HomeMy WebLinkAboutPermit Electrical 1990-4-13
""~ .0..1... .~_Q... .........11&I..........1 11I.....,..............., .... .....,.1... ,...I.L..... J"'_ ._. I.. ,...........11...1..
.. RESIDf TIAl..
APPLICAT IO;;; /PERMIT
225 Nopth 5th Stpeet
Sppingfield~ Opegon 97477
Building Division
726-3753
Job Location: II?))~ Lf
CHtOJ\ )
ASlJessors Map H
Subdivision:
bt~~ /V~
Address: ~ I ~ <6 ~
City: S~/~J/Lt'
Otmer:
,,~ .-,
Rece~pt ,ij
IfQ to Xd/
xciJ
T= Lot H
Or;-
Phone: 79? -S'J- Cf~
Zip: 1) (; 7 '7
/.>-h,p.w
I I Addition
I I Remodel
I I Uobi le Home
~~S[bd'~ { )yjJ
~
Date of Application
Cont.ractors <:~ (-f
General
]
UNDERGROUND PLUMBING. SEWER. WATER,
DRAINAGE: To be made prior to fil-
Zir.g trenches.
J: UNDERFLOOR PLUMBING & MECHANICAL:
, To be made prior to installation of
17001' insu~tion 01' decking.
] POST AND BEAM: To be made pnor to
installation of floor ins~lation or
decking. ~
~6UGH PLUMBING. ~t & MECH-
..=J ANICAL: No wor~e covered
,until these inspections have been
made and approve.:f. '
J, FIREPMCE: Prior to p~cir.g facing
materials and before framing inspec-
tion.
] FRAMING: Must be requested after
approval of rough plumbing, electri-
cal & mechanieal. All roofing
bracing & chimneys, ete. nr~st be
,; completed. No work is to be con-
,'" cee< led unti l this inspection has
. ~ been made and approved.
,.',-'
Address
Value
,Lisc. It
,
,Bldrs Board Reg.
Phnnp
I DRYWALL INSPECTION: To be made
~ after all drywall is in p~ce,
but prior to any taping.
0, MASONRY: Steel looation, bo~d
beams, grouting 01' vertioals in
acoordanoe with U.B.C. Seotion
2415.
0, WOODSTOVE: After installation is
ocmpleted.
D CURB & APPROACH APRON: After forms
are ereeted but prior to pouring
eonerete.
D
SIDEWALK & DRIVErIAY: For all oon-
orete paving within street right-
pf-way, to be made after all exoa-
vating complete & form work & sub-
, base matenal in p~ee.
D
PENCE: h'hen comp let e -- Provide..
gates or movable sections through
P.U.E. '
~
:l
Signed:
Date:
1~'. '
le, mJ ~_
"b-/ ~ ^If)
Plumbing
H~chanical
E~ectric.al'i;((5 .,L:(te-d 3/70 W ./(~ <:20 elf c.. f, ')..J( 3(
S\ip~li"Ja:'Si.ng El_ectr;j.cian 0/ ~ aA./--J:) A_ II/I. Cl'?O s
--T~ ~ \;
It is the responsibility of the permit hoLder to see that all inspeotions are made at the propel' time, that eaoh ~ess is readabre
f1'Om the street, and that the permit oard is located at the front of the property.
~BuiZding Divi~ion approved plan shall remain on the Bu~lding Sits at all times.
,
PROCEDURE FOR INSPECTION REQUEST:CALL 726-3769 (reoorder) state your City designated job number, job address, type of inspection
requested and when you will be ready for inspeotion, Contraotors 01' OWners name and phone number. Requests received before 7:00 am
"->ill be made the scune day, requests made afte:t' 7: 00 am will be made the next working day.
, '." y:rnr City Desigr.ated Job Number Is: q ()DO 1 /
Reoui~ed TnsDp.cticns .
-" SITE INSPECTION: To be made after D INSULATION/VAPOR BARRIER INSPECTION: DEMOLITION OR MOVED BUILDINGS
~ exoavation, but prior to set up of To be made after all insulation a~4
forms. .-', required vapor barriers are in p~oe =:J Sanitary S8'.Jer eapped at p~operty Zine
0' UNDERSLAB PLUMBING, Et:;;;:;uCA & "but before any lath, gypsum board or
.l11tCHIlNICAL: To be m de bef, e any , wll covering is applied, and before
work is eovered. any insulation is ooncealed.
I FOOTING & FOUNDATION: To be made
--1 after trenohes are excavated and
forms are ereoted, but prior to
pouring oonorete.
o
Expir,es
l(-2.Y-?<f
JpJ/3~J
~ Septie tank pumped and filled with gravel
-, Final - f,'hen above items are oompleted
~ and when demolition is oomplete or strue-
ture moved and premises eleaned up.
Mobile Homes
~ Blocking and Set-up
~ Plumbing oonneotions s~er and water
~ Eleotrioal Conneotion - Blooking, set-up
~ and plumbing oonnections nr~st be approved
beforc requesting electrical inspection
~ Aoeessorb' Building
-, Final - After porohes, skirting, decks,
~ eto. are oompleted. '
o
"
All project oonditions, suoh as the installation of street trees,'oo~letion of the
required landscaping, eto., must be satisfied before the BUILDINC'FINAL oan be requested.
] FINAL PLUMBING
] TAL MECHANICAL
YFINAL ELECTRICAL
o
FINAL BUILDING: The Final Building Inspection must be requested after the Final Plumbing
Eleotrioal, and Mechanioal Inspeotions have been made and approved.
]
'ALL MMlflOLES AND CLEANOUTS MUST BE ACCESSIBLE, AD,TUSTNENT TO BE N.~DE AT NO COST TO CITY I Pa~7C of 2
I JOB NO,
I Zone:
L -CO G-ti
SOL A RAe C E S S R E Q.-
Type/Cor.st:
Bedrooms:
Occuoanc!1 Grou:
LOT TYPE.
LOt Sq. Ftg.
I
Z of lot Coverag~
I!I of Sto1'ies
Total Height
Topography
lITEM
8/~)
1\ ..
Main
Ga:raGe
Carport
Accesso1'U
I
Is.D.c.
TOTAL VALUE
(va~uc)
1.5 x
Building Permi t
State Surcharge
Total Charges
i ITEM NO. I FEE
Fixtures
Residential (1 bath)
I San. i ta1'Y S ewe l'
Water
Plumbing pem t
state Surcr.a1'ge
Total CharGes
Interior
Corner
Panhandle
Cul-de-sac
x
Value
I ITEM
'/ Res. sa'. fta.
Naw/Extend Circuits
NO.
, TeJ!TPorary ~e ice _
CJJ.O _ . >f f))
Ele~tr cal Permit
State Sur~harqe
Total Charges
. ITEM
I NO.
Furnace ETU' S
Exhaust Hood
Vent Fan
Woodstove
I
Permit Issuan"Ca
Mechanical Permit
State surcharGe
Total Charaes
__ ENCROACHMENT n
I
Isecurit!1 Deposit
I Storage
I Mtlint~n~e
I Permit
.!'"
Total Cha1'q~s
Curbdlt
I. SidelJa lk
I Fence
I Electrical
[,abel
, Mobile Home
TOTAL AMOUNT DUE: *
CHARGE
'N,
FEE
CHARGE
O')~
(-\'l.~l
~~~
r , *
FEE
CI/ARCE
') &.15'
I Lot Faces -
I Setbacks
I P.L, House Ca1'age I Access.
North
East
South
IWest
i'I Ena1'aZ; Sources
1 I ,iieat
I I
I
I
I
I
T!1oe
Water Heater
Range
Fireplace
Woodstove
-- Fees
Building Value & Permit
This permit is granted on the express condition that the said construction
shall. in all respects. conform to the Ordinance adopted by the City of
Springfield. including the Zoning Ordinance. regulating the construction
and use of buildings. and may be suspended or revoked at any time upon vio-
lation of any provisions of said Ordinances.
/
*
*
Plan Check Fee:
Date Paid:
IReceipt #:,
I Signed:
Plumbing Permit
No person shall construct. install. alter or change any new or existing
plumbing or drainage syste~ in whole or in part. unless such person is the
legal ppssessor of a valid plumber's license. except that a person may do
plumbing work to property which is owned. leased or operated by the appli-
cant.
*
E I e c t r i c a I P e.r m i t
Where State Law requires tr.at the electrical work be done by an Electrical
Contractor. the electrical portion of this permit shall not be valid until
the label has been signed by the Electrical Contractor.
Mechanical Permit
*
Plan Examiner
vate,
I HAVE CAREFULLY EXAMINED the completed application fol' permit. and do
hereby certify that all information hereon is true and correct. and I
further certify that, any ar~ all work perfor>med shall be, done in accor-
dance with the Ordinances of the City of 9pringficld. and the L~~8 of the
* State of Oregon pel'taining to the work described herein. and that NO OCCU-
PANCY will be made of any structure without permission of the Building Di-
vision. I fUl'thel' cel'tify that only contl'a~tors and e~loyees who are in
c~~pliance with ORS 701.055 will be used on this pl'oject
",
'Signed
. Date