HomeMy WebLinkAboutPermit Building 1997-8-6
.
COMMERCIAL/INDUSTRIAL SPRINQFIELD
PERMIT APPLICATION l~
225 Fifth Street, Springfield, Oregon 97477 ~
LOCATION OF PROPOSED WORK: tt\\~'l\~\l)
ASSESSORS MAP \."b?'-a.~3
OWNER: t.~f\ ~
ADDRESS: ~\O~O l ~~
CITY: tu~o_ - . STATE: M ./
DESCRIPTION OF WORK: ~ c;lu ')~i\O
NEW REMODEL ADDITION ~OllSH
NAME
ADDRESS
ARCHITECT'
CONTRACTOR\\\t\Ai(lE t: tQ. . ADDRESS
GENERAL'-.'\ '\\\\ \ \\ ~ l_ n~~
PLUMBING'
MECHANICAl'
ELECTRICA' .
u...
NO.
.
~\riVf?b
JOB NUMBER
INSPECTION LINE: 726.3769
OFFICE: 726.3759
TAX LOT --DS~ 0 ~
PHON'" 4- ~~ 'lYY)..~
OTHER
ZIP: Q1104
V~~~
PHONE
CONST.
to40(~t~R .
PHONE
PLUMBING
EXPIRES
"1'1'
CHARnF
1\Jn I l:'1:l:'
MECHANICAL
I
I"I:IARGi
I
1
I
I
I
I
I
I
I
$10,00 I
I
Single Fixture
Relocated Bldg.
Inew Ilx, addtl)
Water Service
It.
Sanitary Sewer
It.
Storm Sewer
It.
Backfiow Device
TOTAL PERMIT
OUAD AREA:
. OF BLOGS:
OCCY GROUP'
. OF STORIES:
SO. FTG MAIN
SO. FTG ACCESS
SO. FTG OTHER
Furnace/burner & vent
< 100,000 BTUs
Furnace/burner & vent
> 100.000 BTUs
Floor furnace and vent
Suspended wall or floor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent System apart
from AC or htg,
Mechanical exhaust
hood and duct
TOTAL PERMIT
Permit Issuance
- OFFICE USE -
LAND USF'
. OF UNIT~'
CONSTR. TYPF'
HEAT SOURCE:
SO, FT.
$/SO. FT.
X
X
X
PLAN CHECK FEE -'::f!~ 9""!>
I BUILDING PERMIT 1
~.
15% State
SurcharQe
1 MECHANICAL I
15% State
Surcharoe
1 PAVING
RCPT'
OAT"
9'~~
2.~?
I . ":l C;/
, .
I PLUMBING
5% State
SurcharQe
FENCE
VALUE $
SIDEWALK
FT.
I CURB CUT
FT,
HANDICAP ACCESS:
FLOOD PLAIN:
ZONING'
LIGHTING POWER BUDGET:
WATER HEATER'
VALUE
TOTAL VALUE OF PROJECT
BY
I DEMOLITION
SUBTOTAL
PERMITS
SYSTEM S
DEVELOPMENT
?I~C?
#~.
TOTAL PERMIT FEES I
EXCLUDING ELECTRICAl
77.--
.
.
REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all InspectIons are made at the proper time. To request an Inspection, call
726.3769 (fe,corder), state your City designated job number, job address, type of Inspection requested and when you will be ready
for Inspection. Requests received before 7:'00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the following work day.
SITE INSPECTION: To be
made after excavation, but
prior to setup of forms.
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work Is covered.
ROUGH PLUMBING,
ELECTRICAL &
MECHANICAL: No work is to
be covered until these
Inspections have been made
and approved.
PAVING: After gravel Is In
place but prior to placing
asphalt or concrete.
FOOTINGS & FOUNDATtONS:
To be made after trenches are
excavated and forms are
erected, all steel .in prace, but
. prlor \0 placing concrete.
FIREPLACE: Prior to placing
facing materials and before
framing Inspection.
SPECIAL INSPECTIONS: In accordance
Section 306 of th~ State Specialty Code
a special inspector shall be employed
by the Owner! Contractor during
construction of the' following work. A
copy of the special testing reports shall
be furnished to the Building Division.
ATTIC DRAFT STOPS &
CURTAIN WALLS
CONCRETE SLAB: To be
made after all Inslab building
service equipment, conduit,
pi pi ng, accessories and other
ancillary equipment items are
In place but before any
concrete is placed.
FRAMING: To be made after
the roof, a[1 framing, fire
blocking and bracing are In
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
STRUCTURAL CONCRETE: In
excess of 2500 f'S,1. (306 a.1)
STRUCTU RAL WELDS:
Performed on the job, (2722 f)
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are In place but
before any lath or gypsum
board Interior wall covering Is
applied.
HIGH STRENGTH BOLTING:
During all bolt Installation and
tightening operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.BC.
Standards 43-8.
UNDERFLOOR: Plumbing,
electricaf, mechanical. To be
made prior to installation of
floor Insulation, decking or
floor sheathing.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. (306 a.11 &
Chapter 29)
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or f1oo'r sheathing.
LATH AND/OR GYPSUM
BOARD: To be made after al[
lathing and gypsum board,
Interior and exterior, Is In
place but before any
plastering Is applied or before
gypsum board Joints and
fasteners are taped and
finished.
GLU-LAM BEAMS: [nspectlon
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U,BC,
STDS. 25-10,11),
POST & BEAM: To be made
prior to Installation of floor
Insulation, decking or floor
sheathing.
STRUCTURAL MASONRY: (306
a.7)
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
UBC 2415.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
ROOF SHEATHING AND
NAILING: Prior to Installing
any roof covering.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
.In addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Bu[ldlng,
City or Development Code.
-------------------------------------------------------
FINAL ELECTRICAL
SITE PLAN REVIEW BOARD: Must be requested 2 days In advance
of the date you wish Inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting this inspection.
FINAL PLUMBING
y
FINAL BUILDING: Requested after the final p[umblng, electrical,
mechanical and Fire Department Inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the pre'JJ.[ses. ><... ];>.
/f?ET~P tII,l('" Q7~/~"~..?./ - p.eV~~i
FINAL MECHANICAL
,
FINAL FtRE DEPARTMENT
ADD[TIONAL COMMENTS:
PLANS REV[EWED BY / /.:..-~ - ~~ -:> DATE .A!-5'-"';??
( ?// 1-./
By signature, I state and agree, that I have carefully examined the completed applicatlon and do hereby certify that all Information
herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
01 the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made 01 any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are In compliance:'With ORS 701.055 will be used on this project.
I further agree to ensure that all required Inspections are requested at the proper time, that project address is readable from the
street, that the permIt card Is located at the front of the property, and the approved set of plans will remain on the site at all
limes during construction.
Sign~lu;O' .7./,,-1/ ~ _ (h-AfAA ~
Dato g - C-f'?
VALl DAT[ON:
AMOUNT RECEIVE-;Ji.7. OU
h.).J- q94
~ '
DATE PAID' ~-& -77
RECEIVED By:Il.J'Yla CAa../ cl
,.RECEIPT ':