Loading...
HomeMy WebLinkAboutPermit Building 1995-8-1 Page 1 RESIDENTIAL PERMIT APPLICATION CITY OF SPRINGFIELD COMMUNITY SERVICES DIVISION BUILDING SAFETY Job Number: 951164 225 North Fifth Street Springfield, OR 97477 Office: 726-3759 Inspection Line: 726-3769 Location of Propoaed Work: 1?10 RAINBOW DR Assessors Map #: 17032731 Lot: Block: Tax Lot #: 00100 Subdivision: Owner: HABITAT FOR HUMANITY Address: BOX 488 Phone #: 741-1707 City/State/zip: SPRINGFIELD, OREGON 97477 Describe Work: S.F. RESIDENCE NEW Canst. Contractor Contractor # Expires Phone General: KEENER CARPENTR 0075704 08/09/95 344-9479 1828 Hilyard St Eugene OR 974010000 PI urnbing: EUGENE PLUMBING 0044012 01/09/96 484-7440 325 Dellwood Eugene OR 974054909 Electrical: DOUG PALMER 0090725 05/03/95 998-3047 PO Box 482 Junction City OR 9744800 QUAD AREA: lRNW # OF UNITS: 1 CONSTR. TYPE: VN WATER HEATER: E SQ FOOTAGE: 896 OFFICE USE -- LAND USE: 1111 ZONING CODE: LOR # OF BDRMS: 2 RANGE: E # OF BLDGS: 1 OCCY GROUP: R3 HEAT SOURCE: WH INSUL PATH: PI To request an inspection, call the 24 hour recording at 726-3769. All inspections requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following work day. REQUIRED INSPECTIONS TEMPORARY POWER FOOTING - After trenches are excavated. FOUNDATION - After forms are erected but prior to concrete placement, UNDERFLOOR PLUMBING - Prior to insulation or decking, UNDERFLOOR MECHANICAL - Prior to insulation or decking, POST AND BEAM - Prior to floor insulation or decking. INSULATION - Floor; prior to decking wall/Ceiling; Prior to cover STORM SEWER LINE - Prior to filling trench, SANITARY SEWER LINE - Prior to filling trench, WATER LINE - Prior to filling trench, ROUGH PLUMBING - Prior to cover. ROUGH MECHANICAL - Prior to cover. ROUGH ELECTRICAL - Prior to cover. ELECTRICAL SERVICE - Must be approved to obtain permanent power, FRAMING - Prior to cover. INSULATION - Floor; prior to decking wall/Ceiling; Prior to cover DRYWALL - Prior. to taping, CURBCUT - After forms are erected but prior to placement of concrete, SIDEWALK - After excavation is complete, forms and sub-base material in place, FINAL PLUMBING - When all plumbing work is complete, FINAL MECHANICAL - When all mechanical work is complete, FINAL ELECTRICAL - When all electrical work is complete, FINAL BUILDING - When all required inspections have been approved and the building is complete, #, Job Number: 951164 Page 2 Lot Faces: E Topography: 2 Solar Approved: Y Lot Sq, Ft,: 7700 Total Height: 15,5 Lot Type: INTERIOR Setbacks S W E 22 67 34 Lot Coverage: 12 t Setbk From NPL: 67 N House 5 Item Main Garage Total Value BUILDING PERMIT Square Feet x 896 $/Square Feet 56,2 = Value 50,355.00 0,00 50,355,00 Building Permit Fee Surcharge/Admin 289,00 23,12 TOTAL FEE (A) 312.12 --- SYSTEMS DEVELOPMENT CHARGE (SDC) --- (B) 1,418.32 Systems Development Charge is due on all undeveloped properties within the City limits and the Citys Urban Growth Boundry which are being improved, PLUMBING PERMIT --- Item Residential Bath(s) 1 Fee 91. 20 Plumbing Permit Surcharge/Admin 91,20 7.30 TOTAL CHARGE (C) 98.50 MECHANICAL PERMIT - - - Exhaust Hood Vent Fan Dryer Vent 2 4,50 6,00 3.00 Mechanical Permit Issuance Surcharge/Admin 15,00 10.00 1. 20 TOTAL PERMIT (D) 26.20 --- MISCELLANEOUS PERMITS --- Sidewalk Curb Cut WILLAMALANE SDC 12,70 12,70 1,000,00 TOTAL MISCELLANEOUS PERMITS (E) 1,025.40 (Excluding Electrical) unless otherwise noted TOTAL AMOUNT DUE (A, B, C, D, and E combined) 2,880.54 --- BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT --- This permit is granted on the express condition that the said construction shall, in all respects, conform to the Ordinance adopted by the City of Springfield, including the Development Code, regulating the construction and use of buildings, and may be suspended or revoked at any time upon violation of any provisions of said ordinances. , I' SPRINGFIELD Job Number: 951164 Page 3 Plan Check Fee: Received By: Plans Reviewed By: BOB Building Site Reviewed 187,85 Date Paid: 07/13/95 Receipt Number: 18301 BARNHART Date: 07/27/95 By: LISA HOPPER --- ADDITIONAL COMMENTS --- REQUIRES SEPARATE ELECTRICAL PERMIT DRIVEWAY REQUIRED TO BE PAVED By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety, I further certify that only contractors and employees who are in compliance with ORS 701,055 will be used on this project, I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. 7JSL..N..t/7 r ~ <-/ -Signatur( L' tJ", /-<1~/ Date - -- VALIDATION Receipt Number: /.J!i's-YS Date Paid: Jf?/-"7'..'S" t?t:-;';/~c.y&:;">"~~___~ Amount Received: ~e:>:~ Received By: /'7~~ ~ / -'/. ~ O'~< JuY ~ '\Q~' ~N~ ~l , ,j -. . CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE (COMMERCIAL / RESIDENTIAL) Name or Company: HABITAT FOR HUMANITY Location: 1710 RAINBOW DR Developement Type: R Building Size: Job No.: 951164 Lot Size: 1. STORM DRAINAGE Impervious Sq Ft 1219 X 0.210 Per Sq Ft = 2. SANITARY SEWER - CITY Number Of PFUs 11 X 43,43 Per PFU (see Page 2) 3. TRANSPORTATION Number Of Units 1 X X Trip Rate 1. 010 X X Cost Per Trip 437.93 = $442.31 Transportation Total 4. SANITARY SEWER - MWMC Number Of PFUs 11 Per PFU + 18.750 + MWMC Admin Fee 10.00 X X MWMC CREDIT If Applicable (see Page 2) TOTAL - MWMC SDC SUBTOTAL - (Add Items I, 2, 3 & 4) 5. ADMINISTRATIVE FEES Base Charge (Subtotal Above) X 0,50 TOTAL SDC Reviewed By: TROY MCALLISTER Date: 07/17/95 Page 1 Sq Ft $255.99 $477.73 $442.31 $216,25 $41. 50 $174,75 $1,350.78 $67.54 $1,418.32 ~ , .- -. Job Number: 951164 FIXTURE UNIT CALCULATION TABLE Fixture Type Bathtub Drinking Fountain Floor Drain Interceptors For Grease/Oil/Solids/Etc Inteceptors For Sand/Auto Wash/Etc Laundry Tub/Clotheswasher Clotheswasher - 3 Or More Receptor For Refrigerator/Water Station/Etc Receptor for Commercial Sink/Dishwasher/Etc Shower, Single Stall Shower, Gang Sink, Bar, Commercial Urinal, Stall/Wall Wash Basin/Lavatory, Single Water Closet, Public Installation Water Closet, Private Miscellaneous TOTAL FIXTURE UNITS Number of New Fixture 1 o o o o 1 o o o o o 1 o 1 o 1 o . Page 2 Unit Equivalent Fixture Units 2 1 2 3 6 2 6 1 3 2 2 o o o o 2 o o o o o 2 o 1 o 4 o 2 2 1 6 4 11 CREDIT CALCULATION TABLE: Based on assessed value. If improvements occured after annexation date, credits are calculated separately. (calculations are by $1000) Year Annexed: 1966 Credit For Parcel Or Land Only If Applicable: Improvement (if after annexation date) : 11,960 X 3.47 = 41.50 o X 3.47 = 0.00 CREDIT TOTAL = $41.50 (If land value is multiplied by 1 then the parcel/land credit is not accurate.)