HomeMy WebLinkAboutPermit Building 2002-5-15
..
~
,
Job# 00-01461-01
Page 1 of 6
TRANSff. ~ 01 ~-OOO~J05t~
1)H^lT ~ ~'lAY 1 h ')n(i?
L,.L I.." _.1 L.Vv~
AMT RECD~l $ 100000
CHANGE ~
CASHIE~: ~ 063.
COMMERCIAL PERMIT
City Of Springfield
Community Services Division
Building Safety
Job Number: 00-01461-01
225 Fifth Street
Springfield, OR 97477
Office: 726-3759
Inspection Line: 726-3769
Location Of Proposed Site: 4885 Aster St Spr
Assessors Map#: 17023200
Lot: Block: Addition:
Address: PO Box 117 City/State/Zip: Walterville, OR 97478
Scope Of Work: Apartment New Value: $4,923,881
Jenna Village Phases. 1 & 2
Construct multi family housing project and associated site impr~nts.
Tim White. oroiect mar - 736-7724 iob site ~ ~~
Contractor Type Contractor Registrati~,\ ~~ration Date
General Contr Essex General Construction Inc 54531 ~.:~'~~ ~~10/2002
4284 W 7Th Ave, Eugene, OR 97402 ~~~~ ~~
Mckenzie Excavating Inc :y:-~~<Q# 11/21/2001
28568 Bodenhamer Rd, Eugene, OR ~ CO ~~ ~ ~
97402 " ~~.~~ ~ 'S t;;::,~.:" ~~.
Delta Construction Co. ~ ~ Q,,~ #~<$> -A Q,,~
999 Division Ave, Eugene, ~~ ~~~~~ ~'tf
Reynolds Electric Inc ~()~~ ,<O~7252
2175 W 2Nd Ave, Eugene, OR ~
97402-7103
Owner:
General Contr
General Contr
Electrical Contr
Mechanical Contr
Plumbing Contr
Plumbing Contr
Quad Area:
# Of Units:
Constr. Type:
Water Heater:
Tax Lot #: 00902
Subdivision:
Jenna Estates LLC
Phone Number: 541-896-0268
Phone
541-342 -4509
541-689-3085
541-688-2233
Harvey & Price Co
Po Box 1910, Eugene, OR 97440-1910
Jrt Mechanicallnc
Po Box 1450, Battle Ground, WA
98604-1450 .
Sixel Plumbing & Mechanicallnc
Po Box 70617, Eugene, OR 97401
....0
~ .~ is'
2/8/20o..3~ ~ ~o ~>-: ~41-343-7297
-!::o0 0<::- oJb xC:S 'Q
(l~O~0C$ ~0 @ ~0O:J ~0 ~
~... ~ ~ 0-1;. 0 -~
~~~1 Otff11..200"2i~~ ~ ~0~~fi~1-7 46-1621
.~. 'Q~ ~0 ~~ ~o .....re ~
~Qj 0'0,:<::-0 ~o .~ ~0 ~ ~.
98808 ~9 oo~ Q:~^"1!..2-0~~~# #360-666-0330
"-? ~ 'tf ~ ';:)'0 ~~ ~ ~.;s r!g;
~ ~0 Ore " i:f k 0 ~
A<() .....::> ~ ';:)'0 _\ 0 ~ .0C$ ~~
A' ~ -0 n' 0;'""\ ~r'\' q)
14'~'O7.\1) ~!Qv (2'/2,'ft?JJfJ2~
..& .~c; no. OJ ~ ,,^-0 ~ ,;~
-.... ~ ~-~o ~- ~ '0' -
.;::,..0 ("\'f, ..... _ .,,0) ,...0 _~
- -~ ~-~. rt' ()~
'" c>(;5 CJ'tf ~
.;j
<' # Of Buildings: 21
Occupancy Group: Asmb wlo stage 3
Heat Source: Wall Heat
Sq. Footage: 4820
77
541-896-3964
Office Use
3CSC Land Use:
105 Zoning Code:
(VNSPR) Wd Frame-SI Bedrooms: 210
Range:
To request an inspection call the 24 hour recording at 726-3769. All inspections requested before 7:00
a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following
working day. .
.-
ii
Site
Verify Ground Rod
Footing
MH Accessory Struc
Foundation
Slab
Post and Beam
Floor Insulation
Ceiling Insulation
Shear Wall Nailing
Roofing
Framing
Wall Insulation
Drywall
Firewall
Special
Hold Downs Installed
Roof Sheating/Nailing
Vapor Barrier/Insulation
SUB - InsulationNapor
Barrier
SUB - Final
Final Fire
Final Site Plan
Final Building
Temporary Power
Underground Electrical
Rough Electrical
Electrical Service
SUB - Ceiling Grid
Low Voltage
Final Electrical
Underground Plumbing
Rough Plumbing
Water Line
Sanitary Sewer Line
Storm Sewer Line
Perimeter Foundation
Drains
Backflow Device
SUB - Plumbing
Final Plumbing
Rough Gas
Rough Mechanical
Gas Service
SUB - Mechanical
Final Gas
Final Mechanical
I Job# 00-01461-01 I
Required Inspections
I Building I
- To be made after excavation but prior to setting forms.
-Install ground rod at footing, and call for inspection in conjuction with footing and/or foundation ir
-After trenches are excavated.
Page 2 of 6
-After forms are erected but prior to concrete placement.
- To be made after all inslab building service equipment, conduit piping, and other equipment iterr
-Prior to floor insulation or decking.
- Prior to decking.
- Prior to cover.
. - Before covering sheathing with finish materials.
-Prior to installing any roof covering.
- Prior to cover.
- Prior to Cover
-Prior to taping.
- Located and constructed accqrding to plans.
-See Plan Review and/or Inspectors Notes, or prior to cover if applicable.
- Before covering sheathing with finish material.
- To be made after insulation and required vapor barriers are in place, but prior to any wall coverir
- To be called for at the same time as the SUB framing inspection. .
-When all Fire Department requirements have been met.
-After all requirements have been met for Minimum Development Standards or from the Develop
- When all required inspections have been approved and the building is complete.
I Electrical I
-Approval required prior to SUB energizing pole.
- Prior to cover.
- Prior to cover.
- Must be approved to obtain permanent power.
-Interior Lighting
-When all electrical work is complete.
I Plumbing
-Prior to filling the trench.
- Prior to cover.
-Prior to filling trench.
- Prior to filling trench.
-Prior to filling trench.
-After gravel and filter cloth is installed, but prior to backfill.
-After device is installed but before backfilling trench.
-Following City Rough Plumbing inspection approval and prior to cover.
- When all plumbing work is complete.
I Mechanical I
-After line is installed and capped if not attached to an appliance.
- Prior to cover.
-After line is installed and line has been connected to a minimum of one appliance. Pressure tes
-Following City Rough Mechanical inspection approval and prior to cover.
- When all gas work is complete.
- When all mechanical work is complete.
;.-
Job# 00-01461-01
Required Inspections
I Permits w/o Srchg I
-After gravel is in place but prior to placing concete.
-After paving is complE::lte.
Rough Grading
Final Paving
Zoning:
FloodPlain? D Wetlands? D
Journal numbers
1: 2:
Comments:
Overlay District:
# of Street Trees:
3:
Planner: Gary Karp
Urban Growth Boundary? D
Quantity Of Fill:
Supplier:
Drainage:
Floodway FEMA:
Additional Requirements:
Glenwood Area? D Required Attachments:
Source locn:
Material:
Flood Plain FEMA:
Page 3 of 6
land Use:
Pave Driveway? D
Construction Types:(VNSPR) WdFrame-Spr
Occupancy Groups:Asmb w/o stage 300- Hotels, Apartments
# Of Buildings: 21 # Of Stories: 2 Height (feet): 23
# Of Bedrooms: 210 Current Units: Proposed Units:105
Handicap Access? D Census Code: Does not apply
-Area (Sq. Feet)
Main: 4820 Accessory:105000 Total:109820
Fee
Paid On Receipt#
Plan Check
09/27/2000 01-00033
Commercial Plan Check
Total Plan Check
Building Permit ,
State Surcharge For Building Permit
Building Administrative Fee
Total Building
Building
07/19/2001 6192
07/19/2001 6192
07/19/2001 6192
Wiring Footage 1,000 Sq Ft or Less
Permanent: 200 Amps or Less
Permanent: 200 Amps or Less
Temporary: 200 Amps or Less
Branch Circuits With Feeder or Service
Branch Circuits With Feeder or Service
Restricted Energy
State Surcharge - Electrical
State Surcharge - Electrical
State Surcharge - Electrical
Administrative Fee - Electrical
Administrative Fee - Electrical
Administrative Fee - Electrical
Total Electrical
Electrical
07/19/2001 6192
07/19/2001 6192
03/06/2002 8233
02/27/2002 8151
07/19/2001 6192
03/06/2002 8233
07/19/2001, 6192
07/19/2001 6192
02/27/2002 8151
03/06/2002 8233
07/19/2001 6192
02/27/2002 8151
03/06/2002 8233
Value/Quantity
4,600,000
4,552,181
105
2
1
2
58
3
1
Fee Amount
$4,863.95
$4,863.95
$7,412.50
$518.88
$222.38
$8,153.76
$8,925.00
$100.00
$63.00
$80.00
$116.00
$9.00
$36,00
$642.39
$5.60
$5.04
$275.31
$2.40
$5.76
$10,265.50
;;'
Fee
Minimum Plumbing Permit Fee
Number of Fixtures
State Surcharge - Plumbing
Water Service Footage
Sanitary Sewer Footage
Storm Sewer Footage
Administrative Fee - Plumbing
Total Plumbing
Hood and Exhaust
One to Four Outlets
Minimum Mechanical Permit
Administrative Fee - Mechanical
Less than 100,000 BTU
Vent Fan to One Duct
Each Additional Outlet
ApplianceVent (Not Covered in Schedule
Miscellaneous Mechanical
Mechanical Issuance
State Surcharge - Mechanical
Total Mechanical
Apartment - Transportation
Impervious Surface Area - Storm
Sanitary Sewer
MWMC Administrative Fee
SDC Administrative Fee
Miscellaneous MWMC
Single Tenant Office Building - Transp
Total System Development
Multifamily - Willamalane
Total Willamalane SDC
Temporary Occupancy
Temporary Occupancy
Temporary Occupancy
Temporary Occupancy
Temporary Occupancy
Temporary Occupancy
Temporary Occupancy
Temporary Occupancy
Temporary Occupancy
Paving
Total Permits w/o Srchg
Grand Total
Plan Check Type
Checked By
Initial Review-C/IIP
Bob Barnhart
Job# 00-01461-01 I Page 4 of 6
Paid On Receipt# Value/Quantity Fee Amount
Plumbing
07/19/2001 6192 $.00
07/19/2001 6192 854 $8,540.00
07/19/2001 6192 $728.00
07/19/2001 6192 2,750 $430.00
07/19/2001 6192 2,813 $445.00
07/19/2001 6192 6,416 $985.00
07/19/2001 6192 $312,00
$11,440.00
Mechanical
07/19/2001 6192 105 $472.50
07/19/2001 6192 1 $2.00
07/19/2001 6192 $.00
07/19/2001 6192 $112.82
07/19/2001 6192 1 $6.00
07/19/2001 6192 212 $636.00
07/19/2001 6192 209 $104.50
07/19/2001 6192 211 $949.50
07/19/2001 6192 1,590 ' $1,590.00
07/19/2001 6192 $10.00
07/19/2001 6192 $263.24
$4,146.56
System Development
07/19/2001 6192 105 $28,508.19
07/19/2001 6192 219,713 $52,731.00
07/19/2001 6192 1,713 $85,410.18
07/19/2001 6192 1 $10.00
07/19/2001 6192 $9,844.12
07/19/2001 6192 25,731 $29,217.35
07/19/2001 6192 5 $1,005.58
$206,726.42
Willamalane SDC
07/19/2001 6192 105 $72,660.00
$72,660.00
Permits w/o Srchg
02/07/2002 8027 1 $100.00
01/23/2002 7856 1 $100.00
02/26/2002 8143 1 $100.00
02/26/2002 8144 1 $100.00
03/08/2002 8252 1 $100_00
04/02/2002 ' 8489 1 $100.00
04/16/2002 8626 1 $100.00
05/02/2002 8793 1 $100,00
05/15/2002 9045 1 $100.00
07/19/2001 6192 371,700 $1,045.00
$1,945.00
$320,201.19
Date Completed Comment
10/02/2000
;.-
Plan Check Type
Checked By
Job# 00-01461-01 I
Date Completed
Page 6 of 6
Comment
SUB - Comm/lnd David Bowlsby Left msg with Tim White, project mgr for
Essex, to cntc David Harris to resolve addU
form req's.091401
By signature, I state and agree, that I have carefully examined the completed application and do
hereby certify that all information hereon is true and correct, and I further certify that any and all work
performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of
the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made
of any structure without permission of the Community Services Division, Building Safety. I further
certify that only contractors and employees who are in compliance with ORS 701.055 will be used on
this project.
I further agree to ensure that all required inspections are requested at the proper time, that each
address is readable from the street, that the permit card is located at the front of the property, and the
approved set of plans will remain on the site at all times during construction.
C?_~, ~<f~ &-( S'/IS-/O~
Signature
Date