Loading...
HomeMy WebLinkAboutPlan, Tentative APPLICANT 2/9/2012SITE REVIEW PLAN SET LAYS AFFORDABLE STORAGE SEC.31 T.17S. R.2W. W.M. TAX LOT 1700 SPRINGFIELD, LANE COUNTY, OREGON AbZ>tbZ)VKZ> MAP #1 /-U1 -31 -UU IAX LOTS 1700 m  LA -i. PLANTING PLAN I co u- 0 UA C> C> Pl- 0) 0 C>,d- r"- 0 0) cd E C> 0 ck Lo => 0 co E ca CQ cn CJD q ul) o > m 07 40 oom 0 a) cn a. co u- 0 ON-( 14 SHEET cl of -7 UA cd ca CQ m A o a > m cn 8 a) cn M 0 ON-( 14 SHEET cl of -7 UA ca CQ m A o a > m > m 8 0 ON-( 14 SHEET cl of -7 - — - — - — - — - — - — - — - — - — - — - — - — - — - — - — - — - — - — - — - — - — - — - — - — - — - — - — - — - — - — - — - - G STREET co EXISTING II FIRE HYDRANT uu III 36.00 ROADWAY III 57.00 30.00 ,,,,...,........,,..- .......... _ i EXISTING TRAILERS TO BE RELOCATED OFF SITE PRIOR TO PHASE 2 CONSTRUCTION I D(IS1IN6 BUILDING EXISTING STORAGE BUILDING -- TO BE RELOCATED OFF SITE PRIOR TO PHASE 2 CONSTRUCTION 1p0 EXISTING I BUILDING (I EXISTING TRAILER TO BE RELOCATED OFF SITE PRIOR TO PHASE 2 CONSTRUCTION LEGEND P — EXISTING N, PHONE 16"W— EXISTING WATER LINE  I QW EXISTING WATER METER Q  EXISTING WATER VALVE O EXISTING FIRE HYDRANT Q -- PROPOSED FIRE HYDRANT V  —$.WW — — EXISTING WASTEWATER SYSTEM @--24nSD — — EXISTING STORM DRAINAGE SYSTEM  I C EXISTING CLEANOUT z  EXISTING CATCH BASIN W OHE — EXISTING OVERHEAD ELECTRIC Z f— —F EXISTING POWER POLE  -0- EXISTING POWER POLE W%TRANSfORMER N  EXISTING GUY WIRE A-0 EXISTING STREET LIGHT D EXISTING N PEDESTAL QP EXISTING TELEPHONE PEDESTAL 4'G EXISTING GAS LINE KM EXISTING GAS VALVE EXISTING TREE .l  FOUND MONUMENTS N tUD i t7`a ku • G .. w aid r cl, o. n ° t rn . s or cuk M W 13- V) Z w N co ku • G W N • r s W 4 w wW 4 +vy1 Q • N r W 4 w wW SHEET C2 of 7 0 +vy1 Q cwt' SHEET C2 of 7 A I NZ7 G STREET EXISTING FIRE HYDRANT op0  II  r  1 I III 36.00" ROADWAY t 57.00 R/W W ck: V) W N 00 c .4 P G— W co G1  Iii TL 11606 i II illy LEGEND 71 P EXISTING TV, PHONE EXISTING POWER POLE 16"W EXISTING WATER LINE EXISTING POWER POLE W/TRANSFORMER EXISTING WATER METER EXISTING GUY WIRE EXISTING WATER VALVE EXISTING STREET LIGHT EXISTING FIRE HYDRANT loll I M EXISTING TV PEDESTAL "IN PROPOSED FIRE HYDRANT ITPI EXISTING TELEPHONE PEDESTAL *—$"WW — — EXISTING WASTEWATER SYSTEM 4"G EXISTING GAS LINE (I ( 0 Q-- 24 "SD— — EXISTING STORM, DRAINAGE SYSTEM EXISTING GAS VALVE EXISTING CLEANOUT EXISnNG CATCH BASIN EXISTING TREE OHE EXISTING OVERHEAD ELECTRIC SW 1 1=20* FOUND MONUMENTS 20 0 20' 40 C> CL CL C.> Z cr_ CD V) GENERAL NOTES: 1. LOCATION OF UTILITIES AS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL HAVE SERVICING UTILITIES FIELD LOCATE UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR SHALL FOLLOW ALL REQUIREMENTS OF OAR 952-001-0010 THROUGH 952-001-0090. ONE CALL PHONE NUMBER 811. 2. CONSTRUCTION OF ALL PRIVATE SEWERS SHALL COMPLY WITH THE CURRENT OREGON STATE PLUMBING CODES, THE LOCAL AUTHORITY AND AS SPECIFIED HERON. SEWER AND MANHOLE TESTING SHALL COMPLY WITH THE CURRENT OREGON STATE PLUMBING SPECIALTY CODES AND THE LOCAL AUTHORITY. I THE CONTRACTOR SHALL OVEREXCAVATE ALL AREAS WHERE SUBBASE COMPACTION DOES NOT MEET THE REQUIRED STANDARD SPECIFICATIONS, AS DETERMINED BY FIELD INSPECTION AND TESTING. THE CONTRACTOR SHALL OVEREXCAVATE AT 6" BELOW SUBGRADE, LAY APPROVED GEOTEXTILE FABRIC AND COMPACT GRANULAR 'BACKFILL MATERIAL CONTRACTOR SHALL COORDINATE ALLANSPECTION AND TESTING WITH THE PROJECT GEOTECHNICAL PROFESSIONAL 4. PROVIDE SHORING OF ALL TRENCHES AS REQUIRED BY FEDERAL, STATE AND LOCAL AUTHORITIES. 5. WHERE CONNECTING TO AN EXISTING PIPE, THE CONTRACTOR SHALL EXPOSE EXISTING PIPE AND ALLOW THE ENGINEER TO VERIFY EXACT LOCATION AND ELEVATION PRIOR TO LAYING NEW PIPE. 6. REQUESTS BY THE CONTRACTOR FOR CHANGES TO THE PLANS MUST BE APPROVED BY THE CONSULTING ENGINEER AND THE OWNER BEFORE THE CHANGES ARE IMPLEMENTED 7. THE CONTRACTOR SHALL EMPLOY CONSTRUCTION PRACTICES WHICH WILL MINIMIZE THE EROSION OF DISTURBED ' GROUND DURING THE CONSTRUCTION ACTIVITY. THE PRACTICES SHALL COMPLY WITH THE OREGON DEPARTMENT OF ENVIRONMENTAL QUALITY NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM PERMIT. PURSUANT TO ORS 468.740 AND THE FEDERAL CLEAN WATER ACT. 8. WHEN PERFORMING EXCAVATIONS, THE CONTRACTOR SHALL COMPLY WITH THE 'PROVISIONS OF OAR 952-001-0010 TO 952-001-0090, WHICH INCLUDE REQUIREMENTS T14AT THE CONTRACTOR HAND-EXPOSE (POT-HOLE) UNDERGROUND FACILITIES AND USE REASOWL, CARE TO AVOID DAMAGING THEM. 9. PROVIDE DUST CONTROL AT ALL TIMES. SITE DATA TOTAL SITE AREA = 39,711 SQ. FT. (0.91 AC) - -_ TOTAL DEVELOPMENT AREA = 21,224 SO. FT. (0.49 AC) (PHASE 1) LANDSCAPE AREA = 3,763 SQ. FT. (17.727*) IMPERVIOUS AREA = 8,175 SQ. FT. (38.5370 STORAGE- UNIT AREA = 9,286 SQ. FT. (43.750 PARKING: NOT PROPOSED BICYCLE PARKING: NOT PROPOSED I cco o 4"!`  O cd  o  C) Q  -0 rwW4 c) CN c> C*4 LO 0 94. m m 8 bb P ca A Vl z m cq 2) rn I 'C'4 , W c 0 o W E -0 ---) (D cn c: cb a ci :;:  r Ej 4a:w o LO (a 00 ck: a- = u- 0 cn 0- 0 ui w mas cco o 4"!`  O cd  o  C) Q  -0 rwW4 c) CN c> C*4 LO 0 94. m m 8 SHEET C3 of 7 PRE-SUBMITTAL RECD FEB - 9 201Z 014 C44 Vl z m 0 ---) ui SHEET C3 of 7 PRE-SUBMITTAL RECD FEB - 9 201Z G STREET, EXISTING FIRE WDRANWT 36.00 ROADWAY OVO 57.00 R/W P u i   Rp w 1  81 UTLINE  N w W 9 9.0 o Tc l Cl o6 00 57 468.6 -j EX TC \ cn  ~ I  C4 III ,NE P Italia W GI ICI TL 11606 i d I  -I ITT 50 goo 1e F IIEXISTING BUILDING — IL_II i' 'i EXISTING BUILDING SW: 1 =20' 20 0 20-v GRADING LEGEND PROPOSED FLOW DIRECTION S=0.507* PROPOSED SLOPE AC ASPHALT ELEVATION BW BACK OF WALK EX TC EXISTING TOP OF CURB FLS FLOW LINE OF SWALE FIG TOP OF FOOTING TVG TOP OF VALLEY GUTTER ck: VG VALLEY GUTTER ELEVATION cr- CUT = 721 CU. YD. FILL = 690 CU. YD. > CONSTRUCTION NOTES Q. 2. CONST VALLEY GUTTER PER DETAIL REFER TO .7, 1 SHEET C6. rvop 15. CONST 3" AC OVER W CRUSHED ROCK. LLJ 43.1 CONST CONCRETE FOOTING PER DETAIL REFER TO -T SHEET C7. 1-- 44. FLATTEN FINAL 3, OF VALLEY GUTTER TO MATCH. Mw 57. CONST DRIVEWAY APPROACH PER CITY OF SPRINGFIELD STD. DWG 3-22. V) 81. SAW CUT AND REMOVE EXISTING CONCRETE TO CUT LINE. 82. REPLACE CURB & SIDEWALK PER CITY OF SPRINGFIELD STD. DWG 3-7 & 3-12. 105. CONST STD. 6' HIGH CEDAR FENCE. 106. CONST STD. 6' HIGH CHAIN LINK FENCE. 107. CONST STD. CHAIN LINK GATE. NOTE: 1. MATERIAL UNDER FOOTINGS TO BE PLACED AND COMPACTED TO A DRY DENSITY EQUAL TO OR EXCEEDING 957* OF MAXIMUM AS DETERMINED BY ASTM D698. LEGEND mwmmmm P EXISTING IV, PHONE 16"W EXISTING WATER LINE w EXISTING WATER METER EXISTING WATER VALVE EXISTING FIRE HYDRANT (I 4 of q pay-5 cc vuN 0 :>4 CD 0 A Cie C& E ol P, r.) 0 al -r-d- U-) Q C.4 Q) cd n* E w c'4 I cuo" o t nd" w > coa =8 6 f")0 Cal cd 0 9! > > uo bn "Z2 rm4 cd o W rm4 *-8VW — EXISTING WASTEWATER SYSTEM @-24"SD — EXISTING STORM DRAINAGE SYSTEM EXISTING CLEANOUT EXISTING CATCH BASIN PROPOSED AREA DRAIN OHE EXISTING OVERHEAD ELECTRIC EXISTING POWER POLE EXISTING POWER POLE W/ TRANSFORMER EXISTING GUY WIRE EXISTING STREET LIGHT EXISTING TV PEDESTAL nP EXISTING TELEPHONE PEDESTAL 4!'G EXISTING GAS LINE Kll EXISTING GAS VALVE 4 of q pay-5 co co t ux, cc vuN 0 :>4 CD 0 A Cie C& E ol P, r.) 0 al -r-d- U-) Q C.4 Q) cd n* E w c'4 I cuo" o t nd" w > coa =8 6 f")0 Cal cd co co t ux, SHEET C4 of 7 I M RECD 201Z C) CD T- Q) cd Lo cd 0 9! > > uo bn "Z2 rm4 cd o W rm4 SHEET C4 of 7 I M RECD 201Z C) CD T- Lo 0 > > uo SHEET C4 of 7 I M RECD 201Z Ile Al w low G STREET C> EXISTING  FIRE HYDRANT  y pl I w it 36.00' p O  ROADWAY I I III  W I I I I LEGEND p — EXISTING N, PHONE QC EXISTING ClEANOUf II I 16"W— EXISTING WATER LINE EXISTING CATCH BASIN W EXISTING WATER METER —OHE — EXISTING OVERHEAD ELECTRIC EXISTING WATER VALVE EXISTING POWER POLE dN EXISTING FIRE HYDRANT + EXISTING POWER POLE W/TRANSFORMER PROPOSED FIRE HYDRANT  EXISTING GUY WIRE II `` -8"WW — — EXISTING WASTEWATER SYSTEM -o EXISTING STREET LIGHT C-24"SD — — EXISTING STORM DRAINAGE SYSTEM Q EXISTING N PEDESTAL (D- - -8 "ST PROPOSED STORM DRAINAGE SYSTEM EXISTING TELEPHONE PEDESTAL II ( 0 PROPOSED AREA GRAIN 4 "G — EXISTING GAS LINE EXISTING GAS VALVE -oil II i III " GI II III# I  III I — TL 11606 T  1NI I  III j I iii FL SWALE= 468.74 cn rea EXISTING BONDING EXISTING tl q o  BUILDING L i 1 i Z a w O V) (D ST CONSTRUCTION NOTES 409. CONNECT TO EXISTING PIPE SEE NOTE 1. 410. CONST 8" KORE -N --TEE. 411. CONST CONTROL FLOW AREA DRAIN AS PER DETAIL. REFER TO SHEET C6. 412. PLUG END OF PIPE AND MARK WITH 2X4 MARKER PAINTED GREEN. 443. CONST GRASSY SWALE AS PER DETAIL. REFER TO SHEET C6. 444. CONST 3" ROUND ROCK SPLASH PAD. 445. CONST CHECK DAM PER DETAIL. REFER TO SHEET C6. 450. CONST STD. CLEANOUT WITH CAST IRON LID. 476. CONST 4" SOCK WRAPPED D3034 PERFORATED PIPE WITH RUBBER GASKET JOINTS. 477. CONST 4" STORM DRAIN PIPE, HDPE WITH RUBBER GASKET JOINTS AND TRACER WIRE. 478. CONST 6" STORM DRAIN PIPE, HDPE WITH RUBBER GASKET JOINTS AND TRACER WIRE. 479. CONST 8" STORM DRAIN PIPE, HDPE WITH RUBBER GASKET JOINTS AND TRACER WIRE. NOTE: 1. CONTRACTOR SHALL POTHOLE EXISTING STORM DRAINAGE PIPE, IN COORDINATION WITH THE PROJECT ENGINEER, AND VERIFY FLOW LINE ELEVATION PRIOR TO CONSTRUCTION. ( )# PATER CONSTSUCTION NOTES 502. CONST 6" C900 CLASS _DR-18 FIRE LINE W/TONE WIRE. 509. CONNECT TO EXISTING WATER MAIN. 529. CONST 6" GATE VALVE FLG X MJ WITH RETAINER GLANDS. 532. CONST 16" MJ X 6" FLG X 16" MJ TEE WITH RETAINER GLANDS. 535. CONST STD. FIRE HYDRANT. NOTES: 1. LOCATION OF UTILITIES ON SITE ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY PRIOR TO CONSTRUCTION. ONE CALL #811. 2. CONTRACTOR SHALL COORDINATE TAPS TO CITY WATER MAIN WITH SPRINGFIELD UTILITY BOARD. 3. SEE SHEET C6 FOR THRUST BLOCKING DETAILS FOR WATER SYSTEM. # CONSTRUCTION NOTES 16. REPLACE AC PAVING MATCH EXISTING STRUCTURE MINIMUM 4" AC. 83. SAW CUT AND REMOVE EXISTING AC TO CUT LINE. fs 0 C pyt> ca bM CU Cu .A u PEI CA N C> PC) o C> to u w !! 1 . I —, R 0 0 obi O o ar o w Cd W a 00 m c2:5 H W W W a- M A W S bp N .-- w !! 1  0 obi O Cd W a O H W W m A W ama M A W S bp cd 0 fn o  cc N .-- w !! 1 59 A W a W H W W m A W ama M A W S SHEET C5 of 7 PRE-SUS-Mlift KCC'D w • SHEET C5 of 7 PRE-SUS-Mlift KCC'D w BEARING AREA OF THRUST BLOCKS IN SQ. FT. FITTING SIZE TEE, WYE AND HYDRANT STRADDLE BLOCK 90' BEND PLUGGED CROSS TEE PLUGGED ON RUN 45° BEND 22  BEND 11y4 BEND 4 1.3 1.6 1.8 1.0 8 4.0 6 2.8 3.7 4.0 2.2 1.1 12 8 5.0 6.5 7.1 3.8 2.0 1.0 10 7.9 10.2 11.1 6.0 3.1 1.5 12 11.3 14.7 16.0 8.7 4.4 2.2 16 20.1 26.1 28.4 75.4 7.8 3.9 20 31.4 40.8 44.4 24.0 12.3 6.2 24 45.2 1 58.8 j 64.0 34.6 17.7 8.9 VALUES BASED ON 200 PSI WATER PRESSURE & 2,000 PSF SOIL BEARING CAPACITY. TABLE No. 1 HORIZONTAL BLOCKING THRUST BLOCK VOLUMES IN CU. YDS. FITTING SIZE 45' BEND 22 ) BEND 11y BEND 4 1.1 0.4 0.2 6 2.7 1.0 0.4 8 4.0 1.5 0.6 10 6.0 2.3 0.9 12 8.5 3.2 1.3 14 11.5 4.3 1.8 16 14.8 1 5.6 2.3 TABLE No. 2 VERTICAL BLOCKING ,FITTING SIZE ROD SIZE EMBEDMENT 12" & LESS #6 30" 14" -- 16" #8 36" TABLE No. 3 REINFORCING HORIZONTAL TEE xk VERTICAL TEE STRADDLE BLOCK THRUST BLOCK DETAILS 1. NTS KEYED NOTES /` 3 " ASPHALT PAVING- 3" C MIX SINGLE LIFT 12 (MIN.) CLEAN, GRADED AND ! COMPACTED STONE (NO SLAG). 3 FABRIC UNDER ROADWAY (L.INQ GTF OR EQUIVALENT'.) IF REQUIRED DUE TO SOFT SPOTS. 4 WELL - DRAINED SUB -GRADE (SUB -GRADE TO MODIFIED 95 PROCTOR MIN. COMPACTION). APPROVED BY GEOTECHNICAL . PROFESSIONAL. PAVEMENT SECTION DETAIL NTS // \ //\ HORIZONTAL CROSS OM OF Ilk VERTICAL CROSS HORIZONTAL WYE VERTICAL BEND 8.00' 1' 9" 6" PIPE TO STORM DRAINAGE SYSTEM Sm GRATE 1.5" ORIFICE -- 6" STAND PIPE ELBOW CONTROL FLOC AREA DRAIN DETAIL NTS SURFACE AS PER PLANS Il [Jul I UM A u•i%0: 1. SWAL.E SHALL BE FINELY GRADED AND GRASSY SWALE CROSS SECTION SEEDED. REFER TO PLANTING PLAN. NTS 2. INSTALL CHECK DAMS AT 25' INTERVALS IN GRASSY SWAL.E PER DETAIL.. 7° THICK CONCRETE PAVEkIENf 3500 PSI FIELD STRENGTH BASE ROCK AS PER PLANS CONCRETE VALLEY GUTTER NTS m 6.50' x fi 2.00' A 3 ROUND ROCK BOTTOM t° CHECK DAM DETAIL NTS STANDARD STEEL FRAME & COVER GROUND LEVEL MECHANICAL PLUG t NOTE: SECTION TO BE POURED " SO THAT A MINIMUM COVER OF 4 EXISTS ON ALL SURFACES OF PIPE. -- 4"MIN eMIN ' • = PIPE TYPE AND SIZE • .... • ... AS PER PLANS. :: -. • ' :. ' ... DaRA LENGTH TO EXTEND ' • •'= :: ; ::: BELL BEYOND CONCRETE ..... ..... • ... . ..... .... MECHANICAL PLUG NI • • • •f • • . • • .• • • • • • •. • • • • • , • s •• • • • • CLEAN OTT DETAIL N.T.S. C,4 w W w rw o 3 P rn • A    o  Q W a23 co r ° n a O c,4 m I M _O W b CIO T AR pR O 8 Or ZW  CL C,4 w rw o W 7t  a. w C,4  0 obi O _O W b ; AR pR O 8 o   p  N C,4 _O W b ; AR pR Q4 W 8 40.0' DRAIN PIPE TO STORM SYSTEM %.pVflVnLlL CONTAINER RHMNAGE REAR VIEW NTS 14.0 40.0' CONTAINER DRAINAGE SIDE VIEW NONNI Iffs L J Z 5 WI %rfw%p"w DRAIN PIPE TO STORM SYSTEM ow PLACE CONTAINER FOOT AC PAVING PAD ON CENTER OF PER PLAN FOOTING SLOPE VARIES ............. 0.-507* SLOPE FOR ID I GE 4" SOCK WRAPPED "k Vr PVC PERFORATED DRAIN PIPE BASE ROCK 1" ROUND ROCK PER PLAN IN FILTER FABRIC DRAIN TO PROPOSED LINED 8"X8 TRENCH. STORM SYSTEM LINQ1 25EX OR EQUIVALENT. FOOTING DETAIL NTS lwx_. FOOTING -DRAINAGE DETAIL NTS STEEL CONTAINER CONT. CONC. FTG.t 24' x 12' W/ (2) #5 CONT. REBAR TOP & BOT. W/ #5 LAT. BARS @ 16' O.C. 12' CRUSHED ROCK BASE - COMPACTED TO 95% DENSITY z 9 In bm 0 co PA at Lo Q vul) 00 c%j r-_ CNI v i Q) 0) vj *E H-- a U-y 0 C> op E V_ 0 cm C) w o a: Lo Ca C.D -, -6  c>= com 0 W) CL cn cd z 9 In C4 co P z 9 In Lo Q) V_ Z 0 O o   cd z 9 In Lo V_ Z 0 z 9 In GENERAL SITE INFORMATION 1. TYPE OF DEVELOPMENT: INDUSTRIAL WITH PRIVATELY OWNED AND MAINTAINED DRIVEWAY AND STORM DRAINAGE SYSTEMS. 2. CONSTRUCTION ACTIVITY WILL CONSIST OF: - PRIVATE DRIVEWAY, ASPHALT PAVING, AND STORM DRAINAGE SYSTEM -- PUBLIC WATER SYSTEM. 3. PROPOSED CONSTRUCTION SCHEDULE: BEGINNING DATE: MAY 2012 COMPLE11ON DATE: OCTOBER 2012 4. DEVELOPMENT AREAS TOTAL AREA: 0.91 ACRES PERCENT OF SITE DISTURBED = 57% CUT = 721 CU. YD. FILL = 690 CU. YD. 5. SOIL TYPE IS #32 COBURG- URBAN LAND COMPLEX, AS MAPPED AND SPECIFIED IN THE SOILS SURVEY OF LANE COUNTY. CD CONSTRUCTION NOTES 175. CONSTRUCT CRUSHED ROCK ACCESS PAD. PROVIDE 6" MINIMUM DEPTH 2 "--3" CRUSHED ROCK COMPACTED TO 907 MAXIMUM DENSITY. PAD SHALL BE 15' MIN WIDTH BY 100' LONG. 176. CONST SEDIMENTATION CONTROL SILT FENCING PER DETAIL. 177. INSTALL BIO --BAGS AT CATCH BASIN OPENING, PLACE BALES TO AS PER DETAIL. SUPPORT POST 10' O.C. - 2 x 2"X 5' DOUGLAS FIR OR APPROVED EQUAL STAKE PLASTIC 01' O.C.- TO GROUND TO ENCLOSE WASHOUT NOTE: WASHOUT SHALL BE CLEANED AND REPAIRED AS NECESSARY TO PROTECT AGAINST SPILLS AND LEAKS. SAND BAGS STACKED 2' HIGH. LINE WASHO' WITH THREE LAYERS MI 10 MIL. PLASTIC TO COMPLETELY ENCLOSE WASHOUT THREE LAYERS MIN. 10 MIL. PLASTIC cv CONCRETE WASHOUT DETAIL SEDIMENTATION CONTROL FABRIC, AMOCO 2122 OR APPROVED EQUAL. N.T.S. CATCH BASIN INLET PROTECTION DETAIL NTS J Ui MIN :DIMENTATION DAM r r, r  . INSURE POST IS STABLE AND SECURE FABRIC TO POST WITH TIE 178. CONSTRUCT CONCRETE WASHOUT AREA, CAN SUPPORT FENCE. OF WIRE AT POST. TOP' CENTER, AND BOTTOM EXIMM ME MW DISTURBED GROUND DUE TO 0 LEGEND ONSITE CONSTRUCTION. EXISTING CATCH BASIN W /PROTECTION PROTECTED _... 6  PROPOSED AREA DRAIN DOWNSTREAM 36.00' OADWA . --- -- -- EXISTING CONTOURS Z BACKFILL BOTTOM 6" OF FABRIC WITH 'Q 57.00 57 U EXISTING DRAINAGE PATTERN TOPSOIL a' NATIVE TOPS 1 MINIMIZE DISTURBANCE , RAW PROPOSED DRAINAGE PATTERN OF SILT DURING REMOVAL OF FENCE. -- /rn SEDIMENTATION CONTROL - FABRIC _ PE SILT FENCE ESOP CONSTRUCTION NOTES. NTS - . La 1 2 1. Prior to any ground disturbance on the site one inspection with LDAP staff required. Issuance of this plan does not relieve the permit n is w holder and or the contractor from all other ' ' e permitting requirements. Prior to beginning construction activities all other shall be obtained. 9 9  necessary approvals F 2. The erosion and sediment control measures shown on the plan 'are are the minimum requirements for ' ' conditions. =c _ • P q anticipated site During the construction period, these measures shall be upgraded as needed for unexpected storm events and to ensure that sediment and co . sediment —laden water does not leave the site. C4 3. The implementation of the ESCP and the construction, maintenance, replacement, and upgrading of the erosion and sediment control I measures is the responsibility of the permit holder and or the contractor until all construction is completed and accepted and vegetation / landscaping is established. 4. The boundaries of the clearing limits shown on this plan shall b clearly flogged . .9 p e e y in the .field by the engineer prior to construction. During the construction period, no disturbance beyond the flagged clearing limits shall be permitted. The flagging shall be maintained by the permit holder and or the contractor for the duration of construction. 5. The erosion and sediment control measures on active sites shall be inspected and maintained daily and, within the 24 hours after any 1 storm event of greater than 0.5 inches of rain per 24 hour period. Measures shall be inspected by the permit holder and or the contractor after each rainfall and at least daily during prolonged rainfall. Any required repairs or adjustments shall be made immediately. L q P 1 The erosion and sediment control measures on inactive sites shall be inspected a minimum of once every two (2) weeks or within 48 hours following a storm event. 6. All erosion and sediment control measures shall be protected from damage p am ge at all times. Control measures shall remain in lace until . .. P permanent re— vegetation has been stabilized. Any measure that is damaged or destroyed shall be repaired or replaced immediately. 7. Any areas of 'exposed soils, including roadway embankments, that will not be disturbed for two days during the wet season (October 1 to April 30) or seven days during the dry season (May 1 to September 34) shall be immediately stabilized with an approved ESC method (seeding & mulching with straw, bark, compost, or plastic covering, etc. ). 177 8. Street sweeping shall be performed as needed or when directed by the City inspector to ensure public right —of —ways are kept clean and free of debris. Street flushing is prohibited. TL 11606 9. When trucking saturated soils from the site, either water —tight trucks shall be used or loads shall be drained on site until dripping has been reduced to no more than one gallon per hour. Sediment .laden water will not be allowed to enter the storm water system 10. Extracted ground water from excavated trenches shall be disposed of in o suitable manner without damage to adjacent property, City. s storm water system, water features, and related natural resources. Approval of a dewatering system does not guarantee that it will meet compliance or, be acceptable for use in all situations. Modifications to the dewatedrig system will be required if compliance can not be met. At no time will sediment laden water be allowed to leave the construction site. 11. A supply of materials necessary to meet compliance and implement the LDAP or other best management erosion practices under all In fi I weather conditions shall be maintained at all times on the construction site, 12. No hazardous substances, such as paints, thinners, fuels and other chemicals shall be released unto the site, adjacent properties, or into water features, the City's storm water system, or related natural resources. 13. The ESC facilities ' shall, be inspected daily be the contractor and maintained to ensure continued proper functioning. Written records shall be kept of weekly reviews of the ESC facilities during the wet season (October 1 to April 30) and of monthly reviews during the dry season (May1 to September 30 ). rls\ rl\ 0oo F =__i 6 L J VICINITY MAP al tr Q Q c,¢ w z H O A a w v. as a) W cr .4-3 4  a  °o crn CD m "I' 'E  O r:4 Cn -o Cd a Ch w , o v1 r--' -i W W = 8 0 a. c z H O A a w cr 4 W W z H O A a w cis  o N  O Cd a v1 a W W W c Cd w bk Owl.. qz z H O A a w a a W W W w Owl.. SHEET EC 1 of 1 PRE-SUBMINAL RECD 6 q C=.S FEB °° 9 2012 u i I II II  II II IIII i)CK --s IIco T11 wl  II 1 i f i bu I I um GRASSY SWALE CROSS SECTION NTS l l u 'rilsa: 1. SWALE SHALT. BE FINELY GRADED AND SEEDED. 2. INSTALL CHECK DAMS AT 25' INTERVALS IN GRASSY SWALE PER DETAIL. r N t- 6.50' Q C7 ci GY_ U U. C..) Q CL W 1-- C7 BOTTOM CHECK DAM DETAIL NTS N SCALD 1 1=20 20 Q 20 ' 4Q' PLANT LIST 0 SMOL QTY. BOTANICAL NAME SIZE SPACING TREES COMMON NAME CK 8 Cornus kousa 2" Cal. As Shown Kousa Dogwood asV.,p SHRUBS :5 - RV 8 Ribes viburnifoiium 5 Gal. 5' o.c. U Catalina Perfume Evergreen Currant GROUNDCOVER C5 C n, oar, LAWN 4,747 Seed Mix Sq.ft. 1/3 JI3 perennial rye 13 V) 4 o 1/3 Patriot 11 perennial rye L v In C3 C: 0) U 1/3 Evening Shade perennial rye LO CDO xX PLANTING AREA NOTE: L:3SdI .4iiWCL LA_ 1 W 1. The lawn area shown above includes that section within the public right --of—way. The total planting area on site is 3,763 sq. ft. We are providing 2 trees per 1,000 sq. ft. for a. total of 7 trees on site and 1 Street Tree, NOTES: 1. Automatic underground irrigation system is not proposed for the site. Owner shall hand water until plants are established. 2. Because of construction compaction of soil, completely clean area of construction debris and heavily j amend shrub .beds with a three t( six *,nch layer of compost. Till entire area to a depth of 12". I 3. Special care should be taken before planting trees. Excavate area to a depth of 24" and twice the size of the root ball. Heavily amend site with compost. 4. Swale areas should be clearly marked before site work begins to avoid soil disturbance and compaction during construction. No vehicular traffic, except that specifically used to construct the facility, should be allowed within 10 feet of Swale areas. 5. After swale areas are cleared and graded, all disturbed subsoil shall be tilled before capping with 18" of topsoil. if existing areas surrounding the stormwater facility are disturbed by construction, the top 18" of shall be tilled. After tilling is completed, no other construction traffic shall be allowed in the , area, except for planting and related work. 6. Apply seed for lawn areas at rate specified by manufacturer. 7. Contractor is responsible for maintaining seeded area until established. 8. Reseed any areas that fail. 9. Use only shrubs and varieties, as indicated on plan. Changes must be approved by designer. 10. Purchase healthy material at minimum sizes indicated on plan. 11. Placement of shrubs and trees should match design as closely as possible. Minor adjustments in plant spacing is acceptable. 12. Plant quantity should be based on planting plan, not plant list. 13. Designer is not responsible for plant failure. 14. Provide 3" of shredded bark mulch over planting beds. 3" ROUND ROCK FEB 201Z Orr Affi'' U.L *04 ca THE DOCUMENT AND THE IDEAS AND DESIGNS INCORPORATED HEREIN ARE THE PROPERTY OF RUDD HANSEN, ARCHITECT, LLC, AND IS NOT TO BE USED, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF RODD HANSEN, ARCHITECT, LLC N Q TITLE: 1 i P Q NIZ- 0 LJJ Lij I ---- -I I• ---t 1 JOB #: 1064.01,17.2012 DRAWN RH BY: ISSUE DATE: 2 -6 -2012 SCALE: 0 U d Q U asV.,p a :5 - ODD o W I,, *, U 44 r- ; o, C- 00 I C5 C n, oar, - L _P 0) C4 s. 13 V) 4 o _C 1% u -I- d L v In C3 C: 0) U LO CDO xX L:3SdI .4iiWCL LA_ 1 W 1 i P Q NIZ- 0 LJJ Lij I ---- -I I• ---t 1 JOB #: 1064.01,17.2012 DRAWN RH BY: ISSUE DATE: 2 -6 -2012 SCALE: