Loading...
HomeMy WebLinkAboutPermit Plumbing 1996-9-13 -~ SPRINGFIELD =/1,,' -.~" ,--,,~,. ',..... II JI Page 1 COMMERCIAL/INDUSTRIAL PERMIT APPLICATION CITY OF SPRINGFIELD Job Number: 961248 COMMUNITY SERVICES DIVISION BUILDING SAFETY 225 North Fifth Street Springfield, OR 97477 Office: 726-3759 Inspection Line: 726-3769 Location of Proposed Work: 107 W Q ST Assessors Map #: 17032632 Tax Lot #: 00100 Owner:oJu.........,. DV1'ivnoJ:Ii'. Ju It' l.::bY\O roe-- Phone #: 689-1381 Address: 1873 PIONEER PARKWAY E City/State/Zip: SPRINGFIELD, OREGON 97477 Description Of Work: ALLSTATE OFFICE BLDG NEW Value: 0.00 Contractor Const. Contractor # Expires Phone General: FRANK BLAIN JR 0000367 770 Sand Ave Eugene OR 974010000 09/17/97 345-7449 --- PLUMBING--- No. 13 Fee Charge 130,00 55,00 40.00 40,00 10,00 Single Fixture Sanitary Sewer Water Service Storm Sewer BACKFLOW DEVICE 231 108 145 ft, ft, ft, TOTAL PERMIT 275.00 --- MECHANICAL --- No, Fee Charge 18.00 4,50 12.00 10,00 4 Furnace/burner & vent < 1000,000 BTUs Mechanical exhaust hood and duct Vent Fan/Single Duct Permit Issuance TOTAL PERMIT 44.50 HANDICAP ACCESS: Y # OF BLDGS: 1 -- OFFICE USE QUAD AREA: 1 CNW ZONING CODE: CC LAND USE: 5300 Item Sq, Ftg'Main Square Feet 3992 x $/Square Feet Value 235,107,00 TOTAL VALUE OF PROJECT 235,107.00 Plan Check Fee: 588,58 Rec #: 23187 Date: 09/13/96 Rec By: DON MOORE BUILDING SurCharge/Admin 739.00 59,12 SPRINGFIELD ,.,' ':'1 i "-'. '~:J..Jf"'.~l- 11,111,,1. Job Number: 961248 Page 2 MECHANICAL Surcharge/Admin PAVING VALUE PLUMBING Surcharge/Admin SIDEWALK CURB CUT CREDIT FOR PLAN REVIEW OVERPAY SEWER CONNECTION 22,325.00 44,50 2.77 158,50 275,00 22.00 35.50 16,00 0,00 -108.23 5.00 SUBTOTAL PERMITS SYSTEMS DEVELOPMENT 1,249.16 8 , 916 . 16 TOTAL PERMIT FEES EXCLUDING ELECTRICAL 10,165.32 REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time, To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a,m, will be made the same working day, requests made after 7:00 a.m will be made the following work day, Special Inspections: In accordance with a special inspector shall be employed by construction of any following "*" work, shall be furnished to Building Safety, Section 306 of the State Specialty Code the Owner/Contractor during A copy of the special testing reports In addition to the inspections specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code, FOOTING - After trenches are excavated. FOUNDATION - After forms are erected but prior to concrete placement. POST AND BEAM - Prior to floor insulation or decking. WATER LINE - Prior to filling trench. SANITARY SEWER LINE - Prior to filling trench. STORM SEWER LINE - Prior to filling trench. UNDERGROUND ELECTRICAL - Prior to Cover, ROUGH PLUMBING - Prior to cover, ROUGH MECHANICAL - Prior to cover. TEMPORARY POWER ROUGH ELECTRICAL - Prior to cover, ELECTRICAL SERVICE - Must be approved to obtain permanent power, FRAMING - Prior to cover, INSULATION - Floor; prior to decking Wall/Ceiling; Prior to cover DRYWALL - Prior to taping, FINAL PLUMBING - When all plumbing work is complete. FINAL MECHANICAL - When all mechanical work is complete, FINAL ELECTRICAL - When all electrical work is complete. INSUL-V,B,/SUB: TO BE CALLED FOR AT SAME TIME AS SUB FRAMING INSPECT MECH/SUB: FOLLOWING ROUGH MECHANICAL APPROVAL, PRIOR TO COVER FINAL/SUB FINAL FIRE - When all Fire Department requirements have been met. been met. FINAL SITE PLAN - After all requirements have been met for Minimum Development Standards or from the Development Agreement. SPRINGFIELD :/1'~.Jrlh.J~ Job Number: 961248 Page 3 FINAL BUILDING - When all required inspections have been approved and the building is complete. --- ADDITIONAL COMMENTS --- DRC 96-09-176, PLANNER IS JULIA POWELL DEVELOPMENT COORDINATION REVIEW JOURNAL 96-09-176, JULIA POWELL HAJDUK, PLANNER Plans Reviewed By: LORNE PLEGER Date: 10/24/96 Building Site Reviewed By: LISA HOPPER By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701,055 will be used on this project, I further ag~ sure proper yme:- that pro] ct permi~ card is located at, 0" lans will y L/ that all required ins at the address is re e from the street, that the e f nt tHe property, and the approved set site a 1 imes-=::nstW:l_1-91 te I ~ --- VALIDATION Date Paid: 2f/ If f;Y v0(~q1 g() ~L05'. 31- \l~_ Receipt Number: Amount Received: Received By: SPRINGFIELD CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE (COMMERCIAL / INDUSTRIAL) Name or Company: JULIE DONOHUE Location: 107 W Q ST Developement Type: C Building Size: 1. STORM DRAINAGE Impervious Sq Ft 1,0 X 14280 X 0.216 2. SANITARY SEWER - CITY Number Of PFUs 1,0 ,X 25 (see Page 2)' X 44,75 3. TRANSPORTATION Number Of Units 1.0 X 3,990 X Job No.: 961248, Lot Size: Per Sq Ft Per PFU X Cost Per Trip 451,26 $4,033,18 X Trip Rate 2 . 240 X , Transportation Total 4. SANITARY SEWER - MWMC Number Of PFUs 25 X X Per PFU + 20.690 t MWMC CREDIT If Applicable (see Page 2) TOTAL - MWMC SDC SUBTOTAL - (Add Items 1, 2, 3 & 4) 5. ADMINISTRATIVE FEES Base Charge (Subtotal Above) X 0,50 TOTAL SDC Reviewed By: TROY MCALLISTER MWMC Admin Fee 10,00 Date: 01/10/97 Page 1 Sq Ft $3,084.48 $1,118,75 $4,033,18 $527.25 $272,08 $255.17 $8,491. 58 $424.58 $8,916.16 SPRINGFIELD ~- Job Number:' 961248 FIXTURE UNIT CALCULATION TABLE Fixture Type Bathtub Drinking Fountain Floor Drain Interceptors For Grease/Oil/Solids/Etc Inteceptors For Sand/Auto Wash/Etc Laundry Tub/Clotheswasher Clotheswasher - 3 Or More Receptor For Refrigerator/Water Station/Etc Receptor for Commercial Sink/Dishwasher/Etc Shower, Single Stall Shower, Gang Sink, Bar, Commercial, Residential Kitchen Urinal, Stall/Wall Wash Basin/Lavatory, Single Water Closet, Public Installation Water Closet, Private Miscellaneous, Number of New Fixture o o o o o o o o o 1 o 1 o 3 3 o o Unit Equivalent 2 1 2 3 6 2 6 1 3 2 2 2 1 6 4 Page 2 Fixture Units o .0 o o o o o o o 2 o 2 o 3 18 o o TOTAL FIXTURE UNITS 25 CREDIT CALCULATION TABLE: Based on assessed value. If improvements occured after annexation date, credits are calculated separately, (calculations are by $1000) Year Annexed: 1973 Credit For Parcel Or Land Only If Applicable: Improvement (if after annexation date) ; 78,410 X 3.47 o X 3,47 272,08 0,00 $272.08 (If land value is multiplied by 1 then the parcel/land credit is not accurate.) CREDIT TOTAL = SPRINGFIELD Page 1 ENGINEERING DIVISION DEVELOPMENT PLAN REVIEW RESIDENTIAL IMPROVED STREET Developer: JULIE DONOHUE Mail Address: 1873 PIONEER Tax Lot #: 1703263200100 Subdivision: Job No.: 961248 PARKWAY E SPRINGFIELD, OREGON 97477Phone #: 689-1381 Project Address: 107 W Q ST Lot: Blk : Eng, Rev, No.: Book: Street Gravel Ac Mat 107 W Q ST EXISTING IMPROVEMENTS Curb Full Imp SW Width Curbside Setback Y 5 FEET 12:1 FLAIRS PIONEER PARKWAY Y 5 FEET x Existing Curbcut: N ENGINEERING REQUIREMENTS Additional Right of Way: N Improvement Agreement: N Easements: Y Where: SEE LAND USE DECISION (96-09-176) COMMENTS: COMPLY WITH LAND USE DECISION 96-09-176 SANITARY SEWER CALL THE UTILITIES NOTIFICATION CENTER BEFORE YOU DIG 1-800-332-2344 Available: Y Location From N, S, E, W Property Line: AS SHOWN ON DRAWING OR AS-BUILT Make Connection: PER PLUMBING CODE Comments: FIELD VERIFY PUBLIC SANTARY SEWER LOCATION (NEED PRIVATE SEASEMENT) STORM SEWER Available: Y Pipe Downspouts And Drains To: DRAINAGE SYSTEM NEAR S.E, CORNER Pipe Parking Lot Drainage To: GRASS BIO-SWALE (SEE PLAN X-SECTION Comments: COMPLY WITH LAND USE DECISION New Curbcut Appr, : Sidewalk Permit: Y Curbcut Permit: Y Handicap Ramp: Y Comments: RIGHT OUT SIDEWALK AND DRIVEWAY INFORMATION Y COMMERCIAL Width: 29 Ft Flairs: 6 Width: 5 Ft Length: 170 Ft Width: 41 Ft SEE DRAWINGS ONLY Ft ENCROACHMENT AND ASSESSMENT Encroachment Permit Required: Y CONTACT ENGINEERING DIVISION AT 726~3753 Sanitary Sewer In Lieu Of Assessment: N Comments: NEED PUBLIC WORKS PERMIT FOR NEW SANITARY CONNECTION SPECIAL NOTES AND REQUIREMENTS All work within the public right of way shall be in conformance with the City of Springfield standard specifications for construction. All existing unused curbcuts or portions thereof shall be restored to full curb height as directed by the City, The owner/developer is responsible to relocate any utilities and establish private or public easements when the utilities conflict with the development, at their expense, Reviewed By: TROY MCALLISTER Date: 01/10/97 SEE DRAWINGS ON SPECIAL REQUIREMENTS FOR FURTHER IMPORTANT INFORMATION