Loading...
HomeMy WebLinkAboutPermit Building 2001-7-19 (2) ~' , j' \. \- -].....\ ",: \"-G Job# 00-01461-01 Page 1 of 5 TRANS# ~ 01,,-0006192 DATE:JUL 19 2001 AMT REGD~2 $ 314266.44 CHANGE: CASHIER: 003 COMMERCIAL PERMIT City Of Springfield Community Services Division Building Safety Job Number: 00-01461-01 225 North Fifth Street Springfield, OR 97477 Office: 726-3759 Inspection Line: 726-3769 location Of Proposed Site: 4885 Aster St Spr Assessors Map#: 17023200 lot: Block: Addition: Owner: Address: Tax lot #: 00902 Subdivision: Jenna Estates LLC PO Box 117 Phone Number: 541-896-0268 City/State/Zip: Walterville, OR 97478 New Value: $4,552,181 Scope Of Work: Apartment Jenna Village Phases 1 & 2 Contractor Type General Contr Electrical Contr Mechanical Contr Plumbing Contr Quad Area: # Of Units: Constr. Type: Water Heater: Contractor Essex General Construction Inc 4284 W 7Th Ave, Eugene, OR 97402 Reynolds Electric Inc 2175 W 2Nd Ave, Eugene, OR 97402-7103 Harvey & Price Co Po Box 1910, Eugene, OR 97440-1910 Jrt Mechanical,lnc Po Box 1450, Battle Ground, WA , 98604-1450 ' Registration # 54531 Expiration Date 11/10/2002 Phone 541-342-4509 17252 2/8/2003 541-343-7297 77 10/31/2002 541-746-1621 98808 5/4/2003 360-666-0330 Office Use 3CSC land Use: 105 Zoning Code: (VNSPR) Wd Frame-SI Bedrooms: 210' Range: ' # Of Buildings: 21 Occupancy Group: Asmb wlo stage 3 HeatSource: Sq. Footage: 4820 To request an inspection call the 24 hour recording at 726-3769. All inspections requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following working day. Site Footing Slab Ceiling Insulation Shear Wall Nailing Roofing Framing Required Inspections ] Building I - To be made after excavation but prior to setting forms. -After trenches are excavated. - To be made after all inslab building service equipment, conduit piping, and other equipment iter - Prior to cover. - Before covering sheathing with finish materials. -Prior to installing any roof covering. - Prior to cover. , ;; .r Wall Insulation Drywall Firewall Vapor Barrier/Insulation SUB - InsulationNapor Barrier SUB - Final Final Fire Final Site Plan Final Building Underground Electrical Rough Electrical Electrical Service Low Voltage Final Electrical Underfloor Plumbing Rough Plumbing Water Line Sanitary Sewer Line Storm Sewer Line Perimeter Foundation Drains Backflow Device Final Plumbing Rough Gas Rough Mechanical Gas Service SUB - Mechanical Final Gas Final Mechanical Rough Grading Final Paving I Job# 00-01461-01 I Required Inspections Building Page 2 of 5 - Prior to Cover - Prior to taping. - Located and constructed according to plans. - To be made after insulation and required vapor barriers are in place, but prior to any wall coveri - To be called for at the same time as the SUB framing inspection. - When all Fire Department requirements have been met. ~After all requirements have been met for Minimum Development Standards or from the Develo~ - When all required inspections have been approved and the building iscomplete. Electrical - Prior to cover. - Prior to cover. -Must be approved to obtain permanent power. . - When all electrical work is complete. I Plumbing - Prior to insulation or decking. - Prior to cover. - Prior to filling trench. - Prior to filling trench. - Prior to filling trench. -After gravel and filter cloth is installed, but prior to backfill. -After device is installed but before backfilling trench. - When all plumbing work is complete. Mechanical - Prior to cover. -After line is installed and line has been connected to a minimum of one appliance. Pressure te~ - When all gas work is complete. - When all mechanical work is co.mplete. I Permits w/o Srchg I -After gravel is in place but prior to placing concete. -After paving is complete. Construction Types:(VNSPR) Wd Frame-Spr Occupancy Groups:Asmb wlo stage 300- Hotels, Apartments # Of Buildings: 21 # Of Stories: 2 ' Height (feet): 23 # Of Bedrooms: 210 Current Units: Proposed Units:105 Handicap Access? D Census Code: Does not apply -Area (Sq. Feet) . Main:.4820 Acce~sory:105000 Total:109820 i. I ~ Fee Paving Total Permits w/o Srchg Grand Total Plan Check Type Initial Review-C/I/P Engineering-C/IIP Planning-C/IIP Structural-C/I/P Fire Marshal-C/I/P Fire Marshal-CII/P Fire Marshal-C/I/P Checked By. Bob Barnhart Pam Ownby . Gary Karp Lorne Pleger AI Gerard AI Gerard AI Gerard Job# 00-01461-01 I Paid On Receipt# Permits w/o Srchg 07/19/2001 6192 Page 4 of 5 Value/Quantity Fee Amount 371,700 $1,045.00 $1,045.00 $318,516.59 Date Completed Comment 10/02/2000 02/23/2001 07/16/2001 04/09/2001 10/24/2000 Plan Review - **Site** for multi unit townhouses Phase 1 &2 10/24/2000 -Fire Lines: hydrants in and tested prior to combustible construction, flow tested, flushing, hydrotest, visual inspection prior to coverup. -All hydrants in and tested prior to comb construction -Fire access roads in and maintained clear prior to comb construction, -All gates accessing wetlands shall have PW locks -All gates accessing wetlands shall have PW locks -prior to final all curbing to be marked as fire lane - prior to occupancy address numbers required and approved by FMO -prior to occupancy CAD drawings of site and structures submitted to FMO for pre fire planning Plan review Phase 1 & 2 Townhouses 3plex to 8plex, R1 type VN 10/24/2000 - provide sprinkler plans - Coordinate address # placement with FMO Plan review - Recreation Center 4820 sq ft A-3 Type VN non spklr - Provide a knox box - Provide fire alarm plans incl Central station info - note #2 p A21 not permitted power illumination for egress per UBC 1003.2.9.2 By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. .. ';,' ~~LD- Signature I Job# 00-01461-01 I .~e 5 of5 d-~- \ 1, ) ~.~ \ Date ... ,I 'i" .. ATTACHMENT A CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE WORKSHEET JOURNAL OR JOB NUMBER 00-01461-01 NAME OR COMPANY: JENNA ESTATES LLC LOCATION: 4885 ASTER STREET ,TAX LOT NUMBER 17-02-32-00 900,902 DEVELOPMENT TYPE: MUTI-F AMIL Y RESIDENTIAL USE # 1 NUMBER OF UNITS: 105 TYPE OF USE: RESIDENTIAL USE # 2 NEW DEVELOPED BUILDING AREA (S.F.): 4572.0 TYPE OF USE: RECREATIONAL EXIST DEVELOPED BUILDING AREA (S.F.): TOTAL DEVELOPED BUILDING AREA (S.F.): 219712.5 LOT SIZE (S.F.): I. STORM DRAINAGE IMPERVIOUS SQ. FT. $0.240 PER SQ. FT. 219712.50 x 2. SANITARY SEWER-CITY NUMBER OF PFU's (SEE REVERSE SIDE) $49.86 PER PFU 1713 x 3. TRANSPORTATION BLDG AREA TGSF x TRIP RATE x COST PER PM PEAK HOUR TRIP DU EMPLOYEES x $502.79 PER TRIP x $502.79 PER TRIP TOTAL TRANSPORTATION SDC 105 2 x x 0.54 1 4. SANITARY SEWER - MWMC A. REIMBURSEMENT COST: USE # 1 USE # 2 $245.06 $261.40 NUMBER OF FEU's NUMBER OF FEU's 105 4.572 PER FEU PER FEU x x B. IMPROVEMENT COST: USE # 1 NUMBER OF FEU's 105 USE # 2 NUMBER OF FEU's 4.572 MWMC CREDIT IF APPLICABLE (SEE REVERSE) MWMC ADMINISTRATIVE FEE x $20.85 x $22.24 PER FEU PER FEU TOTAL MWMC SDC $52,731.00 l $85,410.18 I $28,508.19 $1,005.58 , $29,513.77 I $25,731.30 $1,195.12 $2,189.25 $10 1.68 $0.00 I $10.00 I $29,227.35 I SUBTOTAL (ADD ITEMS 1,2,3, & 41 $196,882.30 I 5. ADMINISTRATIVE FEES: BASE CHARGE (SUBTOTAL ABOVE) x 0.05 $9,844.12 , ;z:;~ ~ tJ~-'?' SDC COORDINATOR 2/23/01 DATE TOTAL SDC CHARGE~ $206,726,42 , I PLUMBING FIXTURE UNIT (PFU) CALCULATION TABLE NUMBER OF NEW FIXTURES x UNIT EQUIVALENT = PLUMBING FIXTURE UNITS (NOTE: FOR REMODELS, CALCULATE ONLY THE NET ADDITIONAL FIXTURES) FIXTURE TYPE BATHTUB DRINKING FOUNTAIN FLOOR DRAIN INTERCEPTORS FOR GREASE/OIL/SOLIDS/ETC. INTERCEPTORS FOR SAND/AUTO WASH/ETC. LAUNDRY TUB/CLOTHESW ASHER/MOP SINK CLOTHESWASHER- 3 OR MORE MOBILE HOME PARK TRAP (1 PER TRAILER) RECEPTOR FOR REFRIGERA TOR/W A TER ST A TION/ETC. RECEPTOR FOR COMMERCIAL SINK! DISHWASHER/ETC. SHOWER, SINGLE STALL SHOWER, GANG (NUMBER OF HEADS) SINK: BAR, COMMERCIAL, RESIDENTIAL KITCHEN URINAL, ST ALL/W ALL W ASH BASIN/LA V A TORY, SINGLE OR DOUBLE TOILET, PUBLIC INST ALLA TlON TOILET, PRIVATE INSTALLATION MISCELLANEOUS: FIXTURES NEW OLD 105 105 107 I 213 4 210 UNIT EQUIV ALENT 2 I 2 3 6 2 6 6 I 3 2 1 2 2 I 6 4 '1 t; ..... )0 PLUMBING FIXTURE UNITS 210 o o o o 210 o o o o o o 214 2 213 24 840 o o o TOTAL PLUMBING FIXTURE UNIT~ 1713 CREDIT CALCULA TlON TABLE: BASED ON ASSESSED VALUE IF IMPROVEMENTS OCCURRED AFTER ANNEXATION DATE IN TABLE, CALCULATE CREDITS SEP ARA TEl YEAR ANNEXED 1979 or before 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 RATE PER $1,000 ASSESSED VALUE $4.74 $4.65 $4.59 $4.46 $4.30 $4.14 $ 3.93 $3.63 $3.26 $2.85 $ 2.40 YEAR ANNEXED 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 CREDIT FOR PARCEL OR LAND ONLY IF APPLICABLE IMPROVEMENT (IF AFTER ANNEXATION DATE) x x RATE PER $1,000 ASSESSED VALUE $ 1.96 $ 1.55 $ 1.36 $1.23 $ 1.05 $0.90 $0.75 $0.57 $0.35 $0.15 $0.00 $0.00 CREDIT TOTAL $0.00