HomeMy WebLinkAboutPermit Plumbing 1989-7-20
I~
Rcae:pt .'1
.. RESlDit-.lTlAL..
. APPLICATII/PERMIT'
225 North 5th Street
SpringfieZd, Oregon 97477
BuiZding. Division
726-3753 .
p.,~ oc\ \> \ \
\'1n~~L:\ \.Q
/vJ-
~
~
-e.1'~\ ~'"
Taz Lot # \ \ c:::.rv--...
-<.J..l }
Job Location:
AsceslJ,Ol'S Map /I
Subdivision:
CA.me": \~ rl~, ~ 'L'J:\.l\ 0 \\l\ 5:'f\
Awes", -5l O~ \l \- ~ -R 0c\ ~ ~~ JJ Plume:
City: ~ ~~J\ \ ~~o Q~\ iC+Q.)
Qr'\4(jf)
Zip:
rc::r:",
n Addition
n Remod.l
n Uobil(j Homo
Describe fl'ork:
.~ ~~ ~,cJifi)
.V\- \q~SL Val..,. f\ h ) Date: f7-L1/)-~
Data of Application
Contractors
General ~ r\' '\
I Plumbing \ () ~ t'"Y\ 0 Q..J
I Hechanical -
I El,eetrieal
ISuDervi~ing Eleetr~cian
Exoires
Pl,nnp
Bidrs Board R~~.
. .LiRe. II
.\rlrlress
It is thB l'sspono;.bility of th8 permit holder to 888 that al1.. inDpoatio118 arB made at ths propsr ti.m~" that QaCh ::ddreBB is readabZe
j1"OfTl ths Stl'BSt, and that ths permit oard is Zocated at the front of the property.
ABuiUing Divi::ior: approved p1..an,B.hatl remain on tha Building Sit:; at all. times.
PROCEDURE FOR INSPECTION RE.QUEST:CALL 726-3769 (recorder) state your City designated job nwr.ber.. job ad.drcss.. type of in.3pea~icn
raqu.estcd ar.d w.J:en you win be ready for inspection.. Contractors or OI.mers name and Fhone number. Requ€.sts received befere 7:00 am
lIliZl bs made th& BamB day.. rBquBBts made after 7:00 am wilt be rmde the next :.JOrking day.
. . ., '. Y~ City Deaigr-.ated Job Numb.,. Is: Rq () ~ ~-4
Reaui~p.d Insnf1tir.~~
D. SITe INSPECTION: To be made after
excavation.. but prior to set up of
forms.
O : UNDERSLAB PLUMBING. ELECTRICAL &
. MECHANICAL: To bo made before any
work is covered.
D INSULATION/VAPOR BARRIEP TIlSPECTIOIl:
To be made after aU insuz...::t~n ar.d
'. roquired vapor ba:rTiers are in place
'.;' .: but before any lath.. gypsum board or
. . wU covering is app1.ied.. and before
. ~y inoulation is concealed.
DEMOLITION OR gOVED BUILDIIr;S
=:J Sani-;ary smJer ::apped at p~opert'i tir.e
~ Septia tank p:&i7ped and fitt~ with gra~el
:::J Final - rrhen above ite.'1ls are ccmpleted
ar~ when demoZition is compZete or stru~-
ture moved and premises a Zeaned up.
O FOOTING & FOUNDATION: To b. .-ad.
after trenches are excavated and
forms are erected.. but prior to
pouring concrete. '.'
r;--yu. NDSI1GROUN~. SEWER. 'W.1TER,
l.=:J .DRAINAGE: ~. priO" to fa-
.Ur.g trenches.
0, UNDERFWOR PLUMBING & MECHANICAL:
I To be made prior to in3tallat1.on of
floor insulation or decking.
O DRYWALL INSPECTION: Tc be made
after an drywaZZ is in place..
but prior to any taping.
O MASONRY: Steel. location.. bo1ui
beam3.. grouting or vertical.s in
accordance with U.B.C. Section
2415.
O WOODSTOVE: After instal.lation is
compLeted.
Mobile Hcmes
:J Blocking and Sa t-up
:J PZumbing connections -- 8DWer and Wa~er
~ Electrical. Connection - BZocking.. set-up
.--J and plumbing connections ,",,,,,st he approved
, before requesting electrical. inspec~io~
o
D
POST AND BEAM: To be made prior to
instaLlation of floor insu.lation or
d8ckinv .
ROUGH PLUMBING. ELECTRICAL " MECH-
. ANICAL: No work is to be covered
,ur.ti L those inspections have beer.
made and approved. .
PIREPLACE: Prio" to p1.acir.g faoinv
materiaLs and before framing inspec-
tion.
D FRAMING: Must bs requested after
approval. of rough pZwr.bing.. alectri-
.cal. & mechanical. AZZ roofing
bracing & chimneys.. etc. nr""st bs
;' completod. No work is to be can-
. .......ceaZed until thio inspection has
'.~.be~~ made and app~1Jed.
CURB & APPROACH APRON: Afte:- forms
are oreated bu t prior to pouring
oonarete.
SIDEWALK & DRIVEWAY: For all. con-
crete paving within street right-
of-way.. to be made after aZZ exca-
vating complete & form work " sub-
. baDe material in pla.ae.
D
o
~ Acaessor';/ BuiZding
] Final. - Aftar porches.. Skirting.. decks~
etc. are compZeted.
o
D FENCE: When compZ.;;te -- Provide.
. gates or movable sections through
P.U.E. .
D
o
....-.
All project conditions.. such as the instal.lation of street trees.. c~~Zation of the
required landscapir.g.. etc... 7m4st be satisfied before the BUILDING FINAL can be raquestad.
o FIliAL PLUMBIIIG
D PINAL MECHANICAL
D PINAL ELECTRICAL
~~
-0
FINAL BUILDING: The Final Building Inspection must be requested after the FinaZ Plumbing
Electrical... and Meahar.icaZ Inspectiono have been made and approved.
'ALL MANHOLES AND CLEAIIOUTS !lUST BE ACCESSIBLE, ADJUSTlfElIT TO BE MADE AT 110 COST TO CITY Page 1 of 2
NO. ffilY}~LAR ACCESS
Occupczncl/ Group.
LOT TYPE
JOB
Zone:
Lot Sq. Ftg.
~ of lot C~epag&
!I of Stories
Total Height
Topogra;>hy
I
lITEM
SQ. FTG
Main
Ca:raae
I Cal"'oort
IACceS80rU
I
I
TOTAL VAWE
Is.D.c.
lVCt.uC)
1.5 :r:
Building Permit
State Su:t'cha:roge
Total. Charges
i ITEM 110. FEE
I Fixtures
I Residential (J bath)
I Sanitar>y Sewer'
I Wate1"
.~~ t~~~~gO!.~~tJ
State Surcr..arge
Total Charaes
lITEM
j Res. So. fta.
I NBU)/Extend Circuits
Temporary Se1"Vice
NO.
Ele::trica Z Permi t
State Surcharqe
Total Charc;es
IITSM
1 Furnace ETU'S
I Exhaust Hood
I Vent Fan
I WOodstove
NO.
Per-mit Issuance
Me::hanicaZ Pemrit
State Surcharae
Total. Charaes
-- ENCROACHMENT --
SSC!".lM.ty D2posit
Storage
Maintenance
Ptmrrit
Total CharoaoB
I CUrbcut
I Sidewa lk
I Fen:Je
I Electl'ical Label
I Mobi1.e Home
I
I
I 'NJTAl. AMOUNT DUF.:.
Interior
Corner
Panhandle
Cut-de-sac
x
Value
CHARGE
FEE
I
I
15,OCJ
is.CD
.1sl
Ifl.r~~I'
CHARGE I
I
FEE
CHARGE
C
\~.f)~
REQ.-
L-COG~
-,
Type/Const:
. Bedrooms:
. I EnOl'q}1 Sources
I Heat
I Water Rp.atR~
I Hange
I Fireplace
I Wood3tove
I
TII'Oe
I Lot Faces - .
I Setbaoks
I P. L. House Caraqe Access.
INorth
lEast
South
IWest
Fees
Building Value & Permit
This pgromit io granted on the exprs8s oondition that the Bdid construotion
shall~ in all respcot8~ conform to the Ondinance adopted by the City of
springfield, including the Zoning Crdinance~ regulating the construction
and UDe of buildings, and may be suapended Or revoked at any time upon vio-
lation of any provisions of said Ordinances.
.
I
1
I .
IPlan Check Fee:
I Date Paid:
IReceipt #:
ISianed:
Plumbing Permit
No pe:rcon ahal'L construct, install, alter 01' change any no'" or existing
plumbing or drainage systen in ",hole or in part, unless such person is the
legal possessor of a valid plumber's license, except that a person may do
plumbing IJOrk to property which is OLJned, leased Or operated by the appli-
cant.
Electrical Permit
Where State LalJ requires that the electrical lJ01'k be done by an Electrical
Contractor, the electrical portion of this permit shall not be valid until
the label has been signed by the Electrical Contractor.
.
Mechanical Permit
I
I
I
, .
Plan Examiner
va"e
I HAVE CAREFULLY EXAMINED the aorrrpleted applicati<m for pernn:t, and do
hereby certify that all information hepeon is true and correct, and I
further ceptify that any ar.d all IJOrk perfornled shall be done in accop-
dance with ths ardinancss of the City of Springfield, and the La>Js of the
State of Oregon pertaining to the work described herein, and that NO OCCU-
PANCY will be made of any structure IJithout pennission of the Building Di-
vision. I further certify that o:-zly contractors and enp'Loyees who aPe in
compliance with ORS 701.055 will be used on this projeot
j/ ), Ii,lv''- rJ~
sign,{ b
7 -;?j)-8~
Date
j