Loading...
HomeMy WebLinkAboutPermit Building 2006-6-28 City of Springfield Building Permit & Inspection Summary 6/28/2006 1:13:24PM Job #: COM2005-01358 225 Fifth Street 541-726-3753 Phone 541-726-3676 Fax Project Status: Issued Job Address: 3420 Baldy View Ln Springfield Scope of Work: Commercial Miscellaneous Description of Work: Structural Fill for and Construction of Central Utility Plant Name ARC ANSHEN+ALLEN CON TURNER CONSTRUCTION COMPANY ELC MORROW MEADOWS CORP MEC HARDER MECHANICAL CONTRACTOR OWN PEACEHEALTH PLM HARDER MECHANICAL CONTRACTOR Occunancv Construction Tvne Estimate Estimate Estimate Estimate Estimate Estimate Descrintion Owner & Contractor(s) Address 1500 FOURTH AVE, STE 45 90 I MAIN ST #4900 1596 22ND ST SE PO BOX 5118 PO BOX 1479 PO BOX 5118 Citv. State. Zin SEATTLE W 98101 DALLAS TX 75202 SALEM OR 97302 PORTLAND OR 97208 EUGENE OR 97440 PORTLAND OR 97208 Phone 415-882-9500 503 229-6000 503-399-7609 503-281-1112 541-688-3828 503-281-1112 Valuation of Proiect Date Cost Per So Ft So Ftg Valuation Calculated Staff $ 1.00 167,400.00 $167,400.00 2005/1 0104 LLH $ 1.00 21,976,709.00 $21,976,709.00 2006/05/23 LLH $ 1.00 250,000.00 $250,000.00 2006/03/06 DJB $22,394,109.00 Amount Paid Plan Review Comm/lnd/Public $511.32 + 7% State Surcharge $55.07 + 10% Administrative Fee $78.67 Site Work $786.65 Building Permit $1,053.15 Plan Review Comm/lnd/Public $684.55 + 8% State Surcharge $84.26 + 10% Administrative Fee $105.32 Plan Review Fire & Life Safety $421.26 + 8% State Surcharge $575.36 + 10% Administrative Fee $719.20 Perm ServIFdr 200 amps or less $378.00 Perm ServIFdr 201 to 400 amps $525.00 Perm ServIFdr 601 to 999 amps $163.00 Perm ServIFdr 1000 ampslvolts $5,250.00 Add, Alter, Extend Circ Ea Add $471.00 Low Voltage - Commercial Indus $405.00 Plan Review Electrical (25%) $1,798.00 Other Electrical Permit $7,528.00 + 8% State Surcharge $746.08 + 10% Administrative Fee $932.60 + 10% Administrative Fee $174.10 Furnace -uP,to Wp.OOO btu $12.00 Furnace -~~~lJlnc&gfllo.o,%OOAlL EXPIRE IF THE$'I~~(()().K Fu~nace - UHihJ:feater'~\ \ H ER lHIS PERM\'~~~'4!QQn Boller/Comril1<V~R$I>EIlLpU N D $6.9.5..00 A~r Handll~~ J?~E.4"PJ~oo:o.edS ABANDONED ~\grOO AIr Handh~~1 ~nltKl'9'iqCAO(~ 9v:rOD. $30.00 Fees Paid Date Paid Receint # 10106/2005 1200500000000001472 10/06/2005 1200500000000001472 10106/2005 1200500000000001472 10106/2005 1200500000000001472 03/09/2006 2200600000000000286 03/09/2006 2200600000000000286 03/09/2006 2200600000000000286 03/09/2006 2200600000000000286 03/09/2006 22006000'00000000286 04/13/2006 2200600000000000464 _04L13/2006 2200600000000000464 ATTENTd4.Jrs/W'"01Qon law requires you Rj00600000000000464 fo~l?w ~U04;AI~W2(1);063d by the Oregon UtiI~y00600000000000464 .Notlflcatlo04e:l612:o.0.6 Those rules are set fJrt i0600000000000464 In OAR 8SQ4iJ1J'(2ggq 0 through OAR 952_nft2~0600000000000464 0090. Youq4(!VtR.R~in copies of the rule;::rZ)0600000000000464 cellin t91iIJ~+q2p t. 22'60600000000000464 . 9 0~'lbdo.o6 (No,e. the telephonc2200600000000000464 nun-;:"Qr b'4/131260'(Ygon Utility No!ificatioml00600000000000464 C6'4/ig~i'Oao800-332-2344). 2200600000000000464 04/13/2006 2200600000000000464 06/09/2006 1200600000000000840 06/09/2006 1200600000000000840 06/09/2006 1200600000000000840 06/09/2006 1200600000000000840 06/09/2006 1200600000000000840 06/09/2006 1200600000000000840 06/09/2006 1200600000000000840 lof9' ~.........:'."".....iiI.... -.................... .._. City of Springfield Building Permit & Inspection Summary 6/28/2006 1:13:25PM Job #: CO M2005-0 1358 225 Fifth Street 541-726-3753 Phone 541-726-3676 Fax Project Status: Issued Vent Fan Appliance Vent Gas Outlets 1-4 Gas Outlets 4+ Appliance Not Listed -Mechanical Issuance Fee- Plan Review Mechanical (25%) + 8% State Surcharge + 10% Administrative Fee Fixture Sewage Ejector Pump Backflow Device Trap or Waste not Conn to Fixt Not Covered Plumbing Plan Review Plumbing (30%) + 8% State Surcharge Plan Review Comm/lndlPublic Plan Review Fire & Life Safety Building Permit + 8% State Surcharge + 10% Administrative Fee Total Amount Paid Job Address: 3420 Baldy View Ln Scope of Work: Commercial Miscellaneous Description of Work: Structural Fill for and Construction of Central Utility Plant 06/09/2006 06/09/2006 06/09/2006 06/09/2006 06/09/2006 06/09/2006 06/09/2006 06/09/2006 06/09/2006 06/09/2006 06/09/2006 06/09/2006 06/09/2006 06/09/2006 06/09/2006 06/09/2006 06/09/2006 06/09/2006 06/09/2006 06/09/2006 06/09/2006 $48.00 $90.00 $4.00 $5.00 $630.00 $10.00 $435.25 $78.40 $98.00 $126.00 $28.00 $56.00 $280.00 $490.00 $294.00 . $139.28 $46,582.84 $28,666.36 $71,665.90 $5,733.28 $7,166.59 $187,036.49 Plans Reviewed Springfield 1200600000000000840 1200600000000000840 1200600000000000840 1200600000000000840 1200600000000000840 1200600000000000840 1200600000000000840 1200600000000000840 1200600000000000840 1200600000000000840 1200600000000000840 1200600000000000840 1200600000000000840 1200600000000000840 1200600000000000840 1200600000000000840 1200600000000000840 1200600000000000840 1200600000000000840 1200600000000000840 1200600000000000840 Structural Review 05/30/2006 Received Due Date Completed Result Reviewer Comments Denartment Plan Review Comments 06/09/2006 05/30/2006 WI AC 06/13/2006 10 LLH 20f9 Waiting on information from Kaye Wilson to complete permit fee information. See attached documents Electrical permit which was paid on 4/1312006 was placed in electricallsurchargeladmin fee to cover work that was being completed at site. After the money was receipted into the City's system, a change was made on the fees that were due for the proposed electrical work. The new fees have been entered and validated, but are less that the original amount received. I have requested a refund in the amount of$9206.68. City of Springfield Building Permit & Inspection Summary 6/28/2006 1:13:25PM Job #: CO M2005-0 1358 225 Fifth Street 541-726-3753 Phone 541-726-3676 Fax Project Status: Issued Job Address: 3420 Baldy View Ln Springfield Scope of Work: Commercial Miscellaneous Description of Work: Structural Fill for and Construction of Central Utility Plant Underground Electric Insnections Conducted Comments Date Result Insnector Reinforcing steel at utilidor walls 04/24/2006 POK TD (approx. 100') north of hospital grid ine I to closure strip, installed. OK to pour pending special inspectors sign off. CCI Report #B-544 Conduit under north side of CUP 05105/2006 OK DS footing approved. CCI Report #E-629 Conduit chase to utilidor sump, 05109/2006 OK DS south side of CUP approved. CCI Report #E-658 Reinforcing steel installed per 05/] 1/2006 POK TD KPFF drawing #SK-1. Center and eastern two footing poured, western deadman to be poured at future date. OK to pour pending sign off from special inspector. CCI Report #B-688 Fuel tank - 2nd deadman. 05/1 5/2006 POK KW Drawing SK-] KPFF Engineering dated 5/2/06. Reinforcing steel and form clearances. Approved to pour pending special inspectors sign off. CCI Report #B-715 Utilidor walls on C7.3/CK.5-CP, 05/1 6/2006 POK TD C8/CK.5-CP, C7.3-C8/CN.5, C7.3-C.8/CK.5, C7.3-C8/CP, reinforcing steel installed. OK to pour I st lift pending special inspectors sign off. CCI Report #B-758 Tremco waterproofing applied 05/16/2006 POK TD over utilidor lid slab and on utilidor tunnel walls. See special inspection report for waterproofing specifics. OK to pour rat slab. CCI Report #B-759 Insnections Structural Concrete Underslab Electric Structural Concrete Structural Concrete Structural Concrete Special-Structural 30f9 City of Springfield Building Permit & Inspection Summary Job Address: 3420 Baldy View Ln Scope of Wark: Commercial Miscellaneous Description of Wark: Structural Fill for and Construction of Central Utility Plant 05/17/2006 225 Fifth Street 541-726-3753 Phone 541-726-3676 Fax Project Status: Issued Underground Medical Gas First (approx) 8' horizontal 4" ) 02 line to be laid in ditch made up, brazed under purge and observed with a standing pressure test before being buried. Sized in accordance with the design professionals instructions. CCI Report #PMG-725 CUP A and B service lateral north side buried conduit approved. CCI Report #E-727 Chases and conduit under east side of slab CUP. CCI Report #E-738 Duct bank north side, buried conduit in ground north parallel to CUP running east-west, progressive OK. CCI Report #E-739 Buried conduit, C5-M, east west duct bank on north of CUP, progressive ok. CCI Report #E-749 Buried conduit, emergency service lateral, north of CUP, progressive ok. CCI Report #E-750 East west dLict bank under slab, buried conduit, in-ground middle of CUP running EW then NS: Progress inspection. CCI Report #E-775 Duct bank north side. Ingroung north parallel to CUP running east to west. CCI Report #E-773 Duct bank middle of CUP. In-ground middle of CUP running south 18 6" conduits, progressive ok. CCI Report #E-774 Buried conduit C7-N, north end utilidor ceiling, south CUP middle. North termination of Utilidor. Approved. CCI Report #E-776 Underground Electric Underslab Electric Underground Electric Underground Electric Underground Electric Underground Electric Underground Electric Underground Electric Underslab Electric 40f9 05/18/2006 05/19/2006 05/19/2006 OS/25/2006 05/25/2006 05/25/2006 05/25/2006 05/25/2006 05/25/2006 612812006 1:13:25PM Job #: CO M2005-0 1358 Springfield POK RM OK DS OK OS OK DS POK OS POK OS POK DS POK DS POK OS OK DS City of Springfield Building Permit & Inspection Summary 6/28/2006 1:13:25PM Job #: COM2005-01358 Job Address: 3420 Baldy View Ln Scope of Work: Commercial Miscellaneous Description of Wark: Structural Fill for and Construction of Central Utility Plant 05/25/2006 225 Fifth Street 541-726-3753 Phone 541-726-3676 Fax Project Status: Issued Progressive Inspection Received Fuel Oil Tank deferred submittal #0575-15000, item #1 at 12pm today. A+A approved on 5/25/06. Requested and conducted field inspection of in-progress installation of 2 xerexes 40,000 gallon storage tanks at the CUP facility. Pea gravel backfill work was in progress. West tank anchor attachments to the deadman were below gravel backfill level and not accessible for inspection. The tank strap locations in the deferred submittal did not match strap locations as installed in the field. Asked Turner/Harder to submit new skectch that was in Harders possession and used to layout anchor bolt locations. This new skectch from Xerxes, titled Sacred Heart Hospital, #627-581, dated 2/1 7/06 matches the strap locations a sthey are int eh field and differ from manufacturers installation manual and operating guidelines booklet used as information for this submittal. This new sketch is submitted to be part of submittal #0575-15000 submission. Testing per manufacturers spec section 3.4 was discussed with contractor. Contractor to provide test results not witnessed by City Inspector. Confirmed with Springfield Fire Marshal taht it would be acceptable to allow continuing backfilIing with the understanding that the tanks would be retested adn witnessed after completion of backfilIing and before product pipe is connected. Confirmed with Steve Spitzer that backfilling and tank installation would be at risk until complete deferred submittal is received, reviewed, and approved by Anshen and City of Springfield. CCI Report #8-789 50f9 Springfield POK TD ~ City of Springfield Building Permit & Inspection Summary Job Address: 3420 Baldy View Ln Scope of Work: Commercial Miscellaneous Description of Work: Structural Fill for and Construction of Central Utility Plant 05/26/2006 225 Fifth Street 541-726-3753 Phone 541-726-3676 Fax Project Status: Issued Structural Concrete Concrete footings at C.9-C3.2/CM.8, C3.6-C4.8/CN, C2-C3 .1/CN-CS, reinforcing steel installed and conforms with approved plans. OK to pour pending special inspectors sign off. CCI Report #B-799 Fuel Tank Inspection - Backfilling at fuel oil tanks was put off and contractor repeated air test, listed in report #B-789 as not being witnessed by City Inspector. West tank pressurized to 4 psi at 8:00am, was 3.85 psi at 10:00am. East tank pressurized to 4 psi at 10:45 am, was 3.75 at 12:00pm. Fittings soaped at top of tanks, no leaks found. Hot air from compressor cooled in tanks account for pressure lost. Continued inspections required. Pressure test immediately after backfilling not needed. Schedule next after work completed per manufacturers instructions. CCI Report #B-813 Duct bank middle of CUP. In-ground middle of CUP running south 18 6" conduits, progressive ok. CCI Report #E-774 Duct bank at C6 to CCIC7 buried conduit in progress. CCI Report #E-832 Duct bank at C8 to CHlCJ buried conduit in progress. CCI Report #E-833 Special Underground Electric Underground Electric Underground Electric 60f9 05/30/2006 05/31/2006 06/02/2006 06/02/2006 6/28/2006 1:13:25PM Job #: COM2005-01358 Springfield POK TD POK TD POK DS POK DS POK DS City of Springfield Building Permit & Inspection Summary 6/28/2006 I :13:25PM Job #: COM2005-01358 Job Address: 3420 Baldy View Ln Scope of Work: Commercial Miscellaneous Description of Wark: Structural Fill for and Construction of Central Utility Plant 06/02/2006 225 Fifth Street 541-726-3753 Phone 541-726-3676 Fax Project Status: Issued Structural Concrete Utilidor lid section at C.75-C.8/CM-CO had the reinforcing steel placed as is shown in detail R/S4.3C, typical utilidor sectiona ndnot the section cut P/S4.3C called outon S2.1 CB for the utilidor lid section at the above listed location. At the time of the pour the special inspector informed Hyland, and a call was placed to KPFF for a resolution. Gary with Hyland received a verbal answer that the reinforcing as placed would be satisfactory and confirmation would be forth coming. CLAIR Company has received RFI #1343 which confirms verbal and closes report #B-809. CCI Report B-850 Duct bank buried conduit at C6/CH progress inspection. CCI Report #E-846 Duct bank buried conduit at CCICH progress inspection. CCI Report #E-847 First 80' section from CUP dewar riser is observed brazed under purge, allowed to cool under purge, then wiped down and cleaned - 02 - 4" copper main. Brazed was elevated - purge began at pipe/fitting make up before brazeing as a clear precaution. Required sleeve with appropriate marking will be applied before covering as well as marking at backfill at 1/2" depth of ditch. Further connections and extensions will be observed Friday 6/1 6/06. CCI Report #PMG-~84 Generator equipment pads at C6.5-C7.5ICD.3-CD.6, C6.5-C7.5ICE.6-CE.6, and C6.5-C7.5ICF.3-CF.6 ok to pourpending special inspectors sign off. CCI Report #B-931 06/15/2006 Underground Electric 06/06/2006 Underground Electric 06/07/2006 Progressive Inspection - Plumb 06/1 5/2006 Structural Concrete 70f9 POK Springfield POK TD POK DS POK DS POK RM TD ~~ 1*-::,1 City of Springfield Building Permit & Inspection Summary 6/28/2006 1:13:25PM Job #: CO M2005-0 1358 Job Address: 3420 Baldy View Ln Scope of Work: Commercial Miscellaneous Description of Work: Structural Fill for and Construction of Central Utility Plant 06/1 6/2006 225 Fifth Street 541-726-3753 Phone 541-726-3676 Fax Project Status: Issued Structural Concrete Reinforcing steel installed at C6.8-C8/CU, and C.8/CP-CU. OK to pour pending special inspectors sign off. CCI Report #B-932 Observation of brazing and purge of medical gas piping at grids C8/A-K. This portiong of the med gas system conditionally approved pending further tests and inspections as required. CCI Report #PMG-896 Section of duct bank west of CN at C5, buried conduit approved. CCI Report #E-893 Section of buried conduit, duct bank, go-gen duct bank under slab, progress inspection. CCI Report #E-912 Brazing and purge of 4" medical oxygen underground installation approx. 100 ft. Observed 150 psi pressure test using dry oil free nitrogen including purging of system during brazing of joints. The 4" type L copper piping was incased in 6" PVC plastic pipe witht he coupling left unglued during the inspection/testing phase. A continuous ribbon taped to the PVC incasement identifying oxygen. Approved pending special inspection of backfill and a 2nd identifying ribbon placed 1/2 above final depth. CCI Report #PMG-914 Utilidor footing, 105'-0" feet from C8 south. Reinforcing steel installed over bentonite waterproofing. OK to pour pending special inspectors sign off. CCI Report #B-933 Underground Medical Gas Underground Electric Underground Electric Underground Medical Gas Structural Concrete 80f9 06/1 6/2006 06/1 6/2006 06/16/2006 06/19/2006 06/21/2006 Springfield POK TD POK JG OK DS OK JD POK JG POK TD City of Springfield Building Permit & Inspection Summary 6/28/2006 1:13:25PM Job #: COM2005-01358 Job Address: 3420 Baldy View Ln Scope of Work: Commercial Miscellaneous Description of Work: Structural Fill for and Construction of Central Utility Plant 06/22/2006 225 Fifth Street 541-726-3753 Phone 541-726-3676 Fax Project Status: Issued Underslab Plumbing Interior underslab DWV progressive inspection of piping installation, joints and supporting and bedding of system prior to backfill. Observed this portion of system being prepared for inspection and test. Conditionally approved pending future required inspections and tests. CCI Report #P-929 2 portions of combination waste and vent piping are observed with a 10' static head going west to the horizontal building drain. All trap arms, floor drains, trench drains, and attachments will meet all installation and sizing requirements contained in Chapter 9 of the OPSC Table 7-4 for trap loading. The design professional shall submit signed and stamped calculations for resizing of floor drains, trench drains adn other connections before final approval for cover can be granted and concrete poured in this area. CCI Report #P-938 8" ductile fire feed pipe is observed installed in nw section of CUP. Thrust block is observed on 90 degree fitting on horizontal to vertical section coming up within bldg. All underground piping for fire mains shall be installed, anchored, flushed, and hydrostatically pressure tested before final approval will be granted (spec section 152802.3 D). This short section approved for cover but subject to further inspection requirements. CCI Report #P-942 Underslab Plumbing Special - Plumbing 90f9 Springfield POK JG 06/23/2006 POK RM 06/26/2006 POK RM