Loading...
HomeMy WebLinkAboutPermit Building 2002-7-8 " . /' . Page 1 014 TRAN8#:01'OC0985? DATE:JUL 08 2002 AMT RECD:2 $ 4'.'6S.97 C~[.lNGE . CASHIER:061 I Job# 02-00376-01 I 225 Fifth Street Springfield, OR 97477 CITY OF SPRINGFIELD, OREGON RESIDENTIAL PERMIT City Of Springfield Community Services Division Building Safety Job Number: 02-00376-01 Office: 726-3759 Inspection Line: 726-3769 Location Of Proposed Site: 5756 Ridge Ct Spr Assessors Map#: 18020411 Lot: 1 Block: Addition: Owner: Address: Tax Lot #: 07500 Subdivision:Thurston Ridge Repla Phone Number: 541-3fti0647 :\u ",\.1 .'<\ ~)'1 ,,\~.' ~,'" City/StatelZip: . Eugene:,0R97 408 '7(~"'" 'lJ0;~. c:,v C)~ ' V'\-..\ ,.,~ 0\ ~ValiJe:d".)$39,986 " 0 ~ 5(.... \),,-, I?I -< \\<:s' \,s,e o'r ~o(, ~0~'0~ ,"- 00 roe ffj' ~~ CO '1>" ,~,~o 0>J roO ..e't.:,~c, ,() ""',. _< -.0, ,.. _,,'\ ..,",?J.v ~..~'\",...,,~.... {'p'\l'ti~:j,~~:i':)' , "t' \~'-Registratioii,#~o'l;Exj:iiration Date \'\~' 0;-" !;)." :r;,....v \" v".' Dennis Fennell"(~~:~>i"~~'1:<;;J ,.;;\0 ~0\eQ,0;<:'f 86991 N Game Farm Rd, Eugene,'OW. '7~' 0'" <$- '" c,0 ",0 ." 97408 .~.~ O'?' -\ ~ ~ ,.r. ~. "1~. ....,,:,-CJ 1.0'" ~r.( 'S" ~" ~' " Dennis Fennell ' c,'I> ,(''Q'' C" \.' 86991 N Game Farm Rd, Eugene, OR r~\ 97408 Dennis Fennell 86991 N Game Farm Rd Scope Of Work: Manufactured Home on Private Lot New .. ~ -. ,343-0647 !l....~~~. ~rr:s~~ ~~ 'b ~ ~~~ ~~~ ~~~~ ~~~~~~ ~~ ~~~~~D647 .~~ ~ ~~~ ~\fo .~~ ~tS ~~ ~~f::, ~~tS ~~~'" 541-343-0647 't>~~~'?\~ ~~_..~... ~ ~~~~""- To request an inspection call the 24 hour recording at 726-3769. All in'&\", requested before 7:00 a,m. will be made the same working day, inspections requested after 7~~ . will be made the following working day, Contractor Type General Contr Electrical Contr Mechanical Contr Manuf Home Install Plumbing Contr Verify Ground Rod Footing Foundation Shear Wall Nailing Framing Drywall Final Building MH on private lot with garage Contractor Phone 541-343-0647 541-343-0647 Dennis Fennell 86991 N Game Farm Rd, Eugene, OR 97408 Dennis Fennell 86991 N Game Farm Rd, Eugene, OR 97408 Dennis Fennell 86991 N Game Farm Rd, Eugene, OR 97408 Required Inspections I Building I -Install ground rod at footing, and call for inspection in conjuction with footing and/or foundation ir -After trenches are excavated. -After forms are erected but prior to concrete placement. - Before covering sheathing with finish materials, - Prior to cover. - Prior to taping, -When all required inspections have been approved and the building is complete, Street Improvement: Fully Improved Curb Cut?D Improvement Agr.?D San Sewer Depth (Ft): 6 4 Storm Sewer Available? D Special Req.: Security Required: Bond Begin DateTime: 00/00/000000:00:00. Special Instructions: Other Utilities: Project Supervisor: ., / Rough Electrical MH Service Final Electrical Underfloor Drain MH Plumbing Water Line Sanitary Sewer Line Storm Sewer Line MH Set Up MH Final . . Job# 02-00376-01 I Required Inspections Electrical Page 2 of4 - Prior to cover. -When all electrical work is complete. I Plumbing - Prior to cover or placement of concrete. -After home has been connected to water and sewer. -Prior to filling trench, - Prior to filling trench, - Prior to filling trench, I Manufactured Home - When all blocking is complete, -After all required inspections are approved and porches, skirting, decks, venting, house number Sidewalk Type: Curbside - 5' Additional ROW? D Size Of Line (in): 8 Downspouts/Drains: To Storm Sewer Enchroachment Permit: San Sewer Tee (in): 6 Bond End DateTime: 00/00/0000 00:00:00 . Types Of Warning Devices Reqd. Zoning: LDR Overlay District: FloodPlain? D Wetlands? D # of Street Trees: 0 Journal numbers 1: 2: 3: Comments:Pave first 18' of panhandle (if not already) Planner: Urban Growth Boundary?D Glenwood Area? D Quantity Of Fill: Supplier: Drainage: Floodway FEMA: Zone X White Construction Types:(VN) Wood Frame Occupancy Groups: Dwelling # Of Buildings: 2 # Of Bedrooms: 3 Handicap Access? D iArea (Sq. Feet) I Main: 1680 Accessory:484 Land Use: Mfg Home - Not in a Park Pave Driveway? 0 Additional Requirements: Required Attachments: Source Locn: Material: Flood Plain FEMA: Panel 1166 of 2975 Private Garage/Carp/Stor # Of Stories: 1 Height (feet): 16 Current Units: Proposed Units:1 Census Code: New Mfg Home Total:2164 ..-' . Job# 02-00376-01 . Page 3of4 Fee Paid On Receipt# Value/Quantity Fee Amount Plan Check Residential Plan Check 04/04/2002 8513 11,986 $79,95 Total Plan Check $79.95 Building Building Permit 07/08/2002 9852 11,986 $123,00 State Surcharge For Building Permit 07/08/2002 9852 $8,61 8% Building Administrative Fee 07/08/2002 9852 $9,84 Total Building $141.45 Electrical Minimum Electrical Permit Fee 07/08/2002 9852 $,00 Manufactured Home Service\Feeder 07/08/2002 9852 2 $100,00 Branch Circuits With Feeder or Service 07/08/2002 9852 1 $3,00 State Surcharge - Electrical 07/08/2002 9852 $7.21 8% Admin Fee - Electrical 07/08/2002 9852 $8,24 Total Electrical $118.45 L Plumbing Minimum Plumbing Permit Fee 07/08/2002 9852 $.00 State Surcharge - Plumbing 07/08/2002 9852 $13,58 Water Service Footage 07/08/2002 9852 35 $45,00 Sanitary Sewer Footage 07/08/2002 9852 35 $45,00 Storm Sewer Footage 07/08/2002 9852 80 $59,00 Manufactured Home Connection 07/08/2002 9852 1 $45,00 8% Administrative Fee - Plumbing 07/08/2002 9852 $15,52 Total Plumbing $223.10 Manufactured Home Manufactured Home Setup Fee 07/08/2002 9852 28,000 $160,00 Manufactured Home State Issuance 07/08/2002 9852 1 $30,00 State Surcharge For Manufactured Homl 07/08/2002 9852 $11,20 Manufactured Home Administrative Fee 07/08/2002 9852 $12.80 Total Manufactured Home $214.00 System Development Manufactured Home - Storm 07/08/2002 9852 2,960 $808.08 Residential Improvement MWMC 07/08/2002 9852 1 $34.83 MWMC Administrative Fee 07/08/2002 9852 1 $10,00 SDC Administrative Fee 07/08/2002 9852 $143,28 Residential Sanitary MWMC 07/08/2002 9852 1 $332,86 Residential - Improvement 07/08/2002 9852 ,1 $659.76 Residential - Reimbursement 07/08/2002 9852 1 $155,13 Sanitary Sewer SDC Reimbursement 07/08/2002 9852 23 $491,51 Sanitary Sewer SDC Improvement 07/08/2002 9852 23 $373,52 Total System Development $3,008.97 Willamalane sec Manufactured Home - Willamalane 07/08/2002 9852 1 $1,000,00 Total Willamalane sec $1,000.00 Planning Planning Plan Review 07/08/2002 9852 1 $55,00 Total Planning $55.00 .... . Fee Address Assignment Total Permits wlo Srchg Grand Total Plan Check Type Checked By Initial Review-Res Lisa Hopper Initial Review-Res Lisa Hopper Engineering-Res Denny Wright Planning-Res Liz Miller Structural-Res Tom Marx Job# 02~0376~1 Paid On Receipt# r Permits wlo SrchR 07/08/2002 9852 . Page 4 of4 Value/Quantity Fee Amount 1 $8.00 $8.00 $4,848.92 Date Completed Comment 04/08/2002 Hold for floor plan, Spoke with owner 4/8j @ 9:20 am. He will prepare and fax one to me. Received Plot plan via fax, Okay to process 04/11/2002 06/28/2002 04/23/2002 Called owner regarding rearyard setback on garage. Gave his OK to change plans showing required setback. 04/22/2002 By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety, I further certify that only contractors and employees who are in compliance with ORS 701,055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front of the propery, and the approved ~~ans ~II" ;; the site at all times during construction, V 8-'/ 8-:D / At //~~_ ~ Signature r - [. ,-- !Yate I