HomeMy WebLinkAboutPermit Building 2001-7-19 (2)
~'
, j'
\. \- -].....\ ",:
\"-G
Job# 00-01461-01
Page 1 of 5
TRANS# ~ 01,,-0006192
DATE:JUL 19 2001
AMT REGD~2 $ 314266.44
CHANGE:
CASHIER: 003
COMMERCIAL PERMIT
City Of Springfield
Community Services Division
Building Safety
Job Number: 00-01461-01
225 North Fifth Street
Springfield, OR 97477
Office: 726-3759
Inspection Line: 726-3769
location Of Proposed Site: 4885 Aster St Spr
Assessors Map#: 17023200
lot: Block: Addition:
Owner:
Address:
Tax lot #: 00902
Subdivision:
Jenna Estates LLC
PO Box 117
Phone Number: 541-896-0268
City/State/Zip: Walterville, OR 97478
New Value: $4,552,181
Scope Of Work: Apartment
Jenna Village Phases 1 & 2
Contractor Type
General Contr
Electrical Contr
Mechanical Contr
Plumbing Contr
Quad Area:
# Of Units:
Constr. Type:
Water Heater:
Contractor
Essex General Construction Inc
4284 W 7Th Ave, Eugene, OR 97402
Reynolds Electric Inc
2175 W 2Nd Ave, Eugene, OR
97402-7103
Harvey & Price Co
Po Box 1910, Eugene, OR 97440-1910
Jrt Mechanical,lnc
Po Box 1450, Battle Ground, WA
, 98604-1450 '
Registration #
54531
Expiration Date
11/10/2002
Phone
541-342-4509
17252
2/8/2003
541-343-7297
77
10/31/2002
541-746-1621
98808
5/4/2003
360-666-0330
Office Use
3CSC land Use:
105 Zoning Code:
(VNSPR) Wd Frame-SI Bedrooms: 210'
Range: '
# Of Buildings: 21
Occupancy Group: Asmb wlo stage 3
HeatSource:
Sq. Footage: 4820
To request an inspection call the 24 hour recording at 726-3769. All inspections requested before 7:00
a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following
working day.
Site
Footing
Slab
Ceiling Insulation
Shear Wall Nailing
Roofing
Framing
Required Inspections
] Building I
- To be made after excavation but prior to setting forms.
-After trenches are excavated.
- To be made after all inslab building service equipment, conduit piping, and other equipment iter
- Prior to cover.
- Before covering sheathing with finish materials.
-Prior to installing any roof covering.
- Prior to cover.
,
;;
.r
Wall Insulation
Drywall
Firewall
Vapor Barrier/Insulation
SUB - InsulationNapor
Barrier
SUB - Final
Final Fire
Final Site Plan
Final Building
Underground Electrical
Rough Electrical
Electrical Service
Low Voltage
Final Electrical
Underfloor Plumbing
Rough Plumbing
Water Line
Sanitary Sewer Line
Storm Sewer Line
Perimeter Foundation
Drains
Backflow Device
Final Plumbing
Rough Gas
Rough Mechanical
Gas Service
SUB - Mechanical
Final Gas
Final Mechanical
Rough Grading
Final Paving
I Job# 00-01461-01 I
Required Inspections
Building
Page 2 of 5
- Prior to Cover
- Prior to taping.
- Located and constructed according to plans.
- To be made after insulation and required vapor barriers are in place, but prior to any wall coveri
- To be called for at the same time as the SUB framing inspection.
- When all Fire Department requirements have been met.
~After all requirements have been met for Minimum Development Standards or from the Develo~
- When all required inspections have been approved and the building iscomplete.
Electrical
- Prior to cover.
- Prior to cover.
-Must be approved to obtain permanent power.
. - When all electrical work is complete.
I Plumbing
- Prior to insulation or decking.
- Prior to cover.
- Prior to filling trench.
- Prior to filling trench.
- Prior to filling trench.
-After gravel and filter cloth is installed, but prior to backfill.
-After device is installed but before backfilling trench.
- When all plumbing work is complete.
Mechanical
- Prior to cover.
-After line is installed and line has been connected to a minimum of one appliance. Pressure te~
- When all gas work is complete.
- When all mechanical work is co.mplete.
I Permits w/o Srchg I
-After gravel is in place but prior to placing concete.
-After paving is complete.
Construction Types:(VNSPR) Wd Frame-Spr
Occupancy Groups:Asmb wlo stage 300- Hotels, Apartments
# Of Buildings: 21 # Of Stories: 2 ' Height (feet): 23
# Of Bedrooms: 210 Current Units: Proposed Units:105
Handicap Access? D Census Code: Does not apply
-Area (Sq. Feet) .
Main:.4820 Acce~sory:105000 Total:109820
i.
I
~
Fee
Paving
Total Permits w/o Srchg
Grand Total
Plan Check Type
Initial Review-C/I/P
Engineering-C/IIP
Planning-C/IIP
Structural-C/I/P
Fire Marshal-C/I/P
Fire Marshal-CII/P
Fire Marshal-C/I/P
Checked By.
Bob Barnhart
Pam Ownby .
Gary Karp
Lorne Pleger
AI Gerard
AI Gerard
AI Gerard
Job# 00-01461-01 I
Paid On Receipt#
Permits w/o Srchg
07/19/2001 6192
Page 4 of 5
Value/Quantity
Fee Amount
371,700
$1,045.00
$1,045.00
$318,516.59
Date Completed
Comment
10/02/2000
02/23/2001
07/16/2001
04/09/2001
10/24/2000
Plan Review - **Site** for multi unit
townhouses Phase 1 &2
10/24/2000
-Fire Lines: hydrants in and tested prior to
combustible construction, flow tested, flushing,
hydrotest, visual inspection prior to coverup.
-All hydrants in and tested prior to comb
construction
-Fire access roads in and maintained clear
prior to comb construction,
-All gates accessing wetlands shall have PW
locks -All gates accessing wetlands shall
have PW locks
-prior to final all curbing to be marked as fire
lane
- prior to occupancy address numbers
required and approved by FMO
-prior to occupancy CAD drawings of site and
structures submitted to FMO for pre fire
planning
Plan review Phase 1 & 2 Townhouses 3plex
to 8plex, R1 type VN
10/24/2000
- provide sprinkler plans
- Coordinate address # placement with FMO
Plan review - Recreation Center 4820 sq ft A-3
Type VN non spklr
- Provide a knox box
- Provide fire alarm plans incl Central station
info
- note #2 p A21 not permitted power
illumination for egress per UBC 1003.2.9.2
By signature, I state and agree, that I have carefully examined the completed application and do
hereby certify that all information hereon is true and correct, and I further certify that any and all work
performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of
the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made
of any structure without permission of the Community Services Division, Building Safety. I further
certify that only contractors and employees who are in compliance with ORS 701.055 will be used on
this project.
I further agree to ensure that all required inspections are requested at the proper time, that each
address is readable from the street, that the permit card is located at the front of the property, and the
approved set of plans will remain on the site at all times during construction.
.. ';,'
~~LD-
Signature
I Job# 00-01461-01 I
.~e 5 of5
d-~- \ 1, ) ~.~ \
Date
... ,I 'i"
..
ATTACHMENT A
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE WORKSHEET
JOURNAL OR JOB NUMBER 00-01461-01
NAME OR COMPANY: JENNA ESTATES LLC
LOCATION: 4885 ASTER STREET
,TAX LOT NUMBER 17-02-32-00 900,902
DEVELOPMENT TYPE: MUTI-F AMIL Y RESIDENTIAL
USE # 1 NUMBER OF UNITS: 105 TYPE OF USE: RESIDENTIAL
USE # 2 NEW DEVELOPED BUILDING AREA (S.F.): 4572.0 TYPE OF USE: RECREATIONAL
EXIST DEVELOPED BUILDING AREA (S.F.):
TOTAL DEVELOPED BUILDING AREA (S.F.): 219712.5 LOT SIZE (S.F.):
I. STORM DRAINAGE
IMPERVIOUS SQ. FT.
$0.240 PER SQ. FT.
219712.50
x
2. SANITARY SEWER-CITY
NUMBER OF PFU's
(SEE REVERSE SIDE)
$49.86 PER PFU
1713
x
3. TRANSPORTATION
BLDG AREA TGSF x TRIP RATE x COST PER PM PEAK HOUR TRIP
DU
EMPLOYEES
x $502.79 PER TRIP
x $502.79 PER TRIP
TOTAL TRANSPORTATION SDC
105
2
x
x
0.54
1
4. SANITARY SEWER - MWMC
A. REIMBURSEMENT COST:
USE # 1
USE # 2
$245.06
$261.40
NUMBER OF FEU's
NUMBER OF FEU's
105
4.572
PER FEU
PER FEU
x
x
B. IMPROVEMENT COST:
USE # 1 NUMBER OF FEU's 105
USE # 2 NUMBER OF FEU's 4.572
MWMC CREDIT IF APPLICABLE (SEE REVERSE)
MWMC ADMINISTRATIVE FEE
x $20.85
x $22.24
PER FEU
PER FEU
TOTAL MWMC SDC
$52,731.00 l
$85,410.18 I
$28,508.19
$1,005.58 ,
$29,513.77 I
$25,731.30
$1,195.12
$2,189.25
$10 1.68
$0.00 I
$10.00 I
$29,227.35 I
SUBTOTAL (ADD ITEMS 1,2,3, & 41 $196,882.30 I
5. ADMINISTRATIVE FEES:
BASE CHARGE (SUBTOTAL ABOVE) x
0.05
$9,844.12 ,
;z:;~ ~ tJ~-'?'
SDC COORDINATOR
2/23/01
DATE
TOTAL SDC CHARGE~ $206,726,42
, I
PLUMBING FIXTURE UNIT (PFU) CALCULATION TABLE
NUMBER OF NEW FIXTURES x UNIT EQUIVALENT = PLUMBING FIXTURE UNITS
(NOTE: FOR REMODELS, CALCULATE ONLY THE NET ADDITIONAL FIXTURES)
FIXTURE TYPE
BATHTUB
DRINKING FOUNTAIN
FLOOR DRAIN
INTERCEPTORS FOR GREASE/OIL/SOLIDS/ETC.
INTERCEPTORS FOR SAND/AUTO WASH/ETC.
LAUNDRY TUB/CLOTHESW ASHER/MOP SINK
CLOTHESWASHER- 3 OR MORE
MOBILE HOME PARK TRAP (1 PER TRAILER)
RECEPTOR FOR REFRIGERA TOR/W A TER ST A TION/ETC.
RECEPTOR FOR COMMERCIAL SINK! DISHWASHER/ETC.
SHOWER, SINGLE STALL
SHOWER, GANG (NUMBER OF HEADS)
SINK: BAR, COMMERCIAL, RESIDENTIAL KITCHEN
URINAL, ST ALL/W ALL
W ASH BASIN/LA V A TORY, SINGLE OR DOUBLE
TOILET, PUBLIC INST ALLA TlON
TOILET, PRIVATE INSTALLATION
MISCELLANEOUS:
FIXTURES
NEW OLD
105
105
107
I
213
4
210
UNIT
EQUIV ALENT
2
I
2
3
6
2
6
6
I
3
2
1
2
2
I
6
4
'1 t; ..... )0
PLUMBING
FIXTURE
UNITS
210
o
o
o
o
210
o
o
o
o
o
o
214
2
213
24
840
o
o
o
TOTAL PLUMBING FIXTURE UNIT~ 1713
CREDIT CALCULA TlON TABLE: BASED ON ASSESSED VALUE
IF IMPROVEMENTS OCCURRED AFTER ANNEXATION DATE IN TABLE, CALCULATE CREDITS SEP ARA TEl
YEAR
ANNEXED
1979 or before
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
RATE PER $1,000
ASSESSED VALUE
$4.74
$4.65
$4.59
$4.46
$4.30
$4.14
$ 3.93
$3.63
$3.26
$2.85
$ 2.40
YEAR
ANNEXED
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
CREDIT FOR PARCEL OR LAND ONLY IF APPLICABLE
IMPROVEMENT (IF AFTER ANNEXATION DATE)
x
x
RATE PER $1,000
ASSESSED VALUE
$ 1.96
$ 1.55
$ 1.36
$1.23
$ 1.05
$0.90
$0.75
$0.57
$0.35
$0.15
$0.00
$0.00
CREDIT TOTAL $0.00