Loading...
HomeMy WebLinkAboutPermit Electrical 1999-8-31 225 FIFTH STREET SPRINGFIELD, OREGON INSPECTION REQUEST: OFFICE: 726-3759 ~\\~C\ ~;~ 97477 726-3769 ELECTRICAL PERMIT APPLICATION Ci ty Job Number ~~ 3. COMPLETE FEE SCHEDULE BELOY ~IO~~~.{~~,T~<v \~~&ir!L. ~~~:::~~~er:~~e if york is not started vithin 180 days of issuance or if york is suspended for' 180 days. 2. CONTRACTOR INSTALLATION ONLY B. Electrical Contractor t5dh hC,lv- /~It2~'!.. AddressJflU I{(JU, c,bu./t, n lJe.-.. I Ci ty r u~ ~ Phone by,c, 7ft? SuperVl$or License Number ~'1 7.;-5 Expiration Date /o-() 1- 01 , . Constr Contr. Number 1. 0 - ?~-;.. c.. Expiration Date /0- 0 J ~ ')7 A. Nev Residential-Single or Multi-Family per dwelling Service Included: uni t. Items \ 1..2.- Cost Sum 1000 sq.ft. or less Each additional 500 sq. ft or portion thereof Each Manuf'd Home. or Modular .Dvelling Service or Feeder Services or Feeders Installation, Alterations or Relocation: 200 amps or less 201 amps to 400 amps 401 amps to 600 amps 601 amps to 1000 amps Over 1000 amps/volts Reconnect Only $ 85.00 eu Of) $ 15.00 .$ 40.00 $ 50.00 $ 60.00 $100.00 $130.00 $300.00 $ 40.00 C. Temporary Services or Feeders Installation, Alteration or Relocation 200 amps' 'or less \ $ 40.00 4n 201 amps to 400 amps $ 55.00 Over 401 to 600 amps $ 80.00 Over 600 amps or 1000 volts see liB" above D. Branch Circui ts . Signa~re_oJ_~U~.~i~~ectrician -~:p- . . Ovner~ Name~ r~~ Addres~ ~- _, ". CHy &.~09' Ph".'""AA.?Jd:l) 01lNER TALLATION The installation is being made on property I own vhich is not intended for sale, lease or rent. Ovners Signature: --------------------------------------- DATE: RECEIPT 11: RECEIVED BY: New, Alteration or Extension Per Panel One Circuit Each Additional Circuit or with Service or Feeder Permit $ 35.00 $ 2.00 not included) , Miscellaneous (Service/feeder -Each installation Pump or irrigation Sign/Outline Lighting Limited Energy/Res Limited Energy/Comm E. 5. SUBTOTAL OF ABOVE 5% State Surcharge 3% Administrative Fee TOTAL $ $ $ $ 36.00 ~~~ 40.00 40.00 20.00 - .. DEVELOPMENT SERVICES DEPARTMENT 225 FIFTH STREET SPRINGFIELD, OR 97477 (541) 726-3753 FAX (541) 726-3689 CITY OF SPRINGFIELD COMMUNITY'SERVICES DIVISION BUILDING SAFETY AUTHORIZATION TO PROCEED AGREEMENT. THIS AGREEMENT is entered. into this . IS- day of (!..~,/-. bet....een the Ci ty of Springfield , a niUniCi. PN. ~o.Q\<J!~.gi]i ot 'hereinaftercalled. City, and .tfti\l.io _'~., . the. Applicant; . . . . 199"7 by and the State-oI Oregon, ,'hereinafter called community Services Building r~ t\ for development . ').. f"t t.R _ Springfield, l~CYi~ea; Lane 'County , . .fL- . .. YHEREAS, the applicant has asked the City to authorize the Applicant to immediately commence development improvements ...ithout a completed .plan review or subsequent approval as required by the Springfield Building Safety Code -Adm.inistrative Code section 303(a) . \1HEREAS, .the Applicant has submitted to the City a completed permit application, 3 (three) sets.of.construction dra...ings, specifications, and other data required for the City to .complete the necessary plan'revie... of the proposed development improvement. YHE~AS, the intended development impr()vemeilt is of a nature that .requires no other review approval from other State or local .agencies and is 'exempt from the criteria established by the Building Safety Diyision, attached as Exhibit A of this Agreemen t. YHEREAS, the City has not reviewed or approved the submitted materials for the development improvement, theCi ty is. therefore unable to confirm at this time ....hether the permit applicati0~ submitted ...ill be approved, Gnd whether the ~equired construction permits can be issued. .YHEREAS, the ~pplicant has requested th~' City to .provide expedited authorization to proceed ...i th certain phases of construction prior to the completion of .the City~s revie... o,f the permit application; \l'HEREAS, the City's fee for the administrative services r'endered in providing eipedited authorization is $150.00. NOV, THEREFORE, in.consideration of the foregoing recitals and of the mutual promises contained herein; the City authorizes immediate commencement of the development improvement specified in.the. permit application subject to the following terms and conditions: .. ... .. Authorization to Proceed Agreement Pa'ge 2. 1. City agrees that the Applicant may immediately commence vith the development improvements set forth in the permit application. ,City's authorization to proceed, is conditione~ .hovever, .upon Applicant's agreement .that the project viII De constructed as set forth in the attached submitted dravings and specifications, except as may be modified by City, and viII. comply vith all. applicable lavs and ordinances. Applicant's. immediate commencement of construction is at Applicant's ovn risk. The City. makes no assurance that the deveLo~ment or construction improvements viii.be approved or the requlred constructlon permits viii later be issued. 2. City agrees to reviev Applicant's permit application in the normal reviev process and to thereafter: ' a) issue Applicant the appropriate construction permits; or b) advise Applicant of deficiencies in. the proposed construction vhich. . must be remedied before permits can be issued; or . c) advise Applicant of any statutes, ordinances or code provisions vith vhich Applicant must comply vith before City can issue the permit. 3. Applicant agrees that if City finds Applicant's permit application and submitted materials inadequate or deficient in any manner including.but not limited to, .the application or the proposed construction do not comply vith all applicable statutes, ordinances or code provisions, Applicant vill expeditiously cure the deficiencies so that the City may issue the required permits. Should Applicant fail' to expeditiously correct submitted materials, or should correction prove impossible, City may in it's discretion, .take any or all of the .folloving actions: a) stop.all further construction of the project in the manner prescribed. in the Springfield Building Safety Code Administrative Code (BSCAC), SECTION 201 (d) b) order disconnection of serving utilities in a manner as prescribed in BSCAC, SECTION 201 (f) c) issue a NOTICE IS") ORDER for removal of all such ,,'ork in a !Ilanner as prescribed in BSChC, SECTION 204. . ABATEMENT OF UNSAFE, SUBSTANDARD OR DANGEROUS.BUILDINGS, STRUCTURES OR BUILDING SERVICE EQUIPMENT. Upon receipt of such notice, Applicant 'shall'immediately. remove. the vork specified .in the Notice and Order. 4. Applicant agrees, if the issuance of. the permit is denied:. a) to remove, at the Applicant's sole cost and expense, all completed construction or improve!llents; and b) to restore the site or structure to it's pre-agreement condition and free of all hazards .. ... . Authorization ~o Proceed Ag~eement Page 3. 5. Applicant ag~ees that const~uction vill not to by the City\~U; ing 0 until Applicant's pe~mit application is app~oved, p~oceed beyond the point of autho~ization app~oved fictal. Applicant's Point of Authorization'is . 6.' Applicant agree hat ~ll vork performed under this agreement shall be accessible and exposed for inspection purposes and that neither the Building Official nor City shall be liable for the expense entailed in the removal or replacement of. any material necessary to allov.'inspection. . 7. Applicant agrees that any or all'deficiencies identified during the necessary inspections viII be p~omptly remedied, at Applicant's sole cost and expense beforep~oceeding vith' any furthe~ construction. Applicant also agrees that these inspections do not replace the required plan reviev nor do they imply any approval of' the submitted materials. . 8. Applicant agrees that no vork shall be. done .on any part of' the building or structure beyond the point indicated in each successive inspection vithout first obtaining. the approval of the Building Official. Such. approval shall. be given only after an inspection has been made of each successive step in the construction .as indicated on the attached Exhibit B. 9. Notvithstanding any other provisions of this Agreement, this Agreement .shall terminate upon .issuance of a building permit or thirty (30) .days from the. date of this Agreement, vhichever first occurs. .Applicant understands that all vork on the. project shall immediately cease vithout any notice from the City if this Agreement terminates before a building ~er~it'is issued. This agreement shall terminate on (}C.T,. /6 . /'1'1'1 .. , .10. Applicant agrees to defend,. indemnify and hold.City harmless from any and all costs (including attorney fees), liability or damages of any. kind or nature vhatsoever, for personal injury and. property damage arising from the Applicant's early commencement of construction and the vork undertaken or completed. . 11. The terms of this Agreement shall extend to and be binding upon the parties heret~ and their heirs, successors and assigns. 12. If .any suit, action or other pro.ceeding, .or. an appeal t'herefrom, is instituted to obtain, establish, enforce, or compel any right o~ obligation resulting from this Agreement., the prevailing party shall be enti tIed to recover from the adverse party, in addition to costs and disbursements. such additional sums as the courts, both trial and appellate,may judge reasonable attorney fees. , .. ... Authorization to proceed Agreement Page 4 BEFORE SIGNING THIS AGREEMENT, PLEASE READ AND UNDERSTAND THE MEANING OF EACH PARAGRAPH OF THIS AGREEMENT. IT AFFECTS .YOUR INTERESTS IN THE PROPERTY AND, IN THE EVENT OF. DEFAULT, IT PLACES YOU PERSONALLY AT RISK AND. THE SUBJECT PROPERTY AT RISK OF FORECLOSURE . FOR COSTS AND E~ENSES INCURRED BY THE CITY IN ENFORCING THE TERMS OF THIS' AGREEMENT. IN THE EVENT THAT YOU DO NOT UNDERSTAND ANY TERMS OR CONDITIONS OF THIS AGREEMENT, PLEASE SEEK ANY LEGAL OR OUTSIDE OPINIONS YOU MAY DESIRE. f city of Springfield By: at A/J ~~~. Building Official APPLICANT .contractor__' ~~^ CITY Business Name Address..~.\)~ ~ CC Registration # ~~~ };.MID/PROPERTY uw".o.RfS). I/WE HAVE READ THE ABOVE AUTHORIZATION TO PROCEED AGREEMENT. I/WE. UNDERSTAND WHAT IT EXPRESSES AND THE RESPONSIBILITIES IT PLACES UPON US AS THE LAND/PROPERTY OWNERS.. I/WE AGREE TO BE BOUND BY ALL TERMS AND CONDITIONS OF THE AGREEMENT. '~' Name ~~~ Address ~, ~ ' ~. . VALIDATION: DATE PAID (\~\\~~ o 3ss [,. q/i5/rr CITY JOB # I<ECEIPT NUMBER AMOUNT RECEIVED I \"J . RECEIVED BY d tJJ , .. ... .' EXHIBIT A. Purpose The purpose of this agreement is to allov'certa.in development improvements to occur prior to obtaining plan reviev approval from the Springfield Communi ty Services Division. Scope The use of this agreement shall be limited to certain one and tvo-family dvellings not complex in nature as determined by ttie Building Official and minor alterat.ions or modifications to existing commercial and industrial buildings vhich are of a non-structural"type and do not adversely affect any' structural.member of the building or any part of the building having fire resistant construction. One'and tvo-family dwelling plans for structures that are complex in nature that have been prepared by an Oregon licensed architect or engineer and accompanied. by a letter of reviev prepared by said architect or engineer, stating that- the. submitted material is in. compliance. vith the One and Tvo-Family OIIelling Specialty Code, may be considered eligible for this agreement. The folloving items include but are not limited to certain conaitions of development identified as ineligible for this agreement: a) development requiring site approval vhichhas not been obtained; b) nev development located on land vith over six-percent slope; c) lots having expansive (clay) soil; d) development located vithin flood hazard areas; e) development located vithin vetland areas; f) pole buildings or other such type of structure that is nqt of conventional construction. .J .. .. EXHIBIT B Required Inspections To request an inspection, you must call 726-3769. All inspections requested before 7:00 a.m. will be Inspections requested after 7:00a.m. will be made V-Temporary Electric This is a 24 hour recording. made the same working day, the following work day. Site - To be made after excavation, but prior to setting forms ~ Footing - After trenches are excavated ~ Foundation - After forms are erected but prior to concrete placement ~ Underfloor Plumbing.- Prior to filling trench ~ Underfloor Mechanical - Prior to insulation or . decking . ~ Post & Beam - Prior to floor insulation or decking . ~ Underfloor Insulation - Prior to decking . ~ Sanitary Sewer - Prior to filling trench ~ Storm Sewer - Prior to filling trench ~ Water'Line.- Prior. to. ~iliing trench ....