HomeMy WebLinkAboutBuilding Correspondence 1993-6-21
.'
J SE:\T BY:
,
~
.-21-93
KINK)'S E. 2-
503 726 3683: ~ 2/ ..
16:41
.-
.~
nA'/\CKM^N [NGINI:IRING. IHe.
liB w(ST 10TH AVeNU[
llJl~(~(, l)IH(.O,'>l Ill"l)1
~(",'j'Mh1.1
June 17, 1993
Project '219~
Mr. Jim Civens
James w. civens Design
1'~~ Olive Street
Eugene, Oregon 97401
Subject: Qre.." ae..idehee
881 Presco~~ Lane
Springfield. Oregon
,
De~r Hr. G1Yen~:
This letter will co~~lr. th~ telephone c(nv~rBa~1ona that have
taken ploce betw..n you ond lover the p8St rev weeks reqsrdlnq
the subject residencB~
I Indlaa~ed to you that it ~aG acoBptab1, fJr you to eliminate
th.e 1/2" plywood BUb-Bheath~ng from the EKt~rior walls. This
meane ~ha~ the exterIor eid~ng w111 be u.ed to resist shear
forcee. The ex~erIor "lain'! 5houl<1 be 5/8" thlck, e"1:erlor
gn.de, "no-groove", T-lll p~Y"OOd 51ding or ~he eqUIvalent,
I also indicated that it was allow~le fcr che contractor to
reduce the depth ot a 4x12 beam tha~ occ\r~ at the west exterior
wall at the secona floor framing level. Th~ depth of this beam
snoull'1 not: bQ reduced t:o less than 10- 3/' n.
Ploa&9 give me a call if you nave any qUlst10ns.
Sinoerely yours,
_..