HomeMy WebLinkAboutComments SUB 2/13/2004
~
..
.
.
l
. ~,.q! :-":~-7)~'~'
SPRINGFI.ELD UTI LIlY BOARD
\\~H\..'~' ~;l'I"':ic~' C':L'IHlT
-.:'.~'i-': .':' 'Ul h ).."11h "':"L:~"":~
.:'r':';ri.,::ii;:l(.~. t"':'~'",:,,'n "'J,-i.~-:- -)~"":"l;
, ~..:.:' .. 2l"-~ ~,'-!h
r:,:':
February 13, 2004
RECEIVED
~~(Q)
By: {Df7/~
Jim Donovan
City of Springfield
225 N. 5th Street
Springfield, OR 97477
Dear Jim:
SUBJECT:
SUBDIVISION TENTATIVE #SUB2003-00062 MOUNTAIN GATE PHASE rv
18-02-03-00 TL 303
Listed below arc our comments for the above referenced development proposal:
1. The proposed development is within the Springfield city limits and will receive water service ITom
the Springtleld Utility Board (SUB).
2. All new water system facilities and modifications to water system facilities both inside and
adjacent to the proposed development shall be placed in street right-of-way at a location and depth
of.bury that meets the standards of the S1.1B Water Division.
3. All water facility materials shall be to a standard that must meet SUB Water Division
specitlcations.
4. All workmanship shall be performed to meet or exceed SUB Water Division construction
standards.
5. Size of waterline and other facilities, including water meters, must meet the needs of the SUB
Water Division and the long-range needs of the City. These needs include, but are not limited to,
meter location and access, sizes of water distribution and transmission lines, pumping facilities,
and communication lines.
6. Please ask the developer to contact the SUB Water Division for detailed information on the
materials and construction standards, detailed costs for installing SUB water facilities, and a
schedule of construction. Construction expenses may be reduced with good planning of required
water facilities, good timing of facilities installation, and joint trench opportunities.
7. All water meters will be placed in public right-of-way at a location identified by the developer.
Each lot or parcel must have its own water service.
8. Water service facilities will be installed upon collection of development charges. Development
policies and charges identified in this letter are subject to change. Actual charges will be those in
effect at the time water service isrequested.
,,;...A. (to
.
.
i
Site Plan #SUB2003-00062
Mountaingate Phase IV
February 13, 2004
Page 2 of2
9. The development plans do not show any access to the existing Springfield Utility Board reservoir
site in the southwest comer of the development: SUB has had access to this site since construction
of the water storage reservoirs in 1956. Access must be maintained to this site at all times.
Access must be suitable for large trucks and equipment used for maintenance of the reservoirs.
PLEASE NOTE:
SUB development charges are paid directly to SUB Water Division and
SUB Electric Division.
Sincerely,
<iJ0v'0+ 'L YVt c.J~
Bart E. McKee P.E.
Engineer - Water Di vision
BEM:mkm
cc: Mike Evans, Land Planning Consultants, 1071 Harlow Rd, Springfield OR 97477
Tony Favreau, The Favreau Group, 2063 Musket St, Eugene, OR 97408
s:\siteplan\MountainGate Phase IV 2-11-04.doc
FEB-13-2004 12:46
1 541 747 7348 P.01/03
.
.
~f~~
SpRINGFIELD UTILITY BOARD
WATER DEPARTMENT
202 SOUTH 18TH STREET
SPRINGFIELD, OR. 97477
PHONE (541) 72G-2J9G FAX (541) 747-7348
FAX. TRANSMITTAL
DATE:
...2-/..3-04
~() V(..iil1.'
TO:
9' . :~~
7~' - 3~~~
:6~ ~ 'I(.~
FAX#:
FROM:
Number of pages ( total):
(including this page)
COMMENTS:
Date Received:
Planner:
2/1.?/Q'L
/01 if p~
FEB-13-2004 12:46
1 541 747 7348 P.02/03
"."",' ,., ,..',
, .' ~. .
. . .
"." ~ ' . '.
. .
, .
, .
.
SPRINGFIELD UTlUlY BOARD
'Nater SC::'.rvicE~ Center
;'02 South 18' h Slrect
'lplingficld. O,.t,g'H' 91'477-5240
(541) 72(;-2:)96
Fax (541) 7<+1-1:048
February 13,2004
Jim Donovan
City of Springfield
225 N. 5th Street
Springfield, OR 97477
Dear Jim:
SUBJECT:
SUBDIVISION TENTATIVE #SUB2003-00062 MOUNTAINGA TE PHASE IV
18-02-03-00 TL 303
Listed below are our comments for the above n:ferenced development proposal:
1 . Thc proposed development is within the Springfield city limits and will receive water service from
the Sprinb.field Utility Board (SUB).
2. All new water system facilities and modifications to water system facilities both inside and
adjacent to the proposed development shall be placed in street right-of-way at a location and depth
ofhury that meets the standards of the SUB Water Division.
3. All water facility materials shall be to " standard that must meet SUB Water Division
specifications.
4. All workmanship shall be performed to meet or exceed SUB Water Division construction
standards.
5. Size ofwatcrline and other facilitics, iTlcluding water metcrs, must meet the needs of the SUB
Water Division and the long-range needs of the City. These needs include, but are not limited to,
meter location and,access, sir.es ofwat~r distribution and transmission lin,:s, pumping facilities,
and communication lines.
6. Please ask the developer to contact the SUB Water Division for detailed information on the
materials and construction standards, detailed costs for installing SUB water facilitics, and a
schedule of constlUction. Construction expenses may be reduced with good planning of required
water facilities, good timing of facilities instaJlation, and joint trench opportunities.
7. All water meters will be placed in public right-of-way at a location idcntified by the developer.
Each lot or parcel must have its own water service.
8. Water service facilities will be installed upon collection of development charges. Development
policies and charges identified in this letter are subject to changc. Actual charges will be those in
effect at the time water scrvice is reqtwsted.
FEB-13-2004 12:46
1 541 747 7348 P.03/03
.
.
Site Plan #SUB2003.00062
Mountaingate Phase IV
February 13, 2004
Page 2 of2
9. The development plans do not show any access to the existing Springfield Utility Board rcseT'\loir
site in the southwest com~" of the development. SUB has had access to this site si"ce construction
of the water storage reservoirs in 1956. Access must be maintained to this site at an times.
Access must be suitable for large trucks and equipment used for maintenance of the reservoirs.
PLEASE NOTE:
SUB development charges are paid directly to SUB Water Division and
suB Electric Division.
Sincerely,
</]J 'i: yY1c.J~
Bart E. McKee P.E.
Engineer - Water Division
BEM:mkm
cc: Mike Evans, Land Planning Consultants. 1071 Harlow Rd, Springtield OR 97477
Tony Favreau, The Favreau Group, 2063 Musket St, Eugene. OR 97408
,:\,iteplanlMountoinGate Phase IV 2.II.04.doe
TOTAL P.03
02/13/04 FRI 13:34 FAX 5417263689
RECEPTION OK
TX/RX NO
CONNECTION TEL
CONNECTION ID
ST, TIME
USAGE T
PGS,
RESULT
CITY OF SPRINGFIELD
*********************
... RX REPORT ...
*********************
8701
1 541 747 7348
02/13 13:33
00'55
3
OK
141 001
.