HomeMy WebLinkAboutPermit Electrical 1988-9-22
.. RESI~NTlAL"
. APPLICAYlON!PERMIT
225 North 5th Street
Springfield, Oregon 97477
Building Division
726-J75J
Job Loca.tion:
(""~"1 t;;) t-fCLO-r ----K=-=L
try 03 3s 3<} TczLotH
ASDBS80rs Map /J
Subdi vision:
C>7000
().mer: ~c..J<:-" .J:;;,~ n-t,-r~
Addzoess: f.o<l9 ~Lta-.,r.., 'k?d.
. I
City: ~:;/Y;-~i+:e/d"
n
n
n
n
Nm,I
PI-.one: 7</.7- ?'9-.3/
Zip: 97'177
Describe rl'ol"k:
Addi tion
6/e.drL~l .:f.e..r-VL'Ce..
.Ch~~
Remodel
.~1ob1. Le Homa
Date of Application
Contractors
.'7-o:?=< -~
Value
Address
Rcceopt ~ /2.3 q_S
. ~ {)/L--
~I./S-:I
it/I
Signed:
Dato:
qlW
d-G<~
q-~-~
Lise. II
ExoirCB
PhonQ
General.
Plwnbing
Electrical C'"X.Un e..r-
Mec1tar.ic.:zl
Construction Lender
It ia tlls roesponoibility of ths permit holder to 8S6 that aZZ inopections are r.-.ade at the proper tim~.. that each ~88B is l'eadabZi"
fl'Om ths street, and that the permi t aard is tocated at the f1'011t of the property.
4Bui!ding D{,vicion approved plan shalt remain on the BuiZding Sits at all times.
PROCEDURE FOR INSPEc:rON RE:OUEST:CALL 726-3769 (recorder) state your City designa.ted job number, job address, type of in,3poc.;icn
1'r:zqucstcd ar.d when you wi7.l be ready for inspection, Contractors or Owner's ncme and phone number. Requests received beforB '1:00 t::l
:..>iZ'L be made the same day, requests made after '1:00 am will be made the nczt :.>orkirl9 day.
Reauiroed Insvecticn.q _.
D SITE INSPECTION: To be lrk'lde after
excavation, but prior to set up of
forms.
O UNDERSLAB PLUMBING. ELECTRICAL &
MECHANICAL: To be made before any
work is covcl'ed.
o
FOOTING & FOUNDATION: To be lrk'lde
after trenches are excavated and
forms are e1'ected, bu t prior to
pouring ccncret~.
UNDERGROUND PLUMBING, SEWER, W.4TER.
DRAINAGE: To be rmde prio]'> to fi 7.-
Ur.g trenches.
o
o
o
UNDERFLOOR PLUI.'BING & MECHANICAL:
To bo made prior to in3tallation of
fLoor insulation 01' decking.
POST AND BEAM: To be made prio1' to
insta7.7.ation of flool' instolation or
decki1'l{; .
ROUCH PLUMBING, Er.ECTRICAL & MECH-
ANICAL: No work is to be cOL'ored
.ur.ti~ thcse inspections have beer;
made and approved.
FIRF:PLACE: Prior to pk:cirofl facing
materials and before framing inspec-
tior..
FRAMING: Must be requeoted after
approval of rough plwr.bing, electn-
cal & mechanical. All roOfing
bracing & chimneys, eta. lTT'.lst be
. completed. llo work is to be con-
"'" cealed until thio inspection has
.be~n made and approved.
o
o
o
Your City Deoigr.ated Job Number Io:
U INSULATION/VAPOR BARRIER INSPECTION:
To be made after all insulation ar.d
.. required vapor bG:lTiers are in place
. . but before any lath, gypsum board or
wU covering is applied, and before
any i7WuZation is conceaZed.
O DRYWALL INSPECTION: To be made
after- all dryIJall is in place,
but prior to any taping. .
O MASONRY: Steel location, bona
beCIm3, grou ting or vertica ls in
accor-dance with U.B.C. Section
2415.
D WOODSTOVE.: After installation is
ccmp7.eted.
o
CURB & APPROACH APRON: Aftel" forms
are crected but prior to pouring
COn..:::1'8te.
O SIDEWALK & DRIVEWAY: For all con-
crete paving within street right-
pf-ux:.y, to be mads after aU exca-
vating ccmplete & foP.'n wrk & sub-
base roo.terial in p~e.
O PENCE: When cO;71pl-ote -- Provide
gates or movable sections through
P.U.E. .
D
88084-8
I DEMOLITION OR NOVED BUILDIilCS
~ Sani tary Se'.J6r capped at p~opcrt':t' lir:e
~ Septic tank 1T~ed and fille~ with gra~BZ
::J Pinal - Ifiten above iteo"fls are completed
ar.d when demolition is complete or struc-
twos moved and premises cleaned up.
Mobi le Hcmes
::J Blocking and Sat-up
::J Plumbing connections -- BDWer and water
::J Electrical Connection - Blocking, 8st-up
and plwnbing conr.sction8 17l"wlSt bo approved
boforc requesting electrical inspec.;ion
::J Accesso1"'d Building
::J Pinal - After- porcr.ss, skirting, docks,
etc. are completed.
o
All project conditions, sucr. as the installation of street trees, c~~lotion of the
requiroed landscaping, etc., must be satisfied befol'e the BUILDINC FINAL can be l'squost3d.
o FIliAL PLUMBING
o FINAL ME~HANICAL
o FINAL ELECTRICAL
o ~CA.
o
FINAL BUILDINC: The Final Building Inspection must be roqueoted after> tho Final Plwnbing
Electrical, and Mechar:ical Inspectiono havo been made and approvad.
:!tALL MANHOLES AND CLEANOUTS HUST BE ACCESSIBLE, ADJUST!tENT TO BE MADE AT NO COST TO CITY I Page 1 of 2
rc.ge .:::
-~
L-COG-{<
Zone:
SOLAR AC.CESS REQ,~
OacurxzncIl e4
WT TYPE
Type/Cor.st: .
JOB NO,
Lot Sq. Ft{;.
I of lot Coverago
#- of Stories
Total Height
I Topography
lITEM
lJ.bin
I Garace
I Car'DOrt
I AccessorIi
I
I
, SQ.FTG
TOTAL VAWE
IS.D.C.
evatuC)
1.5 "
Building Perrm.t
State Su:rcharge
Total Cha......ges
I ITEM NO.
I Fi.rture8
I Residential 11 bath)
I Sanitary Sel.Jer
I Water
I
Plumbing Pe=i t
State SU1'cr.arge
Total Charaes
I ITEM I NO'1
I Res. Sa. fta.
I New/Extend Circui ts I I
I Tempo"ary Se1"Vioe I I
~c... (l JzClA<..&i C- I I
.
Electrical Permit
State Surcharae
Total CJ1moaes
lITEM
I Furnace ETU' S
I Exhaus t Hood
I NO'1
I I
I I
I I
I I
Vent Fan
WOodstoiJe
I
Permit I3suance
Mechanical Permi t
State Surcharae
'rotnl Chtrt'ons
-- ENCROACHMENT --
ISe~~ritIl DeD03it
I Storage
I Maintentl7lCe
Iperrm.t
1 Tota l ChaNos
Curbcut
Sidewalk
~r;tence
Elect"ical Label # I 5<,:;(.. ~
Mobile Home
TOTAL AMOUNT DUE,'
Interior
Corner
Panhandle
Cul-de-sac
X Va lue
FEE
,.
I
I
I
, .
)
I
I
I
I
I
I
l.
I
I
I
I
/5.c;O I_L./
I
,15 I
15.1~ ,.
I
I
I
I
I
I
CHARGE
FEE
CHARGE
I
FEE
CHARGE
I
I .;;;.0
I
I
I
1'5.95
I Lot Faces -
Bedrooms:
I Enerau Sources
I Heat
I Water ~~Qtpr
I I Range
1 I Fireplace
I I Wood,to.e
II
TOIDe
Setbacks
P. L. House CaPaqe Access.
North
east
SOl<th
West
Fees
Building Value & Permit
This permit is granted on the express condition that the sdid construction
shall, in all respects, conform to the Ordinance adopted by the City of
Springfield, including the Zoning C'rdinance, regulating the construation
and use of buiLdings, and may be sUDpended 01' revoked at cny time upon vio-
lation of any provisions of said Ordinances.
Iplan Check Fee:
Vat€] Paid:
!Recdpt #:
I Signed:
I,
I
,
Plumbing
Pe r m i t
No per80n Dhall construct, instal!, aLter 01' change any new or existing
pLumbing or drainage system in whole 01' in part, unless such person is the
legal possessor of a valid plumber's License, except tr~t a pe~son may do
plumbing work to property which is oumed, Leased or operated by the appU-
cant.
Electrical
Permit
Where State LaLJ requires t'fo~t the electrical work be done by an Electrical
Contractor, the electrical portion of this permit shall not be valid until
the label has been signed by the ElectriaaL Contractor.
Mechanical
Permit
, .
[
I
I
I
I.
PUIn Exam'tner
va.e
I HAVE CAREFULLY EXAMINED tks completed application fo" pernrit. and do
hereby certify that aLl info~tion hereon is true and correct, and I
further certify that any ar.d all work performed shall be done in accor-
dance with the Ordin::znces of the City of SpnngficZd, and th~ La:.:s of tha
State of Oregon p~rtaining to the work cesaribod herein, end that NO OCCU-
PANCY bJilL be TTrlde of any structure without permission of the Building Di-
vision. I further certify that only contractors ar~ empl~yees who are in
compLiance with ORS 701.055 will be used on this project
ed?
,
../
/-. f ,2Z,-ppr
Signad
Date
.