HomeMy WebLinkAboutPermit Miscellaneous 1982-5-4
Date
To:
5-4-!f:,e.
FLOODPLAIN MANAGEMENT
Management/125 East 8th Ave., Eugene, Oregon
687-4357
By K l...A.
Department of Environmental
~ Permit Processing
D Planning
D Publ ic Works
Perm,i t No. 754- 8e..
Partition No.
Subdivision No.
Applicant Name
Address of site
DUTZ'/..<.)AR.D 'ED..,..., f= "..
,:3 4/ '5 'J:::~~.L 1:> Y' V. t 'F....J I _ "- 'or
SFD AG' M.H.' ADD. ' COMM.
SHOP
---..--..
D Approximate flood hazard study area, extra precautions may be appropriate to
assure that the building site will be reasonably safe from flooding.
~ Detail flood hazard study area. Data Source
o Mobile home tie downs required.
0,' .Substantial improvement.
[] Site in regulatory floodway channel, building prohibited unless it is demonstrated
that the cumulative effect of proposed development will not increase the base
flood at any point. Contact Floodplain Management for more information.
, \'
~ BASE FLOOD ELEVATION + l' = 435,"5 I (r1SL). Certification at or above
this elevation required ascheck,ed below.
o OTHER
~***************************************************************************************************~
~. CERTIFICATION OF ELEVATION
, a Registered Professional
in the State of Or~gon, do hereby
certify to Lane County, that the following elevation represents a survey
made by me or under my sup~\~~i~n...: -\op d JeM l0c.1I
~ The foundation elevation (i.nG-l.ud.i,ng::ba's~emen:'&~s.d;gQJ =
D The ground elevation that structure will be placed on =
D The first floor elevation = I (MSl).
D The elevation of the top of floodproofing=
D Other
I,
3:
OJ
'"0
_J
I
o
I (r~SL). :..\l
I (~1SL). J
%
i)~
, (MSL).
Reference Bench Mark No.
Location
-l
Signature
Date
,P'1 ,
,/'
:'Original to be certified
1 Flnodplain Management'
\...... '
1st copy with application/inspection
2nd copy to applicant
3rd copy'to Floodplain Management
SEAL
.
r
.
......
and returned to Lane countY.5>/
\~
f\
\J
(j