Loading...
HomeMy WebLinkAboutPermit Building 2002-8-7 " ". , 1".- \. cJf:J--/ ~ ~ u \ "- ,. jS. Job# 01-01364-01 Page 1 of 5 TRANS#=Ol-00102~j DA TE = ~iUG O? 200~~ AMT RECD:2 $ 300694~86 CHf~i"JGE ; CASHIEr, ~ Ot.l 225 Fifth Street Springfield, OR 97477 COMMERCIAL PERMIT City Of Springfield Community Services Division Building Safety Job Number: 01-01364-01 Office: 726-3759 Inspection Line: 726-3769 Location Of Proposed Site: 4885 Aster St Spr Assessors Map#: 17023200 Lot: Block: Addition: Owner: Address: Tax Lot #: 00902 Subdivision: Jenna Estates LLC PO Box 117 Phone Number: 541-896-0268 City/State/Zip: Walterville, OR 97478 New Value: $4,500,000 Scope Of Work: Apartment Jenna Village Phases 3 & 4 Contractor Type General Contr Electrical Contr Mechanical Contr Plumbing'Contr Quad Area: # Of Units: Constr. Type: Water Heater: Contractor Essex General Construction Inc 4284 W 7Th Ave, Eugene, OR 97402 Registration # 54531 Expiration Date 11/10/2002 Phone 541-342-4509 95 (VN) Wood Frame 2/8/2003 ~'OS ':IO\) \~~fl1-343-7297 'Oo..\)\ f\ \)\\ ~" f\ \e.'IN ~ O~e~O se\ \0 '\, .O~'O~O :\1 \"'0 \~s e.~'o 5?;f:lJ 5~5~\\O~' 60~\'04~j,~tQO\~jOI>-~ 9 ~~~~ ~~2-4509 ~(\ 't;: ~\)\'os ~ ,,\'o~'"\ \,,~O\J.~ 0' \,,'0 X\o'{\'o \\o'IN f\ C'o Q()'\O !)\'os \'O\'o~ ~\O'{\ 'C'l~~9_0fP 'COO'\' UBt'20~~'O.,\~'O ~0'\~41-461-8973 ~o ol>-~ 9~\) ~e.':I ~'{\\'O1. ~ f\ \)\\\\\':1 ~b.~l' ',(\ _ -./0 _ I"B _1"\0 ~nfl. . C\r.S'-fJ\J'. \"" '0 U\ ~... ()":>v- Office Use . i~\'{\~ 'o~ \", "COG c :n'O~. ~'O'\ \S Apartmenh\20"'= UI'1.its'{\ # Of Buildings: 20 HDR Occupancy Group: Hotels, Apartment Heat Source: Sq. Footage: Reynolds Electric Inc 2175 W 2Nd Ave, Eugene, OR 97402-7103 17252 Essex General Construction Inc 4284 W 7Th Ave, Eugene, OR 97402 Statewide Mechanical Lie 4466 Avalon, Eugene, OR 97402 Land Use: Zoning Code: Bedrooms: Range: ,,' To request an inspection call the 24 hour recording at 726-3769. All inspections requested before 7~. 'NQ\\~ a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made t~\.1W ~CO ~CJ\ working day. \. ~~~,~ ?~\\~X O~ . . . ~\.(':t:. of c.\\~~. "(~\CO ~\~\) ~ .' ReqUired Inspectt{\lij)i\ t.~~{\ ".~ ~\,)e\\ ~~VQT . I Building \\\\~ ~Q\\\tt.Q ~ Q\\ 'CO ~'O -Install ground rod at footing, and call for ~)~~~~'\I\r~~ith footing and/or foundation ir -After trenches are excavated. C()~ ~\)~ - After forms are erected but prior to concre~~~ment. . - To be made after all inslab building service equipment, conduit piping, and other equipment iterr -Prior to decking. - Prior to cover. -Before covering sheathing with finish materials. - Prior to cover. Verify Ground Rod Footing Foundation Slab Floor Insulation Ceiling Insulation Shear Wall Nailing Framing ,. Wall Insulation Drywall 'Firewall Final Fire Final Site Plan Final Building Temporary Power Underground Plumbing Rough Plumbing Water line Sanitary Sewer line Storm Sewer line Final Plumbing Rough Mechanical Final Mechanical Rough Grading Final Paving I Job# 01-01364-01 I Required Inspections I Building Page 2 of 5 - Prior to Cover -Prior to taping. - Located and constructed according to plans. - When all Fire Department requirements have been met. -After all requirements have been met for Minimum Development Standards or from the Develop -When all required inspections have been approved and the building is complete. I Electrical I -Approval required prior to SUB energizing pole. I Plumbing -Prior to filling the trench. - Prior to cover. -Prior to filling trench. -Prior to filling trench. - Prior to filling trench. - When all plumbing work is complete. Mechanical - Prior to cover. - When all mechanical work is complete. I Permits w/o Srchg I -After gravel is in place but prior to placing concete. -After paving is complete. Zoning: HDR Overlay District: FloodPlain? D Wetlands? D # of Street Trees: Journal numbers 1: 2001-03-0063 2: 3: Comments:Development Agreement Signed 11/1/01 land Use: Apartment 20+ Units Pave Driveway? 0 Additional Requirements: Glenwood Area? D Required Attachments: Source Locn: Material: Planner: Kay Bork Urban Growth Boundary? D Quantity Of Fill: Supplier: Drainage: Floodway FEMA: Construction Types:(VN) Wood Frame Occupancy, Groups: Hotels, Apartments # Of Buildings: 20 # Of Bedrooms: Handicap Access? D -Area (Sq. Feet) Main: Accessory: Fee Commercial Plan Check Additional Plan Check Flood Plain FEMA: # Of Stories: 2 Current Units: Census Code: Does not apply Height (feet): Proposed Units:95 Total: Paid On Receipt# Plan Check 09/04/2001 6595 08/07/2002 10223 Value/Quantity Fee Amount 4,500,000 4,896 $4,766.45 $4,896.22 Job# 01-01364-01 I Page 3 of 5 J Fee Paid On Receipt# Value/Quantity Fee Amount Plan Check Fire & Life Safety Plan Review 08/07/2002 10223 4,500,000 $5,946.26 Total Plan Check $15,608.93 Building Building Permit 08/07/2002 10223 4,088,000 $13,526.65 State Surcharge For Building Permit 08/07/2002 10223 $946.87 8% Building Administrative Fee 08/07/2002 10223 $1,082.13 Total Building $15,555.65 Electrical Minimum Electrical Permit Fee 08/07/2002 10223 $.00 Temporary: 200 Amps or Less 08/07/2002 10223 $50.00 State Surcharge - Electrical 08/07/2002 10223 $3.50 8% Admin Fee - Electrical 08/07/2002 10223 $4.00 Total Electrical $57.50 Plumbing Minimum Plumbing Permit Fee 08/07/2002 10223 $.00 Number of Fixtures 08/07/2002 10223 760 $10,640.00 State Surcharge - Plumbing 08/07/2002 10223 $835.59 Water Service Footage 08/07/2002 10223 2,318 $367.00 Sanitary Sewer Footage 08/07/2002 10223 1,168 $213.00 Storm Sewer Footage 08/07/2002 10223 4,831 $717.00 8% Administrative Fee - Plumbing 08/07/2002 10223 $954.96 Total Plumbing $13,727.55 Mechanical Hood and Exhaust 08/07/2002 10223 95 $855.00 Minimum Mechanical Permit 08/07/2002 10223 $.00 8% Administrative Fee - Mechanical 08/07/2002 10223 $228.00 Vent Fan to One Duct 08/07/2002 10223 190 $1,140.00 ApplianceVent (Not Covered in Schedule 08/07/2002 10223 95 $855.00 Miscellaneous Mechanical 08/07/2002 10223 $.00 Mechanical Issuance 08/07/2002 10223 $10.00 State Surcharge - Mechanical 08/07/2002 10223 $199.50 Total Mechanical $3,287.50 System Development Apartment - Low Rise - Reimbursement 08/07/2002 10223 95 $10,179.57 Apartment - Low Rise - Improvement 08/07/2002 10223 95 $44,919.09 Impervious Surface Area - Storm 08/07/2002 10223 128,123 $34,977.58 MWMC Administrative Fee 08/07/2002 10223 1 $10.00 SDC Administrative Fee 08/07/2002 10223 $9,038.31 Miscellaneous MWMC 08/07/2002 10223 29,940 $29,939.83 Retail - MWMC 08/07/2002 10223 $.00 Sanitary Sewer SDC Reimbursement 08/07/2002 10223 1,615 $34,512.55 Sanitary Sewer SDC Improvement 08/07/2002 10223 1,615 $26,227.60 Total System Development $189,804.53 Willamalane SDC J Multifamily - Willamalane 08/07/2002 10223 95 $65,740.00 Total Willamalane SDC $65,740.00 .. Fee Final Site Plan Insp for Occy .Total Planning Paving Total Permits w/o Srchg Grand Total Plan Check Type Initial Review-C/I/P Engineering-C/I/P Planning-C/I/P Planning-C/I/P Structural-C/I/P Structural-C/I/P Structural-C/IIP Fire Marshal-C/IIP SUB - Comm/lnd SUB - Comm/lnd Job# 01-01364-01 Paid On Receipt# Planning . 08/07/2002 10223 Checked By Bob Barnhart Pam Ownby Kay Bork Kay Bork Lome Pleger Tom Marx Tom Marx AI Gerard David Harris David Harris Page 4 of 5 Value/Quantity Fee Amount 1 $100.00 $100.00 Permits w/o Srchg 08/07/2002 10223 Date Completed 09/12/2001 12/12/2001 11/26/2001 11/26/2001 02/13/2002 02/13/2002 10/01/2001 12/10/2001 412,000 $1,579.65 $1,579.65 $305,461.31 Comment Waiting for approval of final site plan for phases 3 and 4. Also Develoopment agreement. Final site inspection required Reviewed ONLY additional information submitted by Art Paz to reflect comments from Lome Plegers Plan review dated September 26, 2001. Faxed letter to Art Paz requesting additional information be provided on Detail 8/A4 and Structural calculations. Received structrual calculations Plan Review, New Construction - Townhouses (3-11 plex) VN, R1 & R3 1. Provide building address numbering design to Fire Marshal's Office for review and approval. Include elevation of building (designating location of building number or letter), individual unit number (or letter) location, provide site entrance address design and location, also site entrance locator map designating building and unit locations. 2. Provide a 2A-1 OB:C fire extinguisher for every 75' of travel. Apartments being reviewed, inspected under supergood sense program. The only structure needed to be reviewed and inspected under the commercial program is the community building that is not included in this permit. Status as approved entered to eliminate confusion that we are waiting for completion of plan review from SUB. This information was provided to me by David Harris at SUB on 12/10/01 - L Hopper Energy calc info received from Pacific Air comfort. Faxed to David Harris at SUB 1/8/02 - I hopper ,~ , . I Job# 01-01364-01 I Page 5 of 5 By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front of the property, and the app~ PI: will r~~ during construction. (!b.-, Signature L DaQ .J ""7, ,~(::) ') A IT ACHMENT A CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE WORKSHEET JOURNAL OR JOB NUMBER 01-01364-01 NAME OR COMPANY: JENNA ESTATES LLC, PHASES 3 & 4 LOCATION: 4885 ASTER STREET MAP & TAX LOT NUMBER: 17-02-32-00 00902 DEVELOPMENT TYPE: APARTMENT USE # 1 NEW DWELLING UNITS (EA): NEW DEVELOPED BUILDING AREA (S.F.): TOTAL DEVELOPED BUILDING AREA (S.F.): ITE: ITE: LOT SIZE (S.F.): 95 128123 1. STORM DRAINAGE IMPERVIOUS SQ. FT. I $ 34,977.58 I TOTAL STORM DRAINAGE SDC: 128123 x $ 0.273 PER SF 2. SANITARY SEWER-CITY A. REIMBURSEMENT COST: NUMBER OF DFU's 1615 B. IMPROVEMENT COST: NUMBER OF DFU's 1615 (SEE REVERSE SIDE) 221 '$ 34,977.58 --_..~ x $ 21.37 PER DFU J $ 34,512.55 x $ 16.24 PER DFU , $ 26,227.60 TOTAL LOCAL W ASTEW A TER SDC: J $ 60,740.15 3. TRANSPORTATION DU x TRIP RATE x COST PER ADT x NEW TRIP FACTOR NEW A. REIMBURSEMENT COST: 95 x 6.59 x $ 16.26 PER TRIP B. IMPROVEMENT COST: 95 x 6.59 x $ 71.75 PER TRIP x NTF x NTF TOTAL TRANSPORTATION REIMBURSEMENT SDC: TOTAL TRANSPORTATION IMPROVEMENT SDC: TOTAL TRANSPORTATION SDC: 4. SANITARY SEWER - MWMC NEW: A. REIMBURSEMENT COST: NUMBER OF FEU's B. IMPROVEMENT COST: NUMBER OF FEU's 95 $285.31 PER FEU x 95 $29.85 PER FEU x MWMC CREDIT IF APPLICABLE (SEE REVERSE) TOTAL MWMC REIMBURSEMENT AND IMPROVEMENT FEE: MWMC ADMINISTRATIVE FEE: TOTAL MWMC SDC: ,_.-...~...- ,"' "-"~" SUBTOTAL (ADD ITEMS 1,2,3, & 4) 5. ADMINISTRATIVE FEES~ BASE CHARGE: $ 180,766.22 x 0.05 $ 9,038.31 TOTAL SANITARY ADMINISTRATION FEE: TOTAL TRANSPORTATION ADMINISTRATIVE FEE: 1$ 10,179.57 1$ 44,919.09 $ 10,179.57 $ 44,919.09 $ 55,098.66 1$ 27,104.08 . 1$ 2,835.75 1$ $ 29,939.83 $ 10.00 , $ 29,949.83 I $ 180,766.22 $ 5,736.29 $ 3,302.02 ?~,9. (l---/,,?, 7/31/2002 SDC COORDINATOR DATE 01-01461-01, JENNA VilLAGE 3 & 4 FINAL, 4885 ASTER ST..xls TOTAL SDC CHARGES I $ 189,804.53 I JULY 2001