Loading...
HomeMy WebLinkAboutPermit Building 2005-9-22 -L.,P~RI~GI'I!D-D a , ..- ' Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line -. .. CITY OF SPRINGFIELD Building/Combination Permit PERMIT NO: COM2005-0I174 ISSUED: 09/22/2005 APPLIED: 08/29/2005 EXPIRES: 03/22/2006 VALUE: $ 128,560.00 SITE ADDRESS: 6046 QUARTZ AVE ASSESSOR'S PARCEL NO.: 1802033400186 Springfield TYPE OF WORK: Single Family Residence TYPE OF USE: New Residential PROJECT DESCRIPTION: Single family residence- Jasper Meadows 2nd add lot 139. SAME AS COM2005-00898 6065 Pebble Ct Owner: HAYDEN ENTERPRISES INC Address: 2622 SW GLACIER PL #110 REDMOND OR 97756 I CONTRACTOR INFORMATION., Contractor Type General Contractor HAYDEN ENTERPRISES License 92208 I DEVELOPMENT INFORMATION' F d S ~~'I=NTION: Oregono'a~reqUlreS y.~ m D' t rontyar e Ie :z!!.U 0 ft~ y IS: Side I Setbac : low rules adopte~. li18 e regon rc . Trees Rqd: Side 2 Setb~....,:tification Center. T~~o~ rules are i~~Ri~ !rive Rqd: Rearyard S~tb~ 952-001-001~19!60Jgh OAR 9o};ft-of Jt Coverage: Solar Setba~llO. You may obtall15.'illl1es of the ru es y ...."'IIi....... the "'O"to.. /f\!"ttlo tnp tAlpnhnnA number for the Oregon Utiiirf POOI!;l(NMPROVEMENTS I Center is 1-800-332-"v~~/' Street Improvements: F II I d Sidewalk Type: u y mprovc Storm Sewer Available: Yes " .l!o)V!\spoutsfDrains: Special Instruction: ... ~ . ." .. # of Units: Primary Occupancy Group: Secondary Occupancy Group: Primary Construction Type Secondary Construction Type: # of Bedrooms: BUILDING INFORMATION. I R-3 U VN # of Stories: I Height of Structure 18.00 Type of Heat: Forced Air Gas Water Type: Gas Range Type: Electric Energy Path: Path I Sprinkled Building: n/a 3 Expiration Date 07/29/2007 Phone 541-228-1081 Lot Size: Sq Ft 1st Floor: Sq Ft 2nd Floor: Sq Ft Basement: Sq Ft Garage/Carport Sq Ft Other: Occupant Load: 5.374' 1,235 400 2 Yes 30.40 REQUIRED PARKING Total: 2 Handicapped: Compact: Curbside 5' Curb and Gutter 11',:; f'~I: ,',: S~;\IL f~:f'id:" ,:: Tit ':,' '.r; nUd'~;-~lf~-LJ G;\lll,1-IHI::) j'.Jl"dl!S i~Jl [" '::1 r.,fllS ;\",.d!1I1..iil f,'R I-\I~'I' Ill" UI-\Y t"tr;IOlJ. . Notes: Storm drainage piped to curb face 9/1/2005 I Valuation Descriotion I $ Per Sq Ft or multiplier Square Footage or Bid Amount Description Tvpe of Construction Pa2e I of 4 Value Date Calculated Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line Dwellines Garaee V Wood Frame Garaee Fee Description Plan Review Same As -Mechanical Issuance Fee- + 10% Administrative Fee + 7% State Surcharge 2 Baths One or Two Family Addressing Assignment Appliance Not Listed Building Permit Curbeut Permit Dryer Vent Exhaust Hoods Furnace - up to 100.000 btu Gas Fireplace Gas Outlets 1-4 Plan Review Major - Planning PW Disc - 2nd Permit (Street) Residence Wiring 1000 Sq Ft Residence Wiring Ea Addtl 500 Sanitary Sewer - Improvement Sanitary Sewer - Reimbursement SDC MWMC Administration SDC MWMC Improvement SDC MWMC Reimbursement SDC Sanitary/Storm Admin SDC Transpo Admin SDC Transpo Improvement SDC Transpo Reimbursement Sidewalk Permit Storm Drainage Impervious Area Temp Power 200 amps or less Vent Fan Wmamalane Single Family Total Amount Paid . $96.00 $25.00 Total Value or Project )?pp< pqiiJ Amount Paid Date Paid . CITY OF SPRINGFIELD Building/Combination Permit PERMIT NO: COM2005-01I74 ISSUED: 09/22/2005 APPLIED: 08/29/2005 EXPIRES: 03/22/2006 VALUE: $ 128,560.00 1,235.00 400.00 $118,560.00 $10,000.00 $128,560.00 08/29/2005 08/29/2005 $100.00 $10.00 $117.49 $82.24 $254.00 $31.00 $9.00 $659.90 $80.00 $6.00 $9.00 $12.00 $15.00 $4.00 $150.00 $-30.00 $106.00 $38.00 $400.47 $526.47 $10.00 $865.31 $82.03 $111.30 $67.49 $805.70 $182.69 $80.00 $703.17 $50.00 $12.00 $1,000.00 8/29/05 9/22/05 9/22105 9/22/05 9/22/05 9/22/05 9/22/05 9122/05 9/22/05 9/22/05 9/22/05 9/22/05 9/22/05 9/22/05 9/22/05 9/22/05 9/22/05 9/22/05 9/22/05 9/22/05 9/22105 9/22/05 9/22/05 9/22/05 9/22/05 9/22/05 9/22/05 9/22/05 9/22/05 9/22/05 9/22/05 9/22/05 Receipt Number 2200500000000001178 2200500000000001312 2200500000000001312 2200500000000001312 2200500000000001312 2200500000000001312 2200500000000001312 2200500000000001312 2200500000000001312 2200500000000001312 2200500000000001312 2200500000000001312 2200500000000001312 2200500000000001312 2200500000000001312 2200500000000001312 2200500000000001312 2200500000000001312 2200500000000001312 2200500000000001312 2200500000000001312 2200500000000001312 2200500000000001312 2200500000000001312 2200500000000001312 2200500000000001312 2200500000000001312 2200500000000001312 2200500000000001312 2200500000000001312 2200500000000001312 2200500000000001312 I Plan Reviews I 08/30/2005 08/31/2005 APP LLH 08/31/2005 09/15/2005 APP TAJ 08/31/2005 09/01/2005 APP CAS Paee 2 or 4 Initial Review Plan nine Review Public Works Review $6,550.26 Storm drainage piped to curb race 9/1/2005 . . U 1 }' OF SPRINGFIELD Building/Combination Permit PERMIT NO: COM2005-01174 ISSUED: 09/22/2005 APPLIED: 08/2912005 EXPIRES: 03/2212006 VALUE: $ 128,560.00 Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line Structural Review 08/3112005 08/31/2005 APP JB Same as 6065 Pebble Court To Request an inspection call the 24 hour recording at 726-3769. All inspection requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following work day. I Rpnll~n.,npP~ Ufer Electrical Ground: Install ground rod at footing and call for inspection in conjunction with footing andlor foundation inspection. Footing: After trenches are excavated. Foundation: After forms are erected but prior to concrete placement. Post and Beam: Prior to floor insulation or decking. Floor Insulation: Prior to decking. Shear Wall Nailing: Before covering sheathing with finish materials. Framing Inspection: Prior to cover and after all rough in inspections have been approved. Wall Insulation: Prior to cover. Ceiling Insulation: Prior to cover. Drywall: Prior to taping. Final Building: After all required inspections have been requested and approved and the building is complete. Perimeter Foundation Drains: After gravel and filter cloth is installed but prior to backfill. Rough Plumbing: Prior to cover and Including required testing. Water Line: Prior to filling trench and including required testing. Sanitary Sewer Line: Prior to filling trench and including required testing. Storm Sewer Line: Prior to filling trench. Final Plumbing: When all plumbing work is complete. Undernoor Mechanical. Prior to insulation or decking and including required testing. Rough Gas: After line is installed and required testing and capped if not attached to an appliance. Gas Service: After line is installed and line has been connected to a minimum or one appliance including required testing. Presure test done at this point. Rough Mechanical: Prior to Cover Final Gas: When all gas work is complete. Final Mechanical: When all mechanical work is complete. Temporary Electric: Approval required prior to Utility Company energizing pole. Rough Electric: Prior to Cover Electric Service: Approval required prior to utility company energizing service. Paee 3 of 4 . . CITY OF SPRINGFIELD Building/Combination Permit PERMIT NO: COM2005-01174 ISSUED: 09/22/2005 APPLIED: 08/29/2005 EXPIRES: 03122/2006 VALUE: $ 128,560.00 Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-37691nspection Line Final Electric: When all electrical work is complete. Erosion/Grading Inspection: Prior to ground disturbance and after erosion measures arc installed. Sidewalk - Curbside: After forms are erected but prior to placement of concrete. Curbcut - Standard: After forms are erected but prior to placement of concrete. By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made ohny structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.005 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that each address Is readable from the street, that the permit card Is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. ----z:. ((')/1#. ~r- Owner or Contractors Signatf9'e '1-12-05 Date Paee 4 of 4 Community Services Division 'ding Safety/Building Codes , .., ,., DEVELOPMENT SERVICES DEPARTMENT Notice to Permit Applicant Soils stabilization required for subdivision sites Name of Owner' ~f) \\. Permit: ~es.\\1+ Address of Project: ~q\A\() (~S'OJli~ ' Tax Map: \~1D3?4, TaxLOt:~SUbdiviSion~ ~ The building site at the above address is located on property that has soils prone to shrink-swell or other potential movement. Excavations, placement, of fill materials and drainage for this site must be done under the direct supervision of a properly licensed Professional Engineer or Architect to verify the stability of the resulting building pad and the site. The, owner, or the owner's qualified agent, is responsible to obtain the services of the appropriate professional engineer or architect (design professional). The design professional shall provide direction for the stabilization methods to be used for the building pad (and surrounding site, when site stabilization is also necessary). The geotechnical report, which was prepared for this subdivision, may be utilized to provide appropriate guidance for the methods of stabilization and required compaction for the specific site. The engineer or architect shall prepare a report to be submitted to the City stating how the soil stabilization is being accomplished, including requirements not yet completed (if any). A signed and stamped report from the engineer or architect must be received and aDoroved bv this office before footin!! or foundation inSDection aooroval will be !!ranted bv the Ci/v Buildinf! InsDector. ACKNOWLEDGEMENT: The undersigned acknowledges the forgoing requirements for soil stabilization, including excavation, fill, soil compaction and drainage, as provided in the geotechnical report for the subdivision. The stabilization will be accomplished under the direction of a licensed professional engineer or architect as noted above. , Signature Name 7' -( f)AL. /6,) Date C(- 22-OS- Affiliation to owner