HomeMy WebLinkAboutPermit Building 1995-8-1
Page 1
RESIDENTIAL PERMIT APPLICATION
CITY OF SPRINGFIELD
COMMUNITY SERVICES DIVISION
BUILDING SAFETY
Job Number: 951164
225 North Fifth Street
Springfield, OR 97477
Office: 726-3759
Inspection Line: 726-3769
Location of Propoaed Work: 1?10 RAINBOW DR
Assessors Map #: 17032731
Lot: Block:
Tax Lot #: 00100
Subdivision:
Owner: HABITAT FOR HUMANITY
Address: BOX 488
Phone #: 741-1707
City/State/zip: SPRINGFIELD, OREGON 97477
Describe Work: S.F. RESIDENCE
NEW
Canst.
Contractor Contractor # Expires Phone
General: KEENER CARPENTR 0075704 08/09/95 344-9479
1828 Hilyard St Eugene OR 974010000
PI urnbing: EUGENE PLUMBING 0044012 01/09/96 484-7440
325 Dellwood Eugene OR 974054909
Electrical: DOUG PALMER 0090725 05/03/95 998-3047
PO Box 482 Junction City OR 9744800
QUAD AREA: lRNW
# OF UNITS: 1
CONSTR. TYPE: VN
WATER HEATER: E
SQ FOOTAGE: 896
OFFICE USE --
LAND USE: 1111
ZONING CODE: LOR
# OF BDRMS: 2
RANGE: E
# OF BLDGS: 1
OCCY GROUP: R3
HEAT SOURCE: WH
INSUL PATH: PI
To request an inspection, call the 24 hour recording at 726-3769.
All inspections requested before 7:00 a.m. will be made the same working day,
inspections requested after 7:00 a.m. will be made the following work day.
REQUIRED INSPECTIONS
TEMPORARY POWER
FOOTING - After trenches are excavated.
FOUNDATION - After forms are erected but prior to concrete placement,
UNDERFLOOR PLUMBING - Prior to insulation or decking,
UNDERFLOOR MECHANICAL - Prior to insulation or decking,
POST AND BEAM - Prior to floor insulation or decking.
INSULATION - Floor; prior to decking wall/Ceiling; Prior to cover
STORM SEWER LINE - Prior to filling trench,
SANITARY SEWER LINE - Prior to filling trench,
WATER LINE - Prior to filling trench,
ROUGH PLUMBING - Prior to cover.
ROUGH MECHANICAL - Prior to cover.
ROUGH ELECTRICAL - Prior to cover.
ELECTRICAL SERVICE - Must be approved to obtain permanent power,
FRAMING - Prior to cover.
INSULATION - Floor; prior to decking wall/Ceiling; Prior to cover
DRYWALL - Prior. to taping,
CURBCUT - After forms are erected but prior to placement of concrete,
SIDEWALK - After excavation is complete, forms and sub-base material
in place,
FINAL PLUMBING - When all plumbing work is complete,
FINAL MECHANICAL - When all mechanical work is complete,
FINAL ELECTRICAL - When all electrical work is complete,
FINAL BUILDING - When all required inspections have been approved and
the building is complete,
#,
Job Number: 951164
Page 2
Lot Faces: E
Topography: 2
Solar Approved: Y
Lot Sq, Ft,: 7700
Total Height: 15,5
Lot Type: INTERIOR
Setbacks
S W E
22 67 34
Lot Coverage: 12 t
Setbk From NPL: 67
N
House 5
Item
Main
Garage
Total Value
BUILDING PERMIT
Square Feet x
896
$/Square Feet
56,2
= Value
50,355.00
0,00
50,355,00
Building Permit Fee
Surcharge/Admin
289,00
23,12
TOTAL FEE
(A)
312.12
--- SYSTEMS DEVELOPMENT CHARGE (SDC) ---
(B) 1,418.32
Systems Development Charge is due on all undeveloped properties within the City
limits and the Citys Urban Growth Boundry which are being improved,
PLUMBING PERMIT ---
Item
Residential Bath(s)
1
Fee
91. 20
Plumbing Permit
Surcharge/Admin
91,20
7.30
TOTAL CHARGE
(C)
98.50
MECHANICAL PERMIT - - -
Exhaust Hood
Vent Fan
Dryer Vent
2
4,50
6,00
3.00
Mechanical Permit
Issuance
Surcharge/Admin
15,00
10.00
1. 20
TOTAL PERMIT
(D)
26.20
--- MISCELLANEOUS PERMITS ---
Sidewalk
Curb Cut
WILLAMALANE SDC
12,70
12,70
1,000,00
TOTAL MISCELLANEOUS PERMITS
(E)
1,025.40
(Excluding Electrical)
unless otherwise noted
TOTAL AMOUNT DUE
(A, B, C, D, and E combined)
2,880.54
--- BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT ---
This permit is granted on the express condition that the said construction
shall, in all respects, conform to the Ordinance adopted by the City of
Springfield, including the Development Code, regulating the construction and
use of buildings, and may be suspended or revoked at any time upon violation
of any provisions of said ordinances.
, I'
SPRINGFIELD
Job Number: 951164
Page 3
Plan Check Fee:
Received By:
Plans Reviewed By: BOB
Building Site Reviewed
187,85
Date Paid: 07/13/95
Receipt Number: 18301
BARNHART Date: 07/27/95
By: LISA HOPPER
--- ADDITIONAL COMMENTS ---
REQUIRES SEPARATE ELECTRICAL PERMIT
DRIVEWAY REQUIRED TO BE PAVED
By signature, I state and agree, that I have carefully examined
the completed application and do hereby certify that all information hereon
is true and correct, and I further certify that any and all work performed
shall be done in accordance with the Ordinances of the City of Springfield,
and the Laws of the State of Oregon pertaining to the work described herein,
and that NO OCCUPANCY will be made of any structure without permission of the
Community Services Division, Building Safety, I further certify that only
contractors and employees who are in compliance with ORS 701,055 will be
used on this project,
I further agree to ensure that all required inspections are requested at the
proper time, that each address is readable from the street, that the permit
card is located at the front of the property, and the approved set of plans
will remain on the site at all times during construction.
7JSL..N..t/7 r ~ <-/
-Signatur( L'
tJ", /-<1~/
Date
- -- VALIDATION
Receipt Number: /.J!i's-YS
Date Paid: Jf?/-"7'..'S"
t?t:-;';/~c.y&:;">"~~___~
Amount Received: ~e:>:~
Received By: /'7~~ ~
/ -'/.
~
O'~< JuY ~
'\Q~'
~N~
~l
,
,j
-.
.
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE
(COMMERCIAL / RESIDENTIAL)
Name or Company: HABITAT FOR HUMANITY
Location: 1710 RAINBOW DR
Developement Type: R Building Size:
Job No.: 951164
Lot Size:
1. STORM DRAINAGE
Impervious Sq Ft 1219 X 0.210 Per Sq Ft =
2. SANITARY SEWER - CITY
Number Of PFUs 11 X 43,43 Per PFU
(see Page 2)
3. TRANSPORTATION
Number Of Units
1 X
X Trip Rate
1. 010 X
X
Cost Per Trip
437.93 =
$442.31
Transportation Total
4. SANITARY SEWER - MWMC
Number Of PFUs
11
Per PFU +
18.750 +
MWMC Admin Fee
10.00
X
X
MWMC CREDIT If Applicable (see Page 2)
TOTAL - MWMC SDC
SUBTOTAL - (Add Items I, 2, 3 & 4)
5. ADMINISTRATIVE FEES
Base Charge (Subtotal Above) X
0,50
TOTAL SDC
Reviewed By: TROY MCALLISTER
Date: 07/17/95
Page 1
Sq Ft
$255.99
$477.73
$442.31
$216,25
$41. 50
$174,75
$1,350.78
$67.54
$1,418.32
~
,
.-
-.
Job Number: 951164
FIXTURE UNIT CALCULATION TABLE
Fixture Type
Bathtub
Drinking Fountain
Floor Drain
Interceptors For Grease/Oil/Solids/Etc
Inteceptors For Sand/Auto Wash/Etc
Laundry Tub/Clotheswasher
Clotheswasher - 3 Or More
Receptor For Refrigerator/Water Station/Etc
Receptor for Commercial Sink/Dishwasher/Etc
Shower, Single Stall
Shower, Gang
Sink, Bar, Commercial
Urinal, Stall/Wall
Wash Basin/Lavatory, Single
Water Closet, Public Installation
Water Closet, Private
Miscellaneous
TOTAL FIXTURE UNITS
Number of
New Fixture
1
o
o
o
o
1
o
o
o
o
o
1
o
1
o
1
o
.
Page 2
Unit
Equivalent
Fixture
Units
2
1
2
3
6
2
6
1
3
2
2
o
o
o
o
2
o
o
o
o
o
2
o
1
o
4
o
2
2
1
6
4
11
CREDIT CALCULATION TABLE: Based on assessed value. If improvements occured
after annexation date, credits are calculated separately.
(calculations are by $1000)
Year Annexed: 1966
Credit For Parcel Or Land Only If Applicable:
Improvement (if after annexation date) :
11,960
X
3.47 =
41.50
o
X
3.47 =
0.00
CREDIT TOTAL =
$41.50
(If land value is multiplied by 1 then the parcel/land credit is not accurate.)