Loading...
HomeMy WebLinkAboutPermit Building 1999-12-13 I I I 1 I I I I I I I TOTAL PERMIT I COMMERCIAL/INDUSTRIAL PERMIT APPLICATION SPRINGFIELD 225 Fifth Street, $pringfield, Oregon .97477 LOCATION OF PROPOSED WORK: ..-15/\.H<;;QF"A/' ASSESSORS MAP: I?<p '::3 -;z. "? '"3 4/ --".. , .. , OWNER: -;~R/A/&HFz:'"tl ;:J./~//(' ADDRESS: ,~/~S- MLL ~ CITY: .$:>..-2// ~ k /ct':..,.() _'~/Nl/ STATE: DESCRIPTION OF WORK: C:>".c~~.r= //:r~{)/)~ t" NEW REMODEL' j---- ADDITION DEMOLISH NAME ADDRESS ARCHITECT: CONTRACTOR'S NAME GENERAl . ()u..Nri"/? PLUMBING: ADDRESS MECHANICAL: ELECTRICAl' PLUMBING I .JW NO. FEE CHARGE Single Fixture' Relocated Bldg. (new fix. addtll Water Service ft. Sanitary Sewer ft. ft. Storm Sewer Backflow Device I ' I I TOTAL PERMIT - OFFICE USE - QUAD AREA: # OF BLDGS: LAND U~I=' # OF UNITS: CONSTR. TYPI=' OCCY GROUP' # OF STORIES: HEAT SOURCE: so. FT. $/SO. FT. so. FTG MAIN x so. FTG ACCESS SO. FTG OTHER x . X' JOB NUMBER 99/"~ INSPECTION LINE: 726.3769 OFFICE: 726.3759 ~G1 J / ":-/11/ A-t"' h~h'" ,c/'tl7""..-u:>( / ) . ( j TAX LOT: -CJ 2qt:f!>/ ,. , PHONE: (10 Y'7C/77 ZIP: OTHER VAL..l}~ L./OC>c .--- i PHONE CONST. CO NT RACTO R # EXP\RES PHONE MECHANICAL I FEE I CHARr::E Furnace/burner & vent <100,000 BTUs Furnace/burner & vent > 100,000 BTUs Floor furnace and vent Suspended wall or floor mounted unit heater Appliance Vent separate Stationaryevap. c.o61er Vent Fan/Single duct Vent System apart from AC or htg. Mechanical exhaust hood and duct Permit Issuance $10.00 HANDICAP ACCESS: FLOOD PLAIN: ZON1W::' LIGHTING POWER BUDGET: WATER HEATER: VALUE PLAN CHECK F~.2$. ~ RCPT#. ~~'Ylg TOTAL VALUE OF .PROJECT DATE /2 ~-'7C$ . BY /' /~;;? . - /I'~-- ~ DEMOLITION , . TOTAL PERMIT FEES EXCLUDING ELECTRICAL I I BUILDING PERMIT "'10 State 1'7- SurcharQe T ":J MECHANICAL PLUMBING 'f'flt I ,., ,:.... ...~,:,,-~. ,...~. /70/ State ::>urcharge FENCE VALUE $ I SIDEWALK I CURBCUT FT. ~ 7%State SurcharQe I PAVING \" " FT. .-/ SUBTOTAL PERMITS .SYSTEMS DEVELOPMENT I '/$. 9. I ~ 7":/,16-9 "11. 6j, REQUIRED INSPECTIONS It Is th'e resr:ionslblllty of the permit holder to see that alllnspectlons,are made at the proper tIme, To request an Inspection, call 726.3769 (recorder), state your City designated job number, job address, type of Inspection requested and when you will be ready for Inspection. Requests received before 7:00 a,m. will be made thesame workIng day, requests made after 7:00 a,m, will be made the followIng work day,' . " '" . \ -~"!. \ ~:'~ SITE INSPECTION: To be-",.. ROUGH'pLiJMBING, made after excavatIon, but ELECTRICAL & pri~r to setup 'qf forms: .' MECHANICAL: No'work is to . I .,:~ be "covered until,lth'ese .~,. . inspections have been made' and approved, PAVING: After gravel is in place but prior to placing asphalt or concrete, FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel In place, but prior to placing concrete. FIREPLACE: Prior to placing facing materials and before framing Inspection. SPECIAL INSPECTioNS: In accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Owner/ Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before~any work Is co'vered. ATTIC DRAFT STOPS & CURTAIN WALLS x FRAMING: To be made after the roof, all framing, fire. blockIng and bracing are In place and all pipes, chImneys an9 vents' are complete and the rough electrical, plumbing and mechanIcal are approved. STRUCTURAL CONCRETE: In excess of 2500 PS,L (306 a,1) CONCRETE SLAB: To be made after all inslab buildIng service equipment,conduit, piping, accessories and other ancillary equipment items are In place but before any . concrete Is placed. STRUCTURAL WELDS: Performed on the job, (2722 f) UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or floor sheathing. INSULATION & VAPOR BARRIER: To be made after all Insulation and required vapor barriers are in place but before any lath or gypsum board Interior wall covering Is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. HIGH STRENGTH BOLTING: During all bolt installation and tightening operations, (306 a.6) UNDERGROUND: Plumbing, electrical, gas, sanItary sewer, storm sewer, water and drainage lines. To be made prior to covering or fIlling trenches. SPRAYED ON FIREPROOFING: U.BD. Standards 43.8, SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork, (306 a,11 & Chapter 29) y I LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, InterIor and exterior, is In place but before any plastering Is applied or before gypsum board joints and fasteners are taped and fi nlshed. GLU.LAM BEAMS: InspectIon Certificate by an approved agency, furnished to the City's Building Division before beams are placed, (2501 U.BD. STDS, 25.10,11), POST & BEAM: To be made prior to Installation of floor Insulation, deckIng or floor sheathing. STRUCTURAL MASONRY: (306 a.7) FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of "'''i:JEfckih-g or floor sheathing'. ,MASONRY: Steel location, bond beams grouting or verticals In accordance with, UBC2415. SIDEWALK & DRIVEWAY: Require.d fa~ all conc.r~t!L._ paving within street right of way, to be made after all excavating complete and form work and sub.base materIal in place. ROOF SHEATHING AND NAILING: Prior to Installing any roof covering. CURB AND APPROACH APRONS: After forms are erected but prior to placI ng concrete. .In addition to the inspec- tions specified, the Building Official may make or require other InspectIons of any construction work to ensure , compliance wIth the Building, City or Development Code. ------------------- --- ---------'---------- --------- ----- FINAL PLUMBING SITE PLAN REVIEW BOARD: Must be requested 2 days In advance of the date you wish Inspection. All projeQt conditions such as landscaping, parking lot strl,ping, etc. must be completed before requesting this InspectIon. FINAL ELECTRICAL y FINAL BUILDING: Requested after the final plumbing,' electrical, mechanical. and' Fire Department Inspections are made and approved. No occupancy of the premises can be made until a CertifIcate of Occupancy has been issued by the Building Division and posted on the premises. FINAL MECHANICAL FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS: PLANS REVIEWED BY'., /. ? /:r~- , /$;/ -.-,r" By signature, I state and agree, that I have carefully examined ~~ i'm;,eted application and do hereby certify thp.t all Information herein Is true and correct, and I further certify that any and all work perforrnE:!d shall be done in aC,cordance with the Ordinances of the City of Springfield. an'd the Laws of the'State of Oregon pertaining to the' work described herein, aria'that NO OCCUPANCY will be mage of any structure without permissIon' of the'Bullding Safety Division. I further certify that on'ly contractors and employees who are in compliance with ORS 701,055 will be used on this project. ' ,. , . '. DATF /2.,... h ~ (r /" . [_.. I further agree to ensure that all requlr:.ed.j'Flspections are requested at the proper time, that,project a.ddress Is.readable from the street, that the permit card Is IOQated at th.~ front of the property, and the approved set bf 'plans will remain on the site at all times during constructl .. ,// /e----" /;/. .' . '. ", y // //'?/" ." .__-'. / /.4;> Date /7.../:3-7'7 SignatfJre / '" VALIDATION: AMOUNT RECEIVED: ~ / ./. 39 3'c o//~ RECEIPT #: ,-. DATE PAID: /2 7"7---S ~ RECEIVED BY:/~~' " I