HomeMy WebLinkAboutCorrespondence Miscellaneous 1/28/2004
I )<l~_~'i:Ir~Wf.N - Fw: ~t.G~te
t-'ageJI
~
~
.
.
.'
From:
To:
Date:
Subject:
Geri Betz
DONOVAN James
1/27/047:16PM
Fw: MLGate
f7o;/d \frsll- ('0/6/)0<1/67
~ ; ;;;;::;r
~~~
(JPb, . \
UregoIj.....
----- Original Message -----
From: Geri Betz
To: Pat Thompson
Sent: Tuesday, January 27, 20044:53 PM
Subject: MLGate
LAND PLANNING CONSULTANTS
1071 HARLOW ROAD
SPRINGFIELD OR 97477
\.
-
\
Phone 541-726-8523
From: Mike
_. .
m. . _
~/-
DIVISION OF .
- LANDS -
~ATE treet NE Suite 100
775 sur;.e;;3ln_1279
Salem, 3805 Ext. 232 .
SO:>-37&- \i-4B44
FaX' 50>-37
. . ...,.@<;tate.or.us
dan.ca,)~- tate\ands.US
WWW.pregons
Date: January 27, 2004
. .' .' .' ~WS cWD .
" Dan Cary, . ce CoOrdinator.
'Natura1R~ur. .
field ~rabons
To: Pat
---
Thanks for meeting with me yesterday to go over the wetland issues on MountainGate. I met with
Willamalane and the City planner & engineer this morning to further discuss the issues. I'm looking
forward to meeting with you and Dan Cary onsile tomorrow.
The issues I'd like to discuss and get direction on are as follows:
1. At the time the delineation was done a slash pile covered most of the northeast fork of the area
mapped as the D-1 wetland and that area could not be accessed for wetland evaluation. When we visited
the site it appeared that the upper portion of this area might not qualify as a wetland.
2. As our development design became more refined there is strong interest by Willamalane, the City
and the owner to maintain the currently permitted mitigation site for recreational use and either by credits
or relocate the mitigation site to the detention pond area.
3. We'd iike to enhance the existing wetlands upstream from the quarry to increase water detention
and add vegetation. We have to add Dioswales into our storm water system and I'd like to incorporate the
enhanced wetiand areas if possible.
4. Our subdivision is designed to preserve all of the wetlands except for one road crossing which will
impact 2000 square feet (D-1) and another 1200 square foot isolated wetland (H-1) where the main road
must be located to meet grade and alignment requirements. I understand we'll need ,a fill permit for these
areas prior to construction which is planned for June 1, 2004.
5. I'd like to reexamine the depression wetlands located at the lower floor of the quarry to determine
their actual size. tf they are wetlands can we fill them temporarily with rock during our quarry reclamation
process? . .
For tomorrow's meeting I'd like to accomplish the following objectives in order of prio;iR E C E , V ED
1. Verify that the limited filling of wetlands proposed by our design is permitable.
BYJ./~~/"f jJ?:.
, I
I D12.~
~.'\...
~~~
I Jai ;":i ~v~ti-EY"~1'1LG:\l!e .-. ._~:__.
_._,,-
.._..:.~-_.
. ~ r.._ _.__.._,
Page-2 ,I
... ~
('
~. .,
2. Determine the feasibility of modifying our current permit to purchase credits or use the proposed
detention pond and areas in and adjacent to the D-1 wetlands to the north for mitigatioA.
3. Determine if the full northeast fork of D-1 is wetland.
4. Determine if the mapped area for depression wetlands is accurate.
5. Determine if we can use the depression wetlands to store rock temporarily during the quarry
reclamation. .