HomeMy WebLinkAboutPermit Building 1991-5-8
RESIBENTi')).L
PERMIT APPLICATION
Inspections: 726.3769
Office: 726.3759
LOT'
.
BLOCK'
.
JOB NUMBER
q 1{)~7
225 Fifth Street
Springfield, Oregon 97477
r'J.,.Y+or;
SUBDIVISION'
~Q \I~C'QJ\T \ ,J.' PHONE: fq.~(n~
ADDRF"S: . _ ", \-_ V0 .l-\X\ Q)( ) \. '>D{~) ~ .
CITY:~ l) STATE: (~ ZIP: C{l4il
DESCRIBEW~RK~' ~(\+n \ dt1flLnC31t)
NEW REMODEL ADDITION ~ DEMOLISH OTHER
OWNER:
CONTRACT~ NAME ~
GENERA' ,\..\J.LLJt\Q ~ )
PLUMBING:
MECHANICAl"
~\101l Q If')
~\) \ 0\\ tiLT
ELECTRICAl'
QUAD AREA: t) ~ t\)V
. OF BLDGS: '\
e..~
\
OCCY GROUP'
. OF STORIES:
WATER HEATER'
ADDRESS
CONST.
CONTRACTOR'
PHONE
- OFFICE USE -
LAND USE: \ \\ \
. OF UNITS' \
CONSTR. TYPE: ~^)
HEAT SOURCE:
RANGE:
EXPIRES
FLOOD PLAIN:
ZONING CODE:
1 f~ \2-
. OF BDRMS:
SECONDARY HEAT:
SQUARE FOOTAGE: J{ I)
To request an Inspection, you must call 726-3769. This Is a 24 hour recording. All Inspections requested before 7:00 a.m. will be
made the same working day, Inspections requested after 7:00 a.m. will be made the following work day.
o Temporary Electric
o Si_te Inspection - To be made
after excavation, but prior to
setting forms.
o
Underslab Plumbingl Electricall
Mechanical - Prior to cover.
~ Footing - After trenches are
excavated.
o Masonry - Steel location, bond
beams, grouting.
lLJ Foundation - After forms are
erected but prior to concrete
placement.
o
Underground Plumbing - Prior
to filling trench.
~
Underfloor Plumbing/Mechanical
- Prior to insulation or decking.
~ Post and Beam - Prior to floor
L..,L.J Insulation or decking.
rVl Floor Insulation - Prior to
l...,CJ decking.
o Sanitary Sewer - Prior to filling
trench.
o Storm Sewer - Prior to filling
trench.
o Water Line - Prior to fillln9
trench.
[X] Rough Plumbing - Prior to
cover.
REQUIRED INSPECTIONS
D Rough Mechanical - Prior to
cover.
IX! Rough Electrical - Prior to
cover.
o Electrical Service - Must be
approved to obtain permanent
electrical power.
o Fireplace - Prior to facing
materials and framing Insp.
[E] Framing - Prior to cover.
rVI Wall/Ceiling Insulation - Prior to
l;!:..J cover.
[Kj Drywall - Prior to taping.
o Wood Stove - After installation.
D Insert - After fireplace approval
and installation of unIt.
o
Curbcut & Approach - After
forms are erected but prior to
placement of concrete.
o Sidewalk & Driveway - After
excavation is complete, forms
and sub-base material in place.
o Fence - When completed.
o Street Trees - When all required
trees are planted.
[KJ Final Plumbing - When all
plumbIng work Is complete.
1\71 Final Electrical - When all
~ electrical work Is complete.
o Final Mechanical - When all
mechanical work is complete.
IKJ Final Building - When all
required Inspections have been
approved and building Is
completed.
DO'her
MOBILE HOME INSPECTIONS
o Blocking and Set.Up - When all
blocking Is complete.
o Plu~bing Connections - When
home has been connected to
water and sewer.
o Electrical Connection - When
blocking, set-up, and plumbing
inspections have been approved
and the home is connected to
the service panel.
o Final - After all required
inspections are approved and
0" porches, skirting, decks, and
venting have been installed.
. , THE PROPOSED WOI'IK IN T-.HE
Lot faces Lot Type Setbacks
Lot sq, ftg, Interior I PL. HSE GAR ACC I HISTORICAL DISTRICT, OR ON
IN I THE HISTORICAL REGISTER?
Lot coverage Corner If yes, this application must be signed
Is I ana approved by the Historical
Topography Panhandle Iw I Coordinator prior to permit issuance.
Total height Cul-de.sac
IE I APPROVED:
BUILDING PERMIT
SQ, FT.
tf'h,'=61
ITEM
MaIn
Garage
Carport
Total Value
Building Permit Fee
State Surcharge
Totai Fee
X~~~~b =4Vr1)\
J -
~
(A)
4.ml,
4-~. -5"t:::>
-2..;>3
~.1/3
SYSTEMS DEVELOPMENT CHARGE (SDC)
(B)
PLUMBING PERMIT
ITEM
Fixtures ~
Residential Bath(s) N'
Sanitary Sewer FT,
Water FT,
Storm Sewer FT,
Mobile Home
Plumbing Permit
State Surcharge
Total Charge
MECHANICAL PERMIT
Furnace
Exhaust Hood
Vent Fan
FEE
~._If>
(C)
~.. <>t:>
/.. ;5'&>
p/..50
Dryer Vent
Wood Stove/Insert/Fireplace UnIt
N'
Mechanical Permit
Issuance
State Surcharge
Total Permit
Mobile Home
MISCELLANEOUS PERMITS
(D)
\S.OJ
\ D.aU
(. fK5 ,
QLt? ,f:).'v
State Issuance
State Surcharge
Sidewalk
ft
Curbcut
ft
Demolition
State Surcharge
Total Miscellaneous Permits (E)
TOTAL AMOUNT DUE (excluding electrical)
(A, B, C, D, and E Combined)
BUILDING VALUE, PLAN CHECK
AND BUILDING PERMIT
This permit is granted on the express condition that the said
construction shall; in all respects, conform to the Ordinance
adopted by the City of Springfield, inciuding the
Development Code, regulating the construction and use of
buildings, and may be suspended or revoked at any time
upon violation of any provisi'l5 of said ordinances.
Plan Check Fee: ~ ~a ,n~
Date Paid:
Receipt Num~ R
Received By:L~ 1m
41:iew:d'?~ -~
~-~ ~'?'/
Date
Systems Development Charge is due on all undeveloped
properties within the City limits which are being improved.
ADDITIONAL COMMENTS
By signature, I state and agree, that I have carefully examined
the completed application and do hereby certify that all
Information hereon is true and correct, and I further certify
that any and all work performed shall be done in accordance
with the Ordinances of the City of Springfield, and the Laws
of the State of Oregon pertaining to the work described
herein, and that NO OCCUPANCY will be made of any
structure without permission of the Building Safety Division.
I further certify that only contractors and employees who
are In compliance with ORS 701.055 will be used on this
project.
I further agree to ensure that all required inspections are
requested at the proper time, that each address is readable
from the street, that the permit card Is located at the front
of the property, and the approved set of plans will remain
:~g:::u:~e~J;:;i( z:;
Date _"-- /ti'/ v/
-; w ,,-
VALIDATION: 0/
RECEIPT NUMBER !J ('in; 6
DATE PAIr> ,~:'A ,q /
AMOUNT RECEIVED I ( -4 J . c;, ~
RECEiVED BY ~ ~
~. ..' ..
.
.
Permit No: q \ [)?P/7
Address: 804 I....ID JJ/'JV.JV
i-b - 0
Issued by: ~ I [)() ) Date: ~l!3/Cf 1
FOR OFFICE USE ONLY
STATEMENT:
INFORMATION NOTICE TO PROPERTY OWNERS
ABOUT CONSTRUCTION RESPONSIBILITIES
Note: Oregon Law, ORS 701.055(4), requires residential building permit applicants
who are not registered with the Construction Contractors Board to sign the
following statement before the building permit can be issued. Licensed Architect
and Engineer applicants, exempt from registration under ORS 701.010(7), need
not submit this statement. This statement will be filed with the permit.
Fill in the applicable blanks, and initial box 1 and either box 2A or 2B:
1.h{1
/
I own, reside in, or will reside in the completed structure.
2. A. c=:::::J My general contractor is
Contractor registration number
I will instruct my general contractor that all subcontractors who work on
the structure must be registered with the Construction Contractors Board.
OR
"7
I will be my own general contractor.
If I hire subcontractors, I will hire only subcontractors registered with the
Construction Contractors Board. If I change my mind and Clo hire a general
contractor, I will contract with a contractor who is registered with the
Construction Contractors Board and I will immediately notify the office
issuing this building permit of the name of the contractor.
I hereby certify that the above Information Is correct and that I have read and understand
the Information Notice to Property Owners about Construction Responsibilities on the
Ig'afttre l'permit pplicant b~ie
CONSTRUCTION CONTRACTORS BOARD
0244J 1/90
&f' COPY TO ISSUING AGENCY PERMIT ~ILE
~~Py TO APPLICANT
<P!.