HomeMy WebLinkAboutPermit Building 2005-3-9
Status
Iss u ed
CITY OF SPRINGFIELD
Building/Combination Permit
PERMIT NO: COM2005-01358
ISSUED: 03/09/2006
APPLIED: 10/04/2005
EXPIRES: 11/30/2006
VALUE: $ 21,976,709.00
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
SITE ADDRESS: 3420 Baldy View Ln
ASSESSOR'S PARCEL NO.: 1703220001000
Springfield TYPE OF WORK: Commercial Miscellaneous
TYPE OF USE: New
PROJECT DESCRIPTION: Structural Fill for and Construction of Central Utility Plant
Commercial
Owner: PEACEHEAL TH
Address: PO BOX 1479
EUGENE OR 97440
Phone Number: 541-688-3828
I CONTRACTOR INFORMATION I
Contractor Type
Architect
General
Electrical
Mechanical
Plumbing
Contractor License
ANSHEN+ALLEN .. ~ ...: ::'";on Ia.w requires you to
TURNER CONSTRUCTION (].QMPA~Yhe Or6~988Utility
MORROW MEADOWS.CORRer. Those rUleS91'668et forth
HARDER MECHANIC1Hf(J0~\FRA0Tl.O;RS IJ7Wi 952-001-
.. - _, 0....::"_ .... .....
HARDER ME!l!J!.~NI(s\~h1(jJP~JlRiAc(;W~RS <IlfUle rules by
ca.J:j '-'suiioiNGiNFORWXTIONIJ11u,.'o
numuv, 'v, "'V .....' ~::1V" v ..k1'J . _" cation
CWltfstijr1e~PO-332-2344). 2
Height of Structure 30.90
Type of Heat:
Water Type:
Range Type:
Energy Path:
Sprinkled Building:
Expiration Date
11/09/2007
07/20/2007
04/10/2007
04/10/2007
Phone
415-882-9500
503 229-6000
503-399-7609
503-281-1112
503-281-1112
# of Units:
Primary Occupancy Group:
Secondary Occupancy Group:
Primary Construction Type
Secondary Construction Type:
# of Bedrooms:
Fl
F2
lIB
Lot Size:
Sq Ft 1st Floor: 26,911
Sq Ft 2nd Floor:
Sq Ft Basement:
Sq Ft Garage/Carport
Sq Ft Other:
Occupant Load: 114
Yes
Frontyard Setback:
Side 1 Setback:
Side 2 Setback:
Rearyard Setback:
Solar Setbacks:
I DEVELOPMENT INFORMA nON I
RK REQUIRED PARKING
\tGr~~~~i~r S\-\f\ll ~XPIRE \F iHE ~~Ol Total:
-~t~~~E1'lteel ~M6ER 1\115 PERMIi \ R Handicapped:
t~@"tY-e:R~: 5 f\Bf\NDONED fO Compact:
oelYw~?t~y-{fJg~l I D
O,N'{ "\ 80 Of\'{ PERIO .
I PUBLIC IMPROVEMENTS I
Street Improvements:
Storm Sewer Available:
Special Instruction:
Sidewalk Type:
Downspouts/Drains:
Notes:
Pal!e 1 of 3
Status
Issued
CITY OF SPRINGFIELD -
Building/Combination Permit
PERMIT NO: COM2005-01358
ISSUED: 03/09/2006
APPLIED: 10/0412005
EXPIRES: 11/30/2006
VALUE: $ 21,976,709.00
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
I Valuation Descriotion I
Estimate
Estimate
Estimate
Tvpe of Construction
Estimate
Estimate
Estimate
$ Per Sq Ft
or multiplier
$1.00
$1.00
$1.00
Square Footage
or Bid Amount
167,400.00
21,976,709.00
250,000.00
Value
Date Calculated
Description
Total Value of Project
$167,400.00
$21,976,709.00
$250,000.00
$22,394,109.00
10/04/2005
05/23/2006
03/06/2006
~
Fee Description Amount Paid Date Paid Receipt Number
+ 10% Administrative Fee $78.67 10/6/05 1200500000000001472
+ 7% State Surcharge $55.07 10/6/05 1200500000000001472
Plan Review Comm/Ind/Public $511.32 10/6/05 1200500000000001472
Site Work $786.65 10/6/05 1200500000000001472
+ 10% Administrative Fee $105.32 3/9/06 2200600000000000286
+ 8% State Surcharge $84.26 3/9/06 2200600000000000286
Building Permit $1,053.15 3/9/06 2200600000000000286
Plan Review Comm/Ind/Public $684.55 3/9/06 2200600000000000286
Plan Review Fire & Life Safety $421.26 3/9/06 2200600000000000286
*Electrical Permit $16,518.00 4/13/06 2200600000000000464
+ 10% Administrative Fee $1,651.80 4/13/06 2200600000000000464
+ 8% State Surcharge $1,321.44 4/13/06 2200600000000000464
-Mechanical Issuance Fee- $10.00 6/9/06 1200600000000000840
+ 10% Administrative Fee $98.00 6/9/06 1200600000000000840
+ 10% Administrative Fee $174.10 6/9/06 1200600000000000840
+ 10% Administrative Fee $7,166.59 6/9/06 1200600000000000840
+ 8% State Surcharge $78.40 6/9/06 1200600000000000840
+ 8% State Surcharge $139.28 6/9/06 1200600000000000840
+ 8% State Surcharge $5,733.28 6/9/06 1200600000000000840
Air Handling Unit 10,000 & Ovr $30.00 6/9/06 1200600000000000840
Air Handling Unit Up to 10,000 $88.00 6/9/06 1200600000000000840
Appliance Not Listed $630.00 6/9/06 1200600000000000840
Appliance Vent $90.00 6/9/06 1200600000000000840
Backflow Device $56.00 6/9/06 1200600000000000840
BoilerlComm Over 50 HP $675.00 6/9/06 1200600000000000840
Building Permit $71,665.90 6/9/06 1200600000000000840
Fixture $126.00 6/9/06 1200600000000000840
Furnace - more than 100,000 $15.00 6/9/06 1200600000000000840
Furnace - Unit Heater $144.00 6/9/06 1200600000000000840
Furnace - up to 100,000 btu $12.00 6/9/06 1200600000000000840
Gas Outlets 1-4 $4.00 6/9/06 1200600000000000840
Gas Outlets 4+ $5.00 6/9/06 1200600000000000840
Not Covered Plumbing $490.00 6/9/06 1200600000000000840
Plan Review CommlIndlPublic $46,582.84 6/9/06 1200600000000000840
Pal!e 2 of 3
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
Plan Review Fire & Life Safety
Plan Review Mechanical (25%)
Plan Review Plumbing (30%)
Sewage Ejector Pump
Trap or Waste not Conn to Fixt
Vent Fan
$28,666.36
$435.25
$294.00
$28.00
$280.00
$48.00
6/9/06
6/9/06
6/9/06
6/9/06
6/9/06
6/9/06
Total Amount Paid
$187,036.49
I Plan Reviews,
Structural Review
05/30/2006
WI
05/30/2006
CITY OF SPRINGFIELD -
Building/Combination Permit
PERMIT NO: COM2005-01358
ISSUED: 03/09/2006
APPLIED: 10/0412005
EXPIRES: 11/30/2006
VALUE: $ 21,976,709.00
1200600000000000840
1200600000000000840
1200600000000000840
1200600000000000840
1200600000000000840
1200600000000000840
AC
Waiting on information from Kaye
Wilson to complete permit fee
information. See attached
documents
To Request an inspection call the 24 hour recording at 726-3769. All inspection requested before 7:00 a.m.
will be made the same working day, inspections requested after 7:00 a.m. will be made the following work
day.
Reouired Insnections I
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all
information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with
the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and
that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety.
I further certify that only contractors and employees who are in compliance with ORS 701.005 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the
street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all
times during construction.
Ck
)LI~)
Owner or Contractor(Signature
Pal!e 3 of 3
6~-q. 0-(
Date
,.
,\
525 NW Second Street, Corvallis..Dregon 97330
tf 800.383.8B55 ph 541.758.1302 fx 541.753.2264
www.claircompany.coni
May 26, 2006
City of Springfield
Development Services Department
225 Fifth Street
Springfield, OR 97477
Attention:
David Puent, Building Official
Carole Knapel, RiverBend Project Manager
Subject:
Project:
CLAIR Project No.:
Building Permit No.:
Central Utilities Plant (CUP) Building - Complete I'. Back Check - Conditions of Approval
PeaceHealth at RiverBend - Sacred Heart Medical Center Project
] 14] -002-20
COM2005-01358
Clair Company, Inc. (CLAIR) has reviewed the submitted documents for the CUP Building for the PeaceHealth at RiverBend'
- Sacred Heart Medical Center Project on behalf of the City of Springfield (City). CLAIR recommends approval with
conditions of the associated pennit submittals for the Project.
CLAIR requests that the pennit applicant/designer respond in writing to each Condition of Approval item in the attached plan
review document by adding an applicant response row directly below the CLAIR review comment field and fill in the
indicated fields on the attached EXCEL2000 document along with submitting all necessary requested submittals.
If you have any questions or need clarifications regarding the infonnation we have provided or requested, please do not
hesitate to contact our office at (541) 758-1302 or by email ataclairla)c1aircomDanv.com.
Sincerely,
/] .2.
/)w/l/. /)
tr.:!; ~. /...ff.-..._
Allan Clair, eRO.
Project Manager
Cc:
Ashif Jahan, Anshen + Allen
AI Gerard, City of Springfield Fire Department
Chip Moulds,PeaceHealth
Terry Shugrue, Turner Construction
CLAIR Project File #1 ]4]-002-20
Attached:
#] - Codes and Standards
#2 - Submittal Log
#3 - Plan Review Document
PeaceHealth at RiverBend - Sacred Heart Medical Center Project
CUP Building -:- Complete ]" Back Check
Conditions of Approval
May 26, 2006.
Page: 2 of 3
A TT ACHMENT #1 - CODES AND STANDARDS
State of Oregon 2004 edition Oregon Structural Specialty Code (OSSC)
State of Oregon 2004 edition Oregon Mechanical Specialty Code (OMSC)
State of Oregon 2005 edition Oregon Plumbing Specialty Code (OPSC)
State of Oregon 2005 edition Oregon Electrical Specialty Code (OESC)
2004 City of Springfield Fire Code (SFC) based on the 2004 State of Oregon Fire Code (OFC)
ATTACHMENT #2 -SUBMITTAL LOG
Our plan review comments are based on the following submitted construction documents:
CUP Bid Package #2 -.Permit
Review - Specifications - Volume I
2/14/2006 2/1 0/2006 Anshen + Allen 1003 5 superseded of2 - Divisions 1 through 7. (cover
sheet says volume. I of 5, which is a
missprint)
CUP Bid Package #2 - Permit
Review - Specifications - Volume 2
2/14/2006 2/10/2006 Anshen + Allen 1004 5 superseded of 2 - Divisions 8 through 16. (cover
sheet says volume 2 of 5, which is a
missprint)
CUP Bid Package #2 - ConstruCtion
Documents - Progress Printing -
Drawings - Volume I of I - Scope
2/14/2006 2/10/20Q6 Anshen + Allen 1005 5 superseded including Architectural, Structural,
Mechanical, Plumbing, and
. Electrical. (not signed or stamped)
(3 full, 2 half received)
CUP - Structural Calculations -
2/1512006 2/1 0/2006 KPFF 1006 5 superseded dated February 10, 2006. (not signed
or stamped, for permit review)
State of Oregon Non-Residential
Energy Code Compliance forms
along with applicable worksheets for
3/21/06 3/21/06 GLUMAC 1008 5 n/a Mechanical and Building Envelope.
(I copy received electronically, not
official set) (Received 5 more hard
copies via delivery 3/27/06.)
CUP - Specifications - Volume One
of Three - Divisions I through 14.
4/26/06 4/18106 Anshen + Allen 1013 5 5/26106 IFC. (5 signed and stamped copies,
stamped pages included in 1st
volume, I wet set)
CUP - Specifications - Volume Two
of Three - Division 15. [Fe. (5
4/26/06 4/18/06 Anshen + Allen ]0]4 5 5/26/06 signed and stamped copies; stamped
pages included in 1st volume, I wet
set)
...'....~cLalr
.. . .
PeaceHealth at RiverBend - Sacred Heart Medical Center Project
. CUP Building - Complete 151 Back Check
Conditions of Approval
May 26, 2006
Page: 3 of 3
cup - Specifications - Volume
Three of Three - Division 16. IFC. (5
. 4/26/06 4/18/06 Anshen + Allen .1015 5 5/26/06 signed and stamped copies, stamped
pages included in I st volume, I wet
set)
Hazardous Material and Waste
Management Plan.- PeaceHealth
4/26/06 Anshen + Allen 1016 5 N/A RiverBend Sacred Heart Medical
Center (5 copies received) (response
to CLAIR comment #35 in 1st
review).
cup - Drawings - Volume One of
4/26/06 4/18/06 Anshen + Allen 1017 5 5/26/06 One - Bid Package #2 - IFe. (3 full
and 2 half signed and stamped
copies, including I wet set)
Sit.e Plan Modification (Parking
Garage Addition) dated 3/30/06 in
response to CLAIR's comment #32
5/1/06.. 3/30/06 Anshen + Allen 10]8 5 N/A of the CUP Plan Review. (These are
for informal use in plan review, not
valid construction documents) (5
half-sized sets received)
5/4/06 4/24/06 Anshen + Allen 10]9 N/A AE responses to I st plan review -
complete ~ for the CUP.
CUP Lighting Energy Budget - in
5/4/06 4/24/06 Anshen + Allen 1020 N/A response to 1 st plan review -
received e]ectronically, awaiting
formal submission.
City of Springfield
Anshen + Allen Architects
PeaceHealth at RiverBend
Sacred Heart Medical Center Project
Central Utility Plant (CUP) Bid Package 2
Building Permit: COM2005-01358
Occupan'cy Group(s):
Type of Construction:
StoriP.!l:
Heighqfeet):
F1,F2&H3
liB
2
30' 9"
Building Area (Sq, Ft.):
26,911 soft
Occupant Load:
.11i.persons
Sprinklpro;' Yes,
Alarm~'-' Yes
Fire W"li, No
Please respond in w~iii7,g' to each comment by creating a response row to each item, This plan review document is created in Microsoft EXCELuu, I::ach city comment is a whole number,
Your
response to each item will. be a x. 1 number. For example, City comment is Item 1,0, your response is Item 1,1, Each of your responses will be shown in bold face type, Indicate which
detail,
specification, or calculation shows the requested information, Responses such as "see plans" or "plans .comply" or citing a code section does not resolve a review comment or expedite
plan
approval. An explanation of how compliance with the code requirement is achieved and a reflection of that explanation in the construction document with the revisions clouded is our
expectation, Your complete and clear response will expedite the re-review and approval of this project, or deferred submittal. Thank you for your assistance,
City Comment Construction Response Status of
Item # City Comment From Document or Plan City Comment / Applicant Response Response From
Date Sheet and (Date) Date Item
-- CUP 1 ST PLAN REVIEW - ADMINISTRATIVE - FOUNDATION AND STRUCTURAL SHELL ONLY PHASE
Applicant shall;adhere to all Conditions of Approval provided by
3 CLAIR 3/20/2006 General the City Planning, Engineering, Public Works, Fire Department
II and other regulatory agencies,
3.1 I Concurred. IKPFF 3/31/2006
3,2 Il CLAIR 4/24/2006 General Response acceptable, Condition of
Approval
Special Inspection is required as noted in the Structural Notes on
Plan sheet S1.2C Sheet S1,2C, Submit the City of Springfield Special Inspection
4 CLAIR 3/20/2006 dated 2/10/06 Form listing the areas noted and signed by the owner with the
response package per OSSC Section 1704,
~ Special Inspection form submitted on 3/29/06. ;KPFF 3/31/2006
CLAIR 4/24/2006 Plan sheet S 1 ,2C Response acceptable, Special Inspection Form received, I Note to
4.2 dated 2/10/06 Inspector
'The deferred submittal items including the bidder designee:
stairs, equipment seismic attachment, masonry anchored veneer
Plan sheet S1.1C attachment and cladding attachment shall be revieWed by the
6 CLAIR 3/20/2006 design professional of record and forwarded to the City of
dated 2/10/06 Springfield with the notation that they are in general conformance
with the design of the building per OSSC Section 106.3.4.2.
~ Concurred. :KPFF 3/31/2006 I
CLAIR - 4/24/2006 Plan sheet S 1.1 C Response acceptable, awaiting future submission of deferred' Condition of
6,2 dated 2/10/06 submittal items. Approval
For questions call CLAIR at (!:l00) 383-8855
Page: 1 of 14
SHMC - CUP - Complete 1st Back Check - Conditions of Approval
May 26, 2006
CLAIR: 1141-002-20
City of Springfield
Anshen + Allen Architects
Peace Health at RiverBend
Sacred Heart Medical Center Project
Central Utility Plant (CUP) Bid Package 2
Item #
City Comment
Date
Construction
Document or Plan
Sheet and (Date)
Response From
City Comment From
City Comment / Applicant Response
. .
7
Plan sheet S 1.1 C
dated 2/10/06
The grading and fill on the project has been completed under a
separate permit to remove poor soils and replace them with
compacted structural fill. We understand that the fill has been
brought up to one foot below the bottom of footing elevation for
this building. Copy the final grading reports to this permit file and
continue inspection procedures for the final fill for the bearing
pad' to achieve the 5000 psf allowable bearing pressure
assumed for this building design. OSSC Section 1803.5.
CLAIR
3/20/2006
7.1 I I
7.2 '-I
Concurred. A copy of the final. grading report will belKPFF
rovided b Foundation En ineerinq for the permit file.
Final Summary letters have been received and issued for thel
9.radinQ and fill.... .
The cooling tower is referre.d to and schematically shown in the
mechanical drawings, but no mention can be found within the
structural calculations or drawings. Provide additional
Plan sheets S2.1 CA, information on the proposed support structure, as well as
S2.1 CB, S4.5C, M4.32 anchorage and bracing data. Clarify the loading used for the
dated 2/10/06 foundation design for gravity and lateral. If the tower and support
structure will be ihe subject of a deferred submittal, please note ."
this in the structural notes. OSSC Section 106..
CLAIR
4/24/2006
14
CLAIR
3/20/2006
See supplementary calculations for cooling tower support'KPFF
design; changes to the support configuration based on the
selected equipment are shown on the stamped and signed
drawings. Submittals for nonstructural components and
14.1 their anchorage are required per Section 01610 Seismic
Requirements for Nonstructura/ Components. A
comprehensive list of all items requiring deferred approval
is also Included at the beginning of the Division 1
soeclficatlo'1s.
Supplemental calculations for the cooling tower and changes to
14.2 CLAIR 4/24/2006 the support configuration have been provided based on the
_ . equipment to be used. .
ICUP - COMPLETE 1ST PLAN REVIEW - BUILDING/NON-STRUCTURAL REVIEW (ISSUED.3/21106)
Provide a "Hazardous Materials Inventory Statement" for areas'
35 CLAIR 3/21/2006 General using. hazardous materials. Confirm concurrence with the City of
Sprinqfield Fire Department. SFC 2701.5.2
Copies of the Owner's Hazardous Materials and Waste
35.1 Management Plna by KT A Associates attached. A+A
35.2 I_I
. CLAIR
5/26/2006
IResponse acceptable, CLAIR will review this as a deferredl'
submittal.
HVAC system details are not provided for the Utilidor. Provide
the design for how.this space will be conditioned. OSSC Section
106.
36
CLAIR
3/21/2006
. General
Response
Date
3/31/2006
3/31/2006
4/24/2006
(Received
5/4/06\
Building Permit COM2005:01358
Status of
Item
Note to
Inspector
Note to
Inspector
Condition of
Approval
For questions call CLAIR at (800) 383-8855
Page: 2 of 14
SHMC - CUP - Complete 1st Back Check - Conditions of Approval
May 26, 2006
CLAIR: 1141-002-20
City .of Springfield
Anshen + Allen Architects
Item #
36.1
36.2
37
. 37.1
37.2 n
38
38.1
38.2 '_I
40
40.1
40.2 I I
41
41.1
City Comment From
CLAIR
CLAIR
CLAIR
CLAIR
CLAIR
CLAIR
CLAIR
CLAIR
City Comment
Date
5/26/2006
3/21/2006
5/26/2006 I
3/21/2006
5/26/2006
3/21/2006
Construction
Document or Plan
Sheet and \Datel
General
General
General
PeaceHealth at RiverBend
Sacred Heart Medical Center Project
Central Utility Plant (CUP) Bid Package 2
City Camment / Applicant Response
[Glumac] There is no HVAC system in the Utllidor.
Respanse acceptable. Based an respanse from Glumac
ventilatian will nat be pravided in the utilidar. Based an
OROSHA 1910.146 withaut a ventilatian .or exhaust system this.
will likely be cansidered a permit required canfined space. Is it
the intentian far the utilidar ta. be cansidered a canfined space?
Please clarify.
Manufactures product data far insulatian nat provided. Provide
the product data and manufacturers literature for all types .of
insulatian ta be used in the CUP. OSSC Sectians 703.2 and
1301.3.
[Glumac] Division 15 Insulation products specified in'
section 15030.
IAwaiting submissian .of manufacturers literature and praduct datal
far review and ~aproval.
The specificatians far the fallawing equipment was nat provided
with na indicatian that deferred submittal will be pravided:
medical gas systems. primary heating equipment. seismic
ancharage and restraint, pumps. air handling units, transfarmers,
generatars. chillers. bailers. switch gear, and undergraund fuel .
starage tanks. Pravide specificatians far this equipment or
include in a deferred submittal list. OSSC Sectian 106.
[Glumac] Specifications have been included In 4/18/06 set.
IRespanse acceptable. Submit deferred submittals far review and',
~aval priar ta installatian. OSSC 106.3.4.2
CLAIR understands that the daar hardware is a deferred'
submittal. Hardware will be reviewed far accessibility when
deferred submittal is received. OSSC Sectian 1109.3.2.
Acknowledged. Finish Hardware Is in the Deferrea
Submittals list.
5/26/2006 r IRespanse acceptable. awaiting deferred submittal.
Specificatian 15330 Ty~esand quan~ities .of medical gases are nat. provided. Pravi?e'
3/21/2006 (remaved fram this anllClpated gas Inventory (quantity) claSSified In accardance with
submittal but required) SFC. hazard categanes far the Med Gas Raam 104. SFC
dated 2/10/06 Sectlan 2701.2.2 and 2701.5.2
[Glumacl Quantities for this room are Indicated on plumbing'
plans.
Far questians call CLAIR at (800) 383-8855
Page: 3 .of 14
Response From
Glumac
Glumac
Glumac
A+A
Glumac
Response
Date
4/24/2006
(Received
5/4/06\
4/24/2006
(Received
5/4/06\
4/24/2006
(Received
5/4/06\
4/24/2006
(Received
5/4/06\
4/24/2006
(Received
5/4/06\
Building Permit: COM2005-01358
Status of
Item
Canditian .of
Appraval
Nateta
Inspectar
~f';.
I Canditian .of
Approval .
I Canditian .of
Appraval
SHMC - CUP - Camplete 1 st Back Check - Canditians .of Approval
May 26. 2006
CLAIR: 1141-002-20
City of Springfield
Anshen + Allen Architects
Item #
41.2
42
42.1
42.2
43
43.1
43.2 I I
45.
45.1
45.2 I- I
46
46.1
46.2 I I
City Comment From
CLAIR
CLAIR
CLAIR
CLAIR
CLAIR
CLAIR
CLAIR
CLAIR
CLAIR
Foi questions call CLAIR at (800) 383-8855
City Comment
Date
5/26/2006
3/21/2006
Construction
Document or Plan
Sheet and (Date)
PeaceHealth at RiverBend
Sacred Heart Medical Center Project
Central Utility Plant (CUP) Bid Package 2
City Comment / Applicant Response
Response acceptable, note to inspector.
S ecification 15330 The section ~f the . spe~ification was removed. Previous
S Pt. 1 3 ( d submittal of this specification did not reflect that the outdoor
ec Ion . remove '.
from this submittal but oxygen area must comply with NFPA 50 Stan.dard for Bulk
re uired) dated . Oxyg.en .Systems at Consumer Sites.. Provide corrected
q 2/10/06 specifications to Include NFPA 50 requirements. Section 4-
. 3.1.1.2 of NFPA 99.
[Glumac) Specification section 15330 has been provided In
4/18/06 submission. Bulk system to be leased by owner, we
are providing point of connection only.
Owner to provide required submittals and permit documents for
review and approval prior to installation of bulk oxygen system.
5/26/2006 Submittals will be required to be reviewed as a deferred
submittal in compliance. with general project requirements.
OSSC 106.3.4.2 .
Specification 15330 Quantity of 02 is not provided. Provide quantity so Springfield'
Section 2.6 (removed Fire Code (SFC) requirements can be determined. SFC Chapter
3/21/2006 from this submittal but 40. .
required) dated
2/10/06.
5/26/2006
3/21/2006
5/26/2006
3/21/2006
5/26/2006
[Glumac) .Quantities for this. system are indicated on
plumbing plans.
eesponse acceptable, note to inspector.
S ecification 15330 Req~irements for installers o.f medi~al gas systems are nof
( p d f thO specified. Revised speCification to Include reqUirements for
remove rom IS d' I . II SFC S . 3006
submittal but required) me Ica gas system Insta ers. ectlon .4.1
dated 2/10/06
Specification List of
Deferred Approvals
and the Table of
Contents dated
2/10/06
[Glumac) This has been added to Specification section.
15330 submitted 4/18/06.
IResponse acceptable, note to inspector.
The list of deferred submittals and the table of contents
indicating deferred submittals do not seem to agree or are
inconsistent. In some cases items have strike through text and
are listed as a deferred submittal and other cases no strike
through is .used and the section is listed in both places. Provided
clarification. OSSC Section 106.
The Table of Contents and List of Deferred Approvals List.
IDeferred submittals are required to be submitted for review andj
approval prior to in~t?lIation. OSSC 106.3.4.2
Page: 4 of 14
Response From
Glumac
Glumac
Glumac
A+A
Response
Date
4/24/2006
(Received
5/4/06)
4/24/2006
(Received
5/4/06\
4/24/2006
(Received
5/4/06\
4/24/2006
(Received
5/4/06\
Building Permit: COM2005-01358
Status of
Item
Note to
Inspector
Condition of
.Approval
Note to
Inspector
Note to
Inspector
l Condition of
Approval
SHMC - CUP - Complete 1 st Back Check c. Conditions of Approval.
May 26, 2006
CLAIR: 1141-002-20
Ciiy of Springfield
Anshen + Allen Architects
Item #
50 I_I
50.1
50.2
Il
51
51.1
51.2
1_'
59
59.1
59.2
64 I I
64.1
64.2
65
65.1
65.2
City Comment From
CLAIR
CLAIR
CLAIR
CLAIR
- CLAIR
CLAIR
. CLAIR
CLAIR
CLAIR
CLAIR
For questions call CLAIR at (800) 383-8855
City Comment
Date
3/21/2006 I
5/26/2006 I
3/21/2006
5/26/2006
3/21/2006
5/26/2006
Construction
Document or Plan
Sheet and (Datel
Plan sheet A9.20
dated 2/10/06
Plan sheet A1.01
dated 211 0/06
Plan sheet M4.1CAe
dated 1/20/06
3/21/2006 I Plan sheets A8.05
dated 2/10/06
5/26/2006
3/21/2006
5/26/2006
Plan sheets A8.06
dated 2/10/08
PeaceHealth at RiverBend
Sacred Heart Medical Center Project
Central Utility Plant (CUP) Bid Package 2
City Comment / Applicant Response Response From
IProvide ~tructural calculations for proposed suspende~ Ceiling,'
systems installations. essc 106. ;
Ceiling Suspension Systems Is on List of Deferrec;
Approvals. A+A
IResponse acceptable, awaiting deferred submittal.
. rhe future parking garage is shown to reside over the Utilidor.
I :::LAIR understands that the final placement of this parking
IJarage will not be over the Utilidor. Provide clarification. essc
Section 106.
IThe future parking garage Is still In design and will be'
permitted separately. The columns for the garage will notl
bear on the utilldor too or walls
IResponse acce~tabie, note to inspector. .
Specifications not provided for the underground fuel storage
tanks. Provide the specifications for review. essc Section 106.
[Glumac] Included in 4/18/06 specification set, sectlor.'
15650.
Specifications..will be used in conjunction with the required
deferred submittal- for the underground fu.el storage tanks.
Deferred submittal is required to contain all necessary product
data, engineering, and installation requirements sufficient to
determine code compliance for underground fuel storage tank
system which supports the required hospital emergency
Qenerator system. essc 106.3.4.2
IFor Wall Section 1D detail referenced on sheet A8.20 was notl'
found. Provide clarification. essc Section 106. _
This sheet has been revised.'
Wall Section 1D references sheet A8.20 detail 24 which is
incorrect. Provide updated documents for review and approval.
essc 106
For Wall Sections 1D. 1E, and 3B detail numbers referenced on
A8.20 were not found. Provide clarification. essc Section 106.
This sheet has been revised.
Wall Section 1E references sheet A8.22 detail 15 which is not'
correct. Wall section 3B was moved to A8.02. Provide updated
documents for review and approval. essc 106
Page: 5 of 14
A+A
Glumac
A+A
A+A
Response
Date
r
4/24/2006
(Received
5/4/061
Building Permit: CeM2005-01358
Status of
Item
I Condition of
Approval
Note to
Inspector
Condition of
Approval
Condition of
Approval
Condition of
Approval
:tt;
"':4;
'""
SHMC - CUP - Complete 1st Back Check - Conditions of Approval
May 26. 2006
CLAIR: 1141-002-20
4/24/2006
(Received
5/4/061
4/24/2006
(Received
5/4/061
4/24/2006
(Received
5/4/061
4/24/2006
(Received
5/4/061
. City of Springfield
Anshen + Allen Architects
.Item#
69
69.1
69.2 I_I
72
72.1
72.2 I I
76
76.1
76.2 I
,-
77
77.1
77.2 I I
78
78.1
78.2
City Comment From
CLAIR
CLAIR
. CLAIR
CLAIR
CLAIR
City Comment
Date
3/21/2006
Construction
Document or Plan
Sheet and (Date)
Plan sheet A9.01
dat~d 2/6/06
PeaceHealth at RiverBend
Sacred Heart Medical Center Project
Central Utility Plant (CUP) Bid Package 2
City Comment / Applicant Response'
Reference to section 07270 for fire stopping was not provided in
the specification and is not a listed deferred submittal. Provide
clarification. OSSC Section 106.
Firestopping is in Spec Sections 07840 and 07845 nad Is
added to the List of Deferred Approvals.
IResponse acceptable, awaiting deferred submittal.
Boundary of the smoke partition appears to extend around the
Plan sheets AO.ll and mezzanine. The. waU separating the. mezzanine would. not
A2.2CB dated 2/10/06 extend to the ceiling If It were a mezzanine and could not act as
a smoke partition. PrOVide clanfic.atlon of where the smoke
Qartition is located. OSSC Section 710.4..
The smoke partition goes around the enclosed storage area
on the mezzanine level.
5/26/2006
3/21/2006
5/26/2006 I
3/21/2006
Plan Sheet A5.00
Dated 2/10/06
IResponse acceptable, note to inspector.
Bathroom 105 does not show all dimensions (toilet, mirror)
required to determine compliance. Provide dimensions to.
determine compliance. OSSC 1109.10.5 and Figures'28, 29 &
30. .
Accessible clearances and notes added to Sheet A4.00, also
see 18/A9.10.
CLAIR 5/26/2006 I Response acceptable, note to inspector.
CUP - COMPLETE 1ST PLAN REVIEW - MECHANICAL REVIEW (ISSUED 3/21/06)
Submit Mechanical Permit Application. Permit application is
CLAIR 3/21/2006 General subject to the requirements for mechanical plan review. under
9RS 455.020 and Section 106 of the 2004 OMSC.
Contractor to apply for mechanical permit.
CLAIR
CLAIR
CLAIR
For questions call CLAIR at (800) 383-8855
5/26/2006
3/21/2006
5/26/2006
General
Response acceptable, awaiting submission of permit application. I
Submit State. of Oregon Non-Residential Energy Code
Compliance forms along with applicable worksheets. OSSC Sec.
1301.3.
[Glumacl Submitted 3/21/06.
Documents referenced were not signed when submitted.
Provide updated signed documents for review and approval.
OSSC 106, 1301.3 -
Page: 6 of 14
Response From
A+A
A+A
A+A
A+A
Glumac
Response
Date
4/24/2006
(Received
5/4/06\
4/24/2006
(Received
5/4/06\
412412006
(Received
514106\
412412006
(Received
514106\
4124/2006
(Received
514106\
Building Permit: COM2005-01358
Status of
Item
Condition of
Approval
Noteto I
Inspector .
Note to
Inspector
Condition of
Approval
Condition of
Approval
SHMC - CUP - Complete 1st Back Check - Conditions of Approval
May 26, 2006
CLAIR: 1141-002-20
City of Springfield
Anshen + Allen Arctiitects
Item #
80
80.1
80.2 I_I
81
81.1
81.21l
82 Il
82.1
82.2
I I
83
83.1
83.2.,1
84
City Comment From
CLAIR
CLAIR
CLAIR
CLAIR
CLAIR
CLAIR
CLAIR
CLAIR
CLAIR
For questions call CLAIR at (800) 383-8855.
City Comment
Date
3/21/2006
5/26/2006
3/21/2006
5/26/2006
3/21/2006
5/26/2006
3/21/2006
I . 5/26/2006
3/21/2006
Construction
Document or Plan
Sheet and (Date)
Plan sheet
M4.31 &
Specs.15902. Dated
2/10/06
Plan Sheets
M4.1CB2, M4.2CB1,
M4.2CB2 Dated
2/10/06
General
Plan Sheets
M4.2CB1, M4.2CA2
Dated 2/10/06
Plan Sheets
M4.1CA1,
M4.1CB2 Dated
2/10/06
PeaceHealth at RiverBend
Sacred Heart Medical Center Project
Central Utility Plant (CUP) Bid Package 2
City Comment 1 Applicant Response Response From
'Provide specifications for the draft control dampers on the gas"
fired. boilers exhaust stacks shown at Sections 1 & 2 grid line
C7.4. A damper is not permitted on a gas fired boiler except for
automatic boilers with prepurge, automatic draft control and
interlock. OMSC Sec. 1006.2.
[Glumac] AEi is responsible for project controls.
Response acceptable, awaiting deferred submittal.
Provide calculations to verify the required amount of combustion
air to be provided to the boilers and water heater. OMSC Sec. C
304. .
[Glumac] See aUachment A'for calculation.
Attachment "A" was not included for review and approval With]
this submittal. Provide calculations. OMSC C304
Provide mechanical ventilation rate for required occupancYI
~on 10ads.:OMSC Sec. 403.3.
[Glumac] See OSA schedule on Drawing M1.2.
,Response acceptable, note to inspector.
The return air system requires smoke det~ctors. Provide
specifications for the smoke detectors and clarify drawings as
per Soec. Sec. 15860 3.16- B. OMSC Sec. 606.
[Glumac] Return duct smoke detectors shown on drawings'
issued 4/18/06.
Response acceptable, note to inspector.
Plans show gate valves on the return oil pipes. Valves are not
permitted on return oil lines. Revise plans to show return oil lines
from the top of the tank to the boilers without valves. OMSC
Sec. 1305.4.
Page: 7 of 14
Glumac
Glumac
Glumac
Glumac
,-
Response
Date
4/24/2006
(Received
5/4106\
4/24/2006
(Received
5/4/06\
4/24/2006
(Received
5/4106\
4/24/2006
(Received
5/4106\
Status of
Item
I Condition of
Approval
I Condition of
Approval
Note to
Insoector
Note to
Inspector
Building Permit: COM2005-01358
II
- ~~
SHMC - CUP - Complete 1st Back Check - Conditions of Approval
May 26. 2006
CLAIR: 1141-002-20
City of Springfield
Anshen + Allen Architects
. PeaceHealth at RiverBend
Sacred Heart Medical Center Project
Central Utility Plant (CUP) Bid Package 2
Building Permit: COM2005-01358
Construction
Document or Plan
Sheet and (Date)
City Comment
Date
Item #
84.1
84.2
85 I I
85.1
85.2 I I
90 1.1
City Comment From
City Comment / Applicant Response
Response From
[Glumac) Design will be changed via Addendum.
Glumac .
,Response acceptable. Awaiting revised construction documents.,
ITest pressure for fuel gas piping not specified. Clarify testl
pressure of at least 60 PSI. OMSC Sect. C 406.4.1.
[Glumac) 150 psi test will be included for gas piping higher
than 2 pslln Addendum.
CLAIR
5/26/2006
CLAIR
3/21/2006
Specifications
Glumac
IResponse acceptable. Awaiting revised construction documents.,
IVerify that final HVAC balancing will ensure that the boiler room I
will not be used as a plenum. OMSC Sec. 602.1.
[Glumac] Boller room Is not used as a plenum.
CLAIR
5/26/2006
Specifications
CLAR
3/21/2006
90.1
Glumac
I I I IResponse acceptable, note to inspector.
90.2 . CLAIR 5/26/2006
I ICUP. COMPLETE 1ST PLAN REVIEW - PLUMBING REVIEW
Submit Plumbing Permit application. Permit application. is -
subject to the requirements for plumbing plan review, per OAR
918-780-0040 & Permitting Requirements per OAR 918-780-
0060 and OAR 918-780-0080 '
Contractor to' Apply for Plumbing Permit separately.
General
91
CLAIR
3/21/2006
4/24/2006
(Received
5/4/06\
91.1
A+A
91.2 I_I
Response acceptable, awaiting submission of. permit application.
Condition of
Approval
CLAIR
5/26/2006
The illustrated 2" drain line for the water heater at C8/CT: T&P
. discharge shows no point of connection to the. underfloor
Plan sheet P2.0CB @ plumbing. As described this drain would require a trap and
C81 CT Dated 2110106 primer installed in accordance with the' OPSC. Provide the
missing information. OPSC Sections 1006.0 and 1007.0.
92
CLAIR
3/21/2006
[Glumac] This is intended as an Indirect waste pipe to the
trench.
4/24/2006
(Received
5/4/06\
92.1
Glumac
I I CLAIR 5/26/2006 The maximum developed length ofthe indirect waste piping shall
not exceed 15 feet. OPSC 801.2.1
I-ICUP - COMPLETE 1ST PLAN REVIEW. ELECTRICAL REVIEW (ISSUED 3/21/06)
"Review and approval by the authority having jurisdiction shall
not relieve the applicant of the responsibility of compliance with
this Code." Please aCknowledge or clarify. OESC Art. 80.21 (C)
Note to
Inspector
92.2
96
CLAIR.
3/21/2006
General
Acknowledged.
4/25/2006
(Received
5/4/06\
96.1
Sparling
SHMC - CUP - Complete 1st Back Check - Conditions of Approval
May 26, 2006
CLAIR: 1141-002-20
For questions call CLAIR at (800) 383-8855
Page: 8 of 14
City of Springfield
Anshen + AI/en Architects
Item #
96.2
.98
98.1
98.2
99
99.1
99.21J
100
100.1
~IJ
101
101.1
101.2 ,-
II
IJ
/Response acceptable, verify in field.
Standards for Electrical Plans Review require us to verify conduit
V I 1 f 1 I and box fill. Box fill cannot be verified at this time. Recommend
h 0 ~~e t ~ 02~~/~6 field verification at time of installation. Please concur or clarify.
s ee s a e OAR 918-271-0040. OAR 918-311-0050. OESC Art. 314.16.
chapter nine tables & Art. 80.21 (B)
Concur, field inspection of the electrical work by the'
Contractor is required.
. City Comment From
City Comment
Date
CLAIR ~ 5/26/2006
CLAIR 3/21/2006
CLAIR I 5/26/2006
CLAIR
3/21/2006
CLAIR
I 5/26/2006
CLAIR
3/21/2006
CLAIR
I 5/26/2006
CLAIR
3/21/2006
CLAIR
For questions call CLAIR at (800) 383-8855
Construction
Document or Plan
Sheet and (Date)
General
General
General
PeaceHealth at RiverBend
Sacred Heart Medical Center Project
Central Utility Plant (CUP) Bid Package 2
City Comment / Applicant Response
Response acceptable. note to inspector.
,
There appears to be insufficient information to determine if the
load calculations are appropriate. complete. and accurate per:
OAR.918-271-0040. OAR 918-311-0050 (Standards for
Electrical Plans Review) & (OESC Art. 220 & Art. 80.21 (B)).
Please Clarify.
See the attached Load Calculations.
Response acceptable. verify. in field.
Standards for Electrical - Plans Review requires that the
equipment be suitable for the environment. We cannot
completely verify. that at this time. Recommend field verification
at time of instal/ation. Please concur or clarify. OAR 918-271-
0040. OAR 918-311-0050. OESC Art. 110.02 & Art. 80.21 (B)
Concur, field Inspection of the electrical work by the
Contractor is required.
Response acceptable. verify in field.
I
Standards for Electrical Plans Review require us to confirm if the
service and feeder wirin9 method including size. placement.
protection and termination are in conformance to the Oregon
Electrical Code. A substantial part of this requirement cannot be
verified at this time. Recommend field verification at time of
instal/ation. Please concur or clarify .OAR 918-271-0040. OAR
918-311-0050. OESC Art. 215. 230 & Art. 80.21 (B)
Concur, field Inspection of the electrical work by the'
Contractor Is required.
Response acceptable. verify in field.
Page: 9 of 14
Response From
Sparling
Sparling
Sparling
Sparling
Response
Date
4/25/2006
(Received
5/4/06)
I 4/25/2006
(Received
5/4/06)
4/25/2006
(Received
5/4/06)
4/25/2006
(Received
5/4/06)
Building Permit: COM2005-01358
Status of
Item
Note to
Inspector
Note to
Inspector
Note to
Inspector
Note to
Inspector
Note to
Inspector
SHMC - CUP - Complete 1st Back Check - Conditions of Approval
May 26. 2006
CLAIR: 1141-002-20
City of Springfield
Anshen + Allen Architects
Peace Health at RiverBend
Sacred Heart Medical Center Project
Central Utility Plant (CUP) Bid Package 2
Building Permit: COM2005-01358
Construction
Document or Plan
Sheet and (Date)
City Comment
Date
Response
Date
Item #
Status of
Item
City Comment From
City Comment / Applicant Response
Response From
Standards for Electrical Plans Review require us verify conductor
size. ampacity. placement, protection and termination. Conductor
Volume 1 of 1 of plan placement. protection and termination .canno~ be verified at this
sheets dated 02/10/06 time. Recommend field verification at time of installation. Please
. concur or clarify. OAR 918-271-0040. OAR 918-311-0050,
OESC Art. 210.19 & Art. 80.21(B)
102
CLAIR
3/21/2006
Concur, field inspection of the electrical work by the
Contractor is required.
4/25/2006
(Received
5/4/06\
102;1
Sparling
1_'
IResponse acceptable. verify in field.
Information seems to be missing conceming equipment working
V I 1 f 1 f I clearances. Recommend field verification at time of installation.
o ume 0 0 p an . .
h t d t d 02/10/06 Please concur or clarify. OAR 918-271-0040. OAR 918-311-
s ee s a e 0050 (Standards for Electrical Plans Review) & (OESC Art. 110.
26 & Art. 80.211B)).
Plans drawn to scale show equipment placed to comply with
Electrical Codes for working clearances, and Specifications
require compliance with applicable codes. Concur, field .
Inspection of the electrical work by the Contractor is
reaulred.
IResponse acceptable. verify in field.
Equipment location, size, placement, protection and termination
apparently cannot be completely verified. Recommend field
verification at time of installation. Please concur or clarify. OAR
918-271-0040. OAR 918-311-0050 (Standards for Electrical
Plans Review) & (OESC Art. 110.11 & Art. 80.21(B)).
102.2
Note to
Inspector.
CLAIR
5/26/2006
103
CLAIR
3/21/2006
4/25/2006
(Received
5/4/06) .
103.1
Sparling
'_I
5/26/2006 I
103.2
Note to
Inspector
CLAIR
CLAIR
104
3/21/2006
General
Concur, field Inspection of the electrical work by the'
Contractor Is required.
4/25/2006
(Received
5/4/06\
104.1
Sparling
104.2/ I
5/26/2006 I
IResponse acceptable, verify infield.
Equipment accessibility apparently cannot be determined.
Recommend field verification at time of installation. Please
concur or clarify. OAR 918-271-0040. OAR 918-311-0050
(Standards for Electrical Plans ReviE?w) & (OESC Art. 110.26 &
Art.80.21(B)).
Concur, field inspection of the electrical work by the
Contractor is required. Sparling
CLAIR
Note to
Inspector
105
CLAIR
3/21/2006
General
4/25/2006
(Received
5/4/06\
105.1
105.21_'
5/26/2006 I
IResponse acceptable. verify in field.
CLAIR
l Note to
. Inspector
SHMC - CUP - Complete 1st Back Check - Conditions of Approval
May 26, 2006
CLAIR: 1141-002-20
For questions call CLAIR at (800) 383-8855
Page: 10 of 14
City of Springfield
Anshen + Allen Architects
Item #
107
107.1
107.2/_'
108
108.1
108.2/_1
109
109.1
109.2 IJ
110
110.1
110.21_1
City Comment From
CLAIR.
CLAIR
CLAIR
CLAIR
CLAIR
CLAIR
CLAIR
CLAIR
PeaceHealth at RiverBend
Sacred Heart Medical Center Project
Central Utility Plant (CUP) Bid Package 2
Construction
City Comment Document or Plan
Date
Sheet and (Date)
3/21/2006
5/26/2006 I
General
City Comment/ Applicant Response
-
Plans are required to contain: "complete load calculations, or
applicable load records, for all new installations and for additions
to existing installations...." Please clarify how this requirement is
satisfied. OAR 918-311-0040
Copy of load calculation is attached. Loads at the Hospita:
are based on Hospital design loads with demand factors
applied for this supervised Installation.
IResponse acceptable, verify in field.
Plans are required to show a value for available fault current on
the line side of service. disconnects. Please clarify' where these
values for NORMAL A, NORMAL B, EMERGENCY A, and
EMERGENCY B are found. OAR 918-311-0040
Calculated available fault current values are Indicated on the'
One-Line Diagrams, symbols added In the drawings issued
4/18/2006.
Plan Sheets E5.01
3/21/2006 and E5:02 Dated
02/10/06
5/26/2006
3/21/2006
5/26/2006
3/21/2006
For questions call CLAIR at (800) 383-8855
Plan Sheets E5.01
and E5.,02 Dated
02/10/06
Plan Sheei E5.31
Dated 02/10/06
/Response acceptable, awaiting submission of formal',
construction documents. OSSC 106
Equipment intended to interrupt current at fault levels are'
required to have an interrupting rating sufficient for the nominal
circuit vOltage"'imd the current that is available at the line
terminals of tti~ ~~lUipment. Please c1arifv. OESC 110.9
Nominal voltage and fault current Interrupting ratings are
Indicated on the sheets E5.01, E5.02, and specified in
Division 16 Section 16341, "Medium Voltage Switchgear".
IResponse acceptable, verify in field.
We are unable to find in the specs or in the plans any reference
to which raceway system will be used. If EMT will be used, the
feeder schedule located at E5.31 is not approved. Please Clarify.
OAR 918-271-0040, OAR 918-311-0050 (Standards for
Electrical Plans Review) & (OESC Art. 215, 230 & Art. 80.21
~" ,
The specifications and Index issued February 10, 200e'
referenced common Division 16 sections from the Hospital
Bid Package 3 documents which also apply to the Central
Utility Plant Bid Package. The referenced specification
sections are Included in the documents issued April 18,
. ~onR
Response acceptable, verify in field.
Page: 11 of 14
Response From
Sparling
Sparling
Sparling
Sparling
Response
Date
4/25/2006
(Received
.5/4/06)
4/25/2006
(Received
5/4/06)
4/25/2006
(Received
5/4/06)
4/25/2006
(Received
5/4/06)
Building Permit: COM2005-01358
Status of
Item
Note to
-,nspector
I Condition of
Approval
Note to
Inspector
. Note to
Inspector
SHMC - CUP - Complete 1st Back Check - Conditions of Approval
. May 26, 2006
CLAIR: 1141-002-20
City of Springfield
Anshen + Allen Architects
PeaceHealth at RiverBend
Sacred Heart Medical Center Project
Central Utility Plant (CUP) Bid Package 2
Building Permit: COM2005-01358
Construction
Document or Plan
Sheet and (Date)
City Comment
Date
Response
Date
Status of
Item
Item #
City Comment From
City Comment 1 Applicant Response
Response From
Submit Lighting Energy Budget forms and worksheets as a part
of the Non-Residential Energy Code Compliance documentation.
Forms and instructions are available at:
hltp://egov.oregon.gov/ENERGY /CONS/Codes/cdpub.shtml#Spr
eadsheet
OSSC 1301.3
See the attached Lighting Energy Budget forms.
111
CLAIR
3/21/2006
General
4/25/2006
(Received
5/4/06)
111.1
Sparling
I I
I
CLAIR 5/26/2006 . Response acceptable, awaiting submission of formall
construction documents. OSSC 106
ICUP 1ST BACK CHECK - ADDITIONAL COMMENTS BASED ON 4/18/06 RESUBMITTAL PLANS
The "Sheet Water Proofing Membrane" specification 07135 is
Plan sheet A2.1 CA called out but was not provided in the specifications provided.
dated 4/18/06. Provide updated documents including the missing referenced
specification. OSSC Section 106.
Plan sheet A5.00 For The North Wall of the Chiller Room a reference is missing
dated 4/18/07 sheet and detail information. Provide clarification: OSSC
Section 106.
Several (A6.1CA. A6.1CB, A6.1CC. A6.2CA, A6.2CB) sheets
were removed from the previous revision. Provide explanation
or direction to where the 'content of information on these sheets
is located. essc Section 106.
Plan sheet A9:02 The "Head at Sound Treatment Partition" detail references to
dated 4/18/06 details 3 and. 13 on plan sheet A9.10. Details do not exist.
Provide clarification. essc Section 106.
During plan review backcheck new information was added to the
plans. Provide revision notes to indicate new information added
to plans dated 2/10/06 for clarification. Original discussion and
agreement with Anshen + Allen was to cloud revisions under this
covered under this submittal. OSSC Section 106.
Condition of
Approval
111.2
112
CLAIR
5/26/2006
Condition of
Approval
113
CLAIR
5/26/2006
Condition of
Approval
114
CLAIR
5/26/2006
General
Condition of
Approval
115
CLAIR
5/26/2006
Condition of
Approval
116
CLAIR
5/26/2006
General
Condition of
Approval
PI h. t A9 01 References to details 3 and 13 on sheet A9.10 do not exist.
detai~~ 2s d:~ed 4i18/06 Provide clarification. essc Section 106.
For medical gases located in a 1-hour.exterior room provide at
least two vents in the exterior wall. Each vent shall not be less
than 36 square inches in area. One vent shall be within 6 inches
of the floor and one shall be within 6 inches of the ceiling. Rooms
shall be provided with at least one automatic sprinkler to provide
container cooling in case of fire. OFC Section 3006.2.1
117
CLAIR
5/26/2006
Condition of
Approval
118
CLAIR
5/26/2006
General
Condition of
Approval
This specification does not stipulate acceptance test witnessed
by the City of Springfield. Revise specification to include
acceptance test in presence of the AHJ. Section 7.13.3, NFPA
110, 2002 Edition.
Specifications 16215
and 16250 dated
4/18/06
119
CLAIR
5/26/2006
Condition of
Approval
SHMC - CUP - Complete 1st Back Check - Conditions of Approval
May 26, 2006
CLAIR: 1141-002-20
For questions call CLAIR at (800) 383-8855
Page: 12 of 14
City 0( Springfield
Anshen + Allen Architects
Item # City Comment From City Comment
Date
120 CLAIR 5/26/2006
121 CLAIR 5/26/2006
122 CLAIR 5/26/2006
123 CLAIR 5/26/2006
124
CLAIR
5/26/2006 General
125
CLAIR
Construct/on
. Document or Plan
Sheet and (Date)
Specification 16215
dated
4/18/06
Specification 16215
4/18/06
Specification 16230
dated
4/ 18/0~
Specification 16250
dated
4/18/06
126
5/26/2006 General
. CLAIR
5/26/2006 . General
-
127
CLAIR
5/26/2006 General
128
CLAIR
5/26/2006 ' General
129
CLAIR
5/26/2006
130
CLAIR
5/26/2006
For questions call CL,AIR at (800) 383-8855
General
General
Peace Health at RiverBend
Sacred Heart Medical Center Project
Central Utility Plant (CUP) Bid Package 2
City Comment / Applicant Response Response From
Codes and standards are not listed in this specification, Provide
applicable codes and standards .with edition of. each for work
covered in this soecification, OSSC Section 106.
Section 1.4B requires shop drawings for the Electrical Power
Monitoring and Control System. Submit the drawings as a
deferred submittal for review and approval. OSSC Section
106.3.4.2.
Section 1.8 requires Shop drawings for the Electrical Power
Generation Equipment. Submit the drawings as a deferred
submittal for review and aooroval OSSC Section 106.3.4.2.
It is not clear what systems wiflbe provided with emergency or
standby power. Provide a complete list of systems and
equipment that will be supplied with emergency or standby
power. OSSC Section 106.
Deferred submittals for anchorage ot mechanical, electrical and
fire protection components are required to be submitted. for
review. Component mounting systems or their anchorage shall
be reviewed and approved by the engineer of record and
submitted to the Building Official for review and approval. OSSC
Section 1604.2: . .
CLAIR will review the fire alarm submittal (based on NFPA 72,
2002 Edition) ,upon receipt of working plans (shop drawings)
provided that the submittal has been reviewed for design intent
by the "Architect or Engineer of Record". OSSC Section
106.3.4.2
Working plans (shop drawings) shall include items listed in OFC
907.1.1 and Section 4.5.1, NFPA 72, 2002 Edition
Provide vendor of UL or FM approved monitoring central,
proprietary or remote station. The fire alarm system shall be
supervised by a UL or FM listed approved central station service.
OFC Section 907.15
Fire alarm system plans and specifications shall be developed in
accordance with NFPA 72 by persons who are experienced in
the proper design, application, installation and testing of fire
alarm systems: The system designer shall be identified on the
system design documents. See Section A-1-5.1.3 for examples
of qualified personnel. Provide evidence of qualifications.
Section 4.3.2, NFPA 72, 1999 Edition
Installation personnel shall be supervised by persons who are'
qualified and experienced in the installation, inspection and
testing of fire alarm systems. See Section 4.3.2, NFPA 72, 2002
~on for examoles of qualified personnel.
Provide style and/or class of initiating device, notification
appliance and signaling line circuits for the system. Section
6.4.2, NFPA 72, 2002 Edition
Page: 13 of 14
Building Permit: COM2005-01358
Response
Date
Status of
Item
Condition of
Aporoval
Condition of
~proval
Condition of
Approval
Condition of
Approval
Condition of
Approval
Condition of
Approval_
I Condition of
~pproval
~~
Condition of
Approval
Condition of
Approval
Condition of
Approval
Condition of
Approval
SHMC - CUP - Complete 1st Back Check - Conditions of Approval
May 26, 2006
CLAIR: 1141-002-20
City of Springfield
Anshen + Allen Architects
Item #
City Comment From
131
CLAIR.
132
CLAIR
133
CLAIR
134
CLAIR
135
CLAIR
136
CLAIR
137
CLAIR
138
CLAIR
139
CLAIR
140
CLAIR
For questions call CLAIR at (800) .383-8855
City Comment
Date
5/26/2006
5/26/2006
5/26/2006
5/26/2006
5/26/2006
5/26/2006
. 5/26/2006
5/26/2006 .
5/26/2006
5/26/2006
Construction
Document or Plan
Sheet and (Date)
General
General
General
General
General
General
General
General
General
General
PeaceHealthat RiverBend
Sacred Heart Medical Center Project
Central Utility Plant (CUP) Bid Package 2
City Comment / Applicant Response
Response From
Connections of fire alarms to the light and power service shall be
on a dedicated branch circuit. The circuit and connections shall
be mechanically protected. The circuit disconnecting means
shall have a red marking, shall be accessible only to authorized
personnel and shall be clearly marked FIRE ALARM CIRCUIT
CONTROL The'location of the circuit disconnecting means shall
be permanently identified at the fire alarm control unit. Section
4.4.1.4.1, NFPA 72, 2002 Edition
The fire code official shall be notified before any required
acceptance testinCl. OFC Section 901.5
CLAIR will review the Fire Sprinkler submittal (based on NFPA
13, 2002 Edition) upon receipt of working plans, provided that
the submittal has been reviewed for design intent by the
"Architect or Engineer of Record". OSSC Section 106.3.4.2
Provide working plans (shop drawings) showing items from the
list in Section 8-1.1.1 that pertain to the design of the system for
this project. Section 14.1, NFPA 13, 2002 Edition.
Provide labeling of all valves (including those inside the double'
detector check valve vault). Provide graphic .representation of
the various zones served at the multiple risers at the wall of the
riser room. The graphic representation should be labeled with
the names of the zones consistent with the labeling of the
exterior visual devices. Section 6.7.4, NFPA 13, 2002 Edition
Indicate on a site plan by horizontal and vertical dimension to
riser where the hydrants which provided the water fiow, static
and residual pressure information are located. Section 15.1,
NFPA 13, 2002 Edition
Identify UL listing number of equipment (Le. hose valves, double
detector, FDC...) Section 14.1.4, NFPA 13, 2002 Edition
Provide logarithmic graph comparing allowable and actual water
flow and pressures in relation to system calculations at the test
hydrant. Indicate hose demands as an additional water demand
at the calculated system pressure. Section 14.3.1, NFPA 13,
2002 Edition
Provide notation on hydraulic calculations that indicate extension
of the calculations through the underground (including double
back-flow device) to the location of the flow test hydrant. Section
14.3, NFPA 13, 2002 Edition
Provide electronic monitoring of all valves serving one hundred
heads or more, transmitting to an approved central. station,
remote station or proprietary monitoring station in accordance
with OFC Section 903.4.
Response
Date
Building Permit: COM2005-01358
Status of
Item
Condition of
Approval
Condition of
Approval
Condition of
Approval
Condition of
Approval
Condition of
Approval
Condition of
Approval
Condition of
Approval
Condition of
Approval
Condition of
Approval
Condition of
Approval
Page: 14 of 14
SHMC - CUP - Complete 1st Back Check - Conditions of Approval
May 26, 2006
CLAIR: 1141-002-20
525 NW Second Street, Corvallis, Oregon 97330
tl 800.383.8855 ph 541.758.1302 Ix 541.753.225/
www.claircompanv.com
Letter of Transmittal
Transmittal #: 5525
Attn: David Puent
Company: .Qj!Y~L~Qri!!gfi~Ld
Address: 225 Fifth Street
_SRrin-9field _OR
97477
Date: 6/5/2006
Job Number: 1141-002-20
Originating Office: Clair CVO
Re: SHMC - CUP Plan Review
We are sending you ~ Attached Transmitted
o Under Separate Cover By: Melodv Wood
the following items:
2 1013 G.UP - Sp.~cifi~~ions - Volume One of Three - Divisions 1 through 14. !E.~(5 sig!led_
and stamped copies, stamped pages included in 1 st volume, 1 wet set)
2 1014 I CUP - Specifications - Volume Two of Three - Division 15. IFC. (5 sioned and
stamped copies, stamped pages included in 1 st volume, 1 wet set)
2 1015 I CUP - Specifications - Volume Three of Three - Division16. IFC. (5 sioned and
. stamped copies, stamped pages included in 1 st volume, 1 wet set)
2 1017 I CUP - Drawinos - Volume One of One - Bid Packaoe #2 - IFC. (3 full and 2 half
signed and stamped copies, including 1 wet set)
1 Cover letter
1
Mock permits and fee calculation sheet
o For Approval
~ For Your Use
o As Requested
o For Your Review
o Approved As Submitted
o Approved As Noted
o Returned For Corrections
Submit 0
Return 0
Other:
For Bids Due:
Copies for Distribution
Corrected Prints
Remarks:
Approved CUP construction documents
Thank you,
Signed! ~ Q.. J) \ ,..:) ..;,-1
If enclosures are not as noted, please notify us at once
CITY OF SPRINGFIELD MECHANICAL PERMIT FEES
CUP Mock Mechanical
I TABLE No. 3-D I
REFERENCE
a HVAC
-- ------ ---- --- _. ---- -- ---
BC Up to 100,000 btu
HXI More than 100,000 btu
UHj Unit Heater
I Boiler/Compressor
/ ~~ ~~ ~~~~~o~~r or 100',001 :'500,000 blU-'- - - -
laver 15 to 30 Horsepower - 500,00' - 999,000 btu
lOver 30 to 50 Horsepower or 1,000,000 - 1,750,000 btu
CH, BI Over 50 Horsepower or over 1,750,001 btu
n. - Ail~pHt~n~~~~0~6~~- .- - --- ____.__u~_
AHUI 10,001 cfm and over
I Evaporative Cooler/Fan
dlVents
RHI Hood and Exhaust
SF, RF, EF Vent Fan to One Duct
I Appliance Vent
elGas Pipin~
I Each Piping System 1 -4 Outlets
Each Outlet over 4
"_____n ______ __._. _ _______ __.
f Air, Oxygen, Other Medical Specialty Piping
-, Each Piping System 1 -4 Outlets
I Each Outlet over 4
I LP Gas Tank and Piping
hI Miscellaneous
Domestic Incinerator
I Commercial Incinerator
I Wood/Pellet Stove - Not Applicable
I Heat Pump
Preliminary Inspection
DESCRIPTION
---- ---- - -- -----...- .-.- -----------..
I
I
I
1-
BE, BHR, BBS,
SUT, CT, SG,
RG, EG, SAD,
PRSS, PRV,
FOFU, WPRV,
CRP, RELV,
FOST, P, ET,
WF, AS, FT, CS,
DA, Generators Each Appliance Not Listed on this Schedule
j Inspections Not Covered by this Schedule
k Reinspection Fee
I Mechanical Insurance Fee
m Minimum Permit Fee - Not Applicable
nl"n" Not Listed In Schedule
olParliallnspection (1)
~ Inspections Outside Normal Business Hours
q Investigation Fee (2)
r1Building Without Permit Penalty - Not Applicable
s Hourly Inspection Fee for Requests Not In Permit Tables
SUBTOTAL
State Surcharge
Administrative Fee
SUBTOTAL
Plan Review Fee
TOTAL
EXTENDED
QTY AMOUNT
1
1 I $15.00
12 I $144.00
-1--
$48.00
$90.00
$9.00
$45.00
$45.00
$10.00
$45.00
!L.__iliifIt.di~J
: $45.00 I
$67.50 I
$45.00 I
$630.00
J
I
I
.1..
L
I
$45.00
@
@
@
$1,741.00
$139.28
$174.10
$2,054.38
$435.25
$2,489.63
8.00%
10.00%
25.00%
CITY OF SPRINGFIELD PLUMBING PERMIT FEES TABLE 5
CUP Bldg Shell
Package 2 Volume 1 of 1
TABLE No. 3-C
REFERENCE NO. DESCRIPTION
~ One & Two Family Dwellings - Not Applicable
b Single Plumbing Fixture
~ Sanitary Sewer
(1) First 50 Ft.
(2) Each additional 100 Ft. or portion
d Water Service
(1) First 50 Ft.
_ (2) Each additional 1 00 Ft. or portion
e Storm & Rain Drain
(1) First 50 Ft.
(2) Each additional 1 00 Ft. or portion
f Sewage Ejector Pump
l:! Special Waste Connection
h Manufactured Homes - Not Applicable
I Backflow Prevention Device
j Relocated Structure - Not Applicable
~ Sanitary or Storm Sewer Cap
J Any Trap or Waste not connected to Fixture
~ Any plumbing installation not listed in this schedule with sanitary waste or potable water supply
..'2 Minimum Inspection Fee - Not Applicable
~ Partial Inspection Fee (1)
-E Reinspection Fee (2)
-.9 Inspections Not Covered By Schedule
-.!: Inspections Outside Normal Business Hours
~ Investigation Fee - Not Applicable
t Building Without Permit Penalty - Not Applicable
u Accessible Minor Plumbing Labels NO LONGER AVAILABLE _ Not Applicable
"- Not Accessible Minor Plumbing Labels NO LONGER AVAILABLE - NOT APPLICABLE
'!'!.- Hourly Inspection Fee for Requests Not In Permit Table
FEE QTY
'..i..j~iwiJI_1
$14.00 9
_II
UMC AMOUNT
$45.00
$14.00
!!'ii.~.pM%i
l<W_,....JPRli
~4ij.OO
$14.00
-<<..
$45.00
$14.00
$14.00 2 $28.00
I $14.00' .. _
~:,,-'-/;,_r';'_gp,,;-~,::f'~': .')f-^'t"t;f_:" J'Y/; ;;M'rf;_~f >~--1'>-~f':~' "1
- ..4..'I..t." AuIllDRdl"d.
I:",.~~;~~~,"I"'.'.'M.'K 'mWM.'''f_\W.:mJllI!!;_ii~a_~f;p~~:e'
L:.d,iTh'c;_ ~--~__TfWif?lI!!l&:._
$45.00
$14.00 20 $280.00
$14.00 35 $490.00
$45.00
$45.00
$45.00
$45.00
--
$67.50
$45.00
$1
SUBTOTAL
State Surcharge
Administrative Fee
SUBTOTALI
Plan Review Fees'
TOTALI
$980.00
$78.40
$98.00
$1,156.40
$294.00
$1,450.40
8%
1U%
@
30%
NOTE 1: Assessment of partial inspection fees TBD
NOTE 2: Two (2) inspections allowed, additional inspections required to correct deficiencies at $45.00 each at the inspector's discretion
For questions please call CLAIR at (800) 383-8855
Page: 1 of 1
CLAIR No.: 1141-002
SHMC - Central Utility Plant
COM2005-01358
. May 30, 2006
FLS plan review
permit fees plan review fees fees
10% Admin
Mech issuance
fee
8% State
Electr
Plumb
Mecha
Building
Totals
..
ical $ 7,192.00 $ 1 ,798.00 $ - $ 575.36 $ 719.20
ing $ 980.00 $ 294.00 $ - $ 78.40 $ 98.00
nical. $ 1,741.00 $ 435.25 $ - $ 139.28 $ 174.10 $ 10.00
1$
$
71,665.90 I $
81,578.90 $
46.582.84 I $
49,110.09 $
28,,666.36 I $
28,666.36 $
5.733.28 I $
6,526.32 $
7.166.59 I
8,157.89 I $
Notes:
Electrical permit fees and surcharges (8% state and 10% admin) were paid on 4/13/06 in the amount
of $19,491.24. Above total fees does not take this into consideration. Once confirmed and decided,
this will be reconciled as either a credit towards current fees due or as a refund.
$
$
$
'$
10.00 $
Total
10,284.56
1,450.40
2,499.63
159,814.97
.174,049.56
225 Fifth Street
Spring.field, Oregon 97477
541-726-3759 Phone
"iJv of Springfield Official Receipt
~elopment Services Department
Public Works Department
Job/Journal Number
COM2005-0 1358
COM2005-01358
COM2005-01358
COM2005-01358
COM2005-0 1358
COM2005-0 1358
COM2005-01358
COM2005-01358
COM2005-01358
COM2005-0 1358
COM2005-01358
COM2005-0 1358
COM2005-0 1358
COM2005-0 1358
COM2005-01358
COM2005-01358
COM2005-0 1358
COM2005-01358
COM2005-01358
COM2005-0 1358
COM2005-0 1358
COM2005-0 1358
COM2005-01358
COM2005-01358
COM2005-01358
COM2005-01358
COM2005-01358
COM2005-01358
Payments:
Type of Payment
Check
cReceintl
RECEIPT #:
1200600000000000840
Date: 06/09/2006
Description
+ 10% Administrative Fee
Furnace - up to 100,000 btu
Furnace - more than 100,000
Furnace - Unit Heater
BoilerlComm Over 50 HP
Air Handling Unit Up to 10,000
Air Handling Unit 10,000 & Ovr
Vent Fan
Appliance Vent
Gas Outlets 1-4
Gas Outlets 4+
Appliance Not Listed
-Mechanical Issuance Fee-
Plan Review Mechanical (25%)
+ 8% State Surcharge
+ 10% Administrative Fee
Fixture
Sewage Ejector Pump
Backflow Device
Trap or Waste not Conn to Fixt
Not Covered Plumbing
Plan Review Plumbing (30%)
+ 8% State Surcharge
Plan Review Comm/lndlPublic
Plan Review Fire & Life Safety
Building Permit
+ 8% State Surcharge
+ 10% Administrative Fee
Paid By
PEACEHEALTH
Item Total:
Check Number Authorization
Received By Batch Number Number How Received
djb
259132
In Person
Payment Total:
Page 1 of I
1 :29:06PM
Amount Due
174.10
12.00
15.00
144.00
675.00
88.00
30.00
48.00
90.00
4.00
5.00
630.00
10.00
435.25
78.40
98.00
126.00
28.00
56.00
280.00
490.00
294.00
139.28
46,582.84
28,666.36
71,665.90
5,733.28
7,166.59
$163,765.00
Amount Paid
$163,765.00
$163,765.00