City of Springfield
Building Permit & Inspection Summary
6/28/2006
1:13:24PM
Job #:
COM2005-01358
225 Fifth Street
541-726-3753 Phone
541-726-3676 Fax
Project Status: Issued
Job Address: 3420 Baldy View Ln Springfield
Scope of Work: Commercial Miscellaneous
Description of Work: Structural Fill for and Construction of Central
Utility Plant
Name
ARC ANSHEN+ALLEN
CON TURNER CONSTRUCTION COMPANY
ELC MORROW MEADOWS CORP
MEC HARDER MECHANICAL CONTRACTOR
OWN PEACEHEALTH
PLM HARDER MECHANICAL CONTRACTOR
Occunancv
Construction Tvne
Estimate
Estimate
Estimate
Estimate
Estimate
Estimate
Descrintion
Owner & Contractor(s)
Address
1500 FOURTH AVE, STE 45
90 I MAIN ST #4900
1596 22ND ST SE
PO BOX 5118
PO BOX 1479
PO BOX 5118
Citv. State. Zin
SEATTLE W 98101
DALLAS TX 75202
SALEM OR 97302
PORTLAND OR 97208
EUGENE OR 97440
PORTLAND OR 97208
Phone
415-882-9500
503 229-6000
503-399-7609
503-281-1112
541-688-3828
503-281-1112
Valuation of Proiect
Date
Cost Per So Ft So Ftg Valuation Calculated Staff
$ 1.00 167,400.00 $167,400.00 2005/1 0104 LLH
$ 1.00 21,976,709.00 $21,976,709.00 2006/05/23 LLH
$ 1.00 250,000.00 $250,000.00 2006/03/06 DJB
$22,394,109.00
Amount Paid
Plan Review Comm/lnd/Public $511.32
+ 7% State Surcharge $55.07
+ 10% Administrative Fee $78.67
Site Work $786.65
Building Permit $1,053.15
Plan Review Comm/lnd/Public $684.55
+ 8% State Surcharge $84.26
+ 10% Administrative Fee $105.32
Plan Review Fire & Life Safety $421.26
+ 8% State Surcharge $575.36
+ 10% Administrative Fee $719.20
Perm ServIFdr 200 amps or less $378.00
Perm ServIFdr 201 to 400 amps $525.00
Perm ServIFdr 601 to 999 amps $163.00
Perm ServIFdr 1000 ampslvolts $5,250.00
Add, Alter, Extend Circ Ea Add $471.00
Low Voltage - Commercial Indus $405.00
Plan Review Electrical (25%) $1,798.00
Other Electrical Permit $7,528.00
+ 8% State Surcharge $746.08
+ 10% Administrative Fee $932.60
+ 10% Administrative Fee $174.10
Furnace -uP,to Wp.OOO btu $12.00
Furnace -~~~lJlnc&gfllo.o,%OOAlL EXPIRE IF THE$'I~~(()().K
Fu~nace - UHihJ:feater'~\ \ H ER lHIS PERM\'~~~'4!QQn
Boller/Comril1<V~R$I>EIlLpU N D $6.9.5..00
A~r Handll~~ J?~E.4"PJ~oo:o.edS ABANDONED ~\grOO
AIr Handh~~1 ~nltKl'9'iqCAO(~ 9v:rOD. $30.00
Fees Paid
Date Paid
Receint #
10106/2005 1200500000000001472
10/06/2005 1200500000000001472
10106/2005 1200500000000001472
10106/2005 1200500000000001472
03/09/2006 2200600000000000286
03/09/2006 2200600000000000286
03/09/2006 2200600000000000286
03/09/2006 2200600000000000286
03/09/2006 22006000'00000000286
04/13/2006 2200600000000000464
_04L13/2006 2200600000000000464
ATTENTd4.Jrs/W'"01Qon law requires you Rj00600000000000464
fo~l?w ~U04;AI~W2(1);063d by the Oregon UtiI~y00600000000000464
.Notlflcatlo04e:l612:o.0.6 Those rules are set fJrt i0600000000000464
In OAR 8SQ4iJ1J'(2ggq 0 through OAR 952_nft2~0600000000000464
0090. Youq4(!VtR.R~in copies of the rule;::rZ)0600000000000464
cellin t91iIJ~+q2p t. 22'60600000000000464
. 9 0~'lbdo.o6 (No,e. the telephonc2200600000000000464
nun-;:"Qr b'4/131260'(Ygon Utility No!ificatioml00600000000000464
C6'4/ig~i'Oao800-332-2344). 2200600000000000464
04/13/2006 2200600000000000464
06/09/2006 1200600000000000840
06/09/2006 1200600000000000840
06/09/2006 1200600000000000840
06/09/2006 1200600000000000840
06/09/2006 1200600000000000840
06/09/2006 1200600000000000840
06/09/2006 1200600000000000840
lof9'
~.........:'."".....iiI.... -....................
.._.
City of Springfield
Building Permit & Inspection Summary
6/28/2006
1:13:25PM
Job #:
CO M2005-0 1358
225 Fifth Street
541-726-3753 Phone
541-726-3676 Fax
Project Status: Issued
Vent Fan
Appliance Vent
Gas Outlets 1-4
Gas Outlets 4+
Appliance Not Listed
-Mechanical Issuance Fee-
Plan Review Mechanical (25%)
+ 8% State Surcharge
+ 10% Administrative Fee
Fixture
Sewage Ejector Pump
Backflow Device
Trap or Waste not Conn to Fixt
Not Covered Plumbing
Plan Review Plumbing (30%)
+ 8% State Surcharge
Plan Review Comm/lndlPublic
Plan Review Fire & Life Safety
Building Permit
+ 8% State Surcharge
+ 10% Administrative Fee
Total Amount Paid
Job Address: 3420 Baldy View Ln
Scope of Work: Commercial Miscellaneous
Description of Work: Structural Fill for and Construction of Central
Utility Plant
06/09/2006
06/09/2006
06/09/2006
06/09/2006
06/09/2006
06/09/2006
06/09/2006
06/09/2006
06/09/2006
06/09/2006
06/09/2006
06/09/2006
06/09/2006
06/09/2006
06/09/2006
06/09/2006
06/09/2006
06/09/2006
06/09/2006
06/09/2006
06/09/2006
$48.00
$90.00
$4.00
$5.00
$630.00
$10.00
$435.25
$78.40
$98.00
$126.00
$28.00
$56.00
$280.00
$490.00
$294.00 .
$139.28
$46,582.84
$28,666.36
$71,665.90
$5,733.28
$7,166.59
$187,036.49
Plans Reviewed
Springfield
1200600000000000840
1200600000000000840
1200600000000000840
1200600000000000840
1200600000000000840
1200600000000000840
1200600000000000840
1200600000000000840
1200600000000000840
1200600000000000840
1200600000000000840
1200600000000000840
1200600000000000840
1200600000000000840
1200600000000000840
1200600000000000840
1200600000000000840
1200600000000000840
1200600000000000840
1200600000000000840
1200600000000000840
Structural Review
05/30/2006
Received Due Date Completed Result Reviewer Comments
Denartment
Plan Review Comments
06/09/2006 05/30/2006 WI
AC
06/13/2006 10
LLH
20f9
Waiting on information from
Kaye Wilson to complete
permit fee information. See
attached documents
Electrical permit which was
paid on 4/1312006 was placed
in electricallsurchargeladmin
fee to cover work that was
being completed at site. After
the money was receipted into
the City's system, a change
was made on the fees that
were due for the proposed
electrical work. The new fees
have been entered and
validated, but are less that the
original amount received. I
have requested a refund in the
amount of$9206.68.
City of Springfield
Building Permit & Inspection Summary
6/28/2006
1:13:25PM
Job #:
CO M2005-0 1358
225 Fifth Street
541-726-3753 Phone
541-726-3676 Fax
Project Status: Issued
Job Address: 3420 Baldy View Ln Springfield
Scope of Work: Commercial Miscellaneous
Description of Work: Structural Fill for and Construction of Central
Utility Plant
Underground Electric
Insnections Conducted
Comments Date Result Insnector
Reinforcing steel at utilidor walls 04/24/2006 POK TD
(approx. 100') north of hospital
grid ine I to closure strip,
installed. OK to pour pending
special inspectors sign off.
CCI Report #B-544
Conduit under north side of CUP 05105/2006 OK DS
footing approved.
CCI Report #E-629
Conduit chase to utilidor sump, 05109/2006 OK DS
south side of CUP approved.
CCI Report #E-658
Reinforcing steel installed per 05/] 1/2006 POK TD
KPFF drawing #SK-1. Center
and eastern two footing poured,
western deadman to be poured at
future date. OK to pour pending
sign off from special inspector.
CCI Report #B-688
Fuel tank - 2nd deadman. 05/1 5/2006 POK KW
Drawing SK-] KPFF Engineering
dated 5/2/06. Reinforcing steel
and form clearances. Approved to
pour pending special inspectors
sign off.
CCI Report #B-715
Utilidor walls on C7.3/CK.5-CP, 05/1 6/2006 POK TD
C8/CK.5-CP, C7.3-C8/CN.5,
C7.3-C.8/CK.5, C7.3-C8/CP,
reinforcing steel installed. OK to
pour I st lift pending special
inspectors sign off.
CCI Report #B-758
Tremco waterproofing applied 05/16/2006 POK TD
over utilidor lid slab and on
utilidor tunnel walls. See special
inspection report for
waterproofing specifics. OK to
pour rat slab.
CCI Report #B-759
Insnections
Structural Concrete
Underslab Electric
Structural Concrete
Structural Concrete
Structural Concrete
Special-Structural
30f9
City of Springfield
Building Permit & Inspection Summary
Job Address: 3420 Baldy View Ln
Scope of Wark: Commercial Miscellaneous
Description of Wark: Structural Fill for and Construction of Central
Utility Plant
05/17/2006
225 Fifth Street
541-726-3753 Phone
541-726-3676 Fax
Project Status: Issued
Underground Medical Gas
First (approx) 8' horizontal 4" )
02 line to be laid in ditch made
up, brazed under purge and
observed with a standing pressure
test before being buried. Sized in
accordance with the design
professionals instructions.
CCI Report #PMG-725
CUP A and B service lateral north
side buried conduit approved.
CCI Report #E-727
Chases and conduit under east
side of slab CUP.
CCI Report #E-738
Duct bank north side, buried
conduit in ground north parallel to
CUP running east-west,
progressive OK.
CCI Report #E-739
Buried conduit, C5-M, east west
duct bank on north of CUP,
progressive ok.
CCI Report #E-749
Buried conduit, emergency
service lateral, north of CUP,
progressive ok.
CCI Report #E-750
East west dLict bank under slab,
buried conduit, in-ground middle
of CUP running EW then NS:
Progress inspection.
CCI Report #E-775
Duct bank north side. Ingroung
north parallel to CUP running east
to west.
CCI Report #E-773
Duct bank middle of CUP.
In-ground middle of CUP running
south 18 6" conduits, progressive
ok.
CCI Report #E-774
Buried conduit C7-N, north end
utilidor ceiling, south CUP
middle. North termination of
Utilidor. Approved.
CCI Report #E-776
Underground Electric
Underslab Electric
Underground Electric
Underground Electric
Underground Electric
Underground Electric
Underground Electric
Underground Electric
Underslab Electric
40f9
05/18/2006
05/19/2006
05/19/2006
OS/25/2006
05/25/2006
05/25/2006
05/25/2006
05/25/2006
05/25/2006
612812006
1:13:25PM
Job #:
CO M2005-0 1358
Springfield
POK
RM
OK
DS
OK
OS
OK
DS
POK
OS
POK
OS
POK
DS
POK
DS
POK
OS
OK
DS
City of Springfield
Building Permit & Inspection Summary
6/28/2006
1:13:25PM
Job #:
COM2005-01358
Job Address: 3420 Baldy View Ln
Scope of Work: Commercial Miscellaneous
Description of Wark: Structural Fill for and Construction of Central
Utility Plant
05/25/2006
225 Fifth Street
541-726-3753 Phone
541-726-3676 Fax
Project Status: Issued
Progressive Inspection
Received Fuel Oil Tank deferred
submittal #0575-15000, item #1 at
12pm today. A+A approved on
5/25/06. Requested and
conducted field inspection of
in-progress installation of 2
xerexes 40,000 gallon storage
tanks at the CUP facility. Pea
gravel backfill work was in
progress. West tank anchor
attachments to the deadman were
below gravel backfill level and
not accessible for inspection. The
tank strap locations in the
deferred submittal did not match
strap locations as installed in the
field. Asked Turner/Harder to
submit new skectch that was in
Harders possession and used to
layout anchor bolt locations. This
new skectch from Xerxes, titled
Sacred Heart Hospital, #627-581,
dated 2/1 7/06 matches the strap
locations a sthey are int eh field
and differ from manufacturers
installation manual and operating
guidelines booklet used as
information for this submittal.
This new sketch is submitted to be
part of submittal #0575-15000
submission. Testing per
manufacturers spec section 3.4
was discussed with contractor.
Contractor to provide test results
not witnessed by City Inspector.
Confirmed with Springfield Fire
Marshal taht it would be
acceptable to allow continuing
backfilIing with the understanding
that the tanks would be retested
adn witnessed after completion of
backfilIing and before product
pipe is connected. Confirmed
with Steve Spitzer that backfilling
and tank installation would be at
risk until complete deferred
submittal is received, reviewed,
and approved by Anshen and City
of Springfield.
CCI Report #8-789
50f9
Springfield
POK
TD
~
City of Springfield
Building Permit & Inspection Summary
Job Address: 3420 Baldy View Ln
Scope of Work: Commercial Miscellaneous
Description of Work: Structural Fill for and Construction of Central
Utility Plant
05/26/2006
225 Fifth Street
541-726-3753 Phone
541-726-3676 Fax
Project Status: Issued
Structural Concrete
Concrete footings at
C.9-C3.2/CM.8, C3.6-C4.8/CN,
C2-C3 .1/CN-CS, reinforcing steel
installed and conforms with
approved plans. OK to pour
pending special inspectors sign
off.
CCI Report #B-799
Fuel Tank Inspection - Backfilling
at fuel oil tanks was put off and
contractor repeated air test, listed
in report #B-789 as not being
witnessed by City Inspector.
West tank pressurized to 4 psi at
8:00am, was 3.85 psi at 10:00am.
East tank pressurized to 4 psi at
10:45 am, was 3.75 at 12:00pm.
Fittings soaped at top of tanks, no
leaks found. Hot air from
compressor cooled in tanks
account for pressure lost.
Continued inspections required.
Pressure test immediately after
backfilling not needed. Schedule
next after work completed per
manufacturers instructions.
CCI Report #B-813
Duct bank middle of CUP.
In-ground middle of CUP running
south 18 6" conduits, progressive
ok.
CCI Report #E-774
Duct bank at C6 to CCIC7 buried
conduit in progress.
CCI Report #E-832
Duct bank at C8 to CHlCJ buried
conduit in progress.
CCI Report #E-833
Special
Underground Electric
Underground Electric
Underground Electric
60f9
05/30/2006
05/31/2006
06/02/2006
06/02/2006
6/28/2006
1:13:25PM
Job #:
COM2005-01358
Springfield
POK
TD
POK
TD
POK
DS
POK
DS
POK
DS
City of Springfield
Building Permit & Inspection Summary
6/28/2006
I :13:25PM
Job #:
COM2005-01358
Job Address: 3420 Baldy View Ln
Scope of Work: Commercial Miscellaneous
Description of Wark: Structural Fill for and Construction of Central
Utility Plant
06/02/2006
225 Fifth Street
541-726-3753 Phone
541-726-3676 Fax
Project Status: Issued
Structural Concrete
Utilidor lid section at
C.75-C.8/CM-CO had the
reinforcing steel placed as is
shown in detail R/S4.3C, typical
utilidor sectiona ndnot the section
cut P/S4.3C called outon S2.1 CB
for the utilidor lid section at the
above listed location. At the time
of the pour the special inspector
informed Hyland, and a call was
placed to KPFF for a resolution.
Gary with Hyland received a
verbal answer that the reinforcing
as placed would be satisfactory
and confirmation would be forth
coming. CLAIR Company has
received RFI #1343 which
confirms verbal and closes report
#B-809.
CCI Report B-850
Duct bank buried conduit at
C6/CH progress inspection.
CCI Report #E-846
Duct bank buried conduit at
CCICH progress inspection.
CCI Report #E-847
First 80' section from CUP dewar
riser is observed brazed under
purge, allowed to cool under
purge, then wiped down and
cleaned - 02 - 4" copper main.
Brazed was elevated - purge
began at pipe/fitting make up
before brazeing as a clear
precaution. Required sleeve with
appropriate marking will be
applied before covering as well as
marking at backfill at 1/2" depth
of ditch. Further connections and
extensions will be observed
Friday 6/1 6/06.
CCI Report #PMG-~84
Generator equipment pads at
C6.5-C7.5ICD.3-CD.6,
C6.5-C7.5ICE.6-CE.6, and
C6.5-C7.5ICF.3-CF.6 ok to
pourpending special inspectors
sign off.
CCI Report #B-931
06/15/2006
Underground Electric
06/06/2006
Underground Electric
06/07/2006
Progressive Inspection - Plumb
06/1 5/2006
Structural Concrete
70f9
POK
Springfield
POK
TD
POK
DS
POK
DS
POK
RM
TD
~~
1*-::,1
City of Springfield
Building Permit & Inspection Summary
6/28/2006
1:13:25PM
Job #:
CO M2005-0 1358
Job Address: 3420 Baldy View Ln
Scope of Work: Commercial Miscellaneous
Description of Work: Structural Fill for and Construction of Central
Utility Plant
06/1 6/2006
225 Fifth Street
541-726-3753 Phone
541-726-3676 Fax
Project Status: Issued
Structural Concrete
Reinforcing steel installed at
C6.8-C8/CU, and C.8/CP-CU.
OK to pour pending special
inspectors sign off.
CCI Report #B-932
Observation of brazing and purge
of medical gas piping at grids
C8/A-K. This portiong of the
med gas system conditionally
approved pending further tests
and inspections as required.
CCI Report #PMG-896
Section of duct bank west of CN
at C5, buried conduit approved.
CCI Report #E-893
Section of buried conduit, duct
bank, go-gen duct bank under
slab, progress inspection.
CCI Report #E-912
Brazing and purge of 4" medical
oxygen underground installation
approx. 100 ft. Observed 150 psi
pressure test using dry oil free
nitrogen including purging of
system during brazing of joints.
The 4" type L copper piping was
incased in 6" PVC plastic pipe
witht he coupling left unglued
during the inspection/testing
phase. A continuous ribbon taped
to the PVC incasement identifying
oxygen. Approved pending
special inspection of backfill and
a 2nd identifying ribbon placed
1/2 above final depth.
CCI Report #PMG-914
Utilidor footing, 105'-0" feet from
C8 south. Reinforcing steel
installed over bentonite
waterproofing. OK to pour
pending special inspectors sign
off.
CCI Report #B-933
Underground Medical Gas
Underground Electric
Underground Electric
Underground Medical Gas
Structural Concrete
80f9
06/1 6/2006
06/1 6/2006
06/16/2006
06/19/2006
06/21/2006
Springfield
POK
TD
POK
JG
OK
DS
OK
JD
POK
JG
POK
TD
City of Springfield
Building Permit & Inspection Summary
6/28/2006
1:13:25PM
Job #:
COM2005-01358
Job Address: 3420 Baldy View Ln
Scope of Work: Commercial Miscellaneous
Description of Work: Structural Fill for and Construction of Central
Utility Plant
06/22/2006
225 Fifth Street
541-726-3753 Phone
541-726-3676 Fax
Project Status: Issued
Underslab Plumbing
Interior underslab DWV
progressive inspection of piping
installation, joints and supporting
and bedding of system prior to
backfill. Observed this portion of
system being prepared for
inspection and test. Conditionally
approved pending future required
inspections and tests.
CCI Report #P-929
2 portions of combination waste
and vent piping are observed with
a 10' static head going west to the
horizontal building drain. All trap
arms, floor drains, trench drains,
and attachments will meet all
installation and sizing
requirements contained in Chapter
9 of the OPSC Table 7-4 for trap
loading. The design professional
shall submit signed and stamped
calculations for resizing of floor
drains, trench drains adn other
connections before final approval
for cover can be granted and
concrete poured in this area.
CCI Report #P-938
8" ductile fire feed pipe is
observed installed in nw section
of CUP. Thrust block is observed
on 90 degree fitting on horizontal
to vertical section coming up
within bldg. All underground
piping for fire mains shall be
installed, anchored, flushed, and
hydrostatically pressure tested
before final approval will be
granted (spec section 152802.3
D). This short section approved
for cover but subject to further
inspection requirements.
CCI Report #P-942
Underslab Plumbing
Special - Plumbing
90f9
Springfield
POK
JG
06/23/2006
POK
RM
06/26/2006
POK
RM