HomeMy WebLinkAboutPermit Demolition 2003-7-28
Status
Issued
CITY OF SPRINGFIELD.
Building/Combination Permit
PERMIT NO: COM2003-00675
ISSUED: 07/28/2003
APPLIED: 07/28/2003
EXPIRES: 01/28/2004
VALUE:
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
SITE ADDRESS: 3479 BALDY VIEW LN
ASSESSOR'S PARCEL NO.: 1703140001800
Springfield TYPE OF WORK: Single Family Residence
TYPE OF USE:
Demolition
Residential
PROJECT DESCRIPTION: Demolish house and all out buildings
Owner: PEACEHEAL TH
Address: PO BOX 1479 EUGENE OR 97440
Owner: PEACEHEALTH
Address: PO BOX 1479 EUGENE OR 97440
I CONTRACTOR INFORMATION I
Contractor Type
General
Contractor
TURNER CONSTRUCTION COMPANY
I BUILDING INFORMATION.
License
Expiration Date Phone
503 229-6000
# of Buildings:
Primary Occupancy Group:
Secondary Occupancy Group:
Primary Construction Type
Secondary Construction Type:
# of Bedrooms:
# of Stories:
Height of Structure
Type of Heat:
Water Type:
Range Type:
Energy Path:
Lot Size:
Sq Ft 1st Floor:
Sq Ft 2nd Floor:
Sq Ft Basement:
Sq Ft Garage/Carport
Sq Ft Other:
Impervious Surface Area:
SETBACKS
I DEVELOPMENT INFORMATION I
Frontyard Setback:
Side 1 Setback:
Side 2 Setback:
Rearyard Setback:
Solar Setbacks:
Overlay Dist:
# Street Trees Rqd:
Paved Drive Rqd:
% of Lot Coverage:
REQUIRED PARKING
Total:
Handicapped:
Compact:
I PUBLIC IMPROVEMENTS I
Street Improvements:
Storm Sewer Available:
Special Instruction:
Sidewalk Type:
Downspouts/Drains:
Notes:
"
Pal!e 1 of 2
~$~~J..~g~J~Q.; _,",._."~_
"l
;l
Status
Issued
CITY OF SPRINGFIELD
Building/Combination Permit
PERMIT NO: COM2003-00675
ISSUED: 07/28/2003
APPLIED: 07/28/2003
EXPIRES: 01128/2004
VALUE:
,;;
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
I Valuation Description I
Description
Tvpe of Construction
$ Per Sq Ft
or multiplier
Square Footage
or Bid Amount
Value
Date Calculated
Total Value of Project
L Fees Paid'
Fee Description
+ 10% Administrative Fee
+ 7% State Surcharge
Demolition
Sanitary or Storm Sewer Cap
Amount Paid Date Paid Receipt Number
$9.00 7/28/03 1200200000000001836
$6.30 7/28/03 1200200000000001836
$45.00 7/28/03 1200200000000001836
$45.00 7/28/03 1200200000000001836
Total Amount Paid
$105.30
I Plan Reviews I
To Request an inspection call the 24 hour recording at 726-3769. All inspection requested before 7:00 a.m.
will be made the same working day, inspections requested after 7:00 a.m. will be made the following work
day.
L Reouired Insoections I
1 Demolition: After demolition is complete, sewer is capped or septic is pumped and filled and inspection is
requested and approved, and all debris is removed from the site.
2 Septic Tank Pumped: After septic tank has been pumped and filled. Please provide the inspector with receipt and
verification from company performing pump and fill. "
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all
information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with
the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and
that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety.
I further certify that only contractors and employees who are in compliance with ORS 701.005 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the
street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all
times during construction.
AcJ? u C~Oj
6w~er or Cont~tors Sign~ur~
/-- :2 xr~ /) ~
Date
Pa2e 2 of2
225 Fifth Street
Springfield, Oregon 97477
541-726-3759 Phone
Job/Journal Number
COM2003-00675
COM2003-00675
COM2003-00675
COM2003-00675
Payments:
Type of Payment
Check
Receipt #: 1200200000000001836
Description
Demolition
Sanitary or Storm Sewer Cap
+ 7% State Surcharge
+ 10% Administrative Fee
Paid By
GREGORYPAYNEffiRENDA
PAYNE
Received By
dIm
Check Number
Batch Number Authorization Number
42618
City of Springfield Official Receipt
Development Services Department
Public Works Department
Date: 07/28/2003
3:11:12PM
Amount Paid
45.00
45.00
6.30
9.00
$105.30
Item Total:
How Received
In Person
Amount Paid
$105.30
Payment Total:
$105.30
. '1 "
I~M,
225 FIFTH STREET
SPRINGFIELD, OR 97477
(541) 726-3753
FAX (541) 726-3689
~t
DEVELOPMENTSERWCESDEPARTMENT
13f1L~'( !,elJ Pe/i/e.
Structure to be Demolished: HODOc. ~ At.,L bQ1M/UJIJ./45
Job Number: _ C/Og 2LTO] - ()t)raJ J
~'-I9l1
Address:
. The applicant is hereby notified that any redevelopment of the subject site must comply
with all of the applicable laws, codes, ordinances, policies and plans in effect at the time .
the redevelopment proposal is accepted as complete for City review. This would include
. correction of substandard conditions associated with the present development Examples
of such corrections may include modification of inadequate drainage facilities;
compliance with building set-backs from property lines; correction of substandard
sidewalks and street improvements~ including driveway width and placement; and other
corrections which may be necessary to comply with existing development standards.
. Furthermore, if an existing use is demolished or otherwise removed prior to the
development of the proposed use, then the system development charge credit for the
previously existing use shall expire two years after the date of issuance of the demolition
penmt or other removal of the previously existing use. (Springfield Municipal Code '
3.416(1)).
My signature below indicates that I have read and understand the above conditions
relating to the demolition of the above mentioned structure.
G~t
Signaf:l/ V
---
.I-~"t- O'~
Date
Page 1 of 1
1:\ WORDFILE\PERMITS\Demosdc.doc
".' : ..'
DEVELOPMENT SERVICES
PUBUC WORKS
METROPOLITAN WASTEWATER MANAGEMENT
225 F{FTH S REET
SPRINGFIELD. OR 97477
(503) 726-3753
DEMOLITION PERMIT APPLICATIONS,
Your demolition permit is currently being .processed. There may be a sllght
delay, of up to' 2 working days for small structures, due to the time required
to review the history of the structure to determine if.it needs to be documented
before demolition. This documentation i~ for archival purposes only and will
not affect the granting of the demolition permit. If the structure is very large
or complicated the documentation process may take up to a maximum of 4 working
days. Documentation will consist of photographing the ,building, taking
measurements and making scaled drawings. The documentation will be undertaken
by the City at no cost to you. Documentation is being done on all structures
dated prior to 1940 that may have historic importance to the City's development..
.~ T~IS DOCUMENTATION WI~L NOT IMPEDE THE DEMOLITION PROCESS.
An age cut-off of 1940 was chosen because this is the date that the National
Parks Service and the Springfield Development Code use to determine potential
historical significance." '
, .
If you would prefer to complete this documentation yourself you must provide the
. City with the following information: 1) black and white photographs of each
elevation, a floor plan with measurements, and a set of elevation drawings with
measurements.
, .
Thank you for your patience.
I grant the City of Springfield permission. to enter my
document~~~ W~9lf2iz~~. dc,.demol ;i on of th.e
. Property .owner signature: GkA~'
1/'/. 0
Date: ~7~ ~C13
lA,
property to complete
structure located at'
PO Box 40876
Eugene Oregon 97404 USA
541 461 9115
Douglas J. Moore
President / Sole Prop"etor
541 461 8995 faxx
d rdint!@connect-america.net
. . .
January 7, 2003
Peace Health Property Planning & Development
Attn: Tamara Miller
Re: Pre-demolition asbestos survey
3479 Baldy View Road, Springfield, Oregon
On January 4, 2003 an inspection and site survey for asbestos containing
building materials was conducted at the above-mentioned address. From the
homogeneous list of building materials established, Roofing, ceiling and wall
composites and several types of flooring materials were sampled and analyzed
by an independent laboratory, Magnum Environmental Services. The results
indicated that no asbestos was present in any of the materials sampled,
The house, following this exercise, is considered ready for demolition pursuant to
the rules specified in DEQ Division 340-248-0270 and LRAPA's Title 43-015-10-
A&B regarding asbestos.
All documentation from these activities and the credentials of those who
performed them are on file at the offices of Douglas Internationallnc,
If you or any of your associates have any questions regarding the activities
described, please don't hesitate to call me at 541-461-9115 or 541-954-4369.
Thanks for your patronage.
l )lQ( \~ll'-
Douglas J. Moore, Inspector.
)oug as
nterna'~.o la
lC.
.
.
~
.---