HomeMy WebLinkAboutPermit Curb Cut 1993-3-12
,0
.. RES I D', . T I A L · .
APPLICATION/PERMIT
225 North 5th Street
Springfield, Oregon 97477
Building Division
726-3753
Rece-:.pt # J (p~ LI0
.
Job Location: ) ') l-/ (lp ~.J ~./
As~essors Map # \ r)()38~~ ~ T= Lot # ()~c:aJ
lA&~
~
Subdivision:
Ol.mer:
(' ~ If). ^ P..I L)j J ~(A (J.; n vJ-&vV
, , I
O~~
Add:roess:
\JW
S-rQld
City:
N!?1J
Phone:
'7~{,., -':111 ~
0/Y7~
Zip:
Describe fiorl<:
Addi ticn
').. he(, CD, V- ~~~~
Remodel
Mobile Home
Date of Applicaticn
Contractors
, General
!Plumbing
i Hechanical
E~ectri.cal
Value
N\~
Signed:
Date:
~8
3) I?--
Address Lisc. # Bldrs Board R~g.
l )\ /~ \- 1:t-, '\'1, P,C.fJ-n'f. l~
-"MA"'-"'- \,..d~ 'rl",l.rtv-.<..--r \.P cA.J) <..- (',1-(1;:
0'
Expires
}. J n JOJ{)
Phnnp
Supe~~~ug Electr~cian
It is the l'esponsibiZity of the permit holdezo to see that all inspections are made at the proper time, that each ~ess is readaDZe
fI'01Tl the street, and that the permit card is located at the front of the property.
*Bui!ding Divicion approved plan shall remain on tha Building Sits at all times.
PROCEDURE FOR INSPECTION REQUEST:CALL 726-3769 (recorder) state your City designated joc nw:-;ber, job ad6>ess, type of inspection
requested ar.d when you will be ready for inspection, Contractors or Ol.mers ~e and phone number. Requests received cefore 7:00 ~
"-'ill be made the same day, requests made after 7:00 am will b3 made the next :uorking day.
Reauiped Insoectiens
O SITE INSPECTION: To be made after
excavation, but prier to set up of
forms.
~ UNDERSLAB PLUMBING. ELECTRICAL &
---1 'MECHANICAL: To be made before any
work is covered.
o
FOOTING & FOUNDATION: To be made
after trenches are excavated and
forms are erected, but prior to
pouring concret.:::.
UNDERGROUND PLUMBING. SEWER. W.4TER.
DRAINAGE: To be made prior to fiZ-
Zir.g trenches.
o
o
D
UNDERFLOOR PLUMBING & MECHANICAL.:
To be made prior to installation of
iZoor insuLation or decking.
POST AND BEAM: To be made prior to
installation of floor insulation or
decki7l{j .
ROUGH PLUMBING. ELECTRICAL & MECH-
ANICAL: No work is to be cOllered
,ur.til these inspections have beer.
made and approved, '
FI~EPLACE: Prior to placir.g facing
materials and before framing inspec-
tion.
F~~!ING: Must be requested after
approval of rough plwrhing, alectri-
cal & mechanical. All roofing
bracing & chimneys, etc. must be
. completed. tlo work is to be con-
" cealed until this inspection has
'been made and approved,
o
D
Your City Desigr4ted Job Number Is:
O INSULATION/VAPOR BARRIER INSPECTION:
To be made after all insulation Qr4
, " required vapor carriers are in place
, ., but cefore any lath, gypsum board or
wall covering is applied, and before
'any insulation is concealed.
--, DRYWALL INSPECTION: To be made
.--J after aU drywaU is in place,
but prior to any taping.
O MASONRY: Steel location, bond
beams, grouting or verticals in
accordance with U.B.C. Section
2415.
D WOODSTOVE: After installation is
completed.
D CURB & APPROACH APRON: After>, forms
are erected but prior to pouring
concrete.
r:::vs-IDEWALK &(DRIl'EWAY~ For all con-
~ orete pavi~within street right-
of-ux:.y, to be made after all exca-
vating complete & form work & sub-
base material in pla::Je.
D
PENCE: When complete -- Provide
gates or movable sections through
P.U.E.
OJ fJo :::>_~
, DEMOLITION OR MOVED BUILDINGS
:=J Sanitary S8'..)er capped at pz:.operty Une
~ Septic tank lT~ed and fillad with gra~el
--, Final - f,Then above items are completed
.--J ar.d when demolition is complete or stru::J-
ture moved and premises ::Jleaned up.
Mobile Homes
o
:J Blocking and Set-up
:J Plumbing connections -- sewer and water
~ Electrical Connection - Blocking, set-u?
---l and plumbing connections m"~st ce approved
before requesting electrical inspection
~ Accesso1"',j Bui lding
--, Final - After porches, skirting, decks,
~ etc. are completed.
D
All project conditions, such as the installation of street trees, c~"pletion of the
required landscaping, etc., must be satisfied before the BUILDING FINAL oan be raquestad,
o FIlIAl, PLUMBING
D FIliAL MECHANICAL
o PINAl, ELECTRICAL
[J
o
FINAL BUILDING: The Final Building Inspection must be requested after the Final Plumbing
Electrical, and Mechar..ical Inspections have been made and approved.
*ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE, ADJUSTNENT TO BE !,MDE AT NO COST TO CITY Page of 2
I'JOB NO.
I Zone:
Lot Sq. Ftg.
% af lot CQVerag~
# of Stories
Total Height
Topography
ITEM
I Main
I Garaae
I Carport
I AccessorlJ
SQ. FTG '
Is.D.c.
TOTAL VALUE
(vaLue)
1.5 x
Building Permit
State SUI'chcrt'ge
Total Charogea
ITEM
Fi:::tu:r>es
I Residential (1 bath)
Sani tary Sewer
Water
Plumbing Permit
State SUI'cr.arge
Total Charaes
, ITEM
Res. Sa. fta.
I Naw/Extend Circui ts
I Terrrporcrt'y Service
Ele~trical Permit
State SUI'a'l7aI'qe
Total Charqes
ITEM
Furnace PTU' S
I E:::haust Hood
I Vent Fan
I '
, I Woodstove
I
Permit Issuance
Meahanical Permit
State SUI'charae
Total Charaes
-- ENCROACHMENT --
Se~~ritlJ Deposit
I Storage
I Maintena~e
I Permit
I Total Charqes
I Curbcut
I Sidawalk
IJ- \
Penae
Electrical Label
I Mobile Harne
I
TOT,1L Al,fOUNT DUE: *
t'!1ge 6
L - CO G~
SOL A RAe C E S S R E Q.-
Occupancy Gz
LOT TYPE
NO.
FEE
NO.
FEE
, I
NO.
FEE
Interior -
Corner
Panhandle
Cul-de-sac
x
Value
CHARGE
CHARGE
"
ClIAReE
I~. L.J LJ
r3~ *
Type/Const:
Bedrooms:
Lot Faces -
I I Enera,1.I Sources
I I Heat
Access. I I Water Heater
I Range
Fireplace
Wood3tove
T1fDe
I P.L.
Narth
, East
South
Tlest
S<<tbacks
I HoUse Carage
I
I
II
Fees
Building Value & Permit
This permit is granted on the express condition that the said construction
shall, in all respects, conform to the Ordinance adopted by the City of
Springfield, induding the Zoning Crdinance, , regulating the construction
and use of buildings, and may be suspended or revoked at any time upon vio-
lation of any provisions of said Ordinances.
*
*
Plan Check Fee:
Date Paid:
Receipt #:
I Signed:
Plumbing Permit
No person shall construct, install, alter or change any new or existing
plumbing or drainage system in whole or in pcrt't, unless such person is the
legal possessor of a valid plumber's license, except that a person may do
plumbing work to property which is owned, leased 01' operated by the appli-
cant.
I *
Electrical Permi t
Where State Law requires tr~t the electrical work be done by an Eleatrical
Contractor, the electrical portion of this permit shall not be valid until
the Zabel has been signed by the Electrical Contractor.
I *
Mechanical Permit
*
Plan Examiner
vate
I HAVE CAREFULLY EXA1'fINED the completed application for permit, and do
hereby certify that all information hereon is true and correct, and I
further certify that any ar~ all work performed shall be done in accor-
dance with the Ordinances of the City of Springfield, and th~ LQ".;}s of the
* State of Oregan pertaining to the work described herein, and that NO OCCU-
PANCY will be made of any structure without permission of the Building Di-
vision. I further certify that only contractors ar~ enployees who crt'e in
compliance with ORS 701.055 will be used on this project
x (;La~ a~
I Signed
3/~/ro
Date
, . .
S.D.P.P. #T-4.la
APPLICATION FOR A SECOND DRIVEWAY
c ~
.~~' :~ //0' 0/)
, DI:\ I t. ~.,' ~ / / ,/Cj c
APPLI(ANT (PROPERTY OWNER):
{II jM~ /e.5 /nJ ('(..1 S O./c- tJ0-z l/i () ..u:5!/(/
AD9RESS OF APPLICANT: 17,y/7-/hl/f.. /0/c--,
, ADDRESS OF, PROPERTY FOR 2ND DRIVEWAY: 17/./' ~~tf-/Ie-,V1 ;4vc::- r'
FEB2p 1990
, '
APPLICANT'S TELEPHONE NO. :
/7 ,j/ - '/' rY
/ ~--tc-' ......... ;;z..,./ 6
The following conditions must be answered affirmatively in order for this
application to be considered for approval:
(~
1). Property is either a single family residence or duplex. YES ''I.. NO
2). The pro~o~ed driveway will take direct access from a minor street
(not a collector or arteri al street). YESX NO
3). The driveway will have a minimum setback of 30 feet from the
curb return of an,i ntersecti on (for corner lots). YES ~ NO
4). The proposed driveway (parking area) must have a minimum depth of
20 feet b~iween the front property line and the garage, carport,
fence or wall, if any (identical to setback for garage).
Y ES')( NO .- ' '. ,- '
5)' .
~ - ,/ .
The. .s'econd~ driveway must have di rect access to a garage, carport,
rear yard or t'he side:yard \..,rhefe the vehicle, trailer or boat
I , '
will be stored. YES-4t NQ \, .
If the vehicle, trailer or boat is to be parked/stored in the side
yard, there must be a minimum setback of 5 feet between the stored'
vehicle and the side property line. This setback is for fire
fighting access and to comply with the intent of the zonin~ code.
Setback sati sfi ed YES X NO
6) .
7).
The proposed,p~rking/storage area must not create a vision
obstruction to ~djacent property driveways or to any vehicular
movement on a publ ic street. Satisfied YES \~ NO
,",
Applica~t hereby agrees t6install the requested driveway to City of Springfield
standards. The applicant further agrees to have 6" of concrete in the sidewalk
~rea adjacent to the proposed driveway and further agrees to pave the area
behind the back edge of the sidewalk adjacent to the driveway with a minimum
depth of 3" of asphaltic concrete or with a minimum depth of 6" of portland
cement ~oncr~te. The a~eabehind the sidewalk shall be paved to the property
"lirie o~ for a distance ~f 4 feet whi~h ever,i~ ~re~ter. '
c "
, ,
The ~p~iicant,agrees that if he/she does ~ot Pave the area behind the sidewAl,k
within 30 days of cutting the curb opening, the City of Sp'ringfield has the'
authority to cl osethedri veway access by the removal of the curb cut. All
incurred costs shallbea~sumed by the applicant and if unpaid, said cost
shall become a lien of the Property.,
-2-
~ I <,r
S.O.P.P. #T-4.la
~ .. -
, when, this application is approved by the City, the applicant (property owner)
, :' ..,---~_--:-_c:-::-,_"mus t,obta in a dciyevl.ay permi t Jrom the Pyb 1 i c J~o.rks Depa rtment Bu il ding
'<:~- 'Divis i oh. ,,- ", " '-
. . \ \
PE ~;'lll HE
a. On an',improved street (existing curb):
$1.2.00 plus 1.2~per lineal foot of curb cut.
b.,On'an';'unimproved street (not curbed): $12.00:'
-,'. \
"
c., "On', currently' unimproved . streets that are under-
construction: $12.00.
'PROPERTY OWNER'S SIGNATURE:
DATE: d?.;),FhD
qtY.(, 41/ i a~~
./
, APPROVED BY:
~iL2
TRAFFICVDIVIS'ION
DATE: ZIZ-A /40' " t':2C
BUILDING tERM:T N?.:..:.:,.: _q m8r) .
_ DATE: 6.jJ 'b.HCL
'-
-. ..--'.._--- ---.-,- --._,
,TRA 9-1 "
-.... ;
ATTACHi>1ENT: City of Springfield Standard Drawing No. 3-11
Dated 10/8/82'
"
" ":-'-