Loading...
HomeMy WebLinkAboutPermit Plumbing 1994-6-2 ~ COMMERCIAL/lNDU5TRIAL PERMIT APPLICATION . 225 Fifth Street, Springfield, Oregon 97477 'B NUMB~R q "7'0 s::3// INSPECTION LINE: 726-3769 OFFICE: 726-3759 LOCATION OF PROPOSED WORK' /:2 r ASSESSORS MAP' / 7-"~-'2~ -"<- c.,I ~#/A/?:3'__<=?----, v,. "r ~ TAX LOT' .0'2":::;- C> ~ OWNER' '/V7"'.7-1/ -~?:7J':7 - ADDReee, ~<=a:'::::::;~ G~A7'/4&~o ,>--, CITY- /.;~--f7~r/-:.L/ /'7?y STATF' ~- ZIP' 4?o/~ ' DESCRIPTION OFYJ:Pq-4?~~~~~J;:J~~~ ,z!~-:~~/=:;> ??S%>J/k~ ;r NEW REiM'6~EL ADDITION DEMOLISH OTHER VALUE: ~,"""" NAME ARCHITECT: CONTRACTOR'S NAME ADDRESS GENERA' ' PLUMBING:/~A/ ~~"; MECHANICA' ' ADDRESS PHONE' -::.'7g~~~<21 PHONE CONST, CONTRACTOR' EXPI RES PHONE ~~ ]'t7.:> ~y 7&. ~ r-:j//__~~~-"').....,,--~'~n"Y"')- . '-/"/; /:..; 7; 9'9~-..?~::< ELECTRICAl' PLU MBING NO, FeF r-,H'.\.RnF Single Fixture Relocaled Bldg, lnew fix, addU) ~ -Water Service I ..-- '-::<' C::>f I. Sanitary Sewer /f! ;: I 1 1 ~..~ 1 1 1 I 55 "4' fl. Storm Sewer fl. Backflow Device /:h$" ~ /')~ /~,.:z. . J ~. TOTAL PERMIT I I'M' 1 1 I I I I 1 I I I I, 1 TOTAL PERMIT OUAD AREA' LAN D USE: - OFFICE USE,- I ~:~~ . OF BLDG~' . OF UNITS' OCCY GROUP' CONSTR. TYPE: . OF STORIES' HEAT SOURC"' sa, FT, $/sa, FT, sa, FTG MAIN x sa, FTG ACCESS x sa, FTG OTH ER x PLAN CHECK FEE ,""/---:'~ RCPT' DAT" BY I BUILDING PERMIT 15% State Surcharoe I MECHANICAL 15% Slate Surcharae I PAVING PLUMBING 5% State SurcharQe FENCE VALUE $ SIDEWALK MECHANICAL I"'I:IARG~ I I , J:~~ ' Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent > 100.000 BTUs Floor furnace and vent Suspended wall or floor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent System aparl from AC or hlg, Mechanical exhaust hood and duel Permit Issuance $10,00 HANDICAP ACCESS: FLOOD PLAIN' ZONING' LIGHTING POWER BUDGET: WATER HEATER' VALUE TOTAL VALUE OF PROJECT ,:5"S: ......,.l DEMOLITION -::?-?"? - /.f""'~ '- 7 CURBCUT SUBTOTAL FT, PERMITS SYSTEMS FT, DEVELOPMENT TOTAL PERMIT FEES I EXCLUDING ELECTRlr^ I ~"'7, y~ . REQUIRED INSPECTIONS . It Is the responsibility of the permit holder to see that all Inspections are made al the proper time, To request an Inspection, call 726,3769 (recorder), state your City designated job number, Job aduress, type of inspection requested and when you will be ready for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day, SITE INSPECTION: To be made after excavatlon, but prior to setu p of forms, UNDERSLAB PLUMBING, . ELECTRICAL & MECHANICAL: To be made befqre any work Is covered. ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work Is to. be covered until these Inspectlpns have been made and approved, I ATTIC DRAFT STOPS & CURTAIN WALLS PAVING: After gravel Is In place but prior to placing asphalt or concrete. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel In place, but prior to placing concrete, FIREPLACE: Prior to placing facing materials and before framing Inspection, SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special Inspector shall be employed by the Owner/ Contractor during construction of the following work, A copy of the special testing reports shall be furnished to Ihe Building Division, CONCRETE SLAB: To be made after all Insiab building service equipment, conduit, piping, accessories and other ancillary equlpmenl Items are In place but before any concrete Is placed. FRAMING: To be made after the roof, all framing, fire blocking and bracing are In place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. STRUCTURAL CONCRETE: In excess of 2500 P.S,I, (306 a,1) STRUCTURAL WELDS: Performe~ on the job, (2722 f) UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to Installation of floor Insulation, decking or floor sheathing, INSULATION & VAPOR BARRIER: To be made after all Insulation and required vapor" barriers are In place but . before any lath or gypsum board Interior wall covering Is applied, <tI"~,~ ""I~I:' & SEPARATION WALL: Located and constructed according to plans. HIGH STRENGTH BOLTING: Durlng'all bolt Installation and tightening operations, (306 a,6) K UNDERGROUND: Plumbing, electrical, gas;' sanitary sewer, storm sewer, water and d ral nage II nes. To be made prior to covering or filling trenches. SPRAYED ON FIREPROOFING: U,B,C, Standards 43.8, SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork, (306 a,11 & Chapter 29) POST & BEAM: To be made prior to Inslallatlon of floor Insulation, decking or floor sheathing, LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and exterior, Is In place but before any plaslerlng Is applied or before gypsum board jolnls and fasteners are taped and finished, GLU,LAM BEAMS: Inspection Cerllflcale by an approved agency, furnished to the City's Building Division before beams are placed, (2501 U,B,C, STDS, 25.10,11), STRUCTURAL MASONRY: (306 a,7) FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing, SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub.base material In place. 'In addition to the Inspec. tlons specified, the Building Official may make or require other Inspections of any construction work to ensure compliance with the Building, City or Development Code, MASONRY: Sleel location, bond beams grouting or verticals In accordance with UBC 2415, ROOF SHEATHING AND NAILING: Prior to Installing any roof covering. CURB AND APPROACH APRONS: After forms are erecled but prior to placing concrete. ~ FINAL PLUMBING FINAL ELECTRICAL SITE PLAN REVIEW BOARD: Must be requested 2 days In advance of the date you wish Inspection, All project conditions such as landscaping, parking lot striping, etc, must be completed before reQuesting this Inspection. FINAL MECHANICAL FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department Inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been Issued by the Building Division and posted on the premises. FINAL FIRE DEPARTMENT ADDITIONAL COMMENT"" PLANS REVIEWED BY DATF By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that alllnformatlon heretn Is true and correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are In compliance with ORS 701,055 will be used on this project. I further agree to ensure that all required Inspections are requested at the proper tIme, that project address Is readable from the street, that the permit card Is located at the front of the property, and Ihe approved set of plans will remain on the site at all times during construe n. !,..D rr=tl:f) () P..1 ('7---1.-.. \,.....- - . r Date 6 - '2 -91- ~ - ( Signature VALIDATION: AMOUNT RECEIVED: 5'7- sro RECEIPT ': /~ ~'2. DATE PAID: _,c -:2 - "7 Y RECEIVED BY' .-/'Z~ 0/