Loading...
HomeMy WebLinkAboutPermit System Development Code Charge 1995-7-3 CITY OF SPRINGFIELD SYSTEMS. DEVELOPMENT CHARGE (RESIDENTIAL) Name or Company: HAYDEN ENTERPRISE Location: 874 ALDRIDGE PL Developement Type: R Building Size: 1. STORM DRAINAGE Impervious Sq Ft x 0.209 2. SANITARY SEWER - CITY Number Of PFUs 18 (see Page 2) x 43.26 3. TRANSPORTATION Number Of Units 1 X X Trip Rate 1. 010 X Job No.: 950866 Lot Size: Per Sq Ft Per PFU X Cost Per Trip 436.19 $440.55 Transportation Total 4. SANITARY SEWER - MWMC Number Of PFUs 18 X X Per PFU + 17.190 + MWMC CREDIT If Applicable (see Page 2) TOTAL - MWMC SDC SUBTOTAL - (Add Items I, 2, 3 & 4) 5. ADMINISTRATIVE FEES Base Charge (Subtotal Above) X 0.50 TOTAL SDC Reviewed By: 'KIP BURDICK MWMC Admin Fee 10.00 Date: 07/03/95 Page 1 Sq Ft $0.00 $778.68 $440.55 $319.42 $26.23 $293.19 $1,512.43 $75. 6~ $1,588.05 Job Number: 950866 FIXTURE UNIT CALCULATION TABLE Page 2 Fixture Type Bathtub Drinking Fountain Floor Drain Interceptors For Grease/Oil/Solids/Etc Inteceptors For Sand/Auto Wash/Etc Laundry Tub/Clotheswasher Clotheswasher - 3 Or More Receptor For Refrigerator/Water Station/Etc Receptor for Commercial Sink/Dishwasher/Etc Shower, Single Stall Shower, Gang Sink, Bar, Commercial, Residential Kitchen Urinal, Stall/Wall Wash Basin/Lavatory, Single Water Closet, Public Installation Water Closet, Private Miscellaneous Number of New Fixture 'Unit Equivalent Fixture Units 2 o o o o 1 o o o o o 1 o 2 o 2 o 2 1 2 3 6 2 6 1 3 2 4 o o o o 2 o o o o o 2 o 2 o 8 o 2 2 1 6 4 TOTAL FIXTURE UNITS 18 CREDIT CALCULATION TABLE: Based on assessed value. If improvements occured after annexation date, credits are calculated separately. (calculations are by $1000) Year Annexed: 1960 Credit For Parcel Or Land Only If Applicable: Improvement (~f after annexation date) : 7,580 X 3.46 26.23 o X 3.46 0.00 CREDIT TOTAL = $26.23 (If land value is multiplied by 1 then the parcel/land credit is not accurate.)