HomeMy WebLinkAboutPermit Building 2005-9-22
-L.,P~RI~GI'I!D-D
a
, ..- '
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
-.
.. CITY OF SPRINGFIELD
Building/Combination Permit
PERMIT NO: COM2005-0I174
ISSUED: 09/22/2005
APPLIED: 08/29/2005
EXPIRES: 03/22/2006
VALUE: $ 128,560.00
SITE ADDRESS: 6046 QUARTZ AVE
ASSESSOR'S PARCEL NO.: 1802033400186
Springfield TYPE OF WORK: Single Family Residence
TYPE OF USE: New Residential
PROJECT DESCRIPTION: Single family residence- Jasper Meadows 2nd add lot 139. SAME AS COM2005-00898
6065 Pebble Ct
Owner: HAYDEN ENTERPRISES INC
Address: 2622 SW GLACIER PL #110
REDMOND OR 97756
I CONTRACTOR INFORMATION.,
Contractor Type
General
Contractor
HAYDEN ENTERPRISES
License
92208
I DEVELOPMENT INFORMATION'
F d S ~~'I=NTION: Oregono'a~reqUlreS y.~ m D' t
rontyar e Ie :z!!.U 0 ft~ y IS:
Side I Setbac : low rules adopte~. li18 e regon rc . Trees Rqd:
Side 2 Setb~....,:tification Center. T~~o~ rules are i~~Ri~ !rive Rqd:
Rearyard S~tb~ 952-001-001~19!60Jgh OAR 9o};ft-of Jt Coverage:
Solar Setba~llO. You may obtall15.'illl1es of the ru es y
...."'IIi....... the "'O"to.. /f\!"ttlo tnp tAlpnhnnA
number for the Oregon Utiiirf POOI!;l(NMPROVEMENTS I
Center is 1-800-332-"v~~/'
Street Improvements: F II I d Sidewalk Type:
u y mprovc
Storm Sewer Available: Yes " .l!o)V!\spoutsfDrains:
Special Instruction: ... ~ . ." ..
# of Units:
Primary Occupancy Group:
Secondary Occupancy Group:
Primary Construction Type
Secondary Construction Type:
# of Bedrooms:
BUILDING INFORMATION.
I
R-3
U
VN
# of Stories: I
Height of Structure 18.00
Type of Heat: Forced Air Gas
Water Type: Gas
Range Type: Electric
Energy Path: Path I
Sprinkled Building: n/a
3
Expiration Date
07/29/2007
Phone
541-228-1081
Lot Size:
Sq Ft 1st Floor:
Sq Ft 2nd Floor:
Sq Ft Basement:
Sq Ft Garage/Carport
Sq Ft Other:
Occupant Load:
5.374'
1,235
400
2
Yes
30.40
REQUIRED PARKING
Total: 2
Handicapped:
Compact:
Curbside 5'
Curb and Gutter
11',:; f'~I: ,',: S~;\IL f~:f'id:" ,:: Tit ':,' '.r;
nUd'~;-~lf~-LJ G;\lll,1-IHI::) j'.Jl"dl!S i~Jl
[" '::1 r.,fllS ;\",.d!1I1..iil f,'R
I-\I~'I' Ill" UI-\Y t"tr;IOlJ.
. Notes:
Storm drainage piped to curb face 9/1/2005
I Valuation Descriotion I
$ Per Sq Ft
or multiplier
Square Footage
or Bid Amount
Description
Tvpe of Construction
Pa2e I of 4
Value
Date Calculated
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
Dwellines
Garaee
V Wood Frame
Garaee
Fee Description
Plan Review Same As
-Mechanical Issuance Fee-
+ 10% Administrative Fee
+ 7% State Surcharge
2 Baths One or Two Family
Addressing Assignment
Appliance Not Listed
Building Permit
Curbeut Permit
Dryer Vent
Exhaust Hoods
Furnace - up to 100.000 btu
Gas Fireplace
Gas Outlets 1-4
Plan Review Major - Planning
PW Disc - 2nd Permit (Street)
Residence Wiring 1000 Sq Ft
Residence Wiring Ea Addtl 500
Sanitary Sewer - Improvement
Sanitary Sewer - Reimbursement
SDC MWMC Administration
SDC MWMC Improvement
SDC MWMC Reimbursement
SDC Sanitary/Storm Admin
SDC Transpo Admin
SDC Transpo Improvement
SDC Transpo Reimbursement
Sidewalk Permit
Storm Drainage Impervious Area
Temp Power 200 amps or less
Vent Fan
Wmamalane Single Family
Total Amount Paid
.
$96.00
$25.00
Total Value or Project
)?pp< pqiiJ
Amount Paid
Date Paid
. CITY OF SPRINGFIELD
Building/Combination Permit
PERMIT NO: COM2005-01I74
ISSUED: 09/22/2005
APPLIED: 08/29/2005
EXPIRES: 03/22/2006
VALUE: $ 128,560.00
1,235.00
400.00
$118,560.00
$10,000.00
$128,560.00
08/29/2005
08/29/2005
$100.00
$10.00
$117.49
$82.24
$254.00
$31.00
$9.00
$659.90
$80.00
$6.00
$9.00
$12.00
$15.00
$4.00
$150.00
$-30.00
$106.00
$38.00
$400.47
$526.47
$10.00
$865.31
$82.03
$111.30
$67.49
$805.70
$182.69
$80.00
$703.17
$50.00
$12.00
$1,000.00
8/29/05
9/22/05
9/22105
9/22/05
9/22/05
9/22/05
9/22/05
9122/05
9/22/05
9/22/05
9/22/05
9/22/05
9/22/05
9/22/05
9/22/05
9/22/05
9/22/05
9/22/05
9/22/05
9/22/05
9/22105
9/22/05
9/22/05
9/22/05
9/22/05
9/22/05
9/22/05
9/22/05
9/22/05
9/22/05
9/22/05
9/22/05
Receipt Number
2200500000000001178
2200500000000001312
2200500000000001312
2200500000000001312
2200500000000001312
2200500000000001312
2200500000000001312
2200500000000001312
2200500000000001312
2200500000000001312
2200500000000001312
2200500000000001312
2200500000000001312
2200500000000001312
2200500000000001312
2200500000000001312
2200500000000001312
2200500000000001312
2200500000000001312
2200500000000001312
2200500000000001312
2200500000000001312
2200500000000001312
2200500000000001312
2200500000000001312
2200500000000001312
2200500000000001312
2200500000000001312
2200500000000001312
2200500000000001312
2200500000000001312
2200500000000001312
I Plan Reviews I
08/30/2005 08/31/2005 APP LLH
08/31/2005 09/15/2005 APP TAJ
08/31/2005 09/01/2005 APP CAS
Paee 2 or 4
Initial Review
Plan nine Review
Public Works Review
$6,550.26
Storm drainage piped to curb race
9/1/2005
.
. U 1 }' OF SPRINGFIELD
Building/Combination Permit
PERMIT NO: COM2005-01174
ISSUED: 09/22/2005
APPLIED: 08/2912005
EXPIRES: 03/2212006
VALUE: $ 128,560.00
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
Structural Review
08/3112005
08/31/2005
APP JB
Same as 6065 Pebble Court
To Request an inspection call the 24 hour recording at 726-3769. All inspection requested before 7:00 a.m.
will be made the same working day, inspections requested after 7:00 a.m. will be made the following work
day.
I Rpnll~n.,npP~
Ufer Electrical Ground: Install ground rod at footing and call for inspection in conjunction with footing andlor
foundation inspection.
Footing: After trenches are excavated.
Foundation: After forms are erected but prior to concrete placement.
Post and Beam: Prior to floor insulation or decking.
Floor Insulation: Prior to decking.
Shear Wall Nailing: Before covering sheathing with finish materials.
Framing Inspection: Prior to cover and after all rough in inspections have been approved.
Wall Insulation: Prior to cover.
Ceiling Insulation: Prior to cover.
Drywall: Prior to taping.
Final Building: After all required inspections have been requested and approved and the building is complete.
Perimeter Foundation Drains: After gravel and filter cloth is installed but prior to backfill.
Rough Plumbing: Prior to cover and Including required testing.
Water Line: Prior to filling trench and including required testing.
Sanitary Sewer Line: Prior to filling trench and including required testing.
Storm Sewer Line: Prior to filling trench.
Final Plumbing: When all plumbing work is complete.
Undernoor Mechanical. Prior to insulation or decking and including required testing.
Rough Gas: After line is installed and required testing and capped if not attached to an appliance.
Gas Service: After line is installed and line has been connected to a minimum or one appliance including required
testing. Presure test done at this point.
Rough Mechanical: Prior to Cover
Final Gas: When all gas work is complete.
Final Mechanical: When all mechanical work is complete.
Temporary Electric: Approval required prior to Utility Company energizing pole.
Rough Electric: Prior to Cover
Electric Service: Approval required prior to utility company energizing service.
Paee 3 of 4
.
. CITY OF SPRINGFIELD
Building/Combination Permit
PERMIT NO: COM2005-01174
ISSUED: 09/22/2005
APPLIED: 08/29/2005
EXPIRES: 03122/2006
VALUE: $ 128,560.00
Status Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-37691nspection Line
Final Electric: When all electrical work is complete.
Erosion/Grading Inspection: Prior to ground disturbance and after erosion measures arc installed.
Sidewalk - Curbside: After forms are erected but prior to placement of concrete.
Curbcut - Standard: After forms are erected but prior to placement of concrete.
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all
information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with
the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and
that NO OCCUPANCY will be made ohny structure without permission of the Community Services Division, Building Safety.
I further certify that only contractors and employees who are in compliance with ORS 701.005 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that each address Is readable from the
street, that the permit card Is located at the front of the property, and the approved set of plans will remain on the site at all
times during construction.
----z:. ((')/1#. ~r-
Owner or Contractors Signatf9'e
'1-12-05
Date
Paee 4 of 4
Community Services Division 'ding Safety/Building Codes
, .., ,.,
DEVELOPMENT SERVICES DEPARTMENT
Notice to Permit Applicant
Soils stabilization required for subdivision sites
Name of Owner' ~f) \\. Permit: ~es.\\1+
Address of Project: ~q\A\() (~S'OJli~ '
Tax Map: \~1D3?4, TaxLOt:~SUbdiviSion~ ~
The building site at the above address is located on property that has soils prone to shrink-swell or
other potential movement. Excavations, placement, of fill materials and drainage for this site must
be done under the direct supervision of a properly licensed Professional Engineer or Architect to
verify the stability of the resulting building pad and the site.
The, owner, or the owner's qualified agent, is responsible to obtain the services of the appropriate
professional engineer or architect (design professional). The design professional shall provide
direction for the stabilization methods to be used for the building pad (and surrounding site, when
site stabilization is also necessary). The geotechnical report, which was prepared for this
subdivision, may be utilized to provide appropriate guidance for the methods of stabilization and
required compaction for the specific site.
The engineer or architect shall prepare a report to be submitted to the City stating how the soil
stabilization is being accomplished, including requirements not yet completed (if any). A signed
and stamped report from the engineer or architect must be received and aDoroved bv this office
before footin!! or foundation inSDection aooroval will be !!ranted bv the Ci/v Buildinf! InsDector.
ACKNOWLEDGEMENT: The undersigned acknowledges the forgoing requirements for
soil stabilization, including excavation, fill, soil compaction and drainage, as provided in the
geotechnical report for the subdivision. The stabilization will be accomplished under the
direction of a licensed professional engineer or architect as noted above.
, Signature
Name
7' -( f)AL. /6,)
Date
C(- 22-OS-
Affiliation to owner