HomeMy WebLinkAboutPlan, Tentative APPLICANT 4/18/2012 (2)McKENZIE HIGHWAYI MAIN STREET
PLANT SGHWULE
KEY 107Y. I BOTANICAL NAME COMMON NAME MIN. SIZE I COMMENTS
TREES
AC
1
Acer circinatum
Vine Maple
6 ht.
multi -stem, BOB
FL
4
Fraxinus latifolia
Oregon Ash
1.5" cal.
Matching, full, BOB
NY5
3
N ssa s lvatica
Black Tupelo
2" cal.
Matching, full, BOB
TIG
12
Tilia cordata
Little Leaf Linden
2" cal.
Matching, limbed up to approx. 6 ft.
TPH
14
Thu "a licata 'Ho an'
Ho an Red Cedar
7' ht.
Matching, full, BBB
SHRUBS
AUG
15
Arbutus unedo 'Compacta'
Dwarf Strawberry Bush
56 al.
matching, full
COS
13
Cornus sericea
Red -Osier Dogwood
5 gal.
matching, full
EUAC
12
Euonymus alatu5 'C,ompacta'
Dwarf Burning Bush
5 gal.
matching, full
ICG
21
Ilex crenata 'Compacta'
Compact Japanese Holly
5 gal.
matching, full
MA
8
Mahonia auquifolium
Oregon Grape
3 gal.
matching, full
NADL
21
Nandina domestics 'Lemon Hill'
Lemon Hill Nandina
3 al_
matching, full
PHL
1
Philadelphu5 lewisii
Mock Orange
5 gal.
full
POM
13
Polystichum munitum
Sword Fern
1 al.
matching, full
R15
2
Ribes san ulneum
Red flowering Current
5 al.
matching, full
50
20
5piraea densiflora
Sub- alpine spiraea
3 gal.
matching, full
SDO
6
Spiraea dou lasii
Western spiraea
5 gal.
matching, full
ViD
14
Viburnum davidii
David Viburnum
3 aal
matching, full
VIT
'7
Viburnum tinus Spring Bouquet'
Spring Bouquet Viburnum
5 gal
matching, full
VO
12
Vaccinium ovatum
Evergreen Huckleberry
3 gal .
match in ,full
GROUNDGOVER5 AND PERENNIALS
AU
24" o.c.
Arctosta h los uva -ursi
Kinnikinnick
1 L
jai.
matching, full
GAD
24" o.c.
Garex densa
Dense Sedge
4" pote,
30.0"
CAVA
13
Callum vu! aril 'Aurea'
Aurea Scotch Heather
3 gal.
matching, full
GOSK
15
Cornus sericea 'Kelse i'
Dwarf Redtivig Dogwood
3 gal.
matching, Full
JP
24" o.c.
Juncus patens
Spreading Rush
4" pot s
CU
RUG
24" o.c.
Rubus ca! cinoides 'Emerald Carpet'
Emerald Carpet RubuS
4" pots
match in , full
ADJACENT BUILDING
OR EDGE OF PLANT BED
-Lc-
n 3
SPACING "D" ROW "A" 5PACING "D" RON "A"
3" D.G. 2.6"
18" O.G.
15.6"
6" O.G. 5.2"
24" O.G.
20.8"
9" O.G. '7.5"
30" D.G.
26.0"
12" O.G. 10.4"
36,10.6.
30.0"
15" Q.G. 13.0"
48" O.G.
415"
GROUNDC.OVER
5FAGINCS
DIAGRAM
NOTE: V MULCH (TAPERS TO
FINISHED GRADE, UNLESS V AT SIDEWALK)
INDICATED OTHERWISE, 15
COMPRISED OF A HORIZONTAL
PLANE 3" ABOVE THE
HIGHE5T ADJACENT E126E. -- FINISHED GRADE
9"
i
- = PL ANTIN6 S011.
m 1 ---I I I -1 I I =11 i-=1 l{ .11 {- (SEE SPECIFICATIONS
- III - III - III - III - III - III -1 i l- FOR DEPTH)
a
Iillil
ADJACENT PAVING
PLEB EU (5E AT PAVEMENT
r-L -PNIN IN 15 =)I--(.l M.Wn
NT5
LANDSCAPE (5UIDELINES LEGEND
e
AM
X11111
DOUGHERTY
LANDSCAPE
ARCHITECTS
474 Willamette Street
Suite 345
Eugene, Oregon 97491
P 541.583.5883
F 541.583.8183
www.DLAdesign.com
BSIST.&
L 279
r David J. Dougherty F--4
r OREGON
4p
A. SOIL PREPARATION
cu
1. FINISHED ELEVATION OF SUB -BASE TO BE 8" MINIMUM BELOIN FINISHED GRADE.
2. TILL SUBGRADE THOROUGHLY TO A DEPTH OF 8" MINIMUM PRIOR TO PLACEMENT OF TOPSOIL..
PROPOSED PECIDUOU5 11;ZEES
00
s..
FERTILIZER TO TOPSOIL AT A RATE OF 20 LBS. PER 1000 5F. ROTO -TILL AMENDMENTS AND TOPSOIL TO A
(D
tli
PLANT BEDS
1. FINISHED ELEVATION OF 5UB -BA5E TO BE 18" MINIMUM BEL44N FINISHED GRADE.
V)
FROF05EV CONIFER TREES
2. TILL SUBGRADE THOROUGHLY TO A DEPTH OF 8" MINIMUM PRIOR TO PLACEMENT OF TOPSOIL.
CU
w
rr
FERTILIZER TO TOPSOIL AT THE RATE OF 20 LB5. PER 1040 5F. ROTO TILL AMENDMENTS AND TOPSOIL TO A
-.a
CU
DEPTH OF W MINIMUM.
C
qqt
50D LAWN
4. PROVIDE 3" OF SHREDDED FIR BARK MULCH OVER ALL PLANT BEDS_
Qa
tt3
CQ
5TORMWATER PLANTING AREAS
z
tr
cc
BAR RUN).
M
2. PLACE 12" MINIMUM OF TOPSOIL OVER TILLED SUB6RADE. SEE ENGINEERS DRAWINGS. 5UBMlT SAMPLE OF
A. SOIL PREPARATION
LAWN AREAS
1. FINISHED ELEVATION OF SUB -BASE TO BE 8" MINIMUM BELOIN FINISHED GRADE.
2. TILL SUBGRADE THOROUGHLY TO A DEPTH OF 8" MINIMUM PRIOR TO PLACEMENT OF TOPSOIL..
PROPOSED PECIDUOU5 11;ZEES
3. PLACE. 5" 5ANDY LOAM TOPSOIL OVER TILLED 5UB6RADE. ALLOW FOR DEPTH OF 500. ADD 15- 5 -10 -10
V
FERTILIZER TO TOPSOIL AT A RATE OF 20 LBS. PER 1000 5F. ROTO -TILL AMENDMENTS AND TOPSOIL TO A
(D
DEPTH OF 8-10" MINIMUM.
PLANT BEDS
1. FINISHED ELEVATION OF 5UB -BA5E TO BE 18" MINIMUM BEL44N FINISHED GRADE.
V)
FROF05EV CONIFER TREES
2. TILL SUBGRADE THOROUGHLY TO A DEPTH OF 8" MINIMUM PRIOR TO PLACEMENT OF TOPSOIL.
CU
3. PLACE 18" MINIMUM OF TOPSOIL OVER TILLED SUBGRADE. ADD 4" OF ORGANIC MATERIAL AND 15- 5 -10 -10
rr
FERTILIZER TO TOPSOIL AT THE RATE OF 20 LB5. PER 1040 5F. ROTO TILL AMENDMENTS AND TOPSOIL TO A
-.a
CU
DEPTH OF W MINIMUM.
z00
qqt
50D LAWN
4. PROVIDE 3" OF SHREDDED FIR BARK MULCH OVER ALL PLANT BEDS_
Date: 4/14/12
Drawn By: ER
Checked By:
5TORMWATER PLANTING AREAS
1. FINISHED ELEVATION OF SUB -BASE TO APPROXIMATELY 12" MINIMUM BELOW FINi5HED GRADE (EXCAVATED TO
BAR RUN).
2. PLACE 12" MINIMUM OF TOPSOIL OVER TILLED SUB6RADE. SEE ENGINEERS DRAWINGS. 5UBMlT SAMPLE OF
TOPSOIL FOR APPROVAL BY CIVIL ENGINEER PRIOR TO CONSTRUCTION.
3. PROVIDE 1" OF PEA GRAVEL. MULCH OVER BOTTOM OF STORMANATER AREA. PROVIDE 3" OF SHREDDED FIR
BARK MULCH ON 510E 5LOPE5.
B. PLANT MATERIAL
GROUNDCOVER
1. PROVIDE ONLY HEALTHY, FULL PLANT MATERIAL AT SIZES INDICATED.
2. PLANT SUBSTITUTIONS TO BE APPROVED BY LANDSCAPE ARCH ITEGT.
3. PLANT LAYOUT TO BE APPROVED BY LANDSCAPE ARCHITECT PRIOR TO INSTALLATION.
CRASSS
C. SODDING
1. SOD AVAILABLE A5 'J13 5I6NATURE AS MANUFACTURED BY JB INSTANT L.ANN (800 -52 ?- 1439).
2. INSTALL ACCORDING TO MANUFACTURER'S SPECIFICATIONS.
3. CONTRACTOR RE5PON51BLE FOR MAINTAINING LAWN THROUGH ACCEPTANCE.
, ? '
FERNS
4. RE -50D ANY AREAS AS NECESSARY TO ACHIEVE FULL HEALTHY TURF.
IRRIGATION SYSTEM DESCRIPTION
1. AUTOMATIC IRRI(5ATION SYSTEM MILL BE PROVIDED FOR ALL LAWN AND PLANT BED AREAS.
2. SYSTEM WILL BE AN UNDERGROUND IRRIGATION SYSTEM.
3. SYSTEM WILL PROVIDE HEAL? TO HEAD COVERAGE,
4. SYSTEM WILL PROVIDE SEPARATE ZONES FOR LAM AND SHRUB AREAS,
5. SYSTEM WILL PROVIDE SEPARATE ZONES FOR DIFFERENT SOLAR ORIENTATIONS.
6. HEAD LAYOUT WILL MINIMIZE OVER-SPRAY ONTO PAVED SURFACES. LANDSCAPE
1. MAIN LINE WILL HAVE MANUAL DRAIN VALVES.
8. SYSTEM WILL BE OPERATED AUTOMATICALLY.
9. SYSTEM TO BE DE516N BUILD BY LAND50APE CONTRACTOR.
PLAN
Submission:
Revisions
Q
w
UAd)
V
(D
s
V)
C
CU
CU
rr
-.a
CU
z00
qqt
Date: 4/14/12
Drawn By: ER
Checked By:
Submission:
Revisions
Q