Loading...
HomeMy WebLinkAboutBuilding Miscellaneous 1996-8-19 SPRINOFIELD CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE (RESIDENTIAL) Name or Company: gqrpRE B HOMES Location: ~RIVER KNOLL WAY Developement Type: R Building Size: Job No,: 961124 Lot Size: 1. STORM DRAINAGE Impervious Sq Ft 2732 x 0.216 Per Sq Ft 2. SANITARY SEWER - CITY Number Of PFUs 25 (see Page 2) x 44.75 Per PFU 3. TRANSPORTATION Number Of Units 1 X X Trip Rate 1. 010 X X Cost Per Trip 451.26 $455.77 Transportation Total 4. SANITARY SEWER - MWMC Number Of PFUs 25 x X Per PFU 20.690 + MWMC Admin Fee + 10,00 MWMC CREDIT If Applicable (see Page 2) TOTAL - MWMC SDC SUBTOTAL - (Add Items 1, 2, 3 & 4) 5. ADMINISTRATIVE FEES Base Charge (Subtotal Above) X 0.50 TOTAL SDC Reviewed By: TROY MCALLISTER Date: 08/19/96 Page 1 Sq Ft $590,11 $1,118.75 $455,77 $527,25 $0.00 $527,25 $2,691. 88 $134.59 $2,826.48 ~. SPRINGFIELD Job Number: 961124 FIXTURE UNIT CALCULATION TABLE Page 2 Fixture Type Bathtub Drinking Fountain Floor Drain Interceptors For Grease/Oil/Solids/Etc Inteceptors For Sand/Auto Wash/Etc Laundry Tub/Clotheswasher Clotheswasher - 3 Or More Receptor For Refrigerator/water Station/Etc Receptor for Commercial SinkjDishwasher/Etc Shower, Single Stall Shower, Gang Sink, Bar, Commercial, Residential Kitchen Urinal, Stall/Wall Wash Basin/Lavatory, Single Water Closet, Public Installation Water Closet, Private Miscellaneous TOTAL FIXTURE UNITS Number of New Fixture Unit Equivalent Fixture Units 2 o o o o 1 o o o 1 o 1 o 3 o 3 o 2 1 2 3 6 2 6 1 3 2 4 o o o o 2 o o o 2 o 2 o 3 o 12 o 2 2 1 6 4 25 CREDIT CALCULATION TABLE: Based on assessed value. If improvements occured after annexation date, credits are calculated separately. (calculations are by $1000) Year Annexed: Credit For Parcel Or Land Only If Applicable: Improvement (if after annexation date) : o X 0.00 0.00 o X 0.00 0.00 CREDIT TOTAL = $0.00 (If land value is multiplied by 1 then the parcel/land credit is not accurate.)