Loading...
HomeMy WebLinkAboutNotes, Meeting PLANNER 5/31/2011 f# - Sims Metal Management 3600 Commercial Ave. Map: 17023113 Lots: 600-700-800-900 DeveloDment Issues Meetine: 3 Questions: 1. What development factors trigger an automatic site plan review? 2. What is the current average time frame for site plan approval? 3. What is the largest electrical line distribution voltage in the area (not including a sub- station I? A. Dw P r ~ J,y.e.(J , DeveloDment Summary 'i. Wa-J.) Q tu be r"'-quivc.J +:u AvID <...<.Jl'e &0(j ? Lots 600 and 700 of 3600 Commercial Ave. are developed with asphalt surface, multiple structures and storm water collection and run off system. Lots 800 and 900 are not developed, with a ground surface of compacted gravel and piled fill. Sims Metal Management proposes the following development of lots 800 and 900: "Total development area for lots 800 and 900 equal 3.41 acres. . Installation of impermeable surface, concrete and/or asphalt, in their entirety. . Installation of storm water collection and run off system, to be tied in with existing system if feasible. . Installation of storm water treatment equipment. . Installation of scrap metal shredder. . Possible new electrical utility service (size T6D) Sims Metal Management proposes the following for lots 600 and 700: . Installation of 75' truck scale I Installation of nonferrous metal baler . Date Received: MAY 3 12011 Original Submittal