HomeMy WebLinkAboutPermit Fence 1984-5-4
.. RESI~TIAL..
APPLICATION/PERMIT
225 North 5th Street
Springfield:l Oregon 97477
Building Division
726-3753
Job Location: d I ;;;l.
Asaessors Map #
Subdivision:
OLmer:
(1~&,
J/~ let'
JevouJ
I) ,
Address:
Ci ty :
~mJ
I Addi tion
I Remodel
I ,'fobi le Home
Date of Application
Contractors
General
Plwnbing
Electrica l
Mechanical
Const1"Uction Lender
'Q I 2;1-.---
c:lq~A)...
~
r
6- '-/- &<-1
~-
T= Lot #
f!yU! .
~
Phone: 7t./ ~ -03 &- C;
Zip: t::j7<{ 7 7
,'?cceC:Dt" 'B{,",2~
~~
ii/8.o0
Describe riork:
p~
Value Ii ~ ~D
Addpess
Sigr..ed:
Date:
~
5" ~ V- S C(
Lisc.#
Expires
Phone
It is the responsibility of the permit holder to see that alZ inspections are made at the proper tim€, that each .=ddress is ren~n~:~
from the street, and that the permit card is located at the front of the property.
"Bui!ding Division approved plan shall remain on tha Building Site at an tim€s.
PJ?OCEDURE FOR INSPECTION RE"QUEST:CALL 726-3769 (recorder) state your City designated job nwnber, job address, type of inspec::icn
requested ar.d when you will be ready for inspection, Contractors or OWneps ncme ~nd phone number. Requ€sts received before 7:00 ~
,,:i U be made the same day, requests mc.de after 7: 00 am wi U be made the next :.;orking day.
Reouiped TnsDections
O SITE INSPEC7'ION: To be made after
excavation, but prier to set up of
forms.
O UNDERSLAB PLUMBING. ELECTRICAL &
MECf!AI1ICAL: To be made before any
work is .:Jovered.
o
FOOTING & FOUNDATION: To be made
after trenches are excavated and
forms are erected, but prior to
pourir~ concrete.
UNDERGROUND PLUMBING} SEWER, WATER,
DRAIllAGE: To be made prior to fiZ-
lir.g trenches.
UNDERFLOOR PLUMBING & MECHANICAL:
To be made prior to installation of
11001' insulation or decking.
POST AND BEAM: To be made prior to
installation of floor insulation or
decking.
ROUGH PLUMBIllG. ELECTRICAL & MECH-
ANICAL: No oJork is to be covered-
until these inspections have been
made and approved.
FIREPLACE: Prior to placir.g facing
materials and before framing inspec-
tion.
[]
o
o
D
D
o
FRA!1ING: Must be requested after
approval of rough plwrhing, electri-
cal & mechanical. AU roofing
bracing & chimneys, etc. /1/".Ist be
, camp leted. No work is to be con-
~ cec.led until this inspection has
. been made and approved.
D FINAL PLUMBING
D FINAL !1ECHANICAL
o FINAL ELECTRICAL
=:J
Your City Desigr~ted Job Number Is:
D
INSULATION/VAPOR BARRIER INSPECTION:
To be made after all insul~tion ~.d
required vapor barriers are in place
but befere any lath, gypsum board or
wall covering is applied, and before
any insulation is concealed.
X<!tJ32&
. DENDLITION OR !,JOVE] BUILDI:iGS
~ Sanitary se'.Jer :;apped ~t p:.opert'"d Zir.e
~ Septic tank p:'iJyed and fiZZed with gra::i3
I Final - r"hen above ite:r/s a:re cO:rzrJleted
~ and oJhen demolition is complete 01' strk~-
ture moved and premises cleaned up.
, Mobi le Homes
:=J Blocking and Set-~p
:=J Plumbing connections -- scwer and water
~ Electric~l Connection - Blocking, set-u?
---l and plumbing connections rrr.lst ce approvec
before requestC:ng elec~rical inspec~ion
.=J AccessoI"d Building
I Final - After parcr.es, skirting, decks,
~ etc. are comple~ed.
o
/
All ppoject conditions, such as the instaZlation of street trees, c~~letion of the
required landsc~pir.g, etc., must be satisfied before the BUILDING FINAL can be r2quest2d.
~~AL BUILDING: The Final Building Inspe, ction must be requested after the Final Plumbing
~ Electrical, and Mechar.icaZ Inspections have been made and approud.
D
DRYWALL INSPECTION: To be made
after aU drYoJaU is in place,
but prior to ~ny taping.
*ALL MANHOLES AND CLEANOUTS HUST BE ACCESSIBLE, ADJUSTNENT TO BE !.t1DE I!T NO caST TO CI'I'Y Page 1 of 2
O MASONRY: Steel
beams, grouting
accordance with
2415.
D WOODSTOVE: After installation is
ccmplet€d.
location, bond
or verticals in
U. B. C. Section
D
CURB & APPROACH APRON: After' forms
are erected but prior to pouring
aonorete.
SIDEWALK & DRn'EWAY: For an con-
crete paving within street right-
of-ux:.y, to be made after aU exca-
vating complete & fom UXJrk & sub-
base material in place.
D
I ~~: h'hen complc:te -- Provide
gates or movable sections through
P.U.E.
o
JOB NO.!t ,/D32 0
L-COG~
SOL A R' '; E S S R E Q.-
Beaoor:':s:
, Zone:
Occupancy GrOUo:
Lot Sq. Ftg.
% Qf lot C.?Veragc
# of Stories
Total Height
Topography
lITEM
I Main
I Garaoe
I Carvort
SQ.FTG
Accessoru
TOTAL VALUE
S.D.C. (va~uc)
1.5 x
Building Permit
State SUX'charge
Total Charges
ITEM IND. FEE
Fixtures I
I Residential (1 bath) I
I Sanitary Sewer I
Water I
I
Plumbing Permit
State SUX'cr.arge
Total charoes
ITEM 'NO. ' FEE
Res. Sa. fta.
IN~/Extend Circuits
I Temporary Service
I
Electrical Permit
State SUX'charqe
Total Charc:es
IIT2M
I NO. I FEE
I I
I I
I I
I I
I I
Furnace PTU' S
Ezhaust Hood
I Vent Fan
I Woodstove
I
Permit Issuance
Mechanical Permit
State SUX'charoe
Total Charoes
-- ENCROACHMENT --
Seco.trity Deposit
I Storage
I Maint=e
Parmi t
Total Charqes
Curbcut
Sidewalk
Fen::!e
I Electrical
I
! Mobi le Home
Label
TOTAL AMOUNT DUE:"
LOT TYPE
Interior
Cornel'
Panhandle
Cul-de-sac
x
Value
CHARGE
CHARGE
CHARCE
I
I
I
I
I
I J~'p-O
I
I
I
I
..11)~. oD
':'ijpe/Cor.st:
I Lot Faces -
I Setbacks
I P.L. 'House Carage Access.
INorth
East
lSouth
IWest
Enerau Sources
Heat
Water Heater
Range
Firevlace
Woodstove
TJ.i~e
Fees
Building Value & Permit
This permit is granted on the express condition that the said construction
shall, in all respects, conform to the Ordinance adopted by the City of
Springfield, including the Zoning Ordinance, regulating the construction
and use of buildings, and may be suspended 01' revoked at cny time upon vio-
lation of any provisions of sa'id Ordinances.
*
I *
I
I
I
I
I
I
I
I
, "
I
I
I
I
I
I
Plan Check Fee:
Date Paid:
Receipt #:
Signed:
Plumbing Permit
No person shall construct, install, alter or change any r.sw or existing
plumbing 01' drainage system in whole or in part, unless such person is the
legal possessor of a valid plumber's license, except tr~t a person may do
plumbing work to property which is awned, leased 01' operated by the appli-
cant.
Electrical Permit
Where State Law requires tr~t the electrical work be done by an Electrical
Contractor, the electrical portion of this permit shall r~t be valid until
the Zabel has bcen signed by the Electrical Contractor.
"
Mechanical Permit
"
Plan Examiner
lJate
I HAVE CAREFULLY EXAMINED the completed application for permit, and do
hereby certify that aU inforrmation hereon is true and correct, and I
further certify that any ar.d an work perfo!'7led shall be do:-ze in accor-
dance ~th the Ordinances of the City of Springfield, and th~ L~~s of the
" State of OregQn pertaining to the work describcd herein, and that NO OCCU-
PANCY will be made of any structUX'e without permission of the .Building Di-
vision. I further certify that o:-zly contractors ar~ employees who are in
compliance with CRS 701.05& will be used on this project
/&/ft~/L--
-.7-4--/54"
Date
*