Loading...
HomeMy WebLinkAboutPermit Building 2006-5-18 (6) Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line . .CITY OF SPRINGFIELD Building/Combination Permit PERMIT NO: cOM2004-01488 ISSUED: 05/18/2006 APPLIED: 1210612004 EXPIRES: 06/12/2007 VALUE: $ 212,434,907.00 SITE ADDRESS: 3333 RiverBend Dr ASSESSOR'S PARCEL NO.: 1703220000902 Springfield TYPE OF WORK: Hospital TYPE OF USE: New Commercial PROJECT DESCRIPTION: Riverbend Hospital Contractor License Expiration Date ANSHEN & ALLE~nEN T IUI~;UJ,1.!;l.R~llaw r~ es you to TURNER CONST~!/&Jm~~Y~'pi'im'by thJ?~~~90n Utility 11/09/2007 E C COMPANYNotification Center. Those n4PlJ1re set fort~ 01/15/2008 SECURECOM \N~AR 952-QQ1-0010throu~Fa~ 952-001 09/29/2006 TWIN RIVERS.IrMl~lJmH"\~!;,,"'+~;~ Mn:!i7!i~~.._ _..1__ L 03/11/2007 . . - - -.---,., C1aBUrnDINBIIN:RORM,1\1flON'lllephone" II '.111 numoenorme uregon utility Notification #)JJrl!w.rissl -800-332-2344). Lot Size: Height of Structure Sq Ft 1st Floor: Type of Heat: Sq Ft 2nd Floor: Water Type: Sq Ft Basement: Range Type: Sq Ft GaragelCarport Energy Path: Sq Ft Other: NOTPe~~kled Building: nla Occupant Load: , DEV~P)IWEN3'tINFORMA!TION~'fE WORK /-IV I M~_H~~~D UNDER THIS PERMIT IS NOT COM~thI'edaf)Dj'i\:IS ABANDONED FOR ANY 1Mt~Hr~r,sI~~d: Paved Drive Rqii:' % of Lot Coverage: Owner: PEACEHEAL TH Address: PO BOX 1479 EUGENE OR 97440 Contractor Type Architect General Electrical Low Voltage Electrical Plumbing # of Units: Primary Occupancy Group: Secondary Occupancy Group: Primary Construction Type Secondary Construction Type: # of Bedrooms: Frontyard Setback: Side I Setback: Side 2 Setback: Rearyard Setback: Solar Setbacks: Street Improvements: Storm Sewer Available: Special Instruction: Notes: I CONTRACTOR INFORMATION I Phone 415-882-9500 503 229-6000 503-224-3511 541-988-3585 541-688-1444 1-1.1 B IFR REQUIRED PARKING Total: Handicapped: Compact: I PUBLIC IMPROVEMENTS' Sidewalk Type: DownspoutslDrains: Paee I of 20 Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line Description Estimate Estimate Tvpe of Construction Estimate Estimate Fee Description Plan Review Comm/lnd/Public Plan Review Fire & Life Safety + 1 % Seismic Fee + 10010 Administrative Fee + 7% State Surcharge Building Permit + 10% Administrative Fee + 7% State Surcharge Fixtu re Sanitary Sewer - 1st 50 Feet Special Waste Connection Deposit + 10% Administrative Fee + 7% State Surcharge Plan Review Plumbing (30%) Sanitary Sewer - 1st 50 Feet Sanitary Sewer Each Addtll 00' Special Waste Connection Storm Sewer - 1st 50 Feet Storm Sewer Each Addtll 00' + 10% Administrative Fee + 7% State Surcharge Add, Alter, Extend Circ Ea Add Low Voltage - Commercial Indus Perm Serv/Fdr 1000 ampslvolts Perm Serv/Fdr 200 amps or less Perm Serv/Fdr 201 to 400 amps Perm Serv/Fdr 401 to 600 amps Perm Serv/Fdr 601 to 999 amps Plan Review Electrical (25%) + I % Seismic Fee + 10% Administrative Fee + 7% State Surcharge Building Permit + 10% Administrative Fee . .CITY OF SPRINGFIELD Building/Combination Permit PERMIT NO: cOM2004-01488 ISSUED: 05/18/2006 APPLIED: 1210612004 EXPIRES: 06/12/2007 VALUE: $ 212,434,907.00 I Valuation Descriotion I $ Per Sq Ft or multiplier $1.00 $1.00 Square Footage or Bid Amount 212,186,907.00 248,000.00 Value Date Calculated $212,186,907.00 $248,000.00 $212,434,907.00 07/0112005 06/08/2005 Total Value of Project Fpp<, PIi4.I Amount Paid $443,476.63 $272,908.69 $5,518.79 $55,187.86 $38,631.51 $551,878.72 $21.60 $15.12 $14.00 $90.00 $112.00 $10,000.00 $293.20 $205.24 $1,029.13 $45.00 $560.00 $1,162.00 $45.00 $1,120.00 $14,201.30 $9,940.91 $22,602.00 $63,585.00 $19,125.00 $15,057.00 $18,150.00 $1,375.00 $2,119.00 $41,538.81 $1,379.70 $13,796.97 $9,657.88 $137,969.68 $5.90 Date Paid 1216/04 12/6/04 7/1105 711105 711105 7/1105 7/6/05 7/6/05 7/6/05 7/6/05 7/6/05 7/8/05 8/22/05 8/22105 8/22/05 8/22/05 8/22105 8/22105 8/22105 8/22/05 9/2105 912105 912105 912105 912105 912105 912105 912105 912105 912105 10/21105 10121/05 10121/05 10121/05 2/7/06 Receipt Number 2200400000000001481 2200400000000001481 2200500000000000873 2200500000000000873 2200500000000000873 2200500000000000873 1200500000000000955 1200500000000000955 1200500000000000955 1200500000000000955 1200500000000000955 2200500000000000902 2200500000000001132 2200500000000001132 2200500000000001132 2200500000000001132 2200500000000001132 2200500000000001132 2200500000000001132 2200500000000001132 2200500000000001211 2200500000000001211 2200500000000001211 2200500000000001211 2200500000000001211 2200500000000001211 2200500000000001211 2200500000000001211 2200500000000001211 2200500000000001211 2200500000000001477 2200500000000001477 2200500000000001477 2200500000000001477 3200600000000000057 Paee 2 of 20 _~~AlNcall'lllLl); , : '. ~ 1 _On _ ._' Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line + 8% State Surcharge Plan Review Plumbing (30%) Storm Sewer - 1st 50 Feet Storm Sewer Each Addtll 00' + 10% Administrative Fee + 7% State Surcharge Fixture Special Waste Connection Storm Sewer - 1st 50 Feet Storm Sewer Each AddtllOO' Plan Review CommllndlPublic Plan Review Fire & Life Safety -Mechanical Issuance Fee- + 10% Administrative Fee + 7% State Surcharge Air Handling Unit 10,000 & Ovr Air Handling Unit Up to 10,000 Appliance Not Listed Appliance Vent Backflow Device Evaporative Coolers Exhaust Hoods Fixture Furnace - more than 100,000 Furnace - Unit Heater Furnace - up to 100,000 btu Gas Outlets 1-4 Gas Outlets 4+ Heat Pump Inspection - Preliminary Medical Gas Base Fee Medical Gas Each InletlOutlet Medical Gas Plan Review Not Covered Mechanical Plan Review Electrical (25%) Plan Review Mechanical (25%) Plan Review Plumbing (30%) Plan Review Plumbing (30%) Sanitary Sewer - 1st 50 Feet Sewage Ejector Pump Special Waste Connection Trap or Waste not Conn to Fixt Vent Fan Water Line - 1st 50 Feet Water Line - Each Addtl100' + 10% Administrative Fee + 8% State Surcharge Add, Alter, Extend Circ Ea Add Temp Power 201 - 400 amps . $4.72 $159.30 $45.00 $14.00 $14.30 $10.01 $56.00 $14.00 $45.00 $28.00 $125.58 $77.28 $10.00 $10,748.00 $7,523.60 $435.00 $112.00 $28,260.00 $288.00 $210.00 $72.00 $90.00 $37,450.00 $90.00 $300.00 $18,804.00 $4.00 $6.00 $264.00 $45.00 $219.00 $14,625.00 $4,453.20 $540.00 $-6,035.53 $12,334.50 $-149.53 $12,992.40 $45.00 $112.00 $4,172.00 $1,260.00 $18.00 $45.00 $14.00 $9.00 $7.20 $21.00 $69.00 217/06 217/06 2/7/06 2/7/06 3/9/06 3/9/06 3/9/06 3/9/06 3/9/06 3/9/06 3/10/06 3/10/06 3/22106 3/22106 3/22106 3/22/06 3/22106 3/22/06 3/22/06 3/22106 3122/06 3122106 3/22/06 3/22106 3/22106 3/22/06 3/22106 3/22/06 3/22106 3/22106 3/22/06 3/22/06 3/22106 3/22/06 3/22106 3/22/06 3/22106 3/22106 3/22/06 3/22106 3/22106 3/22/06 3/22106 3/22106 3/22106 5/15/06 5/15/06 5/15/06 5/15/06 Paee 3 of 20 .CITY OF SPRINGFIELD Building/Combination Permit PERMIT NO: cOM2004-01488 ISSUED: 05/18/2006 APPLIED: 12/06/2004 EXPIRES: 06/12/2007 VALUE: $ 212,434,907.00 3200600000000000057 3200600000000000057 3200600000000000057 3200600000000000057 2200600000000000287 2200600000000000287 2200600000000000287 2200600000000000287 2200600000000000287 2200600000000000287 1200600000000000285 1200600000000000285 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000602 2200600000000000602 2200600000000000602 2200600000000000602 Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line + 10% Administrative Fee + 8% State Surcharge Low Voltage - Commercial Indus Plan Review Electrical (25%) Refund - Admin Fee Refund - Electrical Refund - Surcharge + 10% Administrative Fee + 10% Administrative Fee + 10% Administrative Fee + 7% State Surcharge + 8% State Surcharge + 8% State Surcharge Fixture Not Covered Plumbing Plan Review Plumbing (30%) Plan Review Plumbing (30%) Plan Review Plumbing (30%) Refund - Admin Fee Refund - Plumbing Refund - Surcharge Sanitary or Storm Sewer Cap Sanitary Sewer - 1st 50 Feet Sanitary Sewer Each Addtl100' Special Waste Connection Storm Sewer - 1st 50 Feet Storm Sewer Each Addtl1 00' + 10% Administrative Fee + 5% Technology Fee + 8% State Surcharge Low Voltage - Commercial Indus + 10% Administrative Fee + 5% Technology Fee + 8% State Surcharge Low Voltage - Commercial Indus + 10% Administrative Fee + 5% Technology Fee + 8% State Surcharge Low Voltage - Commercial Indus Plan Review Electrical (25%) Total Amount Paid Initial Review Structural Review . $900.00 $720.00 $9,000.00 $2,250.00 $-2.10 $-21.00 $-1.68 $11.50 $11.80 $137.20 $96.04 $9.20 $9.44 $1,344.00 $28.00 $34.50 $35.40 $481.57 $-137.20 $-1,853.57 $-96.04 $45.00 $45.00 $28.00 $42.00 $45.00 $28.00 $13.50 $6.75 $10.80 $135.00 $274.50 $137.25 $219.60 $2,745.00 $144.00 $72.00 $115.20 $1,440.00 $360.00 $1,921,738.33 .CITY OF SPRINGFIELD Building/Combination Permit PERMIT NO: cOM2004-01488 ISSUED: 05/18/2006 APPLIED: 1210612004 EXPIRES: 06/12/2007 VALUE: $ 212,434,907.00 5/18/06 5/18106 5/18/06 5/18/06 5/19/06 5/19/06 5/19/06 6/8106 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 8/9/06 8/9/06 8/9/06 8/9/06 1214/06 1214/06 1214106 1214/06 12112/06 12112106 12112/06 12/12/06 12112106 1200600000000000678 1200600000000000678 1200600000000000678 1200600000000000678 VOUCHER #104418 VOUCHER #104418 VOUCHER #104418 1200600000000000829 1200600000000000829 1200600000000000827 1200600000000000827 1200600000000000829 1200600000000000829 1200600000000000827 1200600000000000827 1200600000000000829 1200600000000000829 '1200600000000000827 VOUCHER # 105568 VOUCHER # 105568 VOUCHER # 105568 1200600000000000829 1200600000000000829 1200600000000000829 1200600000000000829 1200600000000000829 1200600000000000829 1200600000000001228 1200600000000001228 1200600000000001228 1200600000000001228 1200600000000001719 1200600000000001719 1200600000000001719 1200600000000001719 2200600000000001684 2200600000000001684 2200600000000001684 2200600000000001684 2200600000000001684 03/30/2006 03/30/2006 I Plan Reviews I 06/0212005 06/03/2005 10 LLH Received permission from Philip Farrington to recycle old plans. Forwarded revised structural fill drawings to Clair 10 LLH Paee 4 of 20 . .ITY OF SPRINGFIELD Building/Combination Permit Status Issued PERMIT NO: cOM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/18/2006 541-726-3753 Phone APPLIED: 12/06/2004 541-726-3676 Fax EXPIRES: 06/12/2007 541-726-3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 06/19/2006 06/19/2006 APP AC AS1106R.1 - Approved with Conditions Structural Review 06/19/2006 06/1912006 APP AC Proposal Request #35R.3 and #35R.4 - Approved with Conditions Structural Review 06/19/2006 06/19/2006 APP AC Proposal Request #52 - Approved Structural Review 06/19/2006 06/19/2006 APP AC Proposal Request #63 - Approved Structural Review 06/19/2006 06/19/2006 APP AC Proposal Request #80 - Approved with Note to Inspector Structural Review 07/0112006 07/03/2006 APP AC Deferred Submittal No. 0485-05510-DFO - Stair No.7, 9,10, and 11 - 1st Back Check - Approved with Notes to Inspector Structural Review 07/0112006 07/03/2006 APP AC Deferred Submittal No. 0625-03450-DFO - 3rd Floor Precast Bracket Panel Reinforcing Drawing, wi Calculations (APS) - Approved with conditions Structural Review 07/0112006 07/17/2006 APP AC Deferred Submittal Package No. 0707-03450-DFO - 3rd Floor West Elevation Sills (between bracket panels) reivsion (APS) - Approved with Notes to Inspector Structural Review 07/01/2006 07/17/2006 APP AC Deferred Submittal Package No. 0624-03450-DFO - Connection RDE-1 and RDE-3 for panels SPI and SP3 (west elevation) (APS) - Approved with Notes to Inspector Structural Review 07/01/2006 07/17/2006 APP AC Deferred Submittal Package No. 0557-03450-DFO-1 - Parapet and Bay Windows - Hospital (APS) - Approved with Notes to Inspector Structural Review 07/01/2006 07/17/2006 APP AC Deferred Submittal Package No. 0675-03450-DFO - Corner Window sills reinforcing, Level 4 Hospital - including shop drawings (APS)- Approved with Notes to Inspector Structural Review 07/0112006 07/17/2006 APP AC Deferred Submittal Package No. 0676-03450-DFO - Precast Window Sills Reinforcing - OHVI - shop drawings (APS) - Approved with Notes to Inspector Structural Review 07/01/2006 07/17/2006 APP AC Deferred Submittal Package No. 0632-15000-DFI - Seismic Bracing- Level 2. (Previously submitted plans for this submittal were taken and stamped by KPFF and returned to CLAIR 7/11/06 for the back check t( our first review of this submittal) - Approved with Notes to Inspector Structural Review 0710112006 07/17/2006 APP AC Proposal Request #37 - Approved Paee 5 of 20 . .CITY OF SPRINGFIELD Building/Combination Permit Status Issued PERMIT NO: cOM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/18/2006 541-726-3753 Phone APPLIED: 12/06/2004 541-726-3676 Fax EXPIRES: 06/12/2007 541-726-3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 07/01/2006 07/17/2006 APP AC Proposal Request #97 - Approved Structural Review 07/01/2006 07/17/2006 APP AC Construction Change Directive #52 - Approved with Conditions Structural Review 07/01/2006 07/17/2006 APP AC Construction Change Directive #10- Approved Structural Review 07/01/2006 07/17/2006 APP AC Construction Change Directive #53 - Approved with Notes to Inspector Structural Review 07/01/2006 07/17/2006 APP AC Construction Change Directive #70 . Approved with Conditions Structural Review 07/01/2006 07/17/2006 APP AC Construction Change Directive #55R2 - Approved Structural Review 07/01/2006 07/17/2006 APP AC ASI #111 - Approved Structural Review 07/01/2006 07/17/2006 APP AC ASI #61 - Approved Structural Review 07/31/2006 08/0112006 APP AC ASI #62 approved 7/31/06 Structural Review 07/31/2006 08/01/2006 APP AC ASI #1I5R1, 115R3, adn 115R4- Approved on 7/31/06 Structural Review 07/31/2006 08/01/2006 APP AC ASI120 - Approved 7/31/06 Structural Review 07/31/2006 08/01/2006 APP AC ASI130 - Approved 7/31/06 Structural Review 07/31/2006 08/01/2006 APP AC ASI134 - Approved 7/31/06 Structural Review 07/31/2006 08/01/2006 APP AC ASI133 - Approved 7/31/06 Structural Review 07/31/2006 08/01/2006 APP AC CCD 12 - Approved 7/31/06 Structural Review 07/31/2006 08/01/2006 APP AC CCD 13 - Approved 7/31/06 Structural Review 07/31/2006 08/0112006 APP AC CCD 71 - Approved with notes to inspector 7/31/06 Structural Review 07/31/2006 08/01/2006 APP AC CCD 48 - Approved 7/31/06 Structural Review 07/31/2006 08/0112006 APP AC CCD 28 - Approved 7/31/06 Structural Review 07/31/2006 08/01/2006 APP AC PR 65 - Approved 7/31/06 Structural Review 07/31/2006 08/01/2006 APP AC PR 34 - Approved 7/31/06 Structural Review 07/31/2006 08/01/2006 APP AC Deferred Submittal #0704-03450-DFO - 1st Floor Precast Sills (plan and reinforcing) - OHVI . Approved 7/31/06 Structural Review 08/01/2006 08/03/2006 APP AC Deferred Submittal #0777-08810-DFO - West Elevation Window Systems Floors 1-3 - Approved with conditions Structural Review 08/01/2006 08/09/2006 APP AC ASI 122 - Approved Structural Review 08/01/2006 08/09/2006 APP AC ASI 91 - Approved with Notes to Inspector Structural Review 08/01/2006 08/09/2006 APP AC ASI123 - Approved Structural Review 08/01/2006 08/09/2006 APP AC CCD 46 - Approved Structural Review 08/01/2006 08/09/2006 APP AC CCD 81 - Approved Structural Review 08/01/2006 08/09/2006 APP AC PR #21 - Approved Structural Review 08/01/2006 08/09/2006 APP AC PR 42 - Approved Structural Review 08/01/2006 08/09/2006 APP AC Deferred Submittal Package No. 0373-15000-DFI - Larsen VR-1818 Fire Hose Valve Cabinet - product datalcut sheets - Approved Paee 6 of 20 . . CITY OF SPRIN\J1<lJ'.LIJ Building/Combination Permit Status Issued PERMIT NO: cOM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/18/2006 541-726-3753 Phone APPLIED: 12/06/2004 541-726-3676 Fax EXPIRES: 06/12/2007 541-726-3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 08/01/2006 08/09/2006 APP AC Deferred Submittal Package No. 0553-15000-DFO -Interior Accoustical Caulking for Non Fire-rated Wall Penetrations- Tremco Product Data. (Lane-Douglas) - Approved Structural Review 08/01/2006 08/09/2006 APP AC Deferred Submittal Package No. 0558-15000-DFO - Seismic Pipe Bracing - Calculations (JH Kelly). Including Structural Calculations b~ Miller Consulting dated 3/21/06 and Supplemental Structural Calculations by Miller Consulting dated 4/26/06 - Approved with Notes to Inspector Structural Review 08/01/2006 08/14/2006 APP AC ASI1I6 - Approved Structural Review 08/0112006 08/14/2006 APP AC ASI121 - Approved Structural Review 08/0112006 08/14/2006 APP AC ASI 69R2 - Conditions of Approval Structural Review 08/0112006 08/14/2006 APP AC ASI141 - Approved Structural Review 08/01/2006 08/14/2006 APP AC CCD 16 - Approved Structural Review 08/01/2006 08/14/2006 APP AC CCD 3 - Approved Structural Review 08/01/2006 08/14/2006 APP AC CCD 75 - Approved Structural Review 08/01/2006 08/14/2006 APP AC CCD 2 - Approved Structural Review 08/01/2006 08/14/2006 APP AC CCD 78 - Notes to inspector Structural Review 08/01/2006 08/14/2006 APP AC CCD 67 - Approved Structural Review 08/01/2006 08/14/2006 APP AC CCD 15 - Condition of Approval Structural Review 08/01/2006 08/14/2006 APP AC CCD II - Notes to Inspector Structural Review 08/01/2006 08/14/2006 APP AC CCD 20 - Approved Structural Review 08/01/2006 08/14/2006 APP AC CCD 48R1 - Approved Structural Review 08/01/2006 08/14/2006 APP AC CCD 25 - Approved Structural Review 08/01/2006 08/14/2006 APP AC Deferred Submittal 0899-15000-DFO - Seismic Anchorage and Restraints Hilti Kwik Bolt TZ Wedge Anchor- Product DatalCut Sheets - Approved with Notes to Inspector Structural Review 08/01/2006 08/14/2006 APP AC Deferred Submittal - 0843-15000-DFO - OHVI- Seismic Bracing of Suspended Utilities (Twin Rivers) - calculations (ISA T) - Approved with Notes to Inspector Structural Review 08/01/2006 08/14/2006 APP AC Deferred Submittal 0613-15000-DFO - Seismic Bracing - Levell (JH Kelley) - including shop drawings and calculations - Approved with Notes to Inspector Structural Review 08/01/2006 08/21/2006 APP AC ASI #119 - Approved Structural Review 08/01/2006 08/21/2006 APP AC ASI 91R - Approved Structural Review 08/01/2006 08/21/2006 APP AC ASI 142 - Approved Paee 7 of 20 . .CITY OF ~"KH\it..I'lELD' Building/Combination Permit Status Issued PERMIT NO: cOM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/18/2006 541-726-3753 Phone APPLIED: 12/06/2004 541-726-3676 Fax EXPIRES: 06/12/2007 541-726-3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 08/01/2006 08/2112006 APP AC CCD 45 - Approved Structural Review 0810112006 08/21/2006 APP AC CCD 27 - Approved Structural Review 08/01/2006 08/21/2006 APP AC CCD 24 - Approved Structural Review 08/01/2006 08/2112006 APP AC Deferred Submittal 0779-15900-DFO - Parking Garage Ventilation Controls Deferred Submittal - including product datalcut sheets and shop drawings (Johnson Controls) - Approved with notes to inspector Structural Review 08/28/2006 08/28/2006 APP AC ASI123R1 - Approved Structural Review 08/28/2006 08/28/2006 APP AC ASI 139 - Approved Structural Review 08/28/2006 08/28/2006 APP AC ASI147 - Approved Structural Review' 08/28/2006 08/28/2006 APP AC CCD 9R1 - Approved Structural Review 08/28/2006 08/28/2006 APP AC CCD 6 - Approved Structural Review 08/28/2006 08/28/2006 APP AC CCD 8 - Approved Structural Review 09111/2006 0911112006 APP AC ASI118 - Approved with Notes to Inspector Structural Review 09/11/2006 09/11/2006 APP AC ASI 44 - Approved with conditions Structural Review 09/11/2006 09/11/2006 APP AC CCD 43 - Approved with conditions Structural Review 09/11/2006 09/11/2006 DEN AC Deferred Submittal 0684-15000-DFO - Seismic Anchorage and Restraint (Superior Air Handling) - Shop Drawings - Not Approved Structural Review 09/11/2006 09111/2006 APP AC Deferred Submittal 0814-08600-DFO - Skylights - Lobby Atrium and Entry Vestibule - including shop drawings and calculations - Approved with conditions Structural Review 09/11/2006 0911112006 APP AC Deferred Submittal 0836-03450-DFO - Hospital - Bay column, windows, and sills reinforcing - shop drawings. (APS) - Approved with conditions Structural Review 09/1112006 09111/2006 APP AC Deferred Submittal 0677-15000-DFO - OHVI - HV AC Seismic Bracing for Suspended Equipment - Product Data Only (FM Sheet Metal) (ISA T) - Approved with conditions Structural Review 09/11/2006 09/1112006 DEN AC Deferred Submittal 0902-15000-DFO - Hospital - HV AC Ductwork Seismic Bracing - SMACNA/IBC Comparison - Not Approved Structural Review 09111/2006 09/11/2006 APP AC Deferred Submittal 0845-15000-DFO - Hospital - Seismic Bracing - Level 3 (Less Keyplan Areas C, G, K & Q) (JH Kelly) - including shop drawings and calculations- Approved with conditions Paee 8 of 20 -0:'....... ~ . .CITY OF SPRINGFIELD Wi[' ( "1 Building/Combination Permit - . ". . -- ".--.,.. Status Issued PERMIT NO: cOM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/18/2006 541-726-3753 Phone APPLIED: 12/06/2004 541-726-3676 Fax EXPIRES: 06/12/2007 541-726-3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 09/1 1/2006 09/11/2006 DEN AC Deferred Submittal 0379-15000-DFO - HV AC Dry Side - Seismic Product Data - responses and submittals to CLAIR's 1st plan review of submittal #0379-15000-DFO including (5) sets of original submittal, (5) sets oflSA T Quality Assurance Plan, (5) sets ISA T Technical Bulletin with Oregon Stamp on cover page, and (5) sets of missing sheets of ISA T seismic bracing as indicated in the 1st plan review. - Not Approved Structural Review 09/01/2006 09/25/2006 APP AC Deferred Submittal 0839-15000-DFO - Fire Department Valve Cabinet.- Approved Structural Review 09/01/2006 09/25/2006 APP AC Deferred Submittal- 1st Back Ched - 0376-15000-DFO - Seismic Product Data Only - Medical Gas Systems. (Mason Industries) - Approved with conditions Structural Review 09/01/2006 09/25/2006 APP AC Deferred Submittal - 1st Back Ched - 0538-15000-DFI - Response to 1st plan review ofsubmittal no. 0538-15000-DFO (Seismic Locations and Details on the 1st Floor Key Plan Drawings "Q" and "T" (JH Kelly) - Approved with Notes to Inspector Structural Review 09/01/2006 09/25/2006 APP AC Deferred Submittal - 1st Back Ched - 0581-15000-DFI - Response to 1st plan review of submittal no. 0581-15000-DFO (Seismic Bracing- Parking Level (JH Kelly) - Approved with Notes to Inspector Structural Review 09/01/2006 09/18/2006 APP AC Deferred Submittal 0792-14210-DFO - Final Drawings for Elevators 5-6 and 18-19 - including shop drawings and procedures/qualifications- Approved with Conditions Structural Review . 09/01/2006 09/18/2006 APP AC Deferred Submittal 0339-14210-DFO - Electric Elevators 3, 4, 10, II, 12, Car, Machine Room and Hoistway plans with IBC Calculations - Approved with Conditions Paee 9 of 20 . .CITY OF SPRINGFIELD Building/Combination Permit Status Issued PERMIT NO: cOM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/18/2006 541-726-3753 Phone APPLIED: 12/06/2004 541-726-3676 Fax EXPIRES: 06/1212007 541-726-3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 09/0112006 09/18/2006 APP AC Deferred Submittal 0335-14240-DFO - Hosp - Hydraulic Elevators - Cars, Machine Room, Hoistway and Entrance - Drawings with IBC Calculations - Elevators 1, 2, 7, 22 & 23 - Approved with Conditions Structural Review 09/0112006 09/18/2006 APP AC Deferred Submittal 0781-14240-DFO - Hosp - Hydraulic Roped Elevators #8 and #9 IBC Hoist, Car and Machine Room - Approved with Conditions Structural Review 09/0112006 . 09/25/2006 APP AC ASI #63R - Approved Structural Review 09/0112006 09/25/2006 APP AC ASI #73R2 - Approved Structural Review 09/0112006 09/25/2006 APP AC ASI #68 - Approved Structural Review 09/01/2006 09/25/2006 APP AC ASI148RI - Approved Structural Review 09/0112006 09/25/2006 APP AC ASI137 - Approved Structural Review 09/0112006 09/2512006 APP AC ASI151 - Approved Structural Review 09/01/2006 09/25/2006 APP AC ASI 143 - Approved Structural Review 09/01/2006 09/25/2006 APP AC CCD 7 - Approved Structural Review 09/0112006 09/25/2006 APP AC CCD 41 - Approved Structural Review 09/0112006 09/25/2006 APP AC CCD 76 - Approved Structural Review 09/0112006 09/25/2006 APP AC CCD 85 - Approved Structural Review 10/0112006 10/0112006 APP AC ASI145 - Approved Structural Review 10/0112006 10/0112006 APP AC ASI115R1 - Approved Structural Review 10/01/2006 10/0112006 APP AC CCD 21 - Approved Structural Review 10/0112006 10/0112006 APP AC PR 12 - Approved wi Notes to Inspector Structural Review 10/01/2006 10/01/2006 APP AC Deferred Submittal - 0382-14240-DFO - Hydraulic Elevators 7, 22, 23 & 32 - Panels, Hoistway and Cab Details- Approved wi Notes to Inspector Structural Review 10/01/2006 10101/2006 APP AC Deferred Submittal - 0435-14210-DFO - Cab Interiors Electric Elevators 3, 4, 5-6, 18-19, 20-21,24-25,26-27 - Approved wi Notes to Inspector Structural Review 10/0112006 10/0112006 APP AC Deferred Submittal - 0532-14240-DFO - Hydraulic Elevator #1, 2, Entrance, Cab, Controls, Lanterns - Approved wi Notes to Inspector Structural Review 10/0112006 10/0112006 APP AC Deferred Submittal - 0564-14240-DFO - Elevators 8-9, Cab, Control Panel and Hall Signal Drawings - Approved wi Notes to Inspector Paee 10 of20 -~~ Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line Structural Review Structural Review Structural Review Structural Review Structural Review Structural Review Structural Review Structural Review . 10/01/2006 10/01/2006 10/01/2006 10/01/2006 10/01/2006 10/01/2006 10/01/2006 10/01/2006 10/01/2006 10/01/2006 10/01/2006 10/01/2006 10/0212006 10/0212006 10/0212006 10/0212006 . CITY OF SPRINGFIELD Building/Combination Permit PERMIT NO: cOM2004-01488 ISSUED: 05/18/2006 APPLIED: 12/06/2004 EXPIRES: 06/12/2007 VALUE: $ 212,434,907.00 APP AC Deferred Submittal- 0830-16000-DFO - Seismic Bracing of Center Hung Cable Tray (EC) (ISA T) - Approved wi Conditions Deferred Submittal - 0830-16000-DFO - Seismic Bracing of Center Hung Cable Tray (EC) (ISA T) - Approved wi Conditions Deferred Submittal- 0833-16000-DFO - Single Anchorage of Electrical Seismic Bracing (EC) (ISA T) - Approved wi Conditions Deferred Submittal - 0891-15000-DFO - Seismic Calculations for Pipe Shaft Riser Supports (Mason) - Approved with Conditions Deferred Submittal - 0373-15000-DF2 - Parking Level Fire Sprinkler Seismic Bracing - Calculations (Western StatesIWDY) - Approved wi Conditions Deferred Submittal - 0384-14210-DFO - Electric Elevator Car, Hall and Panel Drawings - including Elevator #3, 4,10,11,12, 14,15,18,19,20,21,24,25,26,27- Approved wi Notes to Inspector Deferred Submittal - 0386-14210-DFO - Electric Elevator Power Requirements. Elevators 3, 4,5,6,10-12,14-14,18-19,20-21, 24-25, and 26-27. (Traction Elevator Power Form) - Approved Deferred Submittal - 0459-15000-DF1 - Fire P~otection Hospital and OHVI Standpipe Submittal (WSFP) - including Shop Drawings (Sheets FP-OO, 0.0, 0.1, FP _I-SPN, FP _l-SPS, FP _ISO-SP, FP _ROOF-SP, FP _SUPPLY) Hydraulic Calculations (Class #3, CSP #1, #2, #3, and #4), Standpipe Seismic Bracing Calculations, and responses to CLAIR's 1st plan review - Approved wi Conditions APP AC APP AC APP AC APP AC APP AC APP AC APP AC Paee 11 of 20 . -=ITY OF SPRINGFIELD Building/Combination Permit Status Issued PERMIT NO: cOM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/18/2006 541-726-3753 Phone APPLIED: 12/06/2004 541-726-3676 Fax EXPIRES: 06/12/2007 541-726-3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 10/01/2006 10/02/2006 APP AC Deferred Submittal- 0655-15000-DF1 - Fire Protection - Hospital Levell - including Seismic Bracing - Shop drawings, Hydraulic Calculations, Structural Calculations for Seismic Bracing (WSFP) - Approved wi Conditions Structural Review 10/0112006 10/03/2006 APP AC Deferred Submittal- 853-08810-DFO - Window Systems Shop Drawings and Calculations (Eugene Mirror and Glass) - Shop drawings and calculations - Approved wi Conditions Structural Review 10/0112006 10/09/2006 APP AC ASI 71 - Approved wi Notes to Inspector Structural Review 10/0112006 10/09/2006 APP AC ASI144 - Approved Structural Review 10/0112006 10/09/2006 APP AC ASI149 - Approved Structural Review 10/0112006 10/09/2006 APP AC CCD 91 - Approved Structural Review 10/0112006 10/09/2006 APP AC CCD 32 - Approved wi Conditions Structural Review 10/01/2006 10/09/2006 APP AC CCD 74R1 - Approved Structural Review 10/01/2006 10/09/2006 APP AC PR 93 and 93A1 - Approved Structural Review 10/0112006 10/0212006 APP AC CCD3lR1-Approved Structural Review 10/01/2006 10/0212006 APP AC CCD 35 - Approved Structural Review 10/0112006 10/0212006 APP AC CCD 36 - Approved Structural Review 10/0112006 10/0212006 APP AC CCD 77 - Approved Structural Review 10/01/2006 10/0212006 APP AC CCD 4 - Approved Structural Review 10/01/2006 10/0212006 APP AC CCD 79 - Approved Structural Review 10/0112006 10/02/2006 APP AC CCD 14 - Approved Structural Review 10/01/2006 10/16/2006 APP AC ASI162 - Approved Structural Review 10/01/2006 10/16/2006 APP AC ASI125 - Approved Structural Review 10/01/2006 10/16/2006 APP AC ASI160 - Approved Structural Review 10/01/2006 10/16/2006 APP AC ASI163 - Approved Structural Review 10/01/2006 10/16/2006 APP AC ASI146 - Approved Structural Review 10/01/2006 10/16/2006 APP AC ASI166 - Approved Structural Review 10/01/2006 10/16/2006 APP AC CCD 60 - Approved wi Notes to Inspector Structural Review 10/01/2006 10/16/2006 APP AC CCD 47 - Approved Structural Review 10101/2006 10/16/2006 APP AC CCD 50 - Approved Structural Review 10/0112006 10/16/2006 APP AC CCD 96 - Approved wi Notes to Inspector Structural Review 10/01/2006 10/16/2006 APP AC CCD 8R1 - Approved Structural Review 10/01/2006 10/16/2006 APP AC Proposal Request 94 - Approved Structural Review 10/01/2006 10/16/2006 APP AC Deferred Submittal 0872-15000-DFO - OHVllst floor HV AC Seismic Layout - Shop drawings (FM Sheet Metal) - Approved wi Conditions Paee 12 of 20 . Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line Structural Review 10/01/2006 Structural Review 10/01/2006 Structural Review 10/01/2006 Structural Review 10/01/2006 Structural Review 10/01/2006 Structural Review 10/01/2006 10/16/2006 10/16/2006 10/23/2006 10/16/2006 10/23/2006 10/23/2006 .CITY OF SPRINGFIELD Building/Combination Permit PERMIT NO: cOM2004-01488 ISSUED: 05/18/2006 APPLIED: 12/06/2004 EXPIRES: 06/1212007 VALUE: $ 212,434,907.00 APP AC Deferred Submittal 0811-03450-DFO - Level 2 Parapets (north elevation at stair #1) - Hospital- Layout and reinforcing drawings (APS)- Approved wi Notes to Inspector Deferred Submittal 0908-15730-DFO - Seismic Structural Analysis Report for Fabricated Custom Air Handlin~ Units by 9/5/06 Turner Logistics- Approved wi Conditions Proposal Request 26 - Approved wi Notes to Inspector Deferred Submittal- 1st Back Ched - 0399-16000-DFI - Resubmittal for Seismic Restraint of Suspended Electrical Conduit and Cable Tray - including responses to CLAIR's first plan review with copies oflSA T Technical Bulletin, ISA T QA Plan, EC QA Plan, and letter of Responsibility from EC - Approved wi Notes to Inspector Deferred Submittal 0513-16000-DFI - Resubmittal for Seismic Restraint of Fixed Electrical Equipment' including responses to CLAIR's first plan review with copies of ISA T Technical Bulletin, ISA T QA Plan, EC QA Plan, and letter of Responsibility from EC - Approved wi Conditions Deferred Submittal - 0666-15000-DFl - Fire Protection Systems - Level 2 (WSFP) - including shop drawings, Hydraulic Calculations (RA 1,2,3,4; CSP 1,2, 3,4). Also includes cover sheet to seismic calculations, however, see submittal 655 for actual calculations - Approved wi Conditions APP AC APP AC APP AC APP AC APP AC Paee 13 of 20 . . CITY OF SrK11~t..1<l~LD Building/Combination Permit Status Issued PERMIT NO: cOM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/18/2006 541-726-3753 Phone APPLIED: 12/06/2004 541-726-3676 Fax EXPIRES: 06/12/2007 541-726-3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 10/01/2006 10/23/2006 APP AC Deferred Submittal - 0756-15000-DFO - Fire Protection Level 3 (WSFP) - including Shop Drawings (sheets FP-OO, 0.0, 0.14, SPRINK, 03-A, 03-B, 03-C, 03-D, 03-E, 03-F, 03-G, 03-H, 03-J, 03-K, 03-N, 0-3-P, 03-Q, 03-R, 03-S, 03-T) hydraulic calculations including Standpipe Supply CSP 1, 2, 3, 4 and Level3RA 1,2,3,4 and Fire Protection Seismic Bracing Levels 3-9 - Approved wi Conditions Structural Review 10/0112006 10/23/2006 APP AC Deferred Submittal 0777-08810-DFO - received electronic copy of responses to 1st plan review - Approved wi Notes to Inspector Structural Review 10/0112006 10/23/2006 APP AC Deferred Submittal 0812-03450-DFO - Level 4 Parapet - Hospital - Layoul aDd reinforcing drawings (APS)- Approved wi Notes to Inspector Structural Review 10/0112006 10123/2006 APP AC Deferred Submittal 0813-03450-1 - Level 5 Parapet - Hospital (APS). (see submittal#955 for cales) - Approved wi Conditions Structural Review 10/01/2006 10/23/2006 APP AC Deferred Submittal 0836-03450-DFO - Received structural calculations (submittal no. 0643-03450-0) in reference to our plan revi~w comment #168 for above referenced submittal (Hospital- Bay column, windows, and sills reinforcing - shop drawings - Approved wi Notes to Inspector Structural Review 10/0112006 10/23/2006 APP AC Deferred Submittal 0877-03450-DFO - OHVI Project Bay Panels - Sheet OB5 missing from original submittal (APS) - Approved Structural Review 10/0112006 10/23/2006 APP AC Deferred Submittal 0955-03450-DFO - HospitaVOHVI Parapet Panel Calculations, Bay Window Connection Calculations (APSlBright) - Approved wi Conditions Structural Review 10/0112006 10/23/2006 APP AC Deferred Submittal 0969-03450-DF1 - Hosp - DEI8 and DEI8A Precast Connections - Top of Bay Windows (APS) - Approved wi Notes to Inspector Paee 14 of 20 . .ITY OF SPRINGFIELD Building/Combination Permit Status Issued PERMIT NO: cOM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/18/2006 541-726-3753 Phone APPLIED: 12/06/2004 541-726-3676 Fax EXPIRES: 06/12/2007 541-726-3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 10/01/2006 10123/2006 APP AC Deferred Submittal 0987-15000-DFO - Seismic Bracing (JHK) - Level 3 (Key Plan Areas C, G, K, Q and T) - Approved wi Conditions Structural Review 12101/2006 12101/2006 APP AC 11/20/06 - Submittal Package No. 0989-15000-DFO - Seismic Bracing- Level 4 (Complete) (JHK) - Shop drawings - Approved with Notes to Inspector Structural Review 1210112006 12101/2006 APP AC Submittal Package No. 1040-03450-DFO - Hospital Precast- Soffit panels and connections (DE-24) - details/calcs (APS/Bright) - Approved with Conditions Structural Review 12/01/2006 1210112006 APP AC Submittal Package No. 0918-15000-DFO - OHVI- Seismic for Ductwork - Shop drawings (FM Sheet Metal) - Approved with Notes to Inspector Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - Submittal Package No. 0884-03450-DFO - Revised DE-16 Connection (Bracket Panels - 3rd floor, west elev., bottom connection) (APSlBright) - Approved with Conditions Structural Review 12/01/2006 12101/2006 APP AC 11/20/06 - Submittal Package No. 1062-14580-DFO - Pneumatic Tube Systems Seismic Restraint Level 3 - shop drawings (SwissLog) - Approved with Notes to Inspector Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - Submittal Package No. 0853-08810-DFOI - Hospital- Window Systems - Splice Joint details for Q1-Q9 Curtain Walls- Shop Drawings - Approved with Notes to Inspector Structural Review 12101/2006 12101/2006 APP AC 11/20/06 - Submittal Package No. 1072-15000-DFI - Hosp. - Structural Calcs for Shaft Support (Superior I AZH) - Approved with Notes to Inspector Structural Review 12/01/2006 12101/2006 APP AC 11/20/06 - Submittal Package No. 0845-15000-DFO - Responses to 1st plan review for Hospital - Seismic Bracing - Level 3 (Less Keyplan Areas C, G, K & Q) (JH Kelly)- Approved with Notes to Inspector Paee 15 of20 . . \.-11 i' OF SPRINu.HJ'.LJJ ' Building/Combination Permit Status Issued PERMIT NO: cOM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/18/2006 541-726-3753 Phone APPLIED: 12/06/2004 541-726-3676 Fax EXPIRES: 06/12/2007 541-726-3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 12101/2006 12/01/2006 APP AC 11/20/06 - Submittal Package No. 0376-15000-DFI - response to CLAIR's 1st back check for submittal Seismic Product Data Only - Medical Gas Systems (Twin Rivers) - Approved with Conditions Structural Review 12/01/2006 12101/2006 APP AC 11/20/06 - Submittal Package No. 0792-14210-DFO - response to CLAIR's 1st plan review for submittal Final Drawings for Elevators 5-6 and 18-19 - including responses, copy of ASI #134, email from TKE, and letter from Lerch, Bates & Associates - Approved with Notes to Inspector Structural Review 12101/2006 12101/2006 APP AC 11/20/06 - Submittal Package No. 0853-08810-DFI - Response to CLAIR's 1st plan review of submittal Window Systems Shop Drawings wi Calculations (Eugene Mirror and Glass) - Approved with Notes to Inspector Structural Review 12101/2006 12101/2006 APP AC 11/27/06 - Submittal Package No. 0987-15000-DFl - 1st Back check fOl Seismic Bracing (JHK) - Level 3 (key plan areas C, G, K, Q & T) - Notes to Inspector Structural Review 12104/2006 12104/2006 APP AC Submittal Package No. 0379-15000-DFI - Seismic Producat Data Only - HV AC Dry Side- response to CLAIR's 2nd review including responses, reviewlapproval transmittals from A+A, KPFF, and AEI,ISAT Tech. Bulletin, cover page wi Oregon stamp, QA Plan, and product data - Approved with Notes Structural Review 12104/2006 12/04/2006 APP AC Submittal Package No. 0684-15000-DF1 - Seismic Anchorage and Restraint - Superior Air - response to CLAIR's 1st review including responses, review/approva' transmittals from A+A, KPFF and AEI,ISAT Tech. Bulletin, cover page wi Oregon stamp, QA Plan, and product data - Approved with Notes Paee 16 of 20 . ecITY OF SPRINGFIELD Building/Combination Permit Status Issued PERMIT NO: cOM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/18/2006 541-726-3753 Phone APPLIED: 12/06/2004 541-726-3676 Fax EXPIRES: 06/12/2007 541-726-3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 12104/2006 12/04/2006 APP AC Submittal Package No. 0795-15000-DFO - Hospital Fire Protection - Level 4 (WSFP) - including shop drawings, seismic bracing calculations (levels 3-9 dated 8/16/06) ,hydraulic CSP calculation! 1,2,4, and hydraulic calculations Level 4 RA #1, 2, 3 - Approved with Conditions Structural Review 12/0412006 12/04/2006 APP AC Submittal Package No. 0902-15000-DF02 - responses to 1st plan review for Hosp - HV AC Ductwork Seismic Bracing - SMACNA - IBC Comparison. Including responses, review transmittals from KPFF, A+A, and AEI, letter wi stamp from Miller Engineers dated 9/11/06, and stamped copy of the SMACNA comparison - Approved with Conditions Structural Review 12104/2006 12104/2006 APP AC Submittal Package No. 1011-15400-DFO - OHVI - Seismic Plumbing Coordination - Shop drawings including 1st floor/2nd floor slab, 2nd floor/3rd floor slab, 3rd floor/4th floor slab (Twin Rivers) - Approved with Conditions Structural Review 1210412006 12104/2006 APP AC Submittal Package No. 1092-15510-DFO - Cryovent Seismic and Thermal Expansion Joints- Shop drawings and calculations (JHKelly/Mason) - Approved with Notes Structural Review 12/01/2006 12101/2006 APP AC 11/20/06 - ASI179 - Approved with notes Structural Review 12101/2006 12101/2006 APP AC 11120/06 - ASI181 - Approved Structural Review 12101/2006 12101/2006 APP AC 11/20/06 - ASI170 - Approved Structural Review 12101/2006 12101/2006 APP AC 11120/06 - ASI157 - Approved Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - ASI158 - Approved Structural Review 12101/2006 12101/2006 APP AC 11/20/06 - ASI 124revised - Approved Structural Review 12101/2006 12/01/2006 APP AC 11/20/06 - ASI187 - Approved Structural Review 12101/2006 12101/2006 APP AC 11/20/06 - ASI 175R I - Approved Structural Review 12101/2006 12/01/2006 APP AC 11/20/06 - ASI171 - Approved Structural Review 12101/2006 12/01/2006 APP AC 11/20/06 - CCD 104 - Approved Structural Review 12101/2006 12/0112006 APP AC 11/20/06 - CCD 040 - Approved Structural Review 12101/2006 12/01/2006 APP AC 11/20/06 - CCD 099 - Approved with notes Structural Review 12101/2006 12/01/2006 APP AC 11/20/06 - CCD 103 - Approved Paee 17 of20 --, _At.N!'!..,., ~1fiI,'" "..". ~'J1" ; 1111., , , .,,,, . ....... "..,.~ ,) Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line Structural Review Structural Review Structural Review Structural Review Structural Review Structural Review Structural Review Structural Review Structural Review Structural Review Structural Review Structural Review Structural Review Structural Review Structural Review Structural Review Structural Review Structural Review Structural Review Structural Review Structural Review Structural Review Structural Review Structural Review Structural Review Structural Review . 12101/2006 12101/2006 12101/2006 12/01/2006 12101/2006 12101/2006 12101/2006 12101/2006 12101/2006 06/03/2005 06/30/2005 06/12/2006 06/1212006 06/1212006 06/12/2006 0611212006 06/1212006 06/12/2006 06/12/2006 06/1212006 06/12/2006 06/1212006 06/1212006 06/1212006 0611212006 06/12/2006 12/01/2006 12101/2006 12101/2006 12101/2006 12101/2006 12101/2006 12101/2006 12/01/2006 12/01/2006 06/08/2005 06/30/2005 0611212006 06/1212006 06/1212006 06/1212006 06/12/2006 06/1212006 06/1 212006 06/12/2006 06/1212006 06/12/2006 06/1212006 06/12/2006 06/1212006 06/12/2006 06/1212006 . Lll i' OF ~rKll"lt..1<lJ'.LD Building/Combination Permit PERMIT NO: cOM2004-01488 ISSUED: 05/18/2006 APPLIED: 12/06/2004 EXPIRES: 06/1212007 VALUE: $ 212,434,907.00 APP AC APP AC APP AC APP AC APP AC APP AC APP AC APP AC APP AC APP AC APP AC APP AC APP AC APP AC APP AC APP AC APP AC APP AC APP AC APP AC APP AC APP AC APP AC APP AC APP AC APP AC Paee 18 of 20 11/20/06 - CCD 141 - Approved 11/20/06 - CCD 143 - Approved 11/27/06 - ASI161 - Approved 11/27/06 - ASI184 - Approved 11/27/06 - ASI190 - Approved 11/27/06 - CCD 101 - Approved 11/27/06 - CCD 088R2 - Approved with notes 11/27/06 - CCD 111 - Approved 11/27/06 - PR 25R2 - Approved with notes Approved for Structural fill Only Approved for foundation, shell and core only. See attached documents for plan review comments and or conditions ASI 87 plan review - approved 6/12/06 ASI 100 plan review - approved 6/12/06 ASI 60R.4 plan review - approved. ASI 97 plan review - approved 6/12106 ASII09 plan review - approved 6/12106 ASI 099R.1 plan review - approved 6/1 2106 ASI104 plan review - approved 6/12106 Proposal Request #24 plan review - approved 6/12/06 Proposal Request #22 plan review - approved 6/12/06 Proposal Request #32 plan review- approved 6/12/06 Proposal Request #67 plan review approved 6/12106 Proposal Request #90 plan review approved 6/12106 Proposal Request #36 plan review approved 6/12106 Proposal Request #77 plan review approved 6/12106 Deferred Submittal #0623-15900-DFO - Levell and 2 Reheat Control Valves - plan review - approved 6/12106 . CITY OF SPRIr\jt..1<IELD' Building/Combination Permit PERMIT NO: cOM2004-01488 ISSUED: 05/18/2006 APPLIED: 12/06/2004 EXPIRES: 06/12/2007 VALUE: $ 212,434,907.00 . Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line Structural Review 06/12/2006 0611212006 APP AC Structural Review 06112/2006 06112/2006 APP AC Structural Review 06/19/2006 06/19/2006 WE AC Structural Review 06/19/2006 06/19/2006 APP AC Structural Review 06/1912006 DEN AC 06/19/2006 Structural Review Structural Review 06/19/2006 06/19/2006 APP AC APP AC 06/19/2006 06/19/2006 Deferred Submittal 0536-15000-DFO - Tremco Firestopping (Lane-Douglas) - plan review - approved 6/12106 Deferred Submittal 0645-03450-DFO - Connection Detail DE-ll - plan review - approved with notes to inspector 6/12106 Deferred Submittal 0581-15000-DFO - Seismic Bracing - Parking Level (JH Kelly) - 1st plan review- Conditions of Approval Deferred Submittal 0598-15000-DFO - Seismic Bracing Parking Level Rev. #2 (JH Kelly) - 1st plan review - conditions of approval Deferred Submittal 0632-15000-DFO - Seismic Bracing Level 2 (JH Kelly) - 1st plan review - NOT APPROVED ASII08 - Approved ASI 95 - Approved with note to inspector To Request an inspection call the 24 hour recording at 726-3769. All inspection requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following work day. ~rptlln~ Water Line: Prior to filling trench and including required testing. Storm Sewer Line: Prior to filling trench. Backflow Device: Prior to covering and provide a copy of the test report on site at the time of inspection. Special: See Plan Review andlor Inspector Notes. Footing: After trenches are excavated. Foundation: After forms are erected but prior to concrete placement. Slab: To be made after all inslab building service equipment, conduit piping and other equipment items are in place but prior to concrete. Bolts Installed in Concrete: To be done by a State Certified Special Inspector. Provide inspection test reports to City Building Inspector. Structural Concrete: In excess of 2500 psi. To be done during construction by a State Certified Inspector. Provide results to City Buiding Inspector High Strength Bolting: To be done during construction by a State Certified Special Inspector. Provide inspection results to City Building Inspector. Paee 19 of20 . .\..,11 l' OF ::'rKlJ'\jhHJ'.LIJ Building/Combination Permit Status Issued PERMIT NO: cOM2004-01488 ISSUED: 05/18/2006 APPLIED: 12/06/2004 EXPIRES: 06/1212007 VALUE: $ 212,434,907.00 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line Special Inspection: Weld Inspection: To be done during construction by a State Certified Special Inspector with approval from the City of Springfield. Copies of inspection results shall be provided to the City of Springfield. Special Inspection: Reinforcing Steel Mill Certificate Inspection: To be done during construction by a State Certified Special Inspector with approval from the City of Springfield. Copies of inspection results shall be provided to the City of Springfield. Special Inspection: Masonry, Mortar, Grout, and Reinforcing Steel Certificates Inspection: To be done during construction by a State Certified Special Inspector with approval from the City of Springfield. Copies of inspection results shan be provided to the City of Springfield. Structural Welds: To be done during construction by State Certified Special Inspector. Provide inspection test results to City Building Inspector. Epoxy Anchors: To be done by Certified Spciallnspector. Provide Inspection results to City Building Inspector. Low Voltage: Prior to cover. Low Voltage: Prior to cover. By signature, J state aDd agree, that I bave carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shan be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.005 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. Owner or Contractors Signature Date Paee 20 of 20 225 Fifth Street Springfield, Qregon 97477 541-726-3759 Phone . .~~~;Z.. Wit ' , ", . , q.,.. ".- .. ' , ., ,-,... ,~ Caof Springfield Official Receipt _lopment Services Department Public Works Department Job/Journal Number COM2004-01488 COM2004-01488 COM2004-01488 COM2004-01488 COM2004-0 1488 Payments: Type of Paymeut Check CreditCard Job/Journal Number COM2004-0 1488 COM2004-01488 COM2004-01488 COM2004-0 1488 COM2004-01488 Payments: Type of Payment Check CreditCard cReceint I RECEIPT #: 2200600000000001684 Date: 12/12/2006 Description Low Voltage - Commercial Indus + 5% Technology Fee + 8% State Surcharge + 10% Administrative Fee Plan Review Electrical (25%) Paid By CACHE V ALLEY ELECTRIC INC CACHE VALLEY ELECTRIC INC Item Total: L'heck Number Authorization Received By Batch Number Number How Received djb 1868 In Person djb 012738 In Person Payment Total: Description Low Voltage - Commercial Indus + 5% Technology Fee + 8% State Surcharge + 10% Administrative Fee Plan Review Electrical (25%) Item Total: Paid By CACHE V ALLEY ELECTRIC INC CACHE V ALLEY ELECTRIC INC Lheck Number Authorization Received By Batch Number Number How Received djb 1868 In Person djb 012738 In Person Payment Total: Page I of I 11 :35:28AM Amount Due 1,440.00 72.00 115.20 144.00 360.00 $2,131.20 Amount Paid $1,872.00 $259.20 $2,131.20 Amount Due 1,440.00 72.00 115.20 144.00 360.00 $2,131.20 Amount Paid $1,872.00 $259.20 $2,131.20 12/12/2006