Loading...
HomeMy WebLinkAboutPermit Building 2002-5-2 Job# 00-01461-01 COMMERCIAL PERMIT City Of Springfield Community Services Division Building Safety Pag~ 1 of 6 TRANS#:Ol-0008793 DATE:MAY 02 2002 AMT RECD:l $ 100.00 CHANGE: CASHIEF~: 061 Job Number: 00-01461-01 ~'\-. , 2/8/2003 ~~~ ~\j~541-343-72'97. ~~ ~ .r~~ # ~\j~ ~^@ ~ 77 ~~~~~ 541-746-1621 ~~~~ 9880t. ~ ~~~~~~. ~~ f8:'~ r$> \j~ ~~ ~~ ~ q, ~~ ~<$> ~ q,~ 1'1$..~~~~~ <;)\l.2/23/2002 ~ (;)~ ,~ <:) '\'...\. . ~'- 225 Fifth Street Springfield, OR 97477 Office: 726-3759 Inspection Line: 726-3769 Location Of Proposed Site: 4885 Aster St Spr Assessors Map#: 17023200 Lot: Block: Addition: Tax Lot #: 00902 Subdivision: Owner: Jenna Estates LLC Phone Number: 541-896-0268 City/State/ZiO::~~ W~lterville, OR 97478 :-\Ov ~ ~ Scope Of Work: Apartment New .~0~ -s:--\5 rl;-"O~(;:)"'" Value: $4,923,881 ~ ~o co a: -0'\ Jenna Village Phases 1 & 2 ~,IO d'lO ~0 ~<:, ~0~ 0 Construct multi family housing project and;~S'~o~~tE?.tf-'5~~~~~~nts. Tim White_ oroiect mar - 736-7724 iob sit@'.)..'O~ '\,; 0'~ ~ O~~ '0~ .()~ 0".) u ~ \~ ex .~ Contractor Type Contractor ~9" frIO ~~R~(r!t~~&'E'.<Piration Date ("II.;: 00 ~"w ()~ .~ ~ l).~ General Contr Essex General Construction In:G" r-:,fl>: ~0 ~'V't~$il &0~$- ~t'!; 11/10/2002 4284 W 7Th Ave, Eugene(ct:f\.g~~"f ~~(j a>'~ ~~ 00\:' rffi~ ~ ~ \0.'1.: s:s ~ ~0 o~ ~ Mckenzie Excavating Inc..~O.()~ n.~C); ~fli- o1~6B'SO!O(j 11/21/2001 " .~ ~-.J ~ 0 0 " 28568 Bodenhamer Rd, E~"e8~ O~ ~~ ~~ i..~ 97 402 .~ R>(;:)' ~~ ~"O 0~0 Delta Construction Co, ~(S vfl>: ~0 (J o\:''S 999 Division Ave, Eugene, OR Reynolds Electric Inc 2175 W 2Nd Ave, Eugene, OR 97402-7103 Address: PO Box 117 General Contr General Contr Electrical Contr 17252 Mechanical Contr Harvey & Price Co Po Box 1910, Eugene, OR 97440-1910 Jrt Mechanicallnc Po Box 1450, Battle Ground, WA 98604-1450 Sixel Plumbing & Mechanicallnc Po Box 70617, Eugene, OR 97401 Plumbing Contr Plumbing Contr Quad Area: # Of Units: Constr. Type: Water Heater: Office Use 3CSC Land Use: 105 Zoning Code: (VNSPR) Wd Frame-SI Bedrooms: 210 Range: # Of Buildings: 21 Occupancy Group: Asmb w/o stage 3 Heat Source: Wall Heat Sq. Footage: 4820 To request an inspection call the 24 hour recording at 726-3769. All inspections requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following working day. Phone 541-342 -4509 541-689-3085 541-688-2233 360-666-0330 541-896-3964 ;;- Site Verify Ground Rod Footing MH Accessory Struc Foundation Slab Post and Beam Floor Insulation Ceiling Insulation Shear Wall Nailing Roofing Framing Wall Insulation Drywall Firewall Special Hold Downs Installed Roof Sheating/Nailing Vapor Barrier/Insulation SUB - InsulationNapor Barrier SUB - Final Final Fire Final Site Plan Final Building Temporary Power Underground Electrical Rough Electrical Electrical Service Low Voltage Final Electrical Underground Plumbing Rough Plumbing Water Line Sanitary Sewer Line Storm Sewer Line Perimeter Foundation Drains Backflow Device Final Plumbing Rough Gas Rough Mechanical Gas Service SUB - Mechanical Final Gas Final Mechanical Rough Grading Final Paving Job# 00-01461-01 I Required Inspections I Building I - To be made after excavation but prior to setting forms. -Install ground rod at footing, and call for inspection in conjuction with footing and/or foundation ir -After trenches are excavated. Page 2 of 6 -After forms are erected but prior to concrete placement. - To be made after all inslab building service equipment, conduit piping; and other equipment iterr -Prior to floor insulation or decking. -Prior to decking. - Prior to cover. -Before covering sheathing with finish materials. - Prior to installing any roof covering. - Prior to cover. - Prior to Cover -Prior to taping. - Located and constructed according to plans. -See Plan Review and/or Inspectors Notes, or prior to cover if applicable. -Before covering sheathing with finish material. - To be made after insulation and required vapor barriers are in place, but prior to any wall coverir - To be called for at the same time as the SUB framing inspection. - When all Fire Department requirements have been met. -After all requirements have been met for Minimum Development Standards or from the Develop - When all required inspections have been approved and the building is complete. I Electrical I -Approval required prior to SUB energizing pole. - Prior to cover. - Prior to cover. - Must be approved to obtain permanent power. - When all electrical work is complete. I Plumbing -Prior to filling the trench. - Prior to cover. - Prior to filling trench. - Prior to filling trench. - Prior to filling trench. -After gravel and filter cloth is installed, but prior to backfill. -After device is installed but before backfilling trench. -When all plumbing work is complete. I Mechanical I -After line is installed and capped if not attached to an appliance. - Prior to cover. -After line is installed and line has been connected to a minimum of one appliance. Pressure tes - Following City Rough Mechanical inspection approval and prior to cover. - When all gas work is complete. - When all mechanical work is complete. I Permits w/o Srchg I -After gravel is in place but prior to 'placing concete. -After paving is complete. L Job# 00-01461-01 I , Zoning: FloodPlain? D Wetlands? D Journal numbers 1: 2:, Comments: Overlay District: # of Street Trees: 3: Planner: Gary Karp Urban Growth Boundary? D Quantity Of Fill: Supplier: Drainage: Floodway FEMA: Additional Requirements: Glenwood Area? D Required Attachments: Source Locn: Material: Flood Plain FEMA: Page 3 of 6 Land Use: Pave Driveway? D Construction Types:(VNSPR) Wd Frame-Spr Occupancy Groups:Asmb w/o stage 300- Hotels, Apartments # Of Buildings: 21 # Of Stories: 2 Height (feet): 23 # Of Bedrooms: 210 Current Units: Proposed Units:105 Handicap Access? D Census Code: Does not apply -Area (Sq. Feet) Main: 4820 Accessory:105000 Total:109820 Fee Paid On Receipt# Plan Check 09/27/2000 01-00033 Commercial Plan Check Total Plan Check Building Permit State Surcharge For Building Permit Building Administrative Fee Total Building Building 07/19/2001 6192 07/19/2001 6192 07/19/2001 6192 Wiring Footage 1,000 Sq Ft or Less Permanent: 200 Amps or Less Permanent: 200 Amps or Less Temporary: 200 Amps or Less Branch Circuits With Feeder or Service Branch Circuits With Feeder or Service Restricted Energy State Surcharge - Electrical State Surcharge - Electrical State Surcharge - Electrical Administrative Fee - Electrical Administrative Fee - Electrical Administrative Fee - Electrical Total Electrical Electrical 07/19/2001 6192 07/19/2001 6192 03/06/2002 8233 02/27/2002 8151 07/19/2001 6192 03/06/2002 8233 07/19/2001 6192 07/19/2001 6192 02/27/2002 8151 03/06/2002 8233 07/19/2001 6192 02/27/2002 8151 03/06/2002 8233. Minimum Plumbing Permit Fee Number of Fixtures State Surcharge - Plumbing Water Service Footage Plumbing 07/19/2001 6192 07/19/2001 6192 07/19/2001 6192 07/19/2001 6192 Value/Quantity 4,600,000 4,552,181 105 2 1 2 58 3 1 854 2;750 Fee Amount $4,863.95 $4,863.95 $7,412,50 $518,88 $222.38 $8,153.76 $8,925.00 $100.00 $63.00 $80.00 $116.00 $9.00 $36.00 $642.39 $5.60 $5.04 $275.31 $2.40 $5.76 $10,265.50 $.00 $8,540.00 $728.00 $430.00 ;. . Fee Sanitary Sewer Footage Storm Sewer Footage Administrative Fee - Plumbing Total Plumbing Hood and Exhaust One to Four Outlets Minimum Mechanical Permit Administrative Fee - Mechanical Less than 100,000 BTU Vent Fan to One Duct Each Additional Outlet ApplianceVent (Not Covered in Schedule Miscellaneous Mechanical Mechanical Issuance State Surcharge - Mechanical Total Mechanical Apartment - Transportation Impervious Surface Area - Storm Sanitary Sewer MWMC Administrative Fee SDC Administrative Fee Miscellaneous MWMC Single Tenant Office Building - Transp Total System Development Multifamily - Willamalane Total Willamalane SDC Temporary Occupancy Temporary Occupancy Temporary Occupancy Temporary Occupancy Temporary Occupancy Temporary Occupancy Temporary Occupancy Temporary Occupancy Paving Total Permits w/o Srchg Grand Total Plan Check Type Checked By Initial Review-C/I/P Engineering-C/I/P Planning-C/I/P Structural-C/I/P Bob Barnhart Pam Ownby Gary Karp Lorne Pleger Job# 00-014E)1-01 Page 4 of 6 Paid On Receipt# Value/Quantity Fee Amount Plumbing 07/19/2001 6192 2,813 $445.00 07/19/2001 6192 6,416 $985.00 07/19/2001 6192 $312.00 $11,440.00 Mechanical 07/19/2001 6192 105 $472.50 07/19/2001 6192 1 $2.00 07/19/2001 6192 $.00 07/19/2001 6192 $112.82 07/19/2001 6192 1 $6,00 07/19/2001 6192 212 $636.00 07/19/2001 6192 209 $104.50 07/19/2001 6192 211 $949.50 07/19/2001 6192 1,590 $1,590.00 07/19/2001 6192 $10,00 07/19/2001 6192 $263.24 $4,146.56 System Development I 07/19/2001 6192 105 $28,508.19 07/19/2001 6192 219,713 $52,731.00 07/19/2001 6192 1,713 $85,410.18 07/19/2001 6192 1 $10.00 07/19/2001 6192 $9,844.12 07/19/2001 6192 25,731 $29,217.35 07/19/2001 6192 5 $1,005.58 $206,726.42 Willamalane SDC 07/19/2001 6192 105 $72,660.00 $72,660.00 Permits w/o Srchg 02/07/2002 8027 1 $100.00 01/23/2002 7856 1 $100.00 02/26/2002 8143 1 $100.00 02/26/2002 8144 1 $100.00 03/08/2002 8252 1 $100.00 04/02/2002 8489 1 $100.00 04/16/2002 8626 1 $100.00 05/02/2002 8793 1 $100.00 07/19/2001 6192 371,700 $1,045.00 $1,845.00 $320,101.19 Date Completed Comment 10/02/2000 02/23/2001 07/16/2001 04/09/2001 Job# 00-01461-01 I Page 5 of 6 Plan Check Type Checked By Date Completed Comment Fire Marshal-C/I/P AI Gerard 10/24/2000 Plan Review - **Site** for multi unit townhouses Phase 1 &2 -Fire Lines: hydrants in and tested prior to combustible construction, flow tested, flushing, hydrotest, visual inspection prior to coverup. -All hydrants in and tested prior to comb construction -Fire access roads in and maintained clear prior to comb construction, -All gates accessing wetlands shall have PW locks -All gates accessing wetlands shall have PW locks -prior to final all curbing to be marked as fire lane - prior to occupancy address numbers required and approved by FMO -prior to occupancy CAD drawings of site and structures submitted to FMO for pre fire planning Fire Marshal-CII/P AI Gerard 10/24/2000. Plan review Phase 1 & 2 Townhouses 3plex to 8plex, R 1 type VN - provide sprinkler plans - Coordinate address # placement with FMO Fire Marshal-C/I/P AI Gerard 10/24/200p Plan review - Recreation Center 4820 sq ft A-3 Type VN non spklr - Provide a knox box - Provide fire alarm plans incl Central station info - note #2 p A21 not permitted power illumination for egress per UBC 1003.2.9.2 Fire Marshal-C/I/P AI Gerard 10/25/2001 Request for approval of addressing system to be utilized throughout apartment complex - phase 1 & 2 1. Individual unit numbers are proposed as 6" brass on each unit - Ensure background color contrasts sufficiently to ensure easy visibility. 2. Provide on each building the range of addresses for that building. The range of unit addresses shall be in numbers that are a minimum of 12" in height and mounted on the buildings in the locations specified by the Fire marshal's Office - see attached site plan. Note - some buildings may have 2 locations specified. Numbers shall contrast in color with the background and be easily visible SUB - Comm/lnd David Harris 02/23/2001 request code forms 2a, 3a & b, worksheet 4c or 4a and j. Lighting passes only 2/23101. HVAC passes 1/22/02. SUB - Commllnd David Bowlsby Left msg with Tim White, project mgr for Essex, to cntc David Harris to resolve addtl form req's.091401 I Job# 00-01461-01 I Page 6 of 6 By'signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper'time, that each address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. ~iA~ Signature S 1;;L(o~ Date