HomeMy WebLinkAboutPermit Electrical 1999-8-31
225 FIFTH STREET
SPRINGFIELD, OREGON
INSPECTION REQUEST:
OFFICE: 726-3759
~\\~C\
~;~
97477
726-3769
ELECTRICAL PERMIT APPLICATION
Ci ty Job Number ~~
3. COMPLETE FEE SCHEDULE BELOY
~IO~~~.{~~,T~<v
\~~&ir!L.
~~~:::~~~er:~~e
if york is not started vithin 180 days
of issuance or if york is suspended for'
180 days.
2. CONTRACTOR INSTALLATION ONLY B.
Electrical Contractor t5dh hC,lv- /~It2~'!..
AddressJflU I{(JU, c,bu./t, n lJe.-..
I
Ci ty r u~ ~ Phone by,c, 7ft?
SuperVl$or License Number ~'1 7.;-5
Expiration Date /o-() 1- 01
, .
Constr Contr. Number 1. 0 - ?~-;.. c..
Expiration Date /0- 0 J ~ ')7
A.
Nev Residential-Single or
Multi-Family per dwelling
Service Included:
uni t.
Items
\
1..2.-
Cost
Sum
1000 sq.ft. or less
Each additional 500
sq. ft or portion
thereof
Each Manuf'd Home. or
Modular .Dvelling
Service or Feeder
Services or Feeders
Installation, Alterations
or Relocation:
200 amps or less
201 amps to 400 amps
401 amps to 600 amps
601 amps to 1000 amps
Over 1000 amps/volts
Reconnect Only
$ 85.00
eu
Of)
$ 15.00
.$ 40.00
$ 50.00
$ 60.00
$100.00
$130.00
$300.00
$ 40.00
C.
Temporary Services or Feeders
Installation, Alteration or Relocation
200 amps' 'or less \ $ 40.00 4n
201 amps to 400 amps $ 55.00
Over 401 to 600 amps $ 80.00
Over 600 amps or 1000 volts see liB" above
D. Branch Circui ts
.
Signa~re_oJ_~U~.~i~~ectrician
-~:p- . .
Ovner~ Name~ r~~
Addres~ ~- _, ".
CHy &.~09' Ph".'""AA.?Jd:l)
01lNER TALLATION
The installation is being made on
property I own vhich is not intended
for sale, lease or rent.
Ovners Signature:
---------------------------------------
DATE:
RECEIPT 11:
RECEIVED BY:
New, Alteration or Extension Per Panel
One Circuit
Each Additional
Circuit or with Service
or Feeder Permit
$ 35.00
$ 2.00
not included) ,
Miscellaneous (Service/feeder
-Each installation
Pump or irrigation
Sign/Outline Lighting
Limited Energy/Res
Limited Energy/Comm
E.
5.
SUBTOTAL OF ABOVE
5% State Surcharge
3% Administrative Fee
TOTAL
$
$
$
$ 36.00
~~~
40.00
40.00
20.00
-
..
DEVELOPMENT SERVICES DEPARTMENT
225 FIFTH STREET
SPRINGFIELD, OR 97477
(541) 726-3753
FAX (541) 726-3689
CITY OF SPRINGFIELD
COMMUNITY'SERVICES DIVISION
BUILDING SAFETY
AUTHORIZATION TO PROCEED AGREEMENT.
THIS AGREEMENT is entered. into this . IS- day of (!..~,/-.
bet....een the Ci ty of Springfield , a niUniCi. PN. ~o.Q\<J!~.gi]i ot
'hereinaftercalled. City, and .tfti\l.io _'~., .
the. Applicant; . . .
. 199"7 by and
the State-oI Oregon,
,'hereinafter called
community Services Building
r~ t\ for development .
').. f"t t.R _ Springfield,
l~CYi~ea; Lane 'County ,
. .fL- . ..
YHEREAS, the applicant has asked the City to authorize the Applicant to
immediately commence development improvements ...ithout a completed .plan review or
subsequent approval as required by the Springfield Building Safety Code
-Adm.inistrative Code section 303(a) .
\1HEREAS, .the Applicant has submitted to the City a completed permit application,
3 (three) sets.of.construction dra...ings, specifications, and other data required
for the City to .complete the necessary plan'revie... of the proposed development
improvement.
YHE~AS, the intended development impr()vemeilt is of a nature that .requires no
other review approval from other State or local .agencies and is 'exempt from the
criteria established by the Building Safety Diyision, attached as Exhibit A of
this Agreemen t.
YHEREAS, the City has not reviewed or approved the submitted materials for the
development improvement, theCi ty is. therefore unable to confirm at this time
....hether the permit applicati0~ submitted ...ill be approved, Gnd whether the
~equired construction permits can be issued.
.YHEREAS, the ~pplicant has requested th~' City to .provide expedited authorization
to proceed ...i th certain phases of construction prior to the completion of .the
City~s revie... o,f the permit application;
\l'HEREAS, the City's fee for the administrative services r'endered in providing
eipedited authorization is $150.00.
NOV, THEREFORE, in.consideration of the foregoing recitals and of the mutual
promises contained herein; the City authorizes immediate commencement of the
development improvement specified in.the. permit application subject to the
following terms and conditions:
..
...
..
Authorization to Proceed Agreement
Pa'ge 2.
1. City agrees that the Applicant may immediately commence vith the
development improvements set forth in the permit application. ,City's
authorization to proceed, is conditione~ .hovever, .upon Applicant's agreement
.that the project viII De constructed as set forth in the attached submitted
dravings and specifications, except as may be modified by City, and viII.
comply vith all. applicable lavs and ordinances. Applicant's. immediate
commencement of construction is at Applicant's ovn risk. The City. makes no
assurance that the deveLo~ment or construction improvements viii.be approved
or the requlred constructlon permits viii later be issued.
2. City agrees to reviev Applicant's permit application in the normal reviev
process and to thereafter: '
a) issue Applicant the appropriate construction permits; or
b) advise Applicant of deficiencies in. the proposed construction vhich.
. must be remedied before permits can be issued; or .
c) advise Applicant of any statutes, ordinances or code provisions vith
vhich Applicant must comply vith before City can issue the permit.
3. Applicant agrees that if City finds Applicant's permit application and
submitted materials inadequate or deficient in any manner including.but not
limited to, .the application or the proposed construction do not comply vith
all applicable statutes, ordinances or code provisions, Applicant vill
expeditiously cure the deficiencies so that the City may issue the required
permits. Should Applicant fail' to expeditiously correct submitted materials,
or should correction prove impossible, City may in it's discretion, .take any
or all of the .folloving actions:
a) stop.all further construction of the project in the manner prescribed.
in the Springfield Building Safety Code Administrative Code (BSCAC),
SECTION 201 (d)
b) order disconnection of serving utilities in a manner as prescribed in
BSCAC, SECTION 201 (f)
c) issue a NOTICE IS") ORDER for removal of all such ,,'ork in a !Ilanner as
prescribed in BSChC, SECTION 204. . ABATEMENT OF UNSAFE, SUBSTANDARD OR
DANGEROUS.BUILDINGS, STRUCTURES OR BUILDING SERVICE EQUIPMENT. Upon
receipt of such notice, Applicant 'shall'immediately. remove. the vork
specified .in the Notice and Order.
4. Applicant agrees, if the issuance of. the permit is denied:.
a) to remove, at the Applicant's sole cost and expense, all completed
construction or improve!llents; and
b) to restore the site or structure to it's pre-agreement condition and
free of all hazards
..
...
.
Authorization ~o Proceed Ag~eement
Page 3.
5. Applicant ag~ees that
const~uction vill not to
by the City\~U; ing 0
until Applicant's pe~mit application is app~oved,
p~oceed beyond the point of autho~ization app~oved
fictal. Applicant's Point of Authorization'is
.
6.' Applicant agree hat ~ll vork performed under this agreement shall be
accessible and exposed for inspection purposes and that neither the Building
Official nor City shall be liable for the expense entailed in the removal or
replacement of. any material necessary to allov.'inspection. .
7. Applicant agrees that any or all'deficiencies identified during the
necessary inspections viII be p~omptly remedied, at Applicant's sole cost
and expense beforep~oceeding vith' any furthe~ construction. Applicant also
agrees that these inspections do not replace the required plan reviev nor do
they imply any approval of' the submitted materials. .
8. Applicant agrees that no vork shall be. done .on any part of' the building
or structure beyond the point indicated in each successive inspection
vithout first obtaining. the approval of the Building Official. Such. approval
shall. be given only after an inspection has been made of each successive
step in the construction .as indicated on the attached Exhibit B.
9. Notvithstanding any other provisions of this Agreement, this Agreement
.shall terminate upon .issuance of a building permit or thirty (30) .days from
the. date of this Agreement, vhichever first occurs. .Applicant understands
that all vork on the. project shall immediately cease vithout any notice from
the City if this Agreement terminates before a building ~er~it'is issued.
This agreement shall terminate on (}C.T,. /6 . /'1'1'1 ..
,
.10. Applicant agrees to defend,. indemnify and hold.City harmless from any
and all costs (including attorney fees), liability or damages of any. kind or
nature vhatsoever, for personal injury and. property damage arising from the
Applicant's early commencement of construction and the vork undertaken or
completed. .
11. The terms of this Agreement shall extend to and be binding upon the
parties heret~ and their heirs, successors and assigns.
12. If .any suit, action or other pro.ceeding, .or. an appeal t'herefrom, is
instituted to obtain, establish, enforce, or compel any right o~ obligation
resulting from this Agreement., the prevailing party shall be enti tIed to
recover from the adverse party, in addition to costs and disbursements. such
additional sums as the courts, both trial and appellate,may judge
reasonable attorney fees.
,
..
...
Authorization to proceed Agreement
Page 4
BEFORE SIGNING THIS AGREEMENT, PLEASE READ AND UNDERSTAND THE
MEANING OF EACH PARAGRAPH OF THIS AGREEMENT. IT AFFECTS .YOUR
INTERESTS IN THE PROPERTY AND, IN THE EVENT OF. DEFAULT, IT PLACES
YOU PERSONALLY AT RISK AND. THE SUBJECT PROPERTY AT RISK OF
FORECLOSURE . FOR COSTS AND E~ENSES INCURRED BY THE CITY IN
ENFORCING THE TERMS OF THIS' AGREEMENT. IN THE EVENT THAT YOU DO
NOT UNDERSTAND ANY TERMS OR CONDITIONS OF THIS AGREEMENT, PLEASE
SEEK ANY LEGAL OR OUTSIDE OPINIONS YOU MAY DESIRE.
f
city of Springfield
By: at A/J
~~~.
Building Official
APPLICANT
.contractor__' ~~^
CITY
Business Name
Address..~.\)~ ~
CC Registration # ~~~
};.MID/PROPERTY uw".o.RfS).
I/WE HAVE READ THE ABOVE AUTHORIZATION TO PROCEED AGREEMENT. I/WE.
UNDERSTAND WHAT IT EXPRESSES AND THE RESPONSIBILITIES IT PLACES
UPON US AS THE LAND/PROPERTY OWNERS.. I/WE AGREE TO BE BOUND BY ALL
TERMS AND CONDITIONS OF THE AGREEMENT.
'~'
Name ~~~
Address ~, ~ ' ~. .
VALIDATION:
DATE PAID
(\~\\~~
o 3ss [,.
q/i5/rr
CITY JOB #
I<ECEIPT NUMBER
AMOUNT RECEIVED I \"J .
RECEIVED BY d tJJ
,
..
...
.'
EXHIBIT A.
Purpose
The purpose of this agreement is to allov'certa.in development improvements to
occur prior to obtaining plan reviev approval from the Springfield Communi ty
Services Division.
Scope
The use of this agreement shall be limited to certain one and tvo-family
dvellings not complex in nature as determined by ttie Building Official and
minor alterat.ions or modifications to existing commercial and industrial
buildings vhich are of a non-structural"type and do not adversely affect any'
structural.member of the building or any part of the building having fire
resistant construction.
One'and tvo-family dwelling plans for structures that are complex in nature that
have been prepared by an Oregon licensed architect or engineer and accompanied.
by a letter of reviev prepared by said architect or engineer, stating that- the.
submitted material is in. compliance. vith the One and Tvo-Family OIIelling
Specialty Code, may be considered eligible for this agreement.
The folloving items include but are not limited to certain conaitions of
development identified as ineligible for this agreement:
a) development requiring site approval vhichhas not been obtained;
b) nev development located on land vith over six-percent slope;
c) lots having expansive (clay) soil;
d) development located vithin flood hazard areas;
e) development located vithin vetland areas;
f) pole buildings or other such type of structure that is nqt of conventional
construction.
.J
..
..
EXHIBIT B
Required Inspections
To request an inspection, you must call 726-3769.
All inspections requested before 7:00 a.m. will be
Inspections requested after 7:00a.m. will be made
V-Temporary Electric
This is a 24 hour recording.
made the same working day,
the following work day.
Site - To be made after excavation, but prior to setting forms
~ Footing - After trenches are excavated
~ Foundation - After forms are erected but prior to concrete placement
~ Underfloor Plumbing.- Prior to filling trench
~ Underfloor Mechanical - Prior to insulation or . decking .
~ Post & Beam - Prior to floor insulation or decking
. ~ Underfloor Insulation - Prior to decking
.
~ Sanitary Sewer - Prior to filling trench
~ Storm Sewer - Prior to filling trench
~
Water'Line.- Prior. to. ~iliing trench
....