HomeMy WebLinkAboutPermit Electrical 1986-10-23
\~~~'M..~~~~~.il-Jt\t't~l:t~.::d,~~\'t:l:!r~~"f~0t6i3i0'.w.~~.~~~%o.';ti~~""-~~:i..~~'<,/..:i';~Ol'~'V$~;~~~~~~-....:~':.:n-.~~""',!t.~~~'U:o.:-.~:,,!,,";?":""'_"""~~'1.~",-"~)"""'_""'''''.''''--:"~'
'"--"'~-"
~ . Receipt ,,#
.. RESlnAaTIAL 00
, APPLIC:1JliPERMIT
225 North 5th Street
Springfield~ Oregon 97477
'Building Division
726-3753
Job Location:
;;23 '-I ( (0AJ-(/}j-,-~/
/7D3;;)7 ~-;)..---O Tax Lot #
()C/ ;) D [)
(I fl (l/LlA1.U . ~ k.// A) ....
;;23 if; ~._)/,-, ,2s;,hone: 120 r-1ff6
(/
Assessors Map #
Subdivision:
Or..mer:
Address:
City:
New
Addi tion
Remodel
I Nobile Home
'Date of Application
Contractors
) 6 >::r5~ f0
General
Plumbing
\' Electrical
I
I
f)~Ul/J.{7 1 )
~
Mechar.ic;J.l
Construction Lender
Zip:
.......oz::; t. ~~~p
'Value
Address
blot"-f;:y'K1f
I"
tcUJ-O&
~I K ) ql/S') qqqc;)
~~/
rfy.)
Signed: ~
Date: /0 --?"3 - f ~
Lisc.#
Expires
Phone
It is the responsibility of the permit holder to see that all inapections are made at the proper time, that each .::dd:ress is readab'i-e
from the street, and that the permit card is located at the front of the property.
*Bui!ding Divicion approved plan shall remain 'on tha Building Site at all times.
PROCEDURE FOR INSPECTION RE'QUEST:CALL 726-3769 (recorder) state your City designated job nwnber, job address, type of inspecticn
requested and when you will be ready for inspection, Contractors or Or..mers name and phone number. Requests received before 7:00 ~
;"rill be made the same day, requests made after 7: 00 am wi II be made the next :-Jorking day.
ReauiredTnsDp.cticnR
SITE INSPECTION: To be made after
excavation, but prior to set up of
forms.
UNDERSLAB PLUMBING. ELECTRICAL &
MECHANICAL: To be made before any
work is covered.
D
o
D
FOOTING & FOUNDATION: To be made
after trenches are excavated and
forms are erected, but prior to
pouring concrete.
0,
UNDERGROUND PLUMBING. SEWER, WATER,
DRAINAGE: To be made prior to fil-
,ling trenches.
0;
UNDERFLOOR PLUMBING & MECHANICAL:
To be made prior to installation of
floor insulation or decking.
POST AND BEAM: To be made prior to
installation of floor insulation or
, decking.
ROUGH PLUMBING. ELECTRICAL & MECH-
,ANICAL: No work is to be covered
,until these inspections have been
made and approved. '
FIREPLACE: Prior to placir.g facing
materials and before framing inspec:
tion.
D FRAMING: Must be requested after
approval of rough plumbing, electri-
cal & mechanical. All rOOfing
braaing& chimneys, etc. ~~st be
?',aompleted. No work is to be con-
,'..,,',cealed until this inspection has
, ~ been made and approved.
o
D
D
Your city Desigr.ated Job Number Is:
O INSULATION/VAPOR BARRr,ER INS~ECTION:
To be made after all ~nsulat~on ar~
:, ," required vapor barriers are in place
'but before any lath, gypswn board or
wall covering is applied, and before
:anY insulation is concealed.
D
DRYWALL INSPECTION: To be made
after -all drywall is in place,
but prior to any taping.
rtfoO 1)02--
DEMOLITION OR ,~{QVED BUILDINGS
~ Sanitary se'.Jer ::!apped at p~opert'd lir.e
=:=J Septi::! tank pumped, and filled with gra~el
I Final - i{hen above items are conroleted
~ and when demolition is complete ~r struc-
ture moved and premises cleaned up.
, Mobi le Hemes
~ Blocking and Set-up
~ Plumbing connections sewer and water
~ Electrical Connection - Blocking, set-up
---l and plumbing connections ~~st be approved
" before requesting elec~ricaZ inspectio~
:=J Accessory Building
I Pinal - After porches, skirting, decks,
---l etc. are completed.
D
FINAL PLUMBING
All project conditions, such as the installation of street trees, co~letion of the ,
required landscaping, etc., must be satisfied before the BUILDING FINAL can be requested.
o
o
~
,0
FINAL MECHANICAL
o
FINAL BUILDING: The Final Building Inspection must be requested after the Final'PZwnbing
Electrical, and Mechaniaal Inspections 'have been made and approved.
FINAL ELECTRICAL
"
location, bond
or verticals in
U.B.C. Section
O MASONRY: Steel
beams, grouting
accordance with
2415.
WOODSTOVE: After installation is
completed.
D
D
CURB & APPROACH APRON: After forms
are erected but prior to pouring
concrete.
*ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE, ADJUST!rENT TO BE ~L1DE I1T NO COST TO CITY' I Page 1 of 2
o
SIDEWALK & DRIVEWAY: For all con-
crete paving within street right-
pf-way, to be made after. all exca-
vating complete & form work & sub-
base material in place.
D
FENCE: h'hen complete -- Provide
gates or movable sections through
P.U.E.
o
- .. '.'. .....
JOB No.g(t/D/?fo"Z\ .,:'; SOLAR A
Zone:
OcC!Urxincu Group:
Lot Sq. FtG.
% of lot Coverag~
If of Stories
Total Height
Topography
LOT TYPE
Interior
Corner
Panhandle
Cul-de-sac
I
lITEM
x
Value I
I
I
1
I
I
;1,
I *
, I
*
CHARGE ,
I
I
I
I
I
I
I
I *
CHARGE
SQ.FTG
Main
Ga:I'aae
Carvort
I Accessoru
I
I
TOTAL VALUE
S.D.C.
(va~ue)
1.5 x
Building Permit
State SUX'charge
Total Cha.~ges
lITEM
I NO.' '\ FEE
Fixtures
-)
Residential (1 bath)
I Sani tary Sewer
I Water
'Plumbing Perrr:i t
'State SUX'cr.ax>ge
Total Charaes
I NO.
I
I
I
I
ITEM
I Res. Sa. fta.
I New/Extend CirC!Uits
I Temporary Service
. ~fl flA./e ~_ Ch cti-
u
Eleatrical Permit
FEE
I
/5.00 I
I .~O I
I (S'bU l*
CHARGE I
/
I
I
I
I
State SUX'cha:rqe
Total Charc;es
lITEM
NO.
FEE
Furnace ETU'$
Exhaust Hood
I Vent Pan
I Woodstove
I
Permit Issuance
Meahanical Permit
State SUX'charae
Total Charaes
-- ENCROACHMENT --
Ise~~rity Deposit
Storage
MaintenantJe
I Permit
I
'/
Total Charqes
I Cur DC!U-t
I Sidewalk
I Fenae
I Electrical Label
I Mobile Home
I
I d 1 ( /3 I . ~o
I
I
I
/S.{Jo
I TOTAL AMOUNT, DUE: *
~ S S R E Q.-
'Page 2
~ L-COG*
Type/Const: ' Bedrooms:
'I Enerer}! Sources
Setbacks Heat
House Garage Access. I I Water' Hp.atp-r
I f Range"
I I Fireplace
I I Woodstove
II
I Lot Faces -
I
I P.L.
North
East
South
IWest
Fees
TUDe
I
I
I
I
I
J
Building Value & 'Permit
This permit is granted on the express condition that the said: construction
shall, in all respects, conform to the Ordinance adopted by the City of
Springfield, incZuding the Zoning Ordinance, regulating the construction
and use of buildings, and may be suspended or revoked at any time upon vio-
lation of any provisions of said Ordinances. '
'.
Plan Check Fee:
Date Paid:
IReceipt #:
I Signed:
No person shall construct, install, alter or change any new or existing
plumbing or drainage syste~ in whole or in part, unless such person is the
legal possessor of a valid plumber's license, except tr~t a person may do
plumbing work to property which is owned, leased or operated by the, appli-
cant. ' ,
Plumbing Permit
Electrical Permit
, Where State LCll;) requires tr~t the electrical work be done by an Electrical
Contractor, the electrical portion of -this permit shall not be valid until
the Zabel has been signed by the Electrical Contractor. '
I
l *
Plan. Examiner
I
I
I
I *
I
I
I ;$b7;<SNi
6
Mechanical Permit
Uate
I HAVE CAREFULLY EXAMINED the completed application for permit, and do
hereby certify ,that all information hereon is true and correct, and I
further certify that any ar.d aZZ UJork performed shaH be done in accor-
dance with the Ordinances of the City of Springfield, and thz L~~s of the
State of Oregon pertaining to the work described herein, and that NO OCCU-
PANCY will be made of any structure without permission of the BuiZding Di-
vision. I further certify that only contractors ~ui employees who are in
compliance with ORS 701.055 will be used on this project
~&VYa/L,~
-( /
Signed
*
Date
rO~:2:3 -?it,