Loading...
HomeMy WebLinkAboutPermit Mechanical 1992-2-5 RESIDENTIAL PERMIT APPLICATION Inspections: 726-3769 Office: 726-3759 LOCATION OF PROPOSED WORK: 13CRO ASSESSORS MAP: ,'I 0-:; ~I "1.."2.. LOT: OWNER: \<. \.G~t>.<<....O ~r...\L..€ ADDRESS: "2... ~oo D,(::..VF. e" L-.. '7' CITY: S?e-l ~{":~~lli>.\ .0 .o€ V'tl2...L. Y BLOCK: STATE: f)1( DESCRIBE WORK: l<E..\;-\-A-6 ~ \:>PL ~ I ':'l..,.. ~:L")..q NEW REMODEL ADDITION CONTRACTOR'S NAME GENERAL: J",...+:. BL'l'-~c.k:.l.-p> aIJ~: PLUMBING: MECHANICAL: ELECTRICAl' QUAD AREA: tI OF BLDGS: OCCY GROUP: tI OF STORIES: WATER HEATER: JOB-NUMBER.f!llI C120 liS- 225 Fifth Street Springfield, Oregon 97477 TAX LOT: 4- (0 ~ SUBDIVISION' 4 ' PHONE: ZIP:Q"74'1 DEMOLISH ROT Kt.f'~Ie. OTHER {y E~A<; v - REQU I RE DI NSPECTI 0 N S .0 Rough Mechanical - Prior to ,cover. ',' .0 Rough Electrical - Prior to cover. . o Electrical Service - Must be approved to obtain permanent electrical power. o Fireplace - Prior to facing materials and framing Insp. ~ Framing - Prior' to cover. o Wall/Ceiling Insulation- Prior to , cover. D,,prywall - Prior to taping. D Wood Stove - After installation, D Insert - After fireplace approval . ,. and installation of unit. ' o Curbcut & Approach - After forms are erected but prior to placement of concrete. Oe.~ . S l1. ., (/,.A. CONST. CONTRACTOR tI PHONE ADDRESS - OFFICE USE - LAND USE: /I OF UNITS: CONSTR. TYPE' HEAT SOURCE: RANGE' EXPIRES 4/1 Dlq~_ FLOOD PLAIN: ZONING CODE: /I OF BDRMS: SECONDARY HEAT: . SQUARE FOOTAGE: TOTequest an inspection, you must call 726-3769. This is a 24 hour recording. All inspections requested before' 7:00 a.m.will be made the same working day, inspections requested after 7:00 a.m. will be made the following work day. D Temporary Electric D Site Inspection - To be made after excav?tion, but prior to ' .setting forms. D Underslab Plumbing / Electrical/ Mechanical - Prior to cover. ' o Footing ~ After trenches are excavated. D Masonry - $teel location, bond beams, grouting.. D Foundation - After fonTis are erected but prior to concrete placement. . D Underground Plumbing - Prior to filling trench. ' D Underlloor PlumbingiMechanical - Prior to insulation or decking. o Post and Beam - Prior to floor insulation or decl<ing. ,. o Floor Insulation = :Pi'iorto decking. . . D Sanitary Sewer - Prior to filling trench. o Storm Sewer - Prior to f(lling trench. D Water Line - Prior to filling trench. o Rough Plumbing - -Prior to cover. o Sidewalk & Driveway - After excavation is complete, forms and sub.base material in place. D Fence - When completed. o Street Trees 7 When all required . trees are planted. - . D Final Plumbing - When all plumbingworl< is complete. D Final Electrical - When all electrical worl< is complete.' o m Final Mechanical - When all mechanical worl< is complete. Final Building -When all required inspections have been approved and building is completed'. o Other MOBILE HOME INSPECTIONS D Blocking and Set.Up - When all 1)locking is complete. o Plumbing Connections - When home has been connected to water and sewer. D Electrical Connection - When blocking, set.up. and plumbing inspections have been approved and the home is connected to the service panel. D Final - After all requi red. inspections are approved and porches, skirting, decks, and venting have been installed. Lot Typ Setbacks Interior Pl. HSEIGAR ACC Corner N Is Panhandle \W I Cul-de.sac IE I Lot faces .\ Lot sq. fig. Lot coverage Topography Total heigllt BUILDING PERMIT ITEM sa. FT. X $/ sa. FT. Main Garage Carport Total Value Building Permit Fee State Surcharge :\ r Total Fee (A) VALUE 500,07.) '/,$'; Db ,.7r"' /s; 75,- SYSTEMS DEVELOPMENT CHARGE (SDC) (B) PLUMBING PERMIT ITEM Fixtures Residential Bath(s) NO Sanitary Sewer FT. Water FT. Storm Sewer FT. Mobile Horne Plumbing Permit State Surcharge Total Charge (C) MECHANICAL PERMIT Furnace Exhaust Hood Vent Fan NO I i /' Wood Stove/Insert/Fireplace Unit Dryer Venl Mechanical Permit Issuance State Surcharge Total Permit (D) MISCELLANEOUS PERMITS Mobile Home State Issuance State Surcharge Sidewalk ft Curbcut ft Demolition State Surcharge Total Mis'cellaneous Permits (E) TOTAL AMOUNT DUE (excluding electrical) (A, B, C, D, and E Combined) FEE ~/....c: 7.s.- IS THE PROPOSED WORf< IN THE HISTORICAL DISTRICT, OR ON THE HISTORICAL REGISTER? If yes, this application must be signed and approved by the Historical Coordinator prior to permit issuance. APPROVED: BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT This permit is grant,edpn \~e express condition that the said construction shall, in all respects, conform to the Ordinance adopted by the City of Springfield, . including the Development Code, regulating the construction and use of buildings, and may be suspende'd or revoked at any time upon violation of any provisions of said ordinances. Plan. Check Fee: Date Paid: Receipt Number: Received By: Plans Reviewed By Date Systems Development Charge is due on all undeveloped properties within the City limits which are being improvecl. ADDITIONAL COMMENTS By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the Slale,of/Orenon perlaining to the work described herein; and L1)at NO OCCUPANCY will, be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance willl ORS 701.055 will be used on this project. ti' I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. .{;ignature ';::{2 -,1 ~ v ,'" ~ ;;z. - l.t:: - '1 d... ------- Date VALIDATION: 00 ~ (p(p C:J RECEIPT NUMBER DATE PAiD _ :;l..L~q"1- AMOUNT RECEIV~DI ~ ....,,<5= {\ \'\ RECEIVED By0~ ,,~