HomeMy WebLinkAboutPermit Building 2007-8-17
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
CITY OF SPRINGFIELD'
Building/Combination Permit
PERMIT NO: cOM2007-00964
ISSUED: 08/17/2007
APPLIED: 06/27/2007
EXPIRES: 02/17/2008
VALUE: $ 257,664.00
SITE ADDRESS: 3804 Kathryn Ave
ASSESSOR'S PARCEL NO.: 1702304306800
PROJECT DESCRIPTION: Warehouse
Owner: MTN INVESTMENTS LLC
Address: 59 E 14TH AVE
EUGENE OR 97401
I CONTRACTOR INFORMATION I
Contractor License
MARKUS THOMPSON CONSTRUCTION IN 158184
GOOD CONNECTIONS 160508
BRANCH ENGINEERING
MARSHALL8INC 25790
SURRETTS 158295
BUILDING INFORMATION I
Contractor Type
General
Electrical
Engineer
Mechanical
Plumbing
# of Units:
Primary Occupancy Group:
Secondary Occupancy Group:
Primary Construction Type
Secondary Construction Type:
# of Bedrooms:
Frontyard Setback:
Side 1 Setback:
Side 2 Setback:
Rearyard Setback:
Solar Setbacks:
Street Improvements:
. Storm Sewer Available:
Special Instruction:
Notes:
Springfield
TYPE OF WORK: Warehouse
TYPE OF USE: New
Commercial
Phone Number: 541-484-9381
Expiration Date
01113/2008
07/0112008
Phone
541-284-1121
541-434-6491
541-746-0637
541-747-7445
741-3553
12/23/2009
01/14/2008
4 # of Stories: 1
Fl Height of Structure: 25.00
AI II:NTlON: ~rofdfflJgquires you to Gas
foKmv rules ad~tadr~ Oregon Utility Gas
Notification Centwtngkl~lUles are set forth
In OAR 952-001-00t1Gg~~h OAR 952-001.path 1
0090. You may cS})ilifi1~it6inti~ rules by n/a
f'aJ.lin,-" th~ t"j:lntj:lr f",,.,to' tho +oloph"'''lJ,-
numbolL 19lE~JilMP!MlENJJtII1R'F1IDROOP\nlP!lN .
0......,,,1 lOll 1 uv",-v"u:'-'V'T'TJ.
Lot. Size:
Sq Ft 1st Floor: 7,808
Sq Ft 2nd Floor:
Sq Ft Basement:
Sq Ft Garage/Carport
Sq Ft Other:
Occupant Load: 75
Overlay Dist:
# Street Trees Rqd:
Paved Drive Rqd:
% of Lot Coverage:
REQUIRED PARKING
Total:
Handicapped:
Compact:
I PUBLIC IMPROVEMENTS I
Sidewalk Type:
NOTICE:
THIS PERMlf~~~tfE~~Ra~nfF THE WORK
AUTHORIZED UNDER THIS PERMIT IS NOT
COMMENCED OR IS ABANDONED FOR
ANY 180 DAY PERIOD.
Pa!!e 1 of 4
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
Description
Type of Construction
Estimate
Use Bid Amount
Estimate
Pavin!!
Fee Description
Plan Review Comm/Ind/Public
-Mechanical Issuance Fee-
+ 10% Administrative Fee
+ 5% Technology Fee
+ 8% State Surcharge
Add, Alter, Extend Circ Ea Add
Appliance Vent
Backflow Device
Building Permit
Fire SF Fee - Non-Residential
Fixture
Furnace - Unit Heater
Gas Outlets 1-4
Gas Outlets 4+
Paving
Perm Serv/Fdr 200 amps or less
Plan Review Fire & Life Safety
Sanitary Sewer - 1st 50 Feet
Sanitary Sewer - Improvement
Sanitary Sewer - Reimbursement
Sanitary Sewer Each Addtll00'
SDC MWMC Administration
SDC MWMC Improvement
SDC MWMC' Reimbursement
SDC Sanitary/Storm Admin
SDC Transpo Admin
SDC Transpo Improvement
SDC Transpo Reimbursement
Storm Drainage Impervious Area
Storm Sewer - 1st 50 Feet
Storm Sewer Each Addtll00'
Vent Fan
Water Line - 1st 50 Feet
Water Line - Each Addtll00'
I Valuation Description I
$ Per Sq Ft
or multiplier
$1.00
$1.00
Square Footage
or Bid Amount
209,704.00
47,960.00
Total Value of Project
~
Amount Paid
$701.45
$10.00
$294.79
$108.36
$144.65
$72.00
$24.00
$14.00
$923.15
$780.80
$224.00
$48.00
$4.00
$4.00
$358.95
$252.00
$431.66
$45.00
$554.12
$728.84
$14.00
$10.00
$2,145.01
$204.34
$427.73
$187.88
$2,476.22
$561.32
$5,632.37
$45.00
$56.00
$24.00
$45.00
$14.00
Date Paid
6127/07
8/17/07
8/17/07
8/17/07
8/17/07
8/17/07
8/17/07
8/17/07
8/17/07
8/17/07
8/17/07
8/17/07
8/17/07
8/17/07
8/17/07
8/17/07
8/17/07
8/17/07
8/17/07
8/17/07
8/1 7/07
8/17/07
8/17/07
8/17/07
8/17/07
8/17/07
8/17/07
8/17/07
8/17/07
8/17/07
8/17/07
.8/17/07
8/17/07
8/17/07
Pa!!e 2 of 4
CITY OF SPRINGFIELD'
Building/Combination Permit
PERMIT NO: COM2007-00964
ISSUED: 08/17/2007
APPLIED: 06/27/2007
EXPIRES: 02/17/2008
VALUE: $ 257,664.00
Value
Date Calculated
$209,704.00
$47,960.00
$257,664.00
08/03/2007
08/03/2007
Receipt Number
2200700000000001035
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
2200700000000001308
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
Total Amount Paid
$17,566.64
CITY OF SPRINGFIELD'
Building/Combination Permit
PERMIT NO: cOM2007-00964
ISSUED: 08/17/2007
APPLIED: 06/27/2007
EXPIRES: 02/17/2008
VALUE: $ 257,664.00
I Plan Reviews I
Fire Department Review
Initial Review
Plan Review Comments
07/03/2007
06/2912007
06/2912007
08/07/2007
Plannin!! Review
Plannin!! Review
08/07/2007
07/03/2007
08/07/2007
Public Works Review
Structural Review
Structural Review
07/03/2007
08/17/2007
06/2912007
08/07/2007
08/17/2007
07120/2007
SUB Review
07/03/2007
07/09/2007
APP LLH
10 JMP WI. Nick Skelton delivered revised
drawings and responses to
comments.
APP EMM
WI Steve Hopkins Planner, Need Site
Plan Review decision, Final Site
Plan and Development Agreement.
APP JHJ Attached SDC Worksheet. (JHJ)
APP JMP Received final internal approval.
WE JMP Received 7/3/2007 with other
applications. See attached
documents for 9 structural
comments faxed to Rene Fabricant.
APP DH
To Request an inspection call the 24 hour recording at 726-3769. All inspections requested before 7:00
a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following
work day.
~eouire<UnsD~ctions ,
SUB Insulation Vapor Barrier: To be called for at the same time as the SUB framing inspection.
SUB Final: After all required energy inspections have been requested and approved.
SUB Plumbing: Following City Rough Plumbing inspection approval and prior to cover.
SUB Mechanical: Following City Rough Mechanical inspection approval and prior to any cover.
SUB Ceiling Grid: Interior Lighting
SUB Exterior Lighting
Site Inspection: To be made after excavation but prior to setting forms.
Erosion/Grading Inspection: Prior to ground disturbance and after erosion measures are installed.
Ufer Electrical Ground: Install ground rod at footing and call for inspection in conjunction with footing and/or
foundation inspection.
Footing: After trenches are excavated.
Slab: To be made after all inslab building service equipment, conduit piping and other equipment items are in
place but prior to concrete.
Shear Wall Nailing: Before covering sheathing with finish materials.
Framing Inspection: Prior to cover and after all rough in inspections have been approved.
Pa!!e 3 of 4
CITY OF SPRINGFIELD
Building/Combination Permit
Status
Issued
PERMIT NO: cOM2007-00964
ISSUED: 08/17/2007
APPLIED: 06/27/2007
EXPIRES: 02/17/2008
VALUE: $ 257,664.00
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
Wall Insulation: Prior to cover.
Ceiling Insulation: Prior to cover.
Roofing: Prior to installing any roof covering.
Roof Sheathing
Bolts Installed in Concrete: To be done by a State Certified Special Inspector. Provide inspection test reports to
City Building Inspector.
Final Fire Department. After all requirements of the Fire Department have been met.
Final Building: After all required inspections have been requested and approved and the building is complete.
Rough Grading: After gravel is in place but prior to placing concrete.
Final Paving: After paving is complete.
Underslab Plumbing: Prior to filling the trench and including required testing.
Perimeter Foundation Drains: After gravel and filter cloth is installed but prior to backfill.
Rough Plumbing: Prior to cover and including required testing.
Water Line: Prior to filling trench and including required testing.
Sanitary Sewer Line: Prior to filling trench and including required testing.
Storm Sewer Line: Prior to filling trench.
Final Plumbing: When all plumbing work is complete.
Backflow Device: Prior to covering and provide a copy of the test report on site at the time of inspection.
Rough Gas: After line is installed and required testing and capped if not attached to an appliance.
Rough Mechanical: Prior to Cover
Final Gas: When all gas work is complete.
Final Mechanical: When all mechanical work is complete.
Rough Electric: Prior to Cover
Final Electric: When all electrical work is complete.
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all
information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with
the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and
that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety.
I further certify that only contractors and employees who are in compliance with ORS 701.005 will be used on this project. I
further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the
street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all
limos d"r~.st~"ctiO.n I'j\ """'_. A
~~/WVV-A ~{{JtJ+-
- I' , F .
Owner or Contractors Signature Date
Pa!!e 4 of 4
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE WORKSHEET
JOURNAL OR JOB NUMBER C0M2007-00964
NAME OR COMPANY: MTN Investments LLC
LOCATION: 3804 Kathryn Ave.
MAP & TAX LOT NUMBER: 17 02 30 43 06800
DEVELOPMENT TYPE: Warehouse and Manufacturing
NEW DEVELOPED AREA (SF): 7,808.00
EXISTING DEVELOPED AREA (S.F.):
TOTAL IMPERVIOUS SURFACE (S.F.):
1. STORM DRAINAGE
IMPERVIOUS SQ. FT.
ITE:
ITE:
LOT SIZE (SF):
140
16,763
8955 sf impervious area +7808 sf building rooftop = 16763 sf total
x $ 0.336 PER SF
TOTAL STORM DRAINAGE SDC:I
2. SANITARY SEWER-CITY (see reverse side)
A. REIMBURSEMENT COST:
NUMBER OF DFU's 28
B. IMPROVEMENT COST:
NUMBER OF DFU's 28
x $ 26.03 PER DFU
,
I
1,282.96 I
x $ 19.79 PER DFU
TOTAL LOCAL WASTEWATER SDC:I $
3. TRANSPORTATION
BLDG AREA TGSF x TRIP RATE x COST PER ADT x NEW TRIP FACTOR
NEW:
A. REIMBURSEMENT COST:
7.81 x 3.82
B. IMPROVEMENT COST:
7.81 x 3.82
EXISTING:
A. REIMBURSEMENT COST:
~OO x 0
B. IMPROVEMENT COST:
~OO x 0
x
$ 19.81 PER TRIP
x
0.95
NTF
$561321
$2,4 76.22 I
x
$ 8739 PER TRIP
x
0.95
NTF
x
$ 19.81 PER TRIP
x
NTF
$0.00 I
o
x
$ 8739 PER TRIP x 0 NTF $0.00 I
TOTAL TRANSPORTATION REIMBURSEMENT SDC:
TOTAL TRANSPORTATION IMPROVEMENT SDC:
TOTAL TRANSPORTATION SDC:I $ 3,037.541
4. SANITARY SEWER - MWMC
NEW:
A. REIMBURSEMENT COST:
NUMBER OF FEU's 7.81 x $26.17 PER FEU $204.34 1
B. IMPROVEMENT COST:
NUMBER OF FEU's 7.81 x $274.72 PER FEU $2,145.01 I
EXISTING:
A. REIMBURSEMENT COST:
NUMBER OF FEU's 0.00 x #N/A PER FEU $0.00 I
B. IMPROVEMENT COST:
NUMBER OF FEU's 0.00 x #N/A PER FEU $0.00 I
MWMC CREDIT IF APPLICABLE (SEE REVERSE)
TOTAL MWMC REIMBURSEMENT FEE:
TOTAL MWMC IMPROVEMENT FEE:
MWMC ADMINISTRATIVE FEE:
TOTAL MWMC SDC:I $ 2,359.35
SUBTOTAL (ADD ITEMS 1,2,3, & 4) , $]2,3]2.22
5. ADMINISTRATIVE FEES:
BASE CHARGE (SUBTOTAL ABOVE)
Jesse Jones
Civil Engineer, EIT
$ ]2,312.22 x 5% , $615.61
TOTAL SEWER ADMINISTRATION FEE:
TOTAL TRANSPORTATION ADMINlSTRA TION FEE:
81712007 TOTAL SDC CHARGESI
DATE
$]2,927.83
DRAINAGE FIXTURE UNIT (DFU) CALCULA nON TABLE
NUMBER OF NEW FIXTURES x UNIT EQUIVALENT = DRAINAGE FIXTURE UNITS
(NOTE: FOR REMODELS, CALCULATE ONLY THE NET ADDITIONAL FIXTURES)
Warehouse and Manufacturing
FIXTURE TYPE
BATHTUB
DRINKING FOUNTAIN
FLOOR DRAIN, FLOOR SINK
INTERCEPTORS FOR GREASE/OIUSOLIDS/ETC.
INTERCEPTORS FOR SAND/AUTO WASH/ETC
LAUNDRY TUB
CLOTHES WASHER/MOP SINK
CLOTHES WASHER - 3 OR MORE (EA)
MOBILE HOME PARK TRAP (1 PER TRAILER)
RECEPTOR FOR REFRIGERA TOR/W A TER ST A TIONfETC
RECEPTOR FOR COMMERCIAL SINK! DISHWASHER/ETC
SHOWER, SINGLE STALL
SHOWER, GANG (NUMBER OF HEADS)
SINK: COMMERCIAL, RESIDENTIAL KITCHEN
SINK: COMMERCIAL BAR
SINK: WASH BASIN/DOUBLE LAVATORY
SINK: SINGLE LA V ATORY/RESIDENTIAL BAR
URINAL, STALUWALL
TOILET, PUBLIC INSTALLATION
TOILET, PRIVATE INSTALLATION
MISCELLANEOUS:
NUMBER OF EDU'S*
FIXTURES UNIT
NEW OLD EQUIVALENT
3
1
3
3
6
2
3
6
12
1
3
2
2
3
2
2
4 1
5
4 6
3
DRAINAGE
FIXTURE
UNITS
o.
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
4
o
24
o
o
TOTAL DRAINAGE FIXTURE UNITS = , 28
*EDU (Equivalent Dwelling Unit) is a discharge equivalent to a single famil~}welling (20 DFU) set at 167 gallons per day
CREDIT CALCULA nON TABLE: BASED ON ASSESSED VALUE
IF IMPROVEMENTS OCCURRED AFTER ANNEXATION DATE IN TABLE, CALCULATE CREDITS SEP ARA TEL Y
YEAR
ANNEXED
1979 or before
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
RATE PER $1,000
ASSESSED VALUE
$5.29
$5.19
$5.12
$4.98
$4.80
$4.63
$4.40
$4.07
$3.67
$3.22
$2.73
$2.25
$1.80
CREDIT FOR PARCEL OR LAND ONLY IF APPLICABLE
IMPROVEMENT (IF AFTER ANNEXA nON DATE)
YEAR
ANNEXED
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
RATE PER $1,000
ASSESSED VALUE
$1.45
$1.25
$1.09
$0.92
$0.72
$0.48
$0.28
$0.09
$0.05
$0.00
$0.00
$0.00
x
x
CREDIT TOTAL
$0.00
$0.00
$0.00
225 Fifth Street
Springfield, Oregon 97477
541-726-3759 Phone
City of Springfield Official Receipt
Development Services Department
Public Works Department
Job/Journal Number
COM2007 -00964
COM2007-00964
COM2007 -00964
COM2007-00964
COM2007-00964
CO M2007 -00964
COM2007-00964
COM2007-00964
COM2007-00964
COM2007-00964
COM2007-00964
COM2007-00964
COM2007-00964
COM2007-00964
COM2007-00964
COM2007 -00964
COM2007-00964
COM2007 -00964
CO M2007 -00964
COM2007 -00964
COM2007-00964
COM2007-00964
COM2007-00964
COM2007-00964
COM2007 -00964
COM2007-00964
COM2007-00964
CO M2007 -00964
COM2007-00964
COM2007-00964
COM2007-00964
COM2007-00964
COM2007-00964
Payments:
Type of Payment
Check
cReceintl
RECEIPT #:
2200700000000001308
Date: 08/17/2007
Description
Fire SF Fee - Non-Residential
Plan Review Fire & Life Safety
Building Permit
Paving
Perm Serv/Fdr 200 amps or less
Add, Alter, Extend Circ Ea Add
Storm Drainage Impervious Area
Sanitary Sewer - Reimbursement
Sanitary Sewer - Improvement
SDC Transpo Reimbursement
SDC Transpo Improvement
SDC MWMC Reimbursement
SDC MWMC Improvement
SDC MWMC Administration
SDC Sanitary/Storm Admin
SDC Transpo Admin
Furnace - Unit Heater
Vent Fan
Appliance Vent
Gas Outlets 1-4
Gas Outlets 4+
~Mechanicallssuance Fee~
Fixture
Sanitary Sewer - 1 st 50 Feet
Sanitary Sewer Each Addtl 100'
Water Line - 1st 50 Feet
Water Line - Each AddtlIOO'
Storm Sewer - 1 st 50 Feet
Storm Sewer Each Addtl 100'
Backflow Device
+ 5% Technology Fee
+ 8% State Surcharge
+ 10% Administrative Fee
Paid By
MARKUS THOMPSON
CONSTR
Item Total:
Check Number Authorization
Received By Batch Number Number How Received
djb
4378
In Person
Payment Total:
Page 1 of 1
1:57:05PM
Amount Due
780.80
431.66
923.15
358.95
252.00
72.00
5,632.37
728.84
554.12
561.32
2,4 76.22
204.34
2,145.01
10.00
427.73
187.88
48.00
24.00
24.00
4.00
4.00
10.00
224.00
45.00
14.00
45.00
14.00
45.00
56.00
14.00
108.36
144.65
294.79
$16,865.19
Amount Paid
$16,865.19
$16,865.19
8/17/2007