Loading...
HomeMy WebLinkAboutPermit Building 1996-2-9 SPRINGFIELD' -,~ ... ~.~'!L.)/(~rt'fI)4Y/j, RESIDENTIAL PERMIT APPLICATION CITY OF SPRINGFIELD COMMUNITY SERVICES DIVISION BUILDING SAFETY Page 1 Job Number: 960010 225 Nort~Fifth Street Springf{~ld~ OR 97477 Office: 726-3759 Inspection Line: 726-3769 Location of Proposed Work: 1380 ASPEN ST Assessors Map #: 17032733 Lot: Block: Tax Lot #: 08500 Subdivision: Owner: ALAN GARRET Address: 1380 ASPEN STREET Phone #: 746-0182 City/State/Zip: SPRINGFIELD; OREGON 97477 Describe Work: ADDIT/REMODEL RESIDENCE Contractor Const. Contractor # ADDITION Expires Phone 01/07/96 343-4396 08/10/96 946-1113 11/14/96 688-5004 12/27/96 686-6236. General: MOIR CONSTRUCTI 0041570 87984 Running Springs Drive Springf Plumbing: WILDWOOD 0093086 38385 Lower Brice Creek Rd Culp Cre Me~hanical: B 0004483 300 River Rd Eugene OR 974040000 Electrical: KS ELECTRIC 0070889 PO Box 24933 Eugene OR 974020000 QUAD AREA: 5RNW # OF UNITS: 1 CONSTR. TYPE: VN SQ FOOTAGE: 740 OFFICE USE -- LAND USE: 1111 ZONING CODE: LDR HEAT SOURCE: FG # OF BLDGS: 1 OCCY GROUP: R3 INSUL PATH: PI To request an inspection, call the 24 hour recording at 726-3769. All inspections requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following work day. REQUIRED INSPECTIONS --- FOOTING - After trenches are excavated. UNDERFLOOR PLUMBING - Prior to insulation or decking. UNDERFLOOR MECHANICAL - Prior to insulation or decking. INSULATION - Floor; prior to decking Wall/Ceiling; Prior to cover POST AND BEAM - Prior to floor insulation or decking. ROUGH PLUMBING - Prior to cover. ROUGH MECHANICAL - Prior to cover. ROUGH ELECTRICAL - Prior to cover. FRAMING - Prior to cover. INSULATION - Floor; prior to decking Wall/Ceiling; Prior to cover DRYWALL - Prior to taping. ROUGH GAS - after line is installed and capped if not attached to an appliance FINAL GAS - When all gas work is complete. FINAL PLUMBING - When all plumbing work is complete. FINAL MECHANICAL - When all mechanical work is complete. FINAL ELECTRICAL - When all electrical work is complete. FINAL BUILDING - When all required inspections have been approved and the building is complete. Lot Faces: NE Solar Approved: Y Total Height: 22 Lot Type: INTERIOR Setbk From NPL: 52 -t BUILDING PERMIT --- Square Feet x 740 $/Square Feet 56.2 Value 41,588.00 Item Main. ~ "":j .,.....' (:[it-jj''lA I Il~f I atl ./lll Job Number: 960010 Page 2 Garage REMODEL UTIL.& F.R. Total Value 0.00 32,412.00 74,000.00 Building Permit Fee Surcharge/Admin 355.00 28.40 TOTAL FEE (A) 383.40 PLUMBING PERMIT --- Item Fixtures 7 Fee 70.00 Plumbing Permit Surcharge/Admin 70.00 5.60 ,TOTAL CHARGE ( C) 75.60 MECHANICAL PERMIT --- Furnace Vent Fan Dryer Vent 1 6.00 3.00 3.00 Mechanical Permit Issuance Surcharge/Admin 41.00 10.00 3.28 TOTAL PERMIT (D) 54.28 (Excluding Electrical) unless otherwise noted TOTAL AMOUNT DUE (A, B, C, 0, and E combined) 513.28 --- BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT ___ This permit is granted on the express condition that the said construction shall, in all respects, conform to the Ordinance adopted by the City of Springfield, including the Development Code, regulating the construction and use of buildings, and may be suspended or revoked at any time upon violation of any provisions of said ordinances. Plan Check Fee: Received By: Plans Reviewed By: DON Building Site Reviewed 230.75 Date Paid: 01/02/96 Receipt Number: 19952 MOORE Date: 01/24/96 By: LISA HOPPER --- ADDITIONAL COMMENTS OWNER TO PROVIDE DOCUMENTED APPROVAL FOR GARAGE CONVERSION PRIOR TO BEGINNING C CONSTRUCTION UNDER THIS PERMIT. PATH 1; SEPARATE ELECTRICAL PERMIT IS REQUIRED. By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. -t ,. .. =( ~,~M II) r If.1JJ 1lA ." ;' ~ Job Number: 960010 Page 3 I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. :fIe; /r;. b Daee --- VALIDATION Date Paid: 2..035 5' .2./9a~ / f c?/~ .2.S -~~ - '~ , '- Receipt Number: Amount Received: Received By: -t ~