HomeMy WebLinkAboutBuilding Miscellaneous 1995-7-3
SPRINQFIELD
~*'
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE
(RESIDENTIAL)
Name or Company: HAYDEN
Location: 3774 S
Developement Type: R
ENTERPRISE
REDWOOD DR
Building Size:
1. STORM DRAINAGE
Impervious Sq Ft
x
0.209
2. SANITARY SEWER - CITY
Number Of PFUs 18
(see Page 2)
x
43.26
3. TRANSPORTATION
Number Of Units
1 X
X Trip Rate
1. 010 X
X
Cost Per Trip
436.19
$440.55
Transportation Total
4. SANITARY SEWER - MWMC
Number Of PFUs
18
X
X
Per PFU +
17.190 +
MWMC CREDIT If Applicable (see Page 2)
TOTAL ~ MWMC SDC
SUBTOTAL - (Add Items 1, 2, 3 & 4)
5. ADMINISTRATIVE FEES
Base Charge (Subtotal Above) X
0.50
TOTAL SDC
Reviewed By: KIP BURDICK
Job No.: 950803
Lot Size:
Per Sq Ft
Per PFU =
MWMC Admin Fee
10.00
Date: 07/03/95
Page 1
Sq Ft
$0.00
$778.68
$440.55
=
$319.42
$26.23
$293.19
$1,512.43
$75.~
$1,588.05
Job Number: 950803
FIXTURE UNIT CALCULATION TABLE
Page 2
Fixture Type
Bathtub
Drinking Fountain
Floor Drain
Interceptors For Grease/Oil/Solids/Etc
Inteceptors For Sand/Auto Wash/Etc
Laundry Tub/Clotheswasher
Clotheswasher - 3 Or More
Receptor For Refrigerator/Water Station/Etc
Receptor for Commercial Sink/Dishwasher/Etc
Shower, Single Stall
Shower, Gang
Sink, Bar, Commercial, Residential Kitchen
Urinal, Stall/Wall
Wash Basin/Lavatory, Single
Water Closet, Public Installation
Water Closet, Private
Miscellaneous
TOTAL FIXTURE UNITS =
Number of
New Fixture
Unit
Equivalent
Fixture
Units
2
o
o
o
o
1
o
o
o
o
o
1
o
2
o
2
o
2
1
2
3
6
2
6
1
3
2
4
o
o
o
o
2
o
o
o
o
o
2
o
2
o
8
o
2
2
1
6
4
18
CREDIT CALCULATION TABLE: Based on assessed value. If improvements occured
after annexation date, credits are calculated separately.
(calculations are by $1000)
Year Annexed: 1960
Credit For Parcel Or Land Only If Applicable:
Improvement (if after annexation date) :
7,580
x
3.46
26.23
o
x
3.46 =
0.00
CREDIT TOTAL =
$26.23
(If land value is multiplied by 1 then the parcel/land credit is not accurate.)