Loading...
HomeMy WebLinkAboutItem 06 Bid Award for Project P21046, 58th Street Sanitary Sewer Bypass and Relief ManholeAGENDA ITEM SUMMARY Meeting Date: 6/18/2012 Meeting Type:Regular Meeting Staff Contact/Dept.: Jesse Jones/Development and Public Works Staff Phone No: 541-726-3720 Estimated Time: Consent Calendar S P R I N G F I E L D C I T Y C O U N C I L Council Goals: Maintain and Improve Infrastructure and Facilities ITEM TITLE: BID AWARD FOR PROJECT P21046; 58TH STREET SANITARY SEWER BYPASS AND RELIEF MANHOLE ACTION REQUESTED: Approve or reject the following motion: TO AWARD THE SUBJECT CONTRACT TO KIPCO, INC. IN THE AMOUNT OF $1,597,405.00. ISSUE STATEMENT: Eight bids were received on this Sanitary Sewer Upgrade project. Contract award is now necessary to enable work to proceed. ATTACHMENTS: 1. B id Summary DISCUSSION/ FINANCIAL IMPACT: This project is identified in the 2008 City of Springfield Wastewater Master Plan and will address capacity problems in the wastewater collection system during wet weather and peak flow conditions. This is necessary to enable the City to maintain compliance with federal and state requirements to eliminate sanitary sewer overflows. The project includes construction of a gravity sanitary sewer pipeline, approximately 5 to 20 feet deep, within the public right-of-way from the intersection of Main Street and 54th Street to the intersection of Thurston Road and 58th Street, including the following items: approximately 4,800 linear feet of 18-inch diameter PVC piping; fittings, and appurtenances; manholes; one jacked and bored cased crossings of Highway 126; one sewage diversion manhole; connections to existing sanitary sewer systems; and surface restoration. The following bids were received and opened on June 5, 2012: Kipco, Inc.  $ 1,597,405.00 H & J Construction, Inc. $ 1,709,531.00 Pacific Excavation, Inc. $ 1,753,245.00 Emery and Sons Construction, Inc. $ 1,811,164.00 I & E Construction, Inc. $ 1,824,892.00 K & E Excavating, Inc. $ 1,880,000.00 Babb Construction dba Delta Construction $ 1,975,135.00 Wildish Construction Company $ 2,056,510.00 Engineer’s Estimate $ 1,958,875.00 Kipco, Inc. is the lowest responsible bidder on this project with a bid 18.45% below the Engineer’s Estimate. Sufficient funds to cover the City’s obligation are budgeted in the 58th Street Sanitary Sewer Bypass and Relief Manhole account (850226) in FY 13. Notice to Proceed will not be issued until after the start of FY 13 (July 1, 2012). SUMMARY OF UNIT PRICE BIDS RECEIVED: 06/05/12PROJECT P21046: 58th Street Relief Sanitary Sewer Line and Bypass Manhole Lowest Responsive Bidder: Kipco, Inc. ENGINEER'SENGINEER'S ITEM UNIT PRICEEXTENDED UNIT NO. ITEM DESCRIPTION UNITQUANTITYESTIMATEPRICE ESTIMATE Construction Bid Items: 1 Mobilization, Demobilization, Bonds and Insurance L.S.1175,000.00$ 175,000.00$ 157,000.00$ 157,000.00$ 170,000.00$ 170,000.00$ 169,000.00$ 169,000.00$ 180,000.00$ 180,000.00$ 130,000.00$ 130,000.00$ 194,600.00$ 194,600.00$ 365,297.50$ 365,297.50$ 200,000.00$ 200,000.00$ 2 Erosion Control L.S.1 10,000.00$ 10,000.00$ 13,500.00$ 13,500.00$ 3,000.00$ 3,000.00$ 3,000.00$ 3,000.00$ 15,000.00$ 15,000.00$ 2,000.00$ 2,000.00$ 12,150.00$ 12,150.00$ 6,065.00$ 6,065.00$ 16,000.00$ 16,000.00$ 3 Trench Foundation Overexcavation and Subgrade Stabilization C.Y.50 70.00$ 3,500.00$ 20.00$ 1,000.00$ 25.00$ 1,250.00$ 65.00$ 3,250.00$ 60.00$ 3,000.00$ 74.00$ 3,700.00$ 113.00$ 5,650.00$ 95.00$ 4,750.00$ 52.00$ 2,600.00$ 4 Trench Rock Excavation C.Y.50 110.00$ 5,500.00$ 20.00$ 1,000.00$ 1.00$ 50.00$ 100.00$ 5,000.00$ 100.00$ 5,000.00$ 54.00$ 2,700.00$ 140.00$ 7,000.00$ 81.00$ 4,050.00$ 15.00$ 750.00$ 5 Furnish and Install 36-Inch Diameter Class 52 DI Storm Sewer Pipe, Polyurethane Coated (granular/CDF backfill) L.F.18 500.00$ 9,000.00$ 300.00$ 5,400.00$ 800.00$ 14,400.00$ 750.00$ 13,500.00$ 1,200.00$ 21,600.00$ 642.00$ 11,556.00$ 550.00$ 9,900.00$ 327.00$ 5,886.00$ 550.00$ 9,900.00$ 6 Furnish and Install 18-Inch Diameter ASTM F679 PS 115 PVC Sewer Pipe 6a 18-Inch Diameter PVC ASTM F679 PS 115 (granular/CDF backf ill) - 0 to 10 ft depth L.F.1,975 170.00$ 335,750.00$ 122.00$ 240,950.00$ 145.00$ 286,375.00$ 130.00$ 256,750.00$ 149.00$ 294,275.00$ 118.00$ 233,050.00$ 118.00$ 233,050.00$ 121.00$ 238,975.00$ 170.00$ 335,750.00$ 6b 18-Inch Diameter PVC ASTM F679 PS 115 (granular/CDF backf ill) - 10 to 15 ft depth L.F.770 220.00$ 169,400.00$ 145.00$ 111,650.00$ 164.50$ 126,665.00$ 215.00$ 165,550.00$ 171.00$ 131,670.00$ 200.00$ 154,000.00$ 181.00$ 139,370.00$ 329.00$ 253,330.00$ 250.00$ 192,500.00$ 6c 18-Inch Diameter PVC ASTM F679 PS 115 (granular/CDF backf ill) - 15 to 20 ft depth L.F.1,260 275.00$ 346,500.00$ 243.00$ 306,180.00$ 190.00$ 239,400.00$ 225.00$ 283,500.00$ 200.00$ 252,000.00$ 265.00$ 333,900.00$ 264.00$ 332,640.00$ 178.00$ 224,280.00$ 275.00$ 346,500.00$ 6d 18-Inch Diameter PVC ASTM F679 PS 115 (granular backf ill) - 15 to 20 ft depth L.F.585 250.00$ 146,250.00$ 117.00$ 68,445.00$ 160.00$ 93,600.00$ 167.00$ 97,695.00$ 158.00$ 92,430.00$ 249.00$ 145,665.00$ 228.00$ 133,380.00$ 225.00$ 131,625.00$ 225.00$ 131,625.00$ 7 Bored/Jacked Installation of 36-Inch Diameter Steel Casing (Including 18-inch carrier pipe) I & E Construction, Inc.UNIT PRICE EXTENDED PRICE K & E Excavating, Inc.UNIT PRICE EXTENDED PRICE City's Notice of Intent to Award as required by ORS 279C.375UNIT PRICE UNIT PRICE Kipco, Inc. H & J Construction, Inc. EXTENDED PRICE EXTENDED PRICE It is the policy of the City of Springfield to award Contracts to the Responsible Bidder submitti ng the lowest Responsive Bid. The City of Springfield reserves its right to reject any or all bids not in compliance with all prescribed public bidding procedures and requirements, waive minor irregularities not affecting substantial rights, and may reject for good cause any or all bids upon a finding of the City of Springfield that it is in the best public interest to d o so, and accept such bids that in the opinion of the Springfield City Council are in the best interest of the City of Springfield. Please be informed that the City intends to award a contract to the Bidder so designated. Emery and Sons Construcion, Inc. UNIT PRICE EXTENDED PRICE Pacific Excavation, Inc.UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE Wildish Construction CompanyUNIT PRICE EXTENDED PRICE Babb Construction Co. dba Delta Construction Co. 7 pipe ) 7a Boring Through Unclassified Material L.F.166 1,500.00$ 249,000.00$ 1,200.00$ 199,200.00$ 906.00$ 150,396.00$ 1,250.00$ 207,500.00$ 1,144.00$ 189,904.00$ 1,078.00$ 178,948.00$ 1,220.00$ 202,520.00$ 1,161.00$ 192,726.00$ 950.00$ 157,700.00$ 7b Boring Through Rock L.F.10 1,500.00$ 15,000.00$ 1,200.00$ 12,000.00$ 1.00$ 10.00$ 2,000.00$ 20,000.00$ 2,500.00$ 25,000.00$ 2,200.00$ 22,000.00$ 2,690.00$ 26,900.00$ 2,110.00$ 21,100.00$ 2,200.00$ 22,000.00$ 7c Boring Through Transitional Material L.F.10 1,500.00$ 15,000.00$ 1,600.00$ 16,000.00$ 1.00$ 10.00$ 1,500.00$ 15,000.00$ 2,000.00$ 20,000.00$ 1,600.00$ 16,000.00$ 2,150.00$ 21,500.00$ 1,600.00$ 16,000.00$ 1,700.00$ 17,000.00$ 8 Furnish and Install New Sanitary Sewer Manholes (0 to 10 Feet Deep) 8a New Sanitary Sewer Manholes (0 to 10 Feet Deep) - 48-Inch Diameter EA19 4,500.00$ 85,500.00$ 3,700.00$ 70,300.00$ 3,200.00$ 60,800.00$ 5,000.00$ 95,000.00$ 5,000.00$ 95,000.00$ 3,895.00$ 74,005.00$ 5,185.00$ 98,515.00$ 2,950.00$ 56,050.00$ 3,200.00$ 60,800.00$ 8b New Sanitary Sewer Manholes (0 to 10 Feet Deep) - 72-Inch Diameter EA1 11,000.00$ 11,000.00$ 11,000.00$ 11,000.00$ 14,000.00$ 14,000.00$ 12,000.00$ 12,000.00$ 44,000.00$ 44,000.00$ 89,000.00$ 89,000.00$ 34,880.00$ 34,880.00$ 14,352.00$ 14,352.00$ 14,500.00$ 14,500.00$ 8c New Sanitary Sewer Manholes (0 to 10 Feet Deep) - 84-Inch Diameter EA1 13,000.00$ 13,000.00$ 13,000.00$ 13,000.00$ 15,000.00$ 15,000.00$ 13,000.00$ 13,000.00$ 25,000.00$ 25,000.00$ 13,800.00$ 13,800.00$ 20,785.00$ 20,785.00$ 14,531.00$ 14,531.00$ 12,000.00$ 12,000.00$ 9 Additional Depth of Manholes Beyond 10 Feet Deep 9a Additional Depth of Manholes Beyond 10 Feet Deep - 48-Inch Diameter FT65 225.00$ 14,625.00$ 150.00$ 9,750.00$ 200.00$ 13,000.00$ 300.00$ 19,500.00$ 250.00$ 16,250.00$ 138.00$ 8,970.00$ 228.00$ 14,820.00$ 200.00$ 13,000.00$ 265.00$ 17,225.00$ 9b Additional Depth of Manholes Beyond 10 Feet Deep - 72-Inch Diameter FT8 350.00$ 2,800.00$ 150.00$ 1,200.00$ 200.00$ 1,600.00$ 600.00$ 4,800.00$ 250.00$ 2,000.00$ 138.00$ 1,104.00$ 324.00$ 2,592.00$ 305.00$ 2,440.00$ 265.00$ 2,120.00$ 9c Additional Depth of Manholes Beyond 10 Feet Deep - 84-Inch Diameter FT1 550.00$ 550.00$ 150.00$ 150.00$ 200.00$ 200.00$ 1,250.00$ 1,250.00$ 250.00$ 250.00$ 220.00$ 220.00$ 632.00$ 632.00$ 938.00$ 938.00$ 265.00$ 265.00$ 10 Furnish and Install New 72-Inch Diameter Sewage Diversion Manhole L.S.1 25,000.00$ 25,000.00$ 13,000.00$ 13,000.00$ 25,000.00$ 25,000.00$ 15,000.00$ 15,000.00$ 30,000.00$ 30,000.00$ 54,000.00$ 54,000.00$ 32,875.00$ 32,875.00$ 28,676.00$ 28,676.00$ 36,000.00$ 36,000.00$ 11 Manhole Frame and Cover Adjustment (New and Existing) EA23 1,000.00$ 23,000.00$ 360.00$ 8,280.00$ 400.00$ 9,200.00$ 750.00$ 17,250.00$ 300.00$ 6,900.00$ 348.00$ 8,004.00$ 515.00$ 11,845.00$ 1,068.00$ 24,564.00$ 900.00$ 20,700.00$ 12 Furnish and Install ASTM D3034, SDR 26 PVC Sanitary Sewer Laterals (granular/CDF backfill) L.F.100 45.00$ 4,500.00$ 115.00$ 11,500.00$ 100.00$ 10,000.00$ 75.00$ 7,500.00$ 130.00$ 13,000.00$ 165.00$ 16,500.00$ 93.50$ 9,350.00$ 143.00$ 14,300.00$ 85.00$ 8,500.00$ 13 Saw-Cutting Existing Surfacing 13a Saw-Cutting Existing Surfacing - Saw-Cut First 4-Inch Depth L.F.8,000 1.00$ 8,000.00$ 0.60$ 4,800.00$ 2.00$ 16,000.00$ 1.50$ 12,000.00$ 0.65$ 5,200.00$ 0.60$ 4,800.00$ 0.60$ 4,800.00$ 1.15$ 9,200.00$ 0.55$ 4,400.00$ 13b Saw-Cutting Existing Surfacing - Saw-Cut per Inch Depth Beyond First 4 Inches IN-LF16,000 0.25$ 4,000.00$ 0.15$ 2,400.00$ 0.50$ 8,000.00$ 0.10$ 1,600.00$ 0.16$ 2,560.00$ 0.22$ 3,520.00$ 0.15$ 2,400.00$ 0.15$ 2,400.00$ 0.15$ 2,400.00$ 14 Hot Mix Asphaltic Concrete (HMAC) Trench Pavement Restoration TON1,850 65.00$ 120,250.00$ 85.00$ 157,250.00$ 175.00$ 323,750.00$ 110.00$ 203,500.00$ 109.00$ 201,650.00$ 82.00$ 151,700.00$ 86.00$ 159,100.00$ 89.00$ 164,650.00$ 105.00$ 194,250.00$ 15 Plain Concrete Pavement (PCP) Trench Pavement Restoration S.Y.225 150.00$ 33,750.00$ 80.00$ 18,000.00$ 95.00$ 21,375.00$ 100.00$ 22,500.00$ 95.00$ 21,375.00$ 80.00$ 18,000.00$ 78.00$ 17,550.00$ 88.50$ 19,912.50$ 105.00$ 23,625.00$ 16 Standard Concrete Curb L.F.400 20.00$ 8,000.00$ 18.00$ 7,200.00$ 17.00$ 6,800.00$ 19.00$ 7,600.00$ 24.00$ 9,600.00$ 16.25$ 6,500.00$ 15.60$ 6,240.00$ 22.00$ 8,800.00$ 22.00$ 8,800.00$ 17 Standard Concrete Curb and Gutter L.F.500 30.00$ 15,000.00$ 20.00$ 10,000.00$ 20.50$ 10,250.00$ 23.00$ 11,500.00$ 30.00$ 15,000.00$ 20.40$ 10,200.00$ 19.50$ 9,750.00$ 29.00$ 14,500.00$ 20.00$ 10,000.00$ 18 Concrete Sidewalk S.Y.750 75.00$ 56,250.00$ 37.00$ 27,750.00$ 45.00$ 33,750.00$ 42.00$ 31,500.00$ 40.00$ 30,000.00$ 29.00$ 21,750.00$ 27.80$ 20,850.00$ 34.00$ 25,500.00$ 80.00$ 60,000.00$ 19 S idewalk Ramps EA5 250.00$ 1,250.00$ 700.00$ 3,500.00$ 950.00$ 4,750.00$ 1,000.00$ 5,000.00$ 1,200.00$ 6,000.00$ 1,000.00$ 5,000.00$ 880.00$ 4,400.00$ 785.00$ 3,925.00$ 2,000.00$ 10,000.00$ 20 Concrete Residential Driveway Apron S.Y.100 85.00$ 8,500.00$ 45.00$ 4,500.00$ 63.00$ 6,300.00$ 50.00$ 5,000.00$ 75.00$ 7,500.00$ 40.00$ 4,000.00$ 38.00$ 3,800.00$ 100.00$ 10,000.00$ 100.00$ 10,000.00$ 21 Traffic Signal Loop Detector Replacement EA4 1,000.00$ 4,000.00$ 1,000.00$ 4,000.00$ 900.00$ 3,600.00$ 500.00$ 2,000.00$ 1,500.00$ 6,000.00$ 2,200.00$ 8,800.00$ 1,000.00$ 4,000.00$ 650.00$ 2,600.00$ 850.00$ 3,400.00$ 22 Pothole Existing 36-Inch Diameter Storm Sewer L.S.1 1,500.00$ 1,500.00$ 1,000.00$ 1,000.00$ 2,000.00$ 2,000.00$ 1,000.00$ 1,000.00$ 2,000.00$ 2,000.00$ 1,500.00$ 1,500.00$ 4,500.00$ 4,500.00$ 10,392.00$ 10,392.00$ 1,200.00$ 1,200.00$ 23 Traffic Control L.S.1 25,000.00$ 25,000.00$ 60,000.00$ 60,000.00$ 28,000.00$ 28,000.00$ 12,500.00$ 12,500.00$ 20,000.00$ 20,000.00$ 52,000.00$ 52,000.00$ 65,826.00$ 65,826.00$ 53,935.00$ 53,935.00$ 102,000.00$ 102,000.00$ 24 General Surface Restoration L.S.1 5,000.00$ 5,000.00$ 20,000.00$ 20,000.00$ 2,000.00$ 2,000.00$ 7,500.00$ 7,500.00$ 15,000.00$ 15,000.00$ 27,000.00$ 27,000.00$ 24,580.00$ 24,580.00$ 7,569.00$ 7,569.00$ 15,000.00$ 15,000.00$ 25 Internal Sewer Video Inspection L.S.1 8,500.00$ 8,500.00$ 6,500.00$ 6,500.00$ 9,000.00$ 9,000.00$ 5,000.00$ 5,000.00$ 7,000.00$ 7,000.00$ 11,000.00$ 11,000.00$ 7,250.00$ 7,250.00$ 8,816.00$ 8,816.00$ 7,000.00$ 7,000.00$ CONSTRUCTION BASE BID - TOTAL 1,958,875.00$ 1,597,405.00$ 1,709,531.00$ 1,753,245.00$ 1,811,164.00$ 1,824,892.00$ 1,880,000.00$ 1,975,135.00$ 2,056,510.00$ Percent Over or Under Engineer's Estimate -18.45%-12.73%-10.50%-7.54% -6.84% -4.03% 0.83% 4.98% Attachment 1 Page 1 of 1