HomeMy WebLinkAboutPermit Plumbing 1996-9-13
-~
SPRINGFIELD
=/1,,' -.~" ,--,,~,. ',.....
II JI
Page 1
COMMERCIAL/INDUSTRIAL PERMIT APPLICATION
CITY OF SPRINGFIELD Job Number: 961248
COMMUNITY SERVICES DIVISION
BUILDING SAFETY
225 North Fifth Street
Springfield, OR 97477
Office: 726-3759
Inspection Line: 726-3769
Location of Proposed Work: 107 W Q ST
Assessors Map #: 17032632
Tax Lot #: 00100
Owner:oJu.........,. DV1'ivnoJ:Ii'. Ju It' l.::bY\O roe-- Phone #: 689-1381
Address: 1873 PIONEER PARKWAY E City/State/Zip: SPRINGFIELD, OREGON 97477
Description Of Work: ALLSTATE OFFICE BLDG
NEW
Value:
0.00
Contractor
Const.
Contractor #
Expires
Phone
General:
FRANK BLAIN JR 0000367
770 Sand Ave Eugene OR 974010000
09/17/97
345-7449
--- PLUMBING---
No.
13
Fee
Charge
130,00
55,00
40.00
40,00
10,00
Single Fixture
Sanitary Sewer
Water Service
Storm Sewer
BACKFLOW DEVICE
231
108
145
ft,
ft,
ft,
TOTAL PERMIT
275.00
--- MECHANICAL ---
No,
Fee
Charge
18.00
4,50
12.00
10,00
4
Furnace/burner & vent < 1000,000 BTUs
Mechanical exhaust hood and duct
Vent Fan/Single Duct
Permit Issuance
TOTAL PERMIT
44.50
HANDICAP ACCESS: Y
# OF BLDGS: 1
-- OFFICE USE
QUAD AREA: 1 CNW
ZONING CODE: CC
LAND USE: 5300
Item
Sq, Ftg'Main
Square Feet
3992
x
$/Square Feet
Value
235,107,00
TOTAL VALUE OF PROJECT
235,107.00
Plan Check Fee:
588,58 Rec #: 23187 Date: 09/13/96 Rec By: DON MOORE
BUILDING
SurCharge/Admin
739.00
59,12
SPRINGFIELD
,.,' ':'1 i "-'. '~:J..Jf"'.~l-
11,111,,1.
Job Number: 961248
Page 2
MECHANICAL
Surcharge/Admin
PAVING VALUE
PLUMBING
Surcharge/Admin
SIDEWALK
CURB CUT
CREDIT FOR PLAN
REVIEW OVERPAY
SEWER CONNECTION
22,325.00
44,50
2.77
158,50
275,00
22.00
35.50
16,00
0,00
-108.23
5.00
SUBTOTAL PERMITS
SYSTEMS DEVELOPMENT
1,249.16
8 , 916 . 16
TOTAL PERMIT FEES EXCLUDING ELECTRICAL
10,165.32
REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are
made at the proper time, To request an inspection, call 726-3769
(recorder), state your City designated job number, job address, type of
inspection requested and when you will be ready for inspection. Requests
received before 7:00 a,m, will be made the same working day, requests made after
7:00 a.m will be made the following work day,
Special Inspections: In accordance with
a special inspector shall be employed by
construction of any following "*" work,
shall be furnished to Building Safety,
Section 306 of the State Specialty Code
the Owner/Contractor during
A copy of the special testing reports
In addition to the inspections specified, the Building Official may make or
require other inspections of any construction work to ensure compliance with
the Building, City or Development Code,
FOOTING - After trenches are excavated.
FOUNDATION - After forms are erected but prior to concrete placement.
POST AND BEAM - Prior to floor insulation or decking.
WATER LINE - Prior to filling trench.
SANITARY SEWER LINE - Prior to filling trench.
STORM SEWER LINE - Prior to filling trench.
UNDERGROUND ELECTRICAL - Prior to Cover,
ROUGH PLUMBING - Prior to cover,
ROUGH MECHANICAL - Prior to cover.
TEMPORARY POWER
ROUGH ELECTRICAL - Prior to cover,
ELECTRICAL SERVICE - Must be approved to obtain permanent power,
FRAMING - Prior to cover,
INSULATION - Floor; prior to decking Wall/Ceiling; Prior to cover
DRYWALL - Prior to taping,
FINAL PLUMBING - When all plumbing work is complete.
FINAL MECHANICAL - When all mechanical work is complete,
FINAL ELECTRICAL - When all electrical work is complete.
INSUL-V,B,/SUB: TO BE CALLED FOR AT SAME TIME AS SUB FRAMING INSPECT
MECH/SUB: FOLLOWING ROUGH MECHANICAL APPROVAL, PRIOR TO COVER
FINAL/SUB
FINAL FIRE - When all Fire Department requirements have been met.
been met.
FINAL SITE PLAN - After all requirements have been met for Minimum
Development Standards or from the Development Agreement.
SPRINGFIELD
:/1'~.Jrlh.J~
Job Number: 961248
Page 3
FINAL BUILDING - When all required inspections have been approved and
the building is complete.
--- ADDITIONAL COMMENTS ---
DRC 96-09-176, PLANNER IS JULIA POWELL
DEVELOPMENT COORDINATION REVIEW JOURNAL 96-09-176, JULIA POWELL HAJDUK, PLANNER
Plans Reviewed By: LORNE PLEGER Date: 10/24/96
Building Site Reviewed By: LISA HOPPER
By signature, I state and agree, that I have carefully examined the completed
application and do hereby certify that all information hereon is true and
correct, and I further certify that any and all work performed shall be done
in accordance with the Ordinances of the City of Springfield, and the Laws
of the State of Oregon pertaining to the work described herein, and that
NO OCCUPANCY will be made of any structure without permission of the
Community Services Division, Building Safety. I further certify that only
contractors and employees who are in compliance with ORS 701,055 will be
used on this project,
I further ag~ sure
proper yme:- that pro] ct
permi~ card is located at,
0" lans will
y
L/
that all required ins at the
address is re e from the street, that the
e f nt tHe property, and the approved set
site a 1 imes-=::nstW:l_1-91
te
I
~
--- VALIDATION
Date Paid:
2f/ If f;Y
v0(~q1
g() ~L05'. 31-
\l~_
Receipt Number:
Amount Received:
Received By:
SPRINGFIELD
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE
(COMMERCIAL / INDUSTRIAL)
Name or Company: JULIE DONOHUE
Location: 107 W Q ST
Developement Type: C Building Size:
1. STORM DRAINAGE
Impervious Sq Ft 1,0 X 14280
X
0.216
2. SANITARY SEWER - CITY
Number Of PFUs 1,0 ,X 25
(see Page 2)'
X
44,75
3. TRANSPORTATION
Number Of Units
1.0 X 3,990 X
Job No.: 961248,
Lot Size:
Per Sq Ft
Per PFU
X
Cost Per Trip
451,26
$4,033,18
X Trip Rate
2 . 240 X
, Transportation Total
4. SANITARY SEWER - MWMC
Number Of PFUs
25
X
X
Per PFU +
20.690 t
MWMC CREDIT If Applicable (see Page 2)
TOTAL - MWMC SDC
SUBTOTAL - (Add Items 1, 2, 3 & 4)
5. ADMINISTRATIVE FEES
Base Charge (Subtotal Above) X
0,50
TOTAL SDC
Reviewed By: TROY MCALLISTER
MWMC Admin Fee
10,00
Date: 01/10/97
Page 1
Sq Ft
$3,084.48
$1,118,75
$4,033,18
$527.25
$272,08
$255.17
$8,491. 58
$424.58
$8,916.16
SPRINGFIELD
~-
Job Number:' 961248
FIXTURE UNIT CALCULATION TABLE
Fixture Type
Bathtub
Drinking Fountain
Floor Drain
Interceptors For Grease/Oil/Solids/Etc
Inteceptors For Sand/Auto Wash/Etc
Laundry Tub/Clotheswasher
Clotheswasher - 3 Or More
Receptor For Refrigerator/Water Station/Etc
Receptor for Commercial Sink/Dishwasher/Etc
Shower, Single Stall
Shower, Gang
Sink, Bar, Commercial, Residential Kitchen
Urinal, Stall/Wall
Wash Basin/Lavatory, Single
Water Closet, Public Installation
Water Closet, Private
Miscellaneous,
Number of
New Fixture
o
o
o
o
o
o
o
o
o
1
o
1
o
3
3
o
o
Unit
Equivalent
2
1
2
3
6
2
6
1
3
2
2
2
1
6
4
Page 2
Fixture
Units
o
.0
o
o
o
o
o
o
o
2
o
2
o
3
18
o
o
TOTAL FIXTURE UNITS 25
CREDIT CALCULATION TABLE: Based on assessed value. If improvements occured
after annexation date, credits are calculated separately,
(calculations are by $1000)
Year Annexed: 1973
Credit For Parcel Or Land Only If Applicable:
Improvement (if after annexation date) ;
78,410
X
3.47
o
X
3,47
272,08
0,00
$272.08
(If land value is multiplied by 1 then the parcel/land credit is not accurate.)
CREDIT TOTAL =
SPRINGFIELD
Page 1
ENGINEERING DIVISION DEVELOPMENT PLAN REVIEW
RESIDENTIAL IMPROVED STREET
Developer: JULIE DONOHUE
Mail Address: 1873 PIONEER
Tax Lot #: 1703263200100
Subdivision:
Job No.: 961248
PARKWAY E SPRINGFIELD, OREGON 97477Phone #: 689-1381
Project Address: 107 W Q ST
Lot: Blk : Eng, Rev, No.: Book:
Street Gravel Ac Mat
107 W Q ST
EXISTING IMPROVEMENTS
Curb Full Imp SW Width Curbside
Setback
Y
5 FEET
12:1 FLAIRS
PIONEER PARKWAY
Y
5 FEET
x
Existing Curbcut: N
ENGINEERING REQUIREMENTS
Additional Right of Way: N
Improvement Agreement: N
Easements: Y Where: SEE LAND USE DECISION (96-09-176)
COMMENTS: COMPLY WITH LAND USE DECISION 96-09-176
SANITARY SEWER
CALL THE UTILITIES NOTIFICATION CENTER BEFORE YOU DIG 1-800-332-2344
Available: Y
Location From N, S, E, W Property Line: AS SHOWN ON DRAWING OR AS-BUILT
Make Connection: PER PLUMBING CODE
Comments: FIELD VERIFY PUBLIC SANTARY SEWER LOCATION (NEED PRIVATE SEASEMENT)
STORM SEWER
Available: Y
Pipe Downspouts And Drains To: DRAINAGE SYSTEM NEAR S.E, CORNER
Pipe Parking Lot Drainage To: GRASS BIO-SWALE (SEE PLAN X-SECTION
Comments: COMPLY WITH LAND USE DECISION
New Curbcut Appr, :
Sidewalk Permit: Y
Curbcut Permit: Y
Handicap Ramp: Y
Comments: RIGHT OUT
SIDEWALK AND DRIVEWAY INFORMATION
Y COMMERCIAL Width: 29 Ft Flairs: 6
Width: 5 Ft Length: 170 Ft
Width: 41 Ft
SEE DRAWINGS
ONLY
Ft
ENCROACHMENT AND ASSESSMENT
Encroachment Permit Required: Y CONTACT ENGINEERING DIVISION AT 726~3753
Sanitary Sewer In Lieu Of Assessment: N
Comments: NEED PUBLIC WORKS PERMIT FOR NEW SANITARY CONNECTION
SPECIAL NOTES AND REQUIREMENTS
All work within the public right of way shall be in conformance with the City
of Springfield standard specifications for construction. All existing unused
curbcuts or portions thereof shall be restored to full curb height as directed
by the City, The owner/developer is responsible to relocate any utilities and
establish private or public easements when the utilities conflict with the
development, at their expense,
Reviewed By: TROY MCALLISTER
Date: 01/10/97
SEE DRAWINGS ON SPECIAL REQUIREMENTS FOR FURTHER IMPORTANT INFORMATION