HomeMy WebLinkAboutBuilding Miscellaneous 1996-8-19
SPRINOFIELD
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE
(RESIDENTIAL)
Name or Company: gqrpRE B HOMES
Location: ~RIVER KNOLL WAY
Developement Type: R Building Size:
Job No,: 961124
Lot Size:
1. STORM DRAINAGE
Impervious Sq Ft
2732
x
0.216
Per Sq Ft
2. SANITARY SEWER - CITY
Number Of PFUs 25
(see Page 2)
x
44.75
Per PFU
3. TRANSPORTATION
Number Of Units
1 X
X Trip Rate
1. 010 X
X
Cost Per Trip
451.26
$455.77
Transportation Total
4. SANITARY SEWER - MWMC
Number Of PFUs
25
x
X
Per PFU
20.690
+ MWMC Admin Fee
+ 10,00
MWMC CREDIT If Applicable (see Page 2)
TOTAL - MWMC SDC
SUBTOTAL - (Add Items 1, 2, 3 & 4)
5. ADMINISTRATIVE FEES
Base Charge (Subtotal Above) X
0.50
TOTAL SDC
Reviewed By: TROY MCALLISTER
Date: 08/19/96
Page 1
Sq Ft
$590,11
$1,118.75
$455,77
$527,25
$0.00
$527,25
$2,691. 88
$134.59
$2,826.48
~.
SPRINGFIELD
Job Number: 961124
FIXTURE UNIT CALCULATION TABLE
Page 2
Fixture Type
Bathtub
Drinking Fountain
Floor Drain
Interceptors For Grease/Oil/Solids/Etc
Inteceptors For Sand/Auto Wash/Etc
Laundry Tub/Clotheswasher
Clotheswasher - 3 Or More
Receptor For Refrigerator/water Station/Etc
Receptor for Commercial SinkjDishwasher/Etc
Shower, Single Stall
Shower, Gang
Sink, Bar, Commercial, Residential Kitchen
Urinal, Stall/Wall
Wash Basin/Lavatory, Single
Water Closet, Public Installation
Water Closet, Private
Miscellaneous
TOTAL FIXTURE UNITS
Number of
New Fixture
Unit
Equivalent
Fixture
Units
2
o
o
o
o
1
o
o
o
1
o
1
o
3
o
3
o
2
1
2
3
6
2
6
1
3
2
4
o
o
o
o
2
o
o
o
2
o
2
o
3
o
12
o
2
2
1
6
4
25
CREDIT CALCULATION TABLE: Based on assessed value. If improvements occured
after annexation date, credits are calculated separately.
(calculations are by $1000)
Year Annexed:
Credit For Parcel Or Land Only If Applicable:
Improvement (if after annexation date) :
o
X
0.00
0.00
o
X
0.00
0.00
CREDIT TOTAL =
$0.00
(If land value is multiplied by 1 then the parcel/land credit is not accurate.)