HomeMy WebLinkAboutPermit Building 1990-2-5
Rcce-:.pt fI
lSq [;(1'
00 RESID~~TIAl.o
APPLICAT 1'0" If' 'PERMIT
225 North 5th Street
Springfield~ 'Oregon 97477
Building_Division
726-3753 '
.~
SPRINGFIELD
~
l ..... u_. L_ I
Job Location: 1- 0+ Lt l 6 <J.}.4 P1s f~;- S fr~!-
Assessors Map # I rJ 0 ~ ?J4 4- 4 TGZ Lot # COl dY\
Subdivision: rJ1 1)5.1> b {J d I L..c:> 7 II
Ol.mer:
11 {,4J~~
~S~
Address: . f).1 ~ 8 ~
'City: S/~~p jJ / ()~
MNR/J
I Additien
I Remodel
I Hobi le Home
Dat~ of Application ,~[~'^-
Contractors h(~n~
, General (~-
i Plumbing -l1 A ")
I Hechanical '11. {j" )L
I EJ,eetrical l'1 (=t,
I Stlperv~"'8i.ng Electr~cian
j O('~
- Phone:')LJq - Gd-q l
Zip: q 7t(7?
?f. ,scn, 'be I,ror/{:
[fl~~~
~~(
Signed:
Date:
HrJJ!'~_
,- O~S-Lf()
15' I I ere{ () vaLue5~ B2~~8C>
Address~, '-Lisc. ttBldrs Board
0-0 ~'\t'"f
^~...L(J /'1Ii.J-D ,;..."-" J";~
., '~
Reg.
Expires
'i)hnnp
'I
It is the responaibiLity of the permit hoLder to see that all inapections are made at the prope~ time~ that each ~ess is readabZe
from the street, and ,that the permit card is located at the front of the property:
*BuiZding Divicion approved,pLan ~haLL rema~n on the BuiLding sits at alL times.
.
PROCEDURE FOR INSPECTION REQPEST:CALL 726-3769 (recorder) state YOUI' City designated job nwnber, job address, type of inspecticn
requested and when you !JiLL be ready for inspection, Contractors or OWners ncme and phone number. Requests received befere 7:00 ~
;,,'ilt be made the same day, requests made after 7:00 am wilt be made the next working day.
ReouirRd InsDRctiens
D SITE INSPECTION: To be made
excavation, but prior to set
forms.
o
after
up of
UNDERSLAB PLUMBING. ELECTRICAL &
'MECHANICAL: To be made before, any
work is ~overed.
o
FOOTING & FOUNDATION: To be made
after trenches are excavated and
forms are erected, but prior to
pouring concrete.
[2]
UNDSRGROUND PLUMBING. SEWER. WATER~
DRAINAGE: To be made prior to fil-
Lir.g trenches.
[JJ
UNDERFLOOR PLUMBING & MECHANICAL:
To be made prior to installation,of
j100r insuLation or decking.
[j
POST AND BEAM: To be made prior to
installation of fLoor insulation or
decking .
ROUGH PLUMBING. ELECTRICAl, & MECH-
ANICAL: No work is to be covered
,until these inspections have been
made and approved. '
FIREPLACE:' Prior to pLacir.g facing
materials and before framing inspec-
tion.
~
D
r-11 FRAMING: Must be requested after
~ approval of rough plumbing, eLectri-
cal & mechanicaL. AlL roofing
bracing & chimneys, etc. must be
,completed. No work is to be con-
, ceded until this inspection has
'been made and approved.
Your C{ty Desigr4ted Job Numb~r Is:
I )('1 INSULATION/VAPOR BARRIER INSPECTION:
, V\ To be made after all insulation and
,'-:', required vapor barriers are in pLace
, , ',but before any Lath, gypsum board ,or
, ' walt coyering is appLied, and before'
any insu~tion is concealed.
-xl DRYWALL INSPECTION: Tc be made
~ after all drywalt is in pLace,
but prior to any taping.
O MASONRY: SteeL Location, bond
beams, grouting or verticals in
accordance with U.B.C. Section
2415.
D WOODSTOVE: After instalLation is
cempLeted.
IT]
CURB & APPROACH APRON: After forms
are ere~ted but prior to pouring
eoncrete.
, !;1 SIDEWALK & DRIVEWAY: For alt eon-
~ crete paving within street right-
pf-way, to be made after aLL exca-
vating compLete & form work & sub-
base materiaL i1J. pLace.
D
[Xl 6tr~+- 1(cos (1p)
FENCE: ~~en complete -- Provide'
gates or movabLe sectiens through
P.U.E.
7~~7/
'DEMOLITION OR MOVED BUILDINGS
~ Sanitary s~~er capped at p~operty Line
:==J ~ePtic tank pumped and fiLLed with gra~el
I FinaL - I\~en above items are compLeted
~ and when demoLition is compLete 01' struc-
ture moved and premises cleaned up.
MobiLe Homes
~ Bloeking and Set-up
~ PLumbing connections -- s~er and water
~ ELectricaL Conneetion - BLoeking, set-up
~ and pLumbing connections nr~st ce approved
, before requesting eLectricaL inspection
:=J Accesso1":f. BuiLding
I FinaL - After porches, skirting, decks,
~ etc. are compLeted.
D
ALL project eonditions, such as the instaLlation'of street trees, eo~letion of the
required landseaping, ete., must be satisfied before the BUILDING FINAL ean be requested.
[I] FINAL PLUMBING
[I] FINAl, MECHANICAL
o FINAL ELECTRICAL
o
o
FINAL BUIl,DING: The FinaL Building Inspection must be requested after the FinaL Plumbing
Electrical, and Meehanical Inspeetions have been made and approved.
*ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIB&E, ADJUSTNENT TO BE MADE liT NO COST TO CITY I Page 1 of 2
I JOB NO.
I Zone:
rag__ "
L -CO G-1t
SOL A RAe C E S S R E Q,-
T;';DeICor.st:
-~ ~ ----r-----'.O--
Bedrooms: ..3
I Enerm./ Sources , TUDe 7
I .~eat G.AI--G :];;4 '
I Water .'Ieatc"- . -?
I Range ~~~/c .
Fireplace
Woodstove
Lot Sq. Ftg.
% of lot Coverag~
# of Stones
Total Height
Topography
(P6(JO
Ab~o
d-.
;!)- l;
(J 1lA.xY
I ITEM SQ.FTG
IMain +-~ ,/2~Z
CarMe '2 ~' if .
Carport
Accessorl./
Is.D.c.
TOTAL VALUE
(vaLue)
1.5 x
Building Permit
State $ux'charge
Total Charges
OCCUDancu Grc
'l9. 7t:>
/~/e:'
LOT TYPE
i-... Interior
Corner
Panhandle
Cul-de-sac
x
Value
5~ /~/..~O
'3,...."", <.. 'i"
I Lot Faces -
I Setbacks
P.L. I House' Cqraqe' Access.
North '7J~':Cd' .' I'
. 8',
1:Vi~:'0:l~ {~
East
South
IWest
-- Fees
Building Value &
Pe r m it
This permit is granted on the express condition that the said construction
shall. in all respects. conform to the Ordinance adopted by the City of
Springfield. including the Zoning Ordinance. regulating the construction
and use of buildings. and may be suspended or revoked at any time upon vio-
lation of any provisions of said Ordinances.
J2..#/P 7fTI//EW /,..G€ 5w~,#.Z/ #?Vtt= P:~~:&7
~6~,$2:?,~:' P'/9/.75". ~""?##,CC- ';:;~e ~r;;l' G:~S
8cJ7% * /5 ~~YN'~ ~c=-LJts.~
:z~-l
I~ 7>1
:9~17~1 *
lITEM
I FixtUI'es
\ Residential ff fattJ
I Sanitary Sewer
I Water
NO.
FEE
CHARGE
q
":2
I
}
7r~M Z?7-d/)9~C
Plumbing Perrr:it
State SUI'cr.a:t'ge
Total Charqes
ITEM NO. FEE
Res. Sa. fta./r2l(2 /
I New/Extend Circuits
~emporary Service I I
-:;ZOttP ~y/4;e / I
Electrical Permit
State Surcharqe
Total Charges
ITSM
I NO. I FEE
/
'"
d- 3.~
Permit Issuance
Mechanical Perrrri t
State $ux'cha:t'qe
Total Charaes
-- ENCROACHMENT --
ISecunt!l Deposit
I Sto)age
\ Maintena~e
I Permit
Total Charqes
/~/
66/
TOTIIL IIMOUNT DUE: *
5z-::0
-;;z e::> r -~
/$:~
?cCl. ~
/tt)7 5~
5.- '3 B
1/2 B~ *
CHARGE
"'3:;2So
Plan Check Fee: /..J?5 . ?G:>
Date Paid: /- /t:;-9t:>
IReceipt II: IS" //-J
ISigned:4~
Plumbing P~rmit
No person shall construct. install, alter or change any new C~ existing
plumbing or drainage systa~ in whole or in part. unless such person is the
legal possessor of a valid plumber's license. except that a person may do
plumbing work to property which is owned, leased or operated by the appli-
cant.
Electrical Permi t
Where State Law requires that the electrical work be done by an Electrical
Contractor. the electrical portion of this permit shall not be valid until
/~ -c.. the label has been signed by the Electrical Contractor.
/i/' ~..-:- ...--::;;
3'7-~ /~,,2>. ,1L?fe//'P7 c55-t:E;Z>. /I"/S~
~
( 1.;- ;~~, )
CliARGE
6 . c:>?
~S"o
6.~
6_~
-:::?'2. S- 0
/./~
:::?;'. ~ ~
/2.70
1"7. 9~
?-85'
/-::2 '7'2. c::> 7
6L~c7?J/c#C- ..?"""~//'7~'-/.o.J/;> $;tfr~~~
~]:$???/-'Y ;:1"€",?=> ~,.--cr- ~c::.. ~ /r/ ~
pe/9/77,;?'":' ,
Mechanical Permit
*
~ ~,r.~'
.c::/7~-_c~-r7~~~~-""">
r ~rdI Examiner C -- ,--
'"4 - 5"':. 9~
Date
Furnace ETU' S
I Exhaust Hood
I Vent Fan
I Woodstove
1~//9~.E~~, 2-, '=3,~
CUI'bcut
I Sidewa lk
I~,
I Electrica l r,;,be I
I Mobile Home I
,~~~'~~
I " '.' ' . , ~
I HAVE CAREFULLY EXAMINED the completed application for permit. and do
hereby certify that all information hereon is true and correct. and I
further certify that any ar.d all work performed shall be done in accor-
dance with the ordinances of the City of Springfield. and the L~~s of the
* State of Oregon pertaining to the work described herein. and that NO OCCU-
PANCY will be made of any structure without permission of the Building Di-
vision. I further certify that only contractors and e~ployees who are in
compliance with ORS 701.055 will be used on this project
~.J~
~rt~
01-1\ ) c;, Jer <f(\
tfate
SigwHl