Loading...
HomeMy WebLinkAboutBuilding Miscellaneous 1995-7-3 CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE (COMMERCIAL / RESIDENTIAL) Name or Company: HAYDEN Location: 3285 S Developement Type: R Job No.: 950756 ENTERPRISES REDWOOD DR Building Size: Lot Size: 0 1. STORM DRAINAGE Impervious Sq Ft o 0.209 x Per Sq Ft 2. SANITARY SEWER, CITY Number Of PFUs 18 (see Page 2) x 43.26 Per PFU = 3. TRANSPORTATION Number Of Units 1 X X Trip Rate 1. 010 X X Cost Per Trip 436.19 $440.55 Transportation Total 4. SANITARY SEWER ' MWMC Number Of PFUs 18 Per PFU 17,190 + MWMC Admin Fee + 10.00 X X MWMC CREDIT If Applicable (see Page 2) TOTAL ' MWMC SDC SUBTOTAL - (Add Items 1, 2, 3 & 4) 5. ADMINISTRATIVE FEES Base Charge (Subtotal Above) X 0.50 TOTAL SDC Reviewed By: KIP BURDICK Date: 07/03/95 Page 1 Sq Ft $0.00 $778.68 $440.SS $319.42 $26,23 $293.19 $1,512.43 $75.62 $1,588.05 SPRINGFIELD Job Number: 950756 . Page 2 FIXTURE UNIT CALCULATION TABLE Fixture Type Bathtub Drinking Fountain Floor Drain Interceptors For Grease/Oil/Solids/Etc Inteceptors For Sand/Auto Wash/Etc Laundry Tub/Clotheswasher Clotheswasher ' 3 Or More Receptor For Refrigerator/Water Station/Etc Receptor for Commercial Sink/Dishwasher/Etc Shower, Single Stall Shower, Gang Sink, Bar, Commercial Urinal, Stall/Wall Wash Basin/Lavatory, Single Water Closet, Public Installation Water Closet, Private Miscellaneous TOTAL FIXTURE UNITS = Number of New Fixture Unit Equivalent Fixture Units 2 o o o o 1 o o o o o 1 o 2 o 2 o 2 1 2 3 6 2 6 1 3 2 4 o o o o 2 o o o o o 2 o 2 o 8 o 2 2 1 6 4 18 CREDIT CALCULATION TABLE: Based on assessed value. If improvements occured after annexation date, credits are calculated separately. (calculations are by $1000) Year Annexed: 1960 Credit For Parcel Or Land Only If Applicable: Improvement (if after annexation date) : 7,580 X 3,46 26.23 o X 3.46 = 0.00 CREDIT TOTAL = $26.23 (If land value is multiplied by 1 then the parcel/land credit is not accurate.)