Loading...
HomeMy WebLinkAboutPermit Building 1996-4-26 I ~~i,,@,(~t.L:tI''''.'/;~~~'41 f Page 1 RESIDENTIAL PERMIT APPLICATION CITY OF SPRINGFIELD COMMUNITY SERVICES DIVISION BUILDING SAFETY Job Number: 960452 225 North Fifth Street Springfield, OR 97477 Office: 726-3759 Inspection Line: 726-3769 Location of Proposed Work: 3932 ALCONA ST Assessors Map #: 17023144 Lot: 3 Block: Tax Lot #: 00903 Subdivision: 95-P0652 Owner: MR/MRS COLE Address: 639 C STREET Phone #: 746-3867 City/State/Zip: SPRINGFIELD, OREGON 97477 Describe Work: S.F. RESIDENCE NEW Contractor Const. Contractor # Expires Phone General: DON DILL 0104732 PO BOX 772 COTTAGE GROVE OR 9742400 Plumbing: BMC MECHANICAL 0103570 648 W Oregon Ave Creswell OR 974260 Electrical: BILLS 0021351 3170 W 11th Eugene OR 974020000 02/27/97 915-5055 12/15/96 895-4575 04/28/96 687-1851 ~. QUAD AREA: 3RSC # OF UNITS: 1 CONSTR. TYPE: VN WATER HEATER: E SQ FOOTAGE: 1296 OFFICE USE -- LAND USE: 1111 ZONING CODE: LDR # OF BDRMS: 2 RANGE: E # OF BLDGS: 1 OCCY GROUP: R3 HEAT SOURCE: WH INSUL PATH: P1 To request an inspection, call the 24'hour recording at 726-3769. All inspections requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following work day. REQUIRED INSPECTIONS --- FOOTING - After trenches are excavated. FOUNDATION - After forms are erected but prior to concrete placement. UNDERFLOOR PLUMBING - Prior to insulation or decking. POST AND BEAM - Prior to floor insulation or decking. INSULATION - Floor; prior to decking Wall/Ceiling; Prior to cover SANITARY SEWER LINE - Prior to filling trench. STORM SEWER LINE - Prior to filling trench. WATER LINE - Prior to filling trench. ROUGH PLUMBING - Prior to cover. ROUGH MECHANICAL - Prior to cover. ROUGH ELECTRICAL - Prior to cover. ELECTRICAL SERVICE - Must be approved to obtain permanent power. FRAMING - Prior to cover. INSULATION - Floor; prior to decking Wall/Ceiling; Prior to cover DRYWALL - Prior to taping. CURB CUT - After forms are erected but prior to placement of concrete. SIDEWALK - After excavation is complete, forms and sub-base material in place. FINAL PLUMBING - When all plumbing work is complete. FINAL MECHANICAL - When all mechanical work is complete. FINAL ELECTRICAL - When all electrical work is complete. FINAL BUILDING - When all requir~d inspections have been approved and the building is complete. SPA'NGFOELD ~." ___~llll---" .... 1I1fn~'li-rJI':'I'Jt.)rl=l'it~)~"t a...aJ . Job Number: 960452 Page 2 Lot Faces: S Setbk From NPL: 50 Lot Sq. Ft.: 4994 Solar Approved: Y Total Height: 17 Lot Type: INTERIOR House Garage N 32 Setbacks S W 30 13 20 E 7 7 Item Main Garage Total Value BUILDING PERMIT --- Square Feet x 1056 240 $/Square Feet 64.66 16.27 Value 68,281. 00 3,905.00 72,186.00 Building Permit Fee Surcharge/Admin 352.00 28.16 TOTAL FEE (A) 380.16 --- SYSTEMS DEVELOPMENT CHARGE (SDC) --- (B) 1,578.46 Systems Development Charge is due on all undeveloped properties within the City limits and the Citys Urban Growth Boundry which are being improved. PLUMBING PERMIT --- Item Fixtures 1 Fee 91.20 Plumbing Permit Surcharge/Admin 91. 20 7.30 TOTAL CHARGE (C) 98.50 --- MECHANICAL PERMIT --- Exhaust Hood Dryer Vent 4.50 3.00 Mechanical Permit Issuance Surcharge/Admin 15.00 10.00 1.20 TOTAL PERMIT (D) 26.20 --- MISCELLANEOUS PERMITS --- Surcharge/Admin Sidewalk Curb Cut WILLAMALANE SDC ELECTRICAL PERMIT 0.00 13.60 13.60 1,000.00 108.00 TOTAL MISCELLANEOUS PERMITS (E) 1,135.20 (Excluding Electrical) unless otherwise noted TOTAL AMOUNT DUE (A, B, C, D, and E combined) 3,218.52 ~M~ 6"'Cecr. '/1. "1,~ 12t:t"/.7:< Job Number: 960452 Page 3 --- BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT --- This permit is granted on the express condition that the said construction shall, in all respects, conform to the Ordinance adopted by the City of Springfield, including the Development Code, regulating the construction and use of buildings, and may be suspended or revoked at any time upon violation of any provisions of said ordinances. Plan Check Fee: 228.80 Date Paid: 04/02/96 Received By: LORNE PLEGER Plans Reviewed By: BOB BARNHART Date: 04/12/96 Building Site Reviewed By: LISA HOPPER Receipt Number: 20930 --- ADDITIONAL COMMENTS --- DRIVEWAY REQUIRED TO BE PAVED 2 STREET TREES REQUIRED By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit ca i located at the front of the property, and the approved set of plans w' .1 jemain on ~ ~i7 /1 all times during construction. ~ J-'A -zJJ~ L/-;( C -/k 1/...- ~ v - ; S~gnature Date --- VALIDATION Date Paid: 2/2~? r'~;;?h~9~ 3'26/. /-<.. r..... co . Receipt Number: Amount Received: Received By: