
....!>rJT.
2900
o
~
Y::i
~-~ -
~OREGO?lr\ I-.
~ ~ Q
~~ i'O;/' o:r.
~ Dfr\N1S ~/
EXPIRE~#"4
/
f1\
\2/'
PROJ :CT A iEA PLA ~
111 - 200.
,
" .
"
/, k-a geo~ech~ical/civil
Project: 6883 Forsvthia 8t.
englneenng Client: T owrev
Eugene, OR 97440 Job No: 223.06 Date: 2-8-07
541 684 9399 541 684 9358 fax 8heet:2 of 6
engineering I
..
"\
r
;;.~.
A13
'"
T
r
/",.
l:,
,--
I
I~-
~
F' 0 R S Y T H I A S T R E.~ FIELD-DEVELOPED
~ CROSS SECTION .
(TYP .)
, ./" LOCATION OF BORING
r~ / EXIST. FOUNDATION
I
PROPERTY BOUNDARY
:/ (APPROX-lOCATIONJ
-- -'-
'>
w
~~
r:J
We
'tiL
A12
.i;!
IA11
.
I'
~,~'
., ,~
C:'
I
\
L. =70.0'
R '=14 99.9
--
--
~
FYi
&:i
o
,
,
_ _~ B14~12
,
,
\
,
,
\~
to\;'
~,~
02~
,
,
\
,
,
\
,
,
\ N8~5~O~_-----
\..- _ _ -- - - 54.2\
I
I
p;'
fl"
F~:<
It..
B15
~-
["""J
!;-,,(,<
L~~
en
o
.l>o
~I~
:":I~
-.I
m
;g;
~
~
1 i
I
: I
I
I
\
I
I
I
~'=-
, ,
II
. .- - --~
-= iL)J ---
,
I
./
f1\ SITE PLAN
~. 111 = 20'
"
. ,
'Oka
"\ engineering
geotechnical/civil
engineering
Eugene, OR 97440
541 684 9399 541 684 9358 fax
"\
Project: 6883 Forsvthia St.
Client: Towrev
Job No: 223.06 Date: 2-8-07'
Sheet: 3 of 6
'. r
'\
40.0'
.....I
W 0
Z ci
~ ~
::I:
,u
ll"!
~
~
~w__
2.0' - -4.9'- ~r7",",",~
~ ( ~
_ W- - -\?L _ _ \DI j/(I ) I ~\li- ~ -\?L - __ \DI-,
r-r-r-,+-- I l,-~---/- --/4
I '/ I } \ / I I ( // // I ,
~ / tf /.) j / / / / / ) ~
~. I / / / / "-J
'/ /' j/ } /' /' ........,
/ / /"'" / - / ( /'/ ................ I
/ / / I ( ')././ I/'........
/ / I ......0. - /' ./ 1
. ( r '- - - _0.4-- j /' ./ /'
. ( ,---- - ./ / I
\ _0.6- / ./ /
. \ /---- -- / /' ) ~
\ '\ '- / _o.e- / / u
/--- ........-- / I i!=
b.. \ /' -0....... / ...-:::::1 3:
~ \ ,,_ / ................ - - ~\. _ -: "" / / / I ~- - w
\ ........ _ - - -1.2/ '- - _ / I ~
................ ........ _ " / f2
\ ........ ........ / / / - --'.,,_ ('-.. / I f5
_ _ / _ _ /' / a:
\ / / / / / / Ir- -'.6_ _1~3'RE~CRIPPi:EWAilWPPORTlNGFLOO} I ~
I \ I / /' /" -t.~ - REPI::AC~TUDS @ 16" O.C. I I_
I / / / _/ 'APPLY112'CDXSliEARl}iI~_ I
1-./ //' /// / /--2.0-1-___':.~SHf.G~~"~._ I. ~ ~
o ~ I II /// ///; /:=:.~~"~"~~:-,~'-::.~"~I 0 J
:'J i~ ~I '/1 II .//;IL ~r-r/ IT r (- -- ~ ~_~l ~t
J l/' L.L _ -L _ .J, _ \ .:V ,; I 1\ \ ~~~ I
t ' :.- 7::\- - - 7::\, I \ ./ I I I \ \ _I ~ ~
~ ~ \ I I \ lU 1 ~
2.0' - I- 6.0' -l I L - ...l 11 \ ~ (\ 5 )
l,.. /_\- - I I yl I I '-..::.../
~ L-.J I \ .~~ '
I . L_-, 0 I
- r--2.0' I \ (.
II \ /1
I \ I~I
Ji I \ I ;1
APPROX. CONTOURS OF MAIN FLOOR I I ) /, I I "
INTERVALS AT 0.2.INCHES I I / ~ I I
REPLACE STUDS IN CRIPPLE WALL. INSTALL 1/2' COX SHEATHING I L~ _ ~/- ,.. ~ . k:1
NAfLATEDGESUSING8d@6'O.C. L 17 - - - * - - - - ,1~ PRO
NEWCONC.SLAB 8 NEWCONC.1 ~~\.~ ffs.s;
REPAIR 'PLA,N SAWCUTEXlST.SLAB , GRADE BEAM WEST &- ~~G\Ntc~ ~
GARAGE WALL 2ll 194 4 r:--
SAWCUT EXIST FOUNDATION .----..~
DOWEL GR. BEAM TPO ~ "
EXIST. CONC. 4 ~REGO !\.
USING 2. #4 ~ ~ -..- #.!;
ffi STEEL HELICAL PIER WITH PIER BRACKET AT EXISTING FOOTING. EPOXY INTO EXIST. CONC. ~~ ~ ...ro~
<E1 STEEL HELICAL PIER WITH "T" FITTING SUPPORTING NEW CONCRm GRADE BEAM I. ~\S
~ OPTIONAL STEEL HELICAL PIER WITH PIER BRACKET AT EXISTING fOOTING. EXPIRES / ?'!hrP'
9.8'
12.5'
r'
-6.3'-
- 2.0'
N
.,f
i::
L;
r
L.{"
""'
~
~
[
-J
W
Z
,Z
c(
o 5
~ ~
~
~
t.......
j
fT
I"
I'-
t:..4
(~
~ ..:
::'!
,~
q
~
; ,
il
~
.~
ff
i;~
"'-
Wi
f;
~
~
,
~) .
y.',
fi-
I",
t::
i"""
I",
It.:
"'"
r>
,
....:..
x
CD
u
i!=
3:
w
u
a::
f2 0
z ci
W ~
a:
i::!
M
c>
:E
i5
<D
W
C
C2
C!:>
(,)
z
o
u
if
z
<'!
N
d
. ~
N.
f1\
\2/' 111 = 81
LEGEND
/
-. . , .
rc geo~ech~ical/civil ,
ka Project: 6883 Forsythia St.
englneenng Client: Towrev
Eugene, OR 97440 Job No: 223.06 Date: 2-8-07
541 684 9399 541 684 9358 fax Sheet: 4 of 6
engineering ,/
r '\
I'
STEEL C 8 X 11.5 CHANNEL
INSTAlL AT LOCATIONS SHOWN ON PLAN
ATTACH TO STEM USING
5/8' D EXPANSIVE ANCHOR BOLTS
SPACED AT 24: O.C.
.-
STEEL PIER BRACKET
INSTAll FLUSH WITH STEM WALL ~ '
IN NOTCH CUT INTO FOOTING ~
....... ~~:..;<);/'?YJ.~ :....:
7~xSf;(':/~;A'S."'1-.',<';"::::-',,:.::c . :
~'-;/?~~@(./l'//h"/'''~' .. _
~~~>>'S.;;~'\'YX;'~' .. . .
:I."::{/y-/.' 'x.//..,,<<<A
STEEL HEUCAL PIER %>;''>;'-;::;;>''}f0~,~~/' I, '; .'. ..., ~
2718" D SCHED. TUBULAR STEEL SHAFT w~~~~..~~~r~-,j: ..... .. :~.
ONE 14' AND ONE 12' HELIX AT END ~ ~i~fif~~~i~ i' : ~'~.' 4.
(TYP.) ~~'~';~j:':;{/'S%: t :::::l .. .... ..
"'/'/~~1/<:;('0 I .,z,;:."V,,,-,:,:'
~~> ~>~~~\', I I J~~~~
5 . %~: 'S'><~~:s;?S) ~->~ ".. ~
~s ,'Z- "'",,,,/~....-:0I.! ~';<'{A' 0~~0'-,<~
J
<..... ,,- <.,
BEARING SOIL - STIFF TO VERY STlFF;'~~~~.~~'1 ;,~~Z~~.~5'@1:~
DECOMPOSED SANDSTONE ~~~s.O)':;,m~~il ~~~~~f~j?~~
EST. DEPTH 7 TO 10 FEET ~ ~~~~)S-;:;$.'$<;~1,,: ;,~~:-,>>~\~~\,>~
NOTE FORMATION MAY CONTAIN .~,'~,.>1:~'5:;;~~~"C\/~~.' ~(~<;;~1.'A~.~),%1;
BOULDERS AND COBBLES '~..:~>~".<1:: ~}).'.<~;~~.:,;~'~).,,~,~. ,~,-' ~m:('.''(..''.~7Jt.), '.~."~, ',~:;':~
'~~'<f','0<:ff;:;.<<'0?J .-:"':-; ~\:~%)?~,,:
~~~~~~~~ ~~' ,~~~~
~~
~J.-~
f ,ElGST "-OOR ""'"
"5<
,J
?<I
t., . '. ..
..
.' . ,".,d
<."
r
~
r~
,
r--
c...
~'"
,.'<.
~.
f),
~
~(
r--
TV). SEe-ON
CD 3/4" = 1'-0"
PI :R A ~ ): -iIMETE ~ FaUN JA T O~
,- . ~\.\) PROfrs
'-" ~GINt~
~
~() ~ ...~~
/. DE:1\NIS
EXPIRES IY7.I;:~
/
"- /
. .
I
II. I
"
k-a
I ; engineering
geotechnical/civil
engineering
Eugene, OR 97440
541 684 9399 541 684 9358 fax
Project: 6883 Forsvthia St.
Client: Towrev
Job No: 223.06 Date: 2-8-07
Sheet: 5 of 6
/
'\
2 - #5 BARS TOP AND BOTTOM
Fy = SO ksi
MIN. LAP SPLICE = 28"
TERMINATE AT ENDS WITH S" HOOK
(TYPICAL)
8"
2" CENTER-TO-CENTER BAR SPACING (TYP.)
r--- NEW CONCRETE SLAB-ON-GRADE FLOOR ~ ID?"
L 'N ~~.
8" MIN. SELECT GRANULAR FILL, :.4 :.... :':.. \ ~
OVER COMPACTED SUBGRADE ~. .. . .. .:..: .' _ \
I \:..... ~...::~.< .~', :.'
r J::>:.:::.:::':X:::,:::'::::::'::: ~", .~~ --.
. ....:.:....:.:....:.:.:....:....:.:.......:... .......
. . . . . ....j.
r--.
"PRECONSTRUCTlON T" BRACKET
1/2" X 3" X S" STEEL PLATE
WELDED TO TUBULAR STEEL PIPE TO FIT
DESIGNED TO FIT OVER PIER SHAFT /-
2.875" 13 PIER SHAFT
EXTENDING TO 12"/14 DUAL HELIX LEAD SECTION
EMBEDDED INTO SANDSTONE
20-KIP MIN. ALLOW. BEARING CAPACITY
~
t
~
~N
.!
\2, J-BOL T ANCHORS PER PLANS
8" X 24" CONC. GRADE BEAM
CONTINUOUS ALONG NORTH, EAST, AND SOUTH
ADDITION FOUNDATION.
~
11'
t
<
;.. "
L_
, ff1,'
.iJ
..:'>.,.:r-
o
CD Ir.P.1~;.CTION - G ~ADE BE~_M AND STEEL P ER
;
'--'
NOTES:
1. CONCRffi TO HAVE A MIN. OF 550-LB. PORTLAND CEMENT PER CUBIC YARD OF MIX AND A SLUMP RANGING
BETWEEN 4" AND 8".
2. REINFORCING STEEL HAVE A YIELD STRENGTH OF SO-KSI AND CONFORM TO ASTM AS15.
3. ENGINEER TO INSPECT AND ApPROVE PIER INSTALLATION BASED ON DRIVING TORQUE AND DEPTH. DRNlNG
TORQUE TO BE ESTIMATED BASED ON MANUFACTURER'S CERTIFIED PUBLISHED OF DRIVE PRESSURE VS. TORQUE
CURVE.
4. PIERS AND BRACKETS SHALL BE INSTALLED AROUND EXISTING FOUNDATION AND THE FOUNDATION SHALL BE
LEVELED PRIOR TO INSTALLING PRE-CONSTRUCTION PIERS (TYPE 2) AND GRADE BEAM.
L
./
-1
l....:
r
!
r-
,~
;or.:
~
~
T
;1,
J/"
!L
r
,
r-
I
'-
r..
L,
L.. .
NEW 4' D PERF DRAINPIPE
COVER WITH DRAIN ROCK AND ENVELOPE DRAIN ROCK WITH
< '> ./ SEPARATION GEOIDITILE.
~ PLACE PIPE AT BASE OF EXIST. GRANULAR ALL ALONG GARAGE
R E.-E1 2% MIN. GRADE
~ T ~"_, "'''.FOUNDATION ~,
~'_/ . ~'
L=70.0' ~- -- ~ '.,. .'""-'., .,... .~:.:~ I
-- .~
R=149 .9... :1 ,.
I ..:t.. 'r':"
': ~_m:=; =:~\~A~'1
\ ' ->>
: OR::,,:: :J"5,,""""
4' lIJ PERF. DRAINPIPE
Cf) PLACE PERFORATIONS DOWN
o
,~
~I~
=-:I:t
-.a
=
rn
\':1
~
cg,'~
. ,~
~~
,
,
\
0, "
~lr ~ ~ ' \ : EXTl'ND IlIWN UNOERNfAlH "'ST. SLAn SOUTH "
. \ .-J MASTER BEDROOM PORCH STEPS.
\ N83005'30:f_ -- - -
\-_-----54.2'"
. '
, engineering
/
geotechnical/civil
engineering
Eugene, OR 97440
541 684 9399 541 684 9358 fax
s
--
v
\
1._
I
I
I
\
,
,
\
,
,
\0
,
I
I
I
I
I
\
\r
\ :
I I
I
\ I
I
I \
\~
L_
, . '--1:
I
Fib 1L 1
' I
, [\
I
,\
,
\
I
I
~
~--_.
f1\ DRAINAGE PLAN
\V. 1" ='20'
'\
Project: 6883 Forsvthia St.
Client: Towrev
Job No: 223.06 Date: 2-8-07
Sheet: 6 of 6
,/
'\
CONNECT DRAIN USING SOUD DRAINPIPE
/ ROUTE TO CITY STORM DRAIN SYSTEM.
..-
CD ~E~!ION
I
I
I
I
,/
fl."
1!~
\'..:":'
I
..'
.
. "
i'.
f'"
1;
F
i_
\/'/
i,~~
li~
~
~
I
. .
;,;. lit
,J,,- .
c3
E'nginE'E'ring
February 9, 2007
Mr. Jeff Towery
6883 Forsythia Street
Springfield, OR 97478
Subject: Engineering Calculations
Foundation repair plan
6883 Forsythia St., Springfield, Oregon
Description
Foundation Loads
Allowable pier end-bearing capacity
Grade beam design
Steel channel foundation reinforcement design
EXPIRES
/~3It i'
I I
'-
K & A Engineering, Inc.
3327 Roanoke Ave., Eugene, OR 97408
(541) 684-9399 Voice
(541) 684-9358 FAX
Project: 223.06
Pages
1
2-3
4-5
6-7
']
. ~ oJ. .
. . 6883 Forsythia SI.
. 0
Springfield, OR
Foundation Loads
Garage Perimeter Foundation
Trib.
Design Length,
Load Description Load Type Load., pit tl. OL, kif! LL, klft
Roof DL DL 15 12 0.180 0.000
Roof LL LL 25 12 0.000 0.300
WallDL DL 8 10 0.080 0.000
Cone. Stem wall DL DL 96.7 2 0.193 0.000
Cone. Footing DL DL 96.7 1.25 0.121 0.000
0.574 0.300
Total Unit Load = 0.87 kif!
{ .
North/South Perimeter Foundation - House
Trib.
Design Length,
~ Load Description Load Type Load., pIt tt. OL, k/f1 LL, kif!
Roof DL DL 15 14 0.210 0.000
f Roof LL LL 25 14 0.000 0.350
I Upper Floor DL DL 12 7 0.084 0.000
Upper Floor LL LL 40 7 0.000 0.280
i WallDL DL 8. 18 0.144 0.000
Lower Floor DL DL 12.0 4 0.048 0.000
Lower Floor LL. LL 40.0 4 0.000 0.160
CMU Stem wall DL DL 96.7 2 0.193 0.000
,-. Cone. Footing DL DL 96.7 1.25 0.121 0,000
'- 0.800 0.790
Total Unit Load = 1.59 kilt
East/West Perimeter Foundation. House
Trib.
Design Length,
";' WaIlOL. Load Type Load., plf ft. DL, klft LL, kilt
~ Roof DL DL 15 3 0.045 0.000
Roof LL LL 25 3 0.000 0.075
r Upper Floor DL DL 12 6 0.072 0.000
~. Upper Floor LL LL 40 6 0.000 0.240
~L WallDL DL 8 18 0.144 0.000
Lower Floor DL DL 12.0 2 0.024 0.000
Lower Floor LL. LL 40.0 2 0.000 0.080
CMU Stem wall DL DL 96.7 2 0.193 0.000
Cone. Footing DL DL 96.7 1.25 0.121 0.000
0.599 0.395
Total Unit Load = 0.99 kltt
Design Trib.
Load Description Load Type Load., pIt Area, sf. OL, k LL,k
Roof DL DL 15 130 1.950 0.000
Roof LL LL 25 130 0.000 3.250
WallDL DL 8 90
Floor DL DL 12 70 0.840 0.000
Floor LL LL 40 70 0.000 2.800
2.790 6.050
,- Total Unit Load = 8.84 kips
Client: Towery
Project: 223.06 K & A Engineering, Inc. 2/8/2007
Y7
. ,~ .
.,. -
lioo:::.
rr
e'
,'.
~
,
L
'-
~;."
:~
,
[
:.....
.. ;,J. .
6883 Forsythia St.
Springfield, Oregon
Helical Pier Load Capacity
Unit Definitions:
Ibf
psf == -
ft2
pcf == lbf ksf == IOOO'psf psi == 144.psf kPa == 1000.Pa kips == IOOO.lbf
ft3
Input Parameters:
Soil Moist Unit Weight above helix 1: Yaml:= 125pcf
Soil Moist Unit Weight below helix 1: Ybml:= 125pcf
Groundwater depth:
Unit weight of water
GW:= 20ft
Yw:= 62.4pcf
Soil Moist Unit Weight above helix 2: Yam2:= 125pef Groundwater depth:, GW:= 20ft
Soil Moist Unit Weight below helix 2: Ybm2:= 125pef Unit weight of water Yw:= 62.4pcf
FOS := 3
Helix
Helix Diameter Area
Eft. Unit
Wt.
Above
Footing
Depth
/B ,2
BI := 12in AI:= ~ .1t
,2/
DI := 9ft
Yal = 125 pef
/ B2J2.1t
2 B2:= 14in A2:=
\. 2
D2:= 7ft
Eft. Unit
Wt.
Below
Footing
Soil Soil
Friction Cohesion
~I:= 31.deg cI:= IOOpsf
Ybl= 125 pcf
Ya2 = 125 pcf Yb2 = 125 pcf
$2:= 31.deg c2:= IOOpsf
Client: Towery
Project: 223.06
K & A Engineering, Inc.
Page 1 of 2
2/8/2007
Z/7
. '" ~ .
. .;
lo
Helix 1 Capacity:
6883 Forsythia St.
Springfield, Oregon
( ,Z ()
~ I 1[.tan ~ 1
Nql := tan - + 45.deg .e
\. 2 /
Ncl := it[( ~ I) =:= 0,5.14, (Nql - 1 )cot( ~ I)]
Nyl:= 2.(NqI + I)-tan(~I)
Overburden pressure,
Ultimate bearing pressure,
Net Ultimate bearing pressure,
Net Ultimate Helix Load,
Net Allowable Helix Load,
Helix 2 Capacity:
NqI = 20.63
Ncl = 32.67
Nyl = 25.99
2
AI = 0.79ft
ql := DI'Yal
quI := CI.NeI + ql.Nql + .3.BI'Ybl.Nyl
qunetI:= qui - qI
Qunetl := gunet! .AI
Qunet I
QaI:= FOS
(~Z )Z 1[.tan(~2)
Nq2:= tan - + 45.deg .e
\. 2
Ne2:= it[(~2) = 0,5.14,(NqZ -l)cot(~Z)]
Ny2 := 2.(NqZ + 1 ).tan( ~ 2)
Overburden pressure,
Ultimate bearing pressure,
Net Ultimate bearing pressure,
Net Ultimate Helix Load,
Net Allowable Helix Load,
Nq2 = 20.63
NeZ = 32.67
Ny2 = 25.99
ql = 1.13 ksf
qui = 27.45 ksf
qunet! = 26.33 ksf
Qunetl = 20.68 kips
Qal = 6.89 kips
2
A2 = LOUt
q2 := DI 'Ya2
qu2:= c2.Ne2 + q2.NqZ + .3.BZ'YbZ.NyZ
qunetZ := qu2 - q2
Qunet2 := qunet2.A2
Qunet2
Qa2:= FOS
Qa:= Qal + Qa2
Total Allowable Combined Pier Capacity:
Qa = 16.33kips
Client: Towery
Project: 223.06
K & A Engineering, Inc.
q2 = 1.13 ksf
qu2 = 27.61 ksf
qunet2 = 26.49ksf
Qunet2 = 28.32 kips
Qa2 = 9.44 kips
Page 2 of 2
2/8/2007
-:S/7
f
I
( ~
.. &,.'
" .. _ 110
k~
l'nainl'l'rina (541)684.9358
I Rev: 580001
User: KW-0603459, Ver 5.8,0, l-Nov-2006
(c)1983-2006 ENERCAlC Engineering Software
K & A Engineering, Inc.
3327 Roanoke Ave.
Eugene, OR 97408
(541) 684.9399
Title: Towery Residence
Dsgnr: MDR
Description: 6883 Forsythia St.
Springfield, Oregon
Foundation Repair
Scope:
Multi-Span Concrete Beam
Description
. Grade Beam
-~,--~ ,".~...."~~~.,~.~,.....~,,,,,. ....~-'" ,",,~----- .~-,~- __._<__ '~r'''''_~'_~"",' .. ""."",..~.,~
,- ~_.- -_. -, '". ~'.- :",;,"',-" '.
I General Information
..,....-.........',. .. '''''_'' 'J. ~.,.,.
'".;",
Fy 60,000,0 psi
fc 3,000.0 psi
I Concrete Member Information
-..,- ~ _'_"A~_~ - ',__, -~'~'~'~a. ~~'.......m.-r."""_-=-"'-'_
Description
Span
Beam Width
Beam Depth
End Fixity
Reinforcing
ft
in
in
rr'"
Center Area
Bar Depth
Area
Bar Depth
0.62in2
21.00in
0.62in2
3.00in
0.62in2
3.00in
L-
Left
Right Area
Bar Depth
I Loads
"U;~gLi~e'L~adThi;'Span ??
Dead Load IcIft
Live Load klft
I Results
-~
Job # 223.06
Date: 9:59AM, 9 FEB 07
Page 1 I
towery.ecw:Calculations ~
..~-~~_......__._--.--'--- .~-~, ---..":,i
'.' '. ...' .' _, "," _b "..,. .co~: ~ef~ ~~~~1~~02~,1997 UBC,.~?O~._IBC, 20~3,~:.PA. 50~~ .1
Spans Considered Continuous Over Supports ACI Dead Load Factor 1.40
Stirrup Fy 40,000,0 psi ACI Live Load Factor 1.70
"~"""'~ ,- ~'''''',""'''~,,.,...~., " , ,;, : '" ::"'-"'~ '''''-' - """" '-~..,~-",,- -.-..,. """",..~,,,.,.......
,J
10.00
8,00
24.00
Pin.Pin
2
10.00
8.00
21.00
Pin.Pin
0.62in2
21.00in
0.62in2
3.00in
0.62in2
3.00in
. ~~M"",~,~~ =~' '~~'~",,_,~~
Yes
0,600
0.300
Beam OK
~~'-'j~'-~~~'"";;":"""",","""""""",...........-=...._O>".........,..,,,,,................_,~, ...."""'....,=-..."........~......_._~'''i'''<<-'''' _....... ~"""',.""""-~_"-"''''''''.-.......,..
"""~_^ _~'
~,-.,.,....,;..._~_."...-,.,.~,..,.~~_<_.,,,._...""_,........._<...~ ~Z~
----,--,~ -,
Shear @ Left k
Shear @ Right k
I Reactions & Deflections
"",":I'.~""",",,''''''~~~_"'''v~~_'_ ,,,"..-' ..', "-'-::T^>'~-'W'~'.'_~-"~"~~~'--~''''<=UC~''''__.'.K_''._~~~-:"':",-..'~.-.':":".',';:"='<T""" "'"
DL @ Left k 2.25 7.50
LL @ Left k 1.12 3.75
Total @ Left k 3.37 ,11.25
DL @ Right k 7.50 2.25
LL@ Right k 3.75 1.12
Total @ Right k 11.25 3.37
Max, Deflection in -0.003 -0.004
@ X = ft 4.20 5.80
Inertia: Effective in4 9,216.00 6,174.00
Mmax @ Cntr
@X=
Mn * Phi
Max @ Left End
Mn * Phi
Max @ Right End
Mn * Phi
k-ft
ft
k-ft
k.ft
k.ft
k.ft
k.ft
9.49
3.73
56.04
0.00
56.04
-16.87
56.04
Bending OK
5.06
8.44
-""",","~~~. "'~-~~<-~.'-' '"",'~~=~-, ~
Yes
0.600
0.300
Beam OK
9.49
6.27
56.04
.16.87
47.67
0.00
47.67
Bending OK
8.44
5.06
--"""""''''~'''-=''''''''''''''=''''''''''''''''''''''''''~''''''''"''
I Shear Stirrups
=Sti;~~"R;b~~'A;;~w "._,....i~2'-'"'.- '. O~400.~'.."-.O.400 ---...-- .._~.,..., '-'---'--'-'~~-'.~=~~'~,,--,-,~,.~,
Spacing @ Left in Not Req'd Not Req'd
Spacing @ .2*L in Not Req'd Not Req'd
Spacing @ .4*L . in Not Req'd Not Req'd
Spacing @ .6*L in Not Req'd Not Req'd
Spacing @ .8*L in Not Req'd Not Req'd
Spacing @ Right in Not Req'd Not Req'd
'L'_~"""",,"'~' '~'_..~~
-. ,.1
:...-=-"""-~
..
,
.."..'.."...-- ..--==..........~
4-/7
" \
.I~,t
'--
o
r
I
L_
~
:>i
io:..
C'
.
J>
k<3
enQineerinQ
Rev: 580001
User: KW-0603459, Ver 5.8.0, 1-Nov-2006
(c}1983-2006 ENERCAlC Engineering Software
K & A Engineering, Inc.
3327 Roanoke Ave.
Eugene, OR 97408
(541) 684-9399
(541) 684-9358
Title: Towery Residence
Dsgnr: MDR
Description: 6883 Forsythia SI.
Springfield, Oregon
Foundation Repair
Description
Grade Beam
I Query Values
..
Location
Moment
Shear
Deflection
fl'
k-fl
k
in
0.00
0.0
5.1
0.0000
Scope:
Multi-Span Concrete Beam
Job # 223.06
Date: 9:59AM, 9 FEB 07
Page 2
towery. ecw: Calculations
,
-~
0.00
-16.9
8.4
0.0000
.s:/7
l"
r
I
. .4 ~
"'<~
. .. .
ka
enQineerinQ
I Rev: 580008
User: KW-0603459, Ver 5,8,0, l-Nov.2008
(c)1983-2006 ENERCALC Engineering Software
1:"__ '.'" -:'.':"",":-: ~..._-~:-~. ".-'C"_:",~.'.",'","""""'-l''''''''''_'''''''''''''h''''~~,,,~+_,,,,-_,,,,,0":_
K & A Engineering, Inc.
3327 Roanoke Ave.
Eugene, OR 97408
(541) 684-9399
(541) 684-9358
Description
EasVWest
I General Information
Title: Towery Residence
Dsgnr: MDR
Description: 6883 Forsythia St.
Springfield, Oregon
Foundation Repair
Job # 223.06
Date: 9:59AM, 9 FEB 07
Scope :
Multi-Span Steel Beam
Page 1 iii
towery.ecw:Calculalions II
~,..~.._._-. ~
Yes
0:600
0.400
7.03
6.27
-12.50
0.00
18,461.5
23,760.0
Bending OK
3,551.1
14,400.0
6.25
3.75
7.50
5.00
12.50
2.25
1.50
3.75
-0.099
5.80
1,208.7
0.00
6.25
-12.50
0.0000
'~"-""'"""'-""~""=""'-"-~""",",==~<~~..,_.,
C~~~f: AISC 9th AS~,_~997 UBC, 2003 IBC, 200~FPA 5000 ,
Load Duration Factor 1.00
Fy - Yield Stress 36.00 ksi
Spans Considered Continuous Over Supports
I Span Information ' I;l
.,~._",._."",~,.. ~.r."""-",,,,,,,,,,,,,,,,,,,~,,,,,,,,,,''''~''_''"'''''''''-'''H',*,''''',,.,,. ,..,.,."............,.....-!,.."tr'..<.,,.,,,"'--..,.,,. ......~'.""'.'h,..........~"'.'.....""~-Nt'.
...,.~,..~.", ...,""_............--,..'"""""",..,..,"'-""""",, ~..""'~,. -.L.....-.."""'J~--r-..V"".,..=>.'''~_._'''''-=,~"...,.,=..,........"cr-,=._"..,...,.".'''............- ,._...",....
..,.,__".."........,...,'.,...,-",..." ._...,_~
Description 1 2
Span ft 10.00 10.00
Steel Section caXll.S caX11.S
End Fixity Pin-Pin Pin-Pin
Unbraced Length ft 2.00 2.00
I Loads
"'~"''''''''''''~.-u -"''''=.,.=-"
_~'_"'-___,_,,",.~~,_'__~n:.:__:.>>.-.~_,._~.,__.__,:_.~
.
. ',.='.~-.-'-v:=.--,=,=''''=='=' ." -_~, ---~,.,..., __,... <
'Li~;~C;;d"U~~'dThi;Span ?
Dead Load k/ft
Live Load k/ft
I Results
Yes
0.600
0.400
~---~.p"~~~,:,~~~,,,,,,,~,,,,,-,,,,,,,,,,,,,,,,-,,,,,-~,,,,,=~,>,,,,,,,,,,,,,,,~''''~,~''''-~''''''= _"'r"~"''':.__'A~ .,..,- ;-'-"~' _':~':'."'~"'"':'~"'''''-'~'~....:-~.-:".c:.,--~~,.-,~."
".-..~---_. ~"""'''''"""-~''.''',,,"-'''' ,~,",..:"<.."..",,.,,,,.---
"~._~
I Reactions & Deflections
~ - ..--..._.~..:F"-"","'-_"6___":._"~'''=~"~''''"'''-'',,,,~,'.._'=r......_w=...,.. ,~=-~_ __~'",",~~_.,_,~~.w_.,
Shear @ Left k 3.75
Shear @ Right k 6.25
Reactions... 2.25
DL@ Left k 1.50
LL @ Left k 3.75
Total @ Left k 7.50
DL @ Right k 5.00
LL @ Right k 12.50
Total @ Right k -0.099
Max. Deflection in 4.20
@ X = ft 1,208.7
Span/Deflection Ratio
I Query Values
~"-:':_~_"_". "~:-':::,~-..;Q~,-r__....~~"~"'~~,"'__'_>__,~.~':':.~',":'__'-:-.-:""~-"~~'-~'~""",_."....""~,.-,,.~.~-I:l;:!'>,,~_
Mmax @ Cntr k-ft 7.03
@X= ft 3.73
Max @ Left End k-ft 0.00
Max @ Right End k-ft -12.50
fb : Actual psi 18,461.5
Fb : Allowable psi 23,760.0
tv : Actual Bending OK
psi 3,551.1
Fv : Allowable psi 14,400.0
Location
Shear
Moment
Max. Deflection
ft
k
k-ft
in
0.00
3.75
0.00
0.0000
~~"''''',,''~ . ~--~ .. ....-.. .:':::" ..
._-~-_.~....J
""'~""...':,.'.'.'.."
-.-,. '~",,-,<... ,-"""'''''~
,--".~"_.,.,--",-..............~--,-,",-",,,- -="--~-_..w_,~..,~.,_.~-...........---"..~,_._-_____._-~J
0.00 0.00 0.00 0.00 0.00
~OO ~OO ~OO 0.00 0.00
0.00 0.00 0.00 0,00 0.00
0.0000 0.0000 0.0000 0.0000 0,0000
0.00
0.00
0.00
0.0000
b~
.'
~ ,;
I
;. t ....
k~
pnQinpprinQ
Rev: 580008
User: KW-0603459. Ver 5,8.0, 1-Nov.2006
(c)1983-2006 ENERCALC Engineering Software
w _.~~~~ .~. .~~~_.-,._:. _ .-."..,_~__.,~,...__~",.-..o;..~'~""",~~
K & A Engineering, Inc.
3327 Roanoke Ave.
Eugene, OR 97408
(541) 684-9399
(541) 684-9358
Title: Towery Residence
Dsgnr: MDR
Description: 6883 Forsythia St.
Springfield, Oregon
Foundation Repair
Job # 223.06
Date: 9:59AM, 9 FEB 07
11"-.-...,--..."--.,, ...., ~l2Oli'l:iBlii.:,",~~,',~'c_"r' '---,' ~- ~ '_I-......,.,...-,.~""" >,.":w=-,.~:......._,.~.~-...._.",,....=,~~~~_ .~,""""'''-~
Description
Span
Steel Section
End Fixity
Unbraced Length
I Loads
-Lr;~'L~~d>U;~dThis-Sp~~~?"-'w~-, ._,... .,
Dead Load k1ft
Live Load k1ft
Description
North/South
I General Information
""-~' -
~. .... -.J...__......~~........., _~.." ,_-"_ ~ .....,. __.' 4"""",",
Fy - Yield Stress 36.00 ksi
Spans Considered Continuous Over Supports
I Span Information
,
ft i
8.00
C8Xll.5
Pin-Pin
2.00
ft
Yes
0.800
0.800
I Results
Scope:
Multi-Span Steel Beam
Page 1 ~
towery,ecw.Calculations ~
""."''7"'...... ~"..;: ~.'-"..."""".""""""'";,."-""..'~.',r_".""~_'.M....',,..-""",,,,,,,,,-_,-,,, ..,\ ~_'.'.,.... "
-" -~-;:'<_ "'_'4"~ ,~"'''''<;'_'_'<''';~''. -.'*
>. w.<<~_...-" <:.;.l,E. '''''''''.~...'''~'''_<'''~___' "".....,...-"~
Code Ref: AISC 9th ASD, 1997 UBC, 2003 IBC, 2003 NFPA 5000 ~
".,.-.........., ,-.-. .,_..'..... ..- '.....,.,....... ' ,..'.... ....'...~
Load Duration Factor 1.00
C' .~........~.~" '_''''''-'''~._, ,.c,,,,,,,,,,,",,,,, ..,.."._--...,."'o"'.............."._.""..,...........'__~....._--a~....^_"
J
--.~.~ -.;~,.,..,.>,.~., """"..........___..._. _...,_ .,'d,' ~~~.~ "'" _,~~,., ,,,,,,,'''c_'.~
2
8,00
C8Xll.5
Pin-Pin
2.00
_._~~~_, .~.,.__~~~"N..___~.,_~~__._ ="._==.~.-,,,,,.,,
..j
Yes
0.800
0.800
I~..""'-""-N."'''''''~__..,~,,~.,",,~.,~, 'ft....
'~~~" ''''..~.c~~.~~_-K.,~.~_~'_'~''___~''__,.''"_....~'=...~_"""",,,,",,,,,
T_"~'''''''''~~'''''' .~,~_,.,;~.,...--r.'" ~_,'~ ,.. _"""_~.,...._",,,..._.w.--. _"""-"..,.=,."'.~..,,,....._v~~",......""'~ _~.'_"'=_ ~~., ,....",'..--.......~..,
m
-"....~~~.-.'~....~
Mmax @ Cntr
@X=
Max @ Left End
Max @ Right End
fb : Actual
Fb : Allowable
tv : Actual
Fv : Allowable
k.ft 7.20 7.20
ft 2.99 5.01
k.ft 0.00 -12.80
k.ft -12.80 0.00
psi 18,904.6 18,904.6
psi 23,760.0 23,760.0
Bending OK Bending OK
psi 4,545.5 4,545.5
psi 14,400.0 14,400,0
I Reactions & Deflections
_~.' "~.. ~~9<""'" ,....--.Y""~.."'""" ..{.~~_~--.......__.....'...__.;.~___._'_~"'. "~~~'__~".~_'~''':~_.~~'._: -" ".__~-~. <~_,~_.,.~.",^..~, ~"'~~~..,._~."".~,T~_.__'..,...."',..,
~."'<~~ ~~~~-"<-""",,.~_. -
... ~""~'-"'~"~ .,,-'''~..,..~~_.~~~_. ~
._-~,
Shear @ Left k
Shear @ Right k
Reactions...
DL @ Left k
LL @ Left k
Total @ Left k
DL @ Right k
LL @ Right k
Total @ Right k
Max. Deflection in
@X= ft
Span/Deflection Ratio
I Query Values
4.80
8.00
2.40
2.40
4.80
8.00
8.00
16.00
-0.065
3.36
1,475.4
~'__.~. .-.__.~""'=-vnI'..."'=-.-==<'o."""'_,.."-..---.-,.."" --~==_""._='--=>=.--<>._=..,..
Location
Shear
Moment
Max. Deflection
0.00
4.80
0.00
0.0000
ft
k
k-ft
in
8.00
4.80
8.00
8.00
16,00
2.40
2.40
4.80
-0.065
4.64
1,475.4
I
~.,__..o_~.~."""''''....."..,.~.'''''.....,..~~....,-.--.-..__~~~..__,,~,.~....,~~'''___....'''"'''''''"'"'_~,..,.'~..,.",...~......"'_~,""""""",.'"""'_""'......,,=_.~,~_____,_~
0.00 0.00 0.00 0.00 0.00 0.00 0.00
8.00 0.00 0.00 0.00 0.00 0.00 0.00
-12.80 0.00 0.00 0.00 0.00 0.00 0.00
0.0000 0.0000 0,0000 0.0000 0.0000 0.0000 0.0000
7/7