Job# 01-01364-01
Page 1 of 5
TRANS#=Ol-00102~j
DA TE = ~iUG O? 200~~
AMT RECD:2 $ 300694~86
CHf~i"JGE ;
CASHIEr, ~ Ot.l
225 Fifth Street
Springfield, OR 97477
COMMERCIAL PERMIT
City Of Springfield
Community Services Division
Building Safety
Job Number: 01-01364-01
Office: 726-3759
Inspection Line: 726-3769
Location Of Proposed Site: 4885 Aster St Spr
Assessors Map#: 17023200
Lot: Block: Addition:
Owner:
Address:
Tax Lot #: 00902
Subdivision:
Jenna Estates LLC
PO Box 117
Phone Number: 541-896-0268
City/State/Zip: Walterville, OR 97478
New Value: $4,500,000
Scope Of Work: Apartment
Jenna Village Phases 3 & 4
Contractor Type
General Contr
Electrical Contr
Mechanical Contr
Plumbing'Contr
Quad Area:
# Of Units:
Constr. Type:
Water Heater:
Contractor
Essex General Construction Inc
4284 W 7Th Ave, Eugene, OR 97402
Registration #
54531
Expiration Date
11/10/2002
Phone
541-342-4509
95
(VN) Wood Frame
2/8/2003 ~'OS ':IO\) \~~fl1-343-7297
'Oo..\)\ f\ \)\\ ~"
f\ \e.'IN ~ O~e~O se\ \0 '\,
.O~'O~O :\1 \"'0 \~s e.~'o 5?;f:lJ
5~5~\\O~' 60~\'04~j,~tQO\~jOI>-~ 9 ~~~~ ~~2-4509
~(\ 't;: ~\)\'os ~ ,,\'o~'"\ \,,~O\J.~ 0' \,,'0 X\o'{\'o
\\o'IN f\ C'o Q()'\O !)\'os \'O\'o~ ~\O'{\
'C'l~~9_0fP 'COO'\' UBt'20~~'O.,\~'O ~0'\~41-461-8973
~o ol>-~ 9~\) ~e.':I ~'{\\'O1. ~ f\ \)\\\\\':1 ~b.~l'
',(\ _ -./0 _ I"B _1"\0 ~nfl.
. C\r.S'-fJ\J'. \"" '0 U\ ~... ()":>v-
Office Use . i~\'{\~ 'o~ \", "COG
c :n'O~. ~'O'\ \S
Apartmenh\20"'= UI'1.its'{\ # Of Buildings: 20
HDR Occupancy Group: Hotels, Apartment
Heat Source:
Sq. Footage:
Reynolds Electric Inc
2175 W 2Nd Ave, Eugene, OR
97402-7103
17252
Essex General Construction Inc
4284 W 7Th Ave, Eugene, OR 97402
Statewide Mechanical Lie
4466 Avalon, Eugene, OR 97402
Land Use:
Zoning Code:
Bedrooms:
Range:
,,'
To request an inspection call the 24 hour recording at 726-3769. All inspections requested before 7~. 'NQ\\~
a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made t~\.1W ~CO ~CJ\
working day. \. ~~~,~ ?~\\~X O~
. . . ~\.(':t:. of c.\\~~. "(~\CO ~\~\) ~
.' ReqUired Inspectt{\lij)i\ t.~~{\ ".~ ~\,)e\\ ~~VQT
. I Building \\\\~ ~Q\\\tt.Q ~ Q\\ 'CO ~'O
-Install ground rod at footing, and call for ~)~~~~'\I\r~~ith footing and/or foundation ir
-After trenches are excavated. C()~ ~\)~
- After forms are erected but prior to concre~~~ment. .
- To be made after all inslab building service equipment, conduit piping, and other equipment iterr
-Prior to decking.
- Prior to cover.
-Before covering sheathing with finish materials.
- Prior to cover.
Verify Ground Rod
Footing
Foundation
Slab
Floor Insulation
Ceiling Insulation
Shear Wall Nailing
Framing
,.
Wall Insulation
Drywall
'Firewall
Final Fire
Final Site Plan
Final Building
Temporary Power
Underground Plumbing
Rough Plumbing
Water line
Sanitary Sewer line
Storm Sewer line
Final Plumbing
Rough Mechanical
Final Mechanical
Rough Grading
Final Paving
I Job# 01-01364-01 I
Required Inspections
I Building
Page 2 of 5
- Prior to Cover
-Prior to taping.
- Located and constructed according to plans.
- When all Fire Department requirements have been met.
-After all requirements have been met for Minimum Development Standards or from the Develop
-When all required inspections have been approved and the building is complete.
I Electrical I
-Approval required prior to SUB energizing pole.
I Plumbing
-Prior to filling the trench.
- Prior to cover.
-Prior to filling trench.
-Prior to filling trench.
- Prior to filling trench.
- When all plumbing work is complete.
Mechanical
- Prior to cover.
- When all mechanical work is complete.
I Permits w/o Srchg I
-After gravel is in place but prior to placing concete.
-After paving is complete.
Zoning: HDR Overlay District:
FloodPlain? D Wetlands? D # of Street Trees:
Journal numbers
1: 2001-03-0063 2: 3:
Comments:Development Agreement Signed 11/1/01
land Use: Apartment 20+ Units
Pave Driveway? 0
Additional Requirements:
Glenwood Area? D Required Attachments:
Source Locn:
Material:
Planner: Kay Bork
Urban Growth Boundary? D
Quantity Of Fill:
Supplier:
Drainage:
Floodway FEMA:
Construction Types:(VN) Wood Frame
Occupancy, Groups: Hotels, Apartments
# Of Buildings: 20
# Of Bedrooms:
Handicap Access? D
-Area (Sq. Feet)
Main: Accessory:
Fee
Commercial Plan Check
Additional Plan Check
Flood Plain FEMA:
# Of Stories: 2
Current Units:
Census Code: Does not apply
Height (feet):
Proposed Units:95
Total:
Paid On Receipt#
Plan Check
09/04/2001 6595
08/07/2002 10223
Value/Quantity
Fee Amount
4,500,000
4,896
$4,766.45
$4,896.22
Job# 01-01364-01 I Page 3 of 5
J
Fee Paid On Receipt# Value/Quantity Fee Amount
Plan Check
Fire & Life Safety Plan Review 08/07/2002 10223 4,500,000 $5,946.26
Total Plan Check $15,608.93
Building
Building Permit 08/07/2002 10223 4,088,000 $13,526.65
State Surcharge For Building Permit 08/07/2002 10223 $946.87
8% Building Administrative Fee 08/07/2002 10223 $1,082.13
Total Building $15,555.65
Electrical
Minimum Electrical Permit Fee 08/07/2002 10223 $.00
Temporary: 200 Amps or Less 08/07/2002 10223 $50.00
State Surcharge - Electrical 08/07/2002 10223 $3.50
8% Admin Fee - Electrical 08/07/2002 10223 $4.00
Total Electrical $57.50
Plumbing
Minimum Plumbing Permit Fee 08/07/2002 10223 $.00
Number of Fixtures 08/07/2002 10223 760 $10,640.00
State Surcharge - Plumbing 08/07/2002 10223 $835.59
Water Service Footage 08/07/2002 10223 2,318 $367.00
Sanitary Sewer Footage 08/07/2002 10223 1,168 $213.00
Storm Sewer Footage 08/07/2002 10223 4,831 $717.00
8% Administrative Fee - Plumbing 08/07/2002 10223 $954.96
Total Plumbing $13,727.55
Mechanical
Hood and Exhaust 08/07/2002 10223 95 $855.00
Minimum Mechanical Permit 08/07/2002 10223 $.00
8% Administrative Fee - Mechanical 08/07/2002 10223 $228.00
Vent Fan to One Duct 08/07/2002 10223 190 $1,140.00
ApplianceVent (Not Covered in Schedule 08/07/2002 10223 95 $855.00
Miscellaneous Mechanical 08/07/2002 10223 $.00
Mechanical Issuance 08/07/2002 10223 $10.00
State Surcharge - Mechanical 08/07/2002 10223 $199.50
Total Mechanical $3,287.50
System Development
Apartment - Low Rise - Reimbursement 08/07/2002 10223 95 $10,179.57
Apartment - Low Rise - Improvement 08/07/2002 10223 95 $44,919.09
Impervious Surface Area - Storm 08/07/2002 10223 128,123 $34,977.58
MWMC Administrative Fee 08/07/2002 10223 1 $10.00
SDC Administrative Fee 08/07/2002 10223 $9,038.31
Miscellaneous MWMC 08/07/2002 10223 29,940 $29,939.83
Retail - MWMC 08/07/2002 10223 $.00
Sanitary Sewer SDC Reimbursement 08/07/2002 10223 1,615 $34,512.55
Sanitary Sewer SDC Improvement 08/07/2002 10223 1,615 $26,227.60
Total System Development $189,804.53
Willamalane SDC J
Multifamily - Willamalane 08/07/2002 10223 95 $65,740.00
Total Willamalane SDC $65,740.00
..
Fee
Final Site Plan Insp for Occy
.Total Planning
Paving
Total Permits w/o Srchg
Grand Total
Plan Check Type
Initial Review-C/I/P
Engineering-C/I/P
Planning-C/I/P
Planning-C/I/P
Structural-C/I/P
Structural-C/I/P
Structural-C/IIP
Fire Marshal-C/IIP
SUB - Comm/lnd
SUB - Comm/lnd
Job# 01-01364-01
Paid On Receipt#
Planning .
08/07/2002 10223
Checked By
Bob Barnhart
Pam Ownby
Kay Bork
Kay Bork
Lome Pleger
Tom Marx
Tom Marx
AI Gerard
David Harris
David Harris
Page 4 of 5
Value/Quantity Fee Amount
1
$100.00
$100.00
Permits w/o Srchg
08/07/2002 10223
Date Completed
09/12/2001
12/12/2001
11/26/2001
11/26/2001
02/13/2002
02/13/2002
10/01/2001
12/10/2001
412,000
$1,579.65
$1,579.65
$305,461.31
Comment
Waiting for approval of final site plan for
phases 3 and 4. Also Develoopment
agreement.
Final site inspection required
Reviewed ONLY additional information
submitted by Art Paz to reflect comments from
Lome Plegers Plan review dated September
26, 2001. Faxed letter to Art Paz requesting
additional information be provided on Detail
8/A4 and Structural calculations.
Received structrual calculations
Plan Review, New Construction - Townhouses
(3-11 plex) VN, R1 & R3
1. Provide building address numbering design
to Fire Marshal's Office for review and
approval. Include elevation of building
(designating location of building number or
letter), individual unit number (or letter)
location, provide site entrance address design
and location, also site entrance locator map
designating building and unit locations.
2. Provide a 2A-1 OB:C fire extinguisher for
every 75' of travel.
Apartments being reviewed, inspected under
supergood sense program. The only structure
needed to be reviewed and inspected under
the commercial program is the community
building that is not included in this permit.
Status as approved entered to eliminate
confusion that we are waiting for completion of
plan review from SUB. This information was
provided to me by David Harris at SUB on
12/10/01 - L Hopper
Energy calc info received from Pacific Air
comfort. Faxed to David Harris at SUB 1/8/02
- I hopper
,~
, .
I Job# 01-01364-01 I Page 5 of 5
By signature, I state and agree, that I have carefully examined the completed application and do
hereby certify that all information hereon is true and correct, and I further certify that any and all work
performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of
the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made
of any structure without permission of the Community Services Division, Building Safety. I further
certify that only contractors and employees who are in compliance with ORS 701.055 will be used on
this project.
I further agree to ensure that all required inspections are requested at the proper time, that each
address is readable from the street, that the permit card is located at the front of the property, and the
app~ PI: will r~~ during construction. (!b.-,
Signature L DaQ
.J
""7,
,~(::) ')
A IT ACHMENT A
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE WORKSHEET
JOURNAL OR JOB NUMBER 01-01364-01
NAME OR COMPANY: JENNA ESTATES LLC, PHASES 3 & 4
LOCATION: 4885 ASTER STREET
MAP & TAX LOT NUMBER: 17-02-32-00 00902
DEVELOPMENT TYPE: APARTMENT
USE # 1
NEW DWELLING UNITS (EA):
NEW DEVELOPED BUILDING AREA (S.F.):
TOTAL DEVELOPED BUILDING AREA (S.F.):
ITE:
ITE:
LOT SIZE (S.F.):
95
128123
1. STORM DRAINAGE
IMPERVIOUS SQ. FT.
I $ 34,977.58 I
TOTAL STORM DRAINAGE SDC:
128123
x
$ 0.273 PER SF
2. SANITARY SEWER-CITY
A. REIMBURSEMENT COST:
NUMBER OF DFU's 1615
B. IMPROVEMENT COST:
NUMBER OF DFU's 1615
(SEE REVERSE SIDE)
221
'$ 34,977.58
--_..~
x $ 21.37 PER DFU J $ 34,512.55
x $ 16.24 PER DFU , $ 26,227.60
TOTAL LOCAL W ASTEW A TER SDC: J $ 60,740.15
3. TRANSPORTATION
DU x TRIP RATE x COST PER ADT x NEW TRIP FACTOR
NEW
A. REIMBURSEMENT COST:
95 x 6.59 x $ 16.26 PER TRIP
B. IMPROVEMENT COST:
95 x 6.59 x $ 71.75 PER TRIP
x
NTF
x
NTF
TOTAL TRANSPORTATION REIMBURSEMENT SDC:
TOTAL TRANSPORTATION IMPROVEMENT SDC:
TOTAL TRANSPORTATION SDC:
4. SANITARY SEWER - MWMC
NEW:
A. REIMBURSEMENT COST:
NUMBER OF FEU's
B. IMPROVEMENT COST:
NUMBER OF FEU's
95
$285.31
PER FEU
x
95
$29.85
PER FEU
x
MWMC CREDIT IF APPLICABLE (SEE REVERSE)
TOTAL MWMC REIMBURSEMENT AND IMPROVEMENT FEE:
MWMC ADMINISTRATIVE FEE:
TOTAL MWMC SDC:
,_.-...~...-
,"' "-"~"
SUBTOTAL (ADD ITEMS 1,2,3, & 4)
5. ADMINISTRATIVE FEES~
BASE CHARGE:
$ 180,766.22 x 0.05 $ 9,038.31
TOTAL SANITARY ADMINISTRATION FEE:
TOTAL TRANSPORTATION ADMINISTRATIVE FEE:
1$ 10,179.57
1$ 44,919.09
$ 10,179.57
$ 44,919.09
$ 55,098.66
1$ 27,104.08 .
1$ 2,835.75
1$
$ 29,939.83
$ 10.00
, $ 29,949.83
I $ 180,766.22
$ 5,736.29
$ 3,302.02
?~,9. (l---/,,?, 7/31/2002
SDC COORDINATOR DATE
01-01461-01, JENNA VilLAGE 3 & 4 FINAL, 4885 ASTER ST..xls
TOTAL SDC CHARGES
I $
189,804.53 I
JULY 2001