Building/Combination Permit
PERMIT NO: COM2004-01488
ISSUED: 05/18/2006
APPLIED: 12/06/2004
EXPIRES: 01111/2008
VALUE: $ 212,434,907.00
Status
Issued
SITE ADDRESS: 3333 RiverBend Dr
ASSESSOR'S PARCEL NO.: 1703220000902
Springfield
TYPE OF WORK: Hospital
TYPE OF USE: New
Commercial
PROJECT DESCRIPTION: Riverbend Hospital
Owner: PEACEHEALTH
Address: PO BOX 1479
EUGENE OR 97440
Contractor Type
Architect
General
Electrical
Low Voltage Electrical
Plumhing
I CONTRACTOR INFORMATION I
Contractor License
ANSHEN & ALLEN
TURNER CONSTRUCTION COMPANY 69988
E C COMPANY 49737
SECURECOM INC 117195
BOHEMIA PLUMBING & CONSTRUCTION 141468
BUILDING INFORMATION I
Expiration Date
11/09/2007
01/15/2008
09/07/2007
03/03/2007
Phone
415-882-9500
503 229-6000
503-224-3511
541-988-3585
541-942.8333
# of Units:
Primary Occupancy Group:
Secondary Occupancy Group:
Primary Construction Type
Secondary Construction Type:
# of Bedrooms:
1-1.1
B
IFR
# of Stories:
Height of Structure:
Type of Heat:
Water Type:
Range Type:
Energy Path:
Sprinkled Building:
Lot Size:
Sq Ft 1st Floor:
Sq Ft 2nd Floor:
Sq Ft Basement:
Sq Ft Garage/Carport
Sq Ft Other:
Occupant Load:
n/a
I DEVELOPMEN I mru"l,IATION I
Frontyard Setback:
Side 1 Setback:
Side 2 Setback:
Rearyard Setback:
Solar Setbacks:
Overlay Dist:
# Street Trees Rqd:
Paved Drive Rqd:
% of Lot Coverage:
REQUIRED PARKING
Total:
Handicapped:
Compact:
~6N: OrGgon law requlre~ IJliBIdC IMPROVEMENTS I
St t I CoIitr.::1lii!lQO cdopted by the Orego(, UlIlIlY
ree ~RfIt~tenter. Those rules are set forth \VIt)TIi!:~Q Sidewalk Type:
~~:7:.I:~a:;:~t~nt~~~~= ~~~e9r~~~~O~~ THIS PERMR"~Am~mrIF WE WORK
ooIllnt! ~ClI center. (Note: the telept:one AUTHORIZED UNDER THIS PERMIT IS NOT
Notes: ~m!w ~ the Oregon Utility Notification COMMENCED OR IS ABANDONED FOR
Canter 1ll1-aOO.332.2344). Af<< 180 DAY PERIOD.
Pa2e 1 of27
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
Description
Tvpe of Construction
Estimate
Estimate
Estimate
Estimate
Fee Description
Plan Review CommlIndlPublic
Plan Review Fire & Life Safety
+ 1 % Seismic Fee
+ 100/0 Administrative Fee
+ 7% State Surcharge
Building Permit
+ 10% Administrative Fee
+ 7% State Surcharge
Fixture
Sanitary Sewer - 1st 50 Feet
Special Waste Connection
Deposit
+ 10% Administrative Fee
+ 7% State Surcharge
Plan Review Plumbing (30%)
Sanitary Sewer - 1st 50 Feet
Sanitary Sewer Each Addtll 00'
Special Waste Connection
Storm Sewer - 1st 50 Feet
Storm Sewer Each Addtll 00'
+ 10% Administrative Fee
+ 7% State Surcharge
Add, Alter, Extend Circ Ea Add
Low Voltage - Commercial Indus
Perm ServlFdr 1000 amps/volts
Perm ServlFdr 200 amps or less
Perm ServlFdr 201 to 400 amps
Perm ServlFdr 401 to 600 amps
Perm Serv/Fdr 601 to 999 amps
Plan Review Electrical (25%)
+ 1 % Seismic Fee
+ 10% Administrative Fee
+ 7% State Surcharge
Building Permit
+ 10% Administrative Fee
.
. CITY OF SPRIN(.....l~L1J
Building/Combination Permit
PERMIT NO: COM2004-01488
ISSUED: 05/18/2006
APPLIED: 12/06/2004
EXPIRES: 01/11/2008
VALUE: $ 212,434,907.00
I Valuation Description I
$ Per Sq Ft
or multiplier
$1.00
$1.00
Square Footage
or Bid Amount
212,186,907.00
248,000.00
Value
Date Calculated
$212,186,907.00
$248,000.00
$212,434,907.00
07/01/2005
06/08/2005
Total Value of Project
Fpp< P1W
Amount Paid
$443,476.63
$272,908.69
$5,518.79
$55,187.86
$38,631.51
$55 I ,878.72
$21.60
$15.12
$14.00
$90.00
$ 112.00
$10,000.00
$293.20
$205,24
$1,029.13
$45.00
$560.00
$1,162.00
$45.00
$1,120.00
$14,201.30
$9,940.91
$22,602.00
$63,585.00
$19,125.00
$15,057.00
$18,150.00
$1,375.00
$2,119.00
$41,538.81
$1,379.70
$13,796.97
$9,657.88
$137,969.68
$5.90
Date Paid
Receipt Number
12/6/04
12/6/04
7/1/05
7/1105
7/1/05
7/1/05
7/6/05
7/6/05
7/6/05
7/6/05
7/6/05
7/8/05
8/22/05
8/22/05
8122/05
8/22/05
8/22/05
8/22/05
8/22/05
8/22/05
9/2/05
9/2105
9/2105
9/2/05
9/2/05
9/2/05
9/2/05
9/2/05
9/2/05
9/2/05
10/21/05
10/21/05
10/21/05
10/21/05
217106
Paee 2 of 27
2200400000000001481
2200400000000001481
2200500000000000873
2200500000000000873
2200500000000000873
2200500000000000873
1200500000000000955
1200500000000000955
1200500000000000955
1200500000000000955
1200500000000000955
2200500000000000902
2200500000000001132
2200500000000001132
2200500000000001132
2200500000000001132
2200500000000001132
2200500000000001132
2200500000000001132
2200500000000001132
2200500000000001211
2200500000000001211
2200500000000001211
2200500000000001211
2200500000000001211
2200500000000001211
2200500000000001211
2200500000000001211
2200500000000001211
2200500000000001211
2200500000000001477
2200500000000001477
2200500000000001477
2200500000000001477
3200600000000000057
-~~~~!I~, .
'. I
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
+ 8% State Surcharge
Plan Review Plumbing (30%)
Storm Sewer - 1st 50 Feet
Storm Sewer Each Addtll 00'
+ 10% Administrative Fee
+ 7% State Snrcharge
Fixture
Special Waste Connection
Storm Sewer - 1st 50 Feet
Storm Sewer Each Addtll00'
Plan Review Comm/IndlPublic
Plan Review Fire & Life Safety
-Mechanical Issuance Fee-
+ 10% Administrative Fee
+ 7% State Surcharge
Air Handling Unit 10,000 & Ovr
Air Handling Unit Up to 10,000
Appliance Not Listed
Appliance Vent
Backflow Device
Evaporative Coolers
Exhaust Hoods
Fixtu re
Furnace - more than 100,000
Furnace - Unit Heater
Fnrnace - up to 100,000 btu
Gas Outlets 1-4
Gas Ou tlets 4+
Heat Pump
Inspection - Preliminary
Medical Gas Base Fee
Medical Gas Each Inlet/Outlet
Medical Gas Plan Review
Not Covered Mechanical
Plan Review Electrical (25%)
Plan Review Mechanical (25%)
Plan Review Plumbing (30%)
Plan Review Plumbing (30%)
Sanitary Sewer - 1st 50 Feet
Sewage Ejector Pump
Special Waste Connection
Trap or Waste not Conn to Fixt
Vent Fan
Water Line - 1st 50 Feet
Water Line - Each AddtlIOO'
+ 10% Administrative Fee
+ 8% State Surcharge
Add, Alter, Extend Circ Ea Add
Temp Power 201 - 400 amps
.
$4.72
$159.30
$45.00
$14.00
$14.30
$10.01
$56.00
$14.00
$45.00
$28.00
$125.58
$77.28
$10.00
$10,748.00
$7,523.60
$435.00
$112.00
$28,260.00
$288.00
$210.00
$72.00
$90.00
$37,450.00
$90.00
$300.00
$18,804.00
$4.00
$6.00
$264.00
$45.00
$219.00
$14,625.00
$4,453.20
$540.00
$-6,035.53
$12,334.50
$-149.53
$12,992.40
$45.00
$112.00
$4,172.00
$1,260.00
$18.00
$45.00
$14.00
$9.00
$7.20
$21.00
$69.00
2/7/06
2/7/06
2/7/06
2/7/06
3/9/06
3/9/06
3/9/06
3/9/06
3/9/06
3/9/06
3/10/06
3/10/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
3/22/06
5/15/06
5/15/06
5/15/06
5/15/06
Pae;e 3 of 27
. CITY OF ~rKlj"lt..1'lJ<.,LU
Building/Combination Permit
PERMIT NO: COM2004-01488
ISSUED: 05/18/2006
APPLIED: 12/06/2004
EXPIRES: 0111112008
VALUE: $ 212,434,907.00
3200600000000000057
3200600000000000057
3200600000000000057
3200600000000000057
2200600000000000287
2200600000000000287
2200600000000000287
2200600000000000287
2200600000000000287
2200600000000000287
1200600000000000285
1200600000000000285
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000366
2200600000000000602
2200600000000000602
2200600000000000602
2200600000000000602
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
54 I -726-3676 Fax
541-726-3769 Inspection Line
+ 10% Administrative Fee
+ 8% State Surcharge
Low Voltage - Commercial Indus
Plan Review Electrical (25%)
Refund - Admin Fee
Refund - Electrical
Refund - Surcharge
+ 10% Administrative Fee
+ 10% Administrative Fee
+ 10% Administrative Fee
+ 7% State Surcharge
+ 8% State Surcharge
+ 8% State Surcharge
Fixture
Not Covered Plumbing
Plan Review Plumbing (30%)
Plan Review Plumbing (30%)
Plan Review Plumbing (30%)
Refund - Admin Fee
Refund - Plumbing
Refund - Surcharge
Sanitary or Storm Sewer Cap
Sanitary Sewer - 1st 50 Feet
Sanitary Sewer Each Addtll00'
Special Waste Connection
Storm Sewer - 1st 50 Feet
Storm Sewer Each Addtl100'
+ 10% Administrative Fee
+ 5% Technology Fee
+ 8% State Surcharge
Low Voltage - Commercial Indus
+ 10% Administrative Fee
+ 5% Technology Fee
+ 8% State Surcharge
Low Voltage - Commercial Indus
+ 10% Administrative Fee
+ 5% Technology Fee
+ 8% State Surcharge
Low Voltage - Commercial Indus
Plan Review Electrical (25%)
+ 10% Administrative Fee
+ 5% Technology Fee
+ 8% State Surcharge
Low Voltage - Commercial Indus
Plan Review Electrical (25%)
+ 10% Administrative Fee
+ 5% Technology Fee
+ 8% State Surcharge
Low Voltage - Commercial Indus
.
$900.00
$720.00
$9,000.00
$2,250.00
$-2.10
$-21.00
$.1.68
$11.50
$11.80
$137.20
$96.04
$9.20
$9.44
$1,344.00
$28.00
$34.50
$35.40
$481.57
$-137.20
$-1,853.57
$-96.04
$45.00
$45.00
$28.00
$42.00
$45.00
$28.00
$13.50
$6.75
$10.80
$135.00
$274.50
$137.25
$219.60
$2,745.00
$144.00
$72.00
$ II 5.20
$1,440.00
$360.00
$603.00
$301.50
$482.40
$6,030.00
$1,507.50
$490.50
$245.25
$392.40
$4,905.00
5/18/06
5/18/06
5/18/06
5/18/06
5/19/06
5/19/06
5/19/06
6/8/06
6/8/06
6/8/06
6/8/06
6/8/06
6/8/06
6/8/06
6/8/06
6/8/06
6/8/06
6/8/06
6/8/06
6/8/06
6/8/06
6/8/06
6/8/06
6/8/06
6/8/06
6/8/06
6/8/06
8/9/06
8/9/06
8/9/06
8/9/06
12/4/06
12/4/06
12/4/06
12/4/06
12/12/06
12/12/06
12/12/06
12/12/06
12/12/06
2/15/07
2/15/07
2/15/07
2/15/07
2/15/07
3/19/07
3/19/07
3/19/07
3/19/07
Paee 4 of 27
.
CITY OF SPRINGFIELD
Building/Combination Permit
PERMIT NO: COM2004-01488
ISSUED: 05/18/2006
APPLIED: 12/06/2004
EXPIRES: 0111112008
VALUE: $ 212,434,907.00
1200600000000000678
1200600000000000678
1200600000000000678
1200600000000000678
VOUCHER #104418
VOUCHER #104418
VOUCHER #104418
1200600000000000829
1200600000000000829
1200600000000000827
1200600000000000827
1200600000000000829
1200600000000000829
1200600000000000827
1200600000000000827
1200600000000000829
1200600000000000829
1200600000000000827
VOUCHER # 105568
VOUCHER # 105568
VOUCHER # 105568
1200600000000000829
1200600000000000829
1200600000000000829
1200600000000000829
1200600000000000829
1200600000000000829
1200600000000001228
1200600000000001228
1200600000000001228
1200600000000001228
1200600000000001719
1200600000000001719
1200600000000001719
1200600000000001719
2200600000000001684
2200600000000001684
2200600000000001684
2200600000000001684
2200600000000001684
2200700000000000210
2200700000000000210
2200700000000000210
2200700000000000210
2200700000000000210
3200700000000000157
3200700000000000157
3200700000000000157
3200700000000000157
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
Plan Review Mechanical (25%)
+ 10% Administrative Fee
+ 5% Technology Fee
+ 8% State Surcharge
Plan Review Plumbing (30%)
Sanitary Sewer - 1st 50 Feet
Sanitary Sewer Each Addtl 100'
Special Waste Connection
Storm Sewer - 1st 50 Feet
Storm Sewer Each Addtl 100'
Sanitary Sewer - Reimbursement
SDC MWMC Administration
SDC MWMC Improvement
SDC MWMC Reimbursement
SDC Sanitary/Storm Admin
SDC Transpo Admin
SDC Transpo Improvement
SDC Transpo Reimbursement
Storm Drainage Impervious Area
+ 100/0 Administrative Fee
+ 5% Technology Fee
+ 8% State Surcharge
Low Voltage - Commercial Indus
Total Amount Paid
Initial Review
Public Works Review
.
$1,226.25
$67.80
$33.90
$54.24
$203.40
$45.00
$28.00
$224.00
$45.00
$336.00
$172,729.80
$10.00
$768,682.48
$72,795.91
$33,130.87
$87,265.55
$853,215.71
$282,168.90
$258,325.56
$5.00
$2.50
$4.00
$50.00
3/19/07
4/20/07
4/20/07
4/20/07
4/20/07
4120/07
4/20/07
4120/07
4/20/07
4/20/07
6/22/07
6/22107
6/22107
6/22/07
6/22/07
6/22/07
6/22/07
6/22/07
6/22/07
7/27/07
7/27/07
7/27/07
7/27/07
. CITY OF SPRINGFIELD
Building/Combination Permit
PERMIT NO: COM2004-01488
ISSUED: 05/18/2006
APPLIED: 12/06/2004
EXPIRES: 01/11/2008
VALUE: $ 212,434,907.00
3200700000000000157
2200700000000000563
2200700000000000563
2200700000000000563
2200700000000000563
2200700000000000563
2200700000000000563
2200700000000000563
2200700000000000563
2200700000000000563
1200700000000000802
1200700000000000802
1200700000000000802
1200700000000000802
1200700000000000802
1200700000000000802
1200700000000000802
1200700000000000802
1200700000000000802
2200700000000001194
2200700000000001194
2200700000000001194
2200700000000001194
LLH
Received permission from Philip
Farrington to recycle old plans.
Added SDC fees provided by Ken.
Processed info into cashier as
provided by Les in amount of
$2,528,324.77 check #00291969.
Fee's are for Hospital 7-01488,
Central Utility Plant 5-01358, and
OHVI4-01488.
ASI 95 - Approved with note to
inspector
ASI I06R.l - Approved with
Conditions
Proposal Request #35R.3 and
#35R.4 - Approved with Conditions
Proposal Request #52 - Approved
Proposal Request #63 - Approved
Proposal Request #80 - Approved
with Note to Inspector
$4,467,345.75
I Plan Reviews I.
03/30/2006
03/30/2006
10
JLP
Structural Review 06/19/2006 06/19/2006 APP AC
Structural Review 06/19/2006 06/19/2006 APP AC
Structural Review 06/19/2006 06/19/2006 APP AC
Structural Review 06/19/2006 06/19/2006 APP AC
Structural Review 06/1912006 06/19/2006 APP AC
Structural Review 06/19/2006 06/19/2006 APP AC
06/21/2007
06/20/2007
10
Paee 5 of 27
. . CITY OF ~rKll'lGFIELD
Building/Combination Permit
Status Issued PERMIT NO: COM2004-01488
225 Fifth Street, Springfield, OR ISSUED: 05/18/2006
541-726-3753 Phone APPLIED: 12/06/2004
541-726-3676 Fax EXPIRES: 01/11/2008
541-726-3769 Inspection Line VALUE: $ 212,434,907.00
Structural Review 07/01/2006 07/03/2006 APP AC Deferred Submittal No.
0485-05510-DFO - Stair No.7, 9,10,
and 11 - 1st Back Check - Approved
with Notes to Inspector
Structural Review 07/01/2006 07/03/2006 APP AC Deferred Submittal No.
0625-03450-DFO - 3rd Floor Precast
Bracket Panel Reinforcing Drawing'
w/ Calculations (APS) - Approved
with conditions
Structural Review 07/01/2006 07/17/2006 APP AC Deferred Submittal Package No,
0707-03450-DFO - 3rd Floor West
Elevation Sills (between bracket
panels) reivsion (APS) - Approved
with Notes to Inspector
Structural Review 07/01/2006 07/17/2006 APP AC Deferred Submittal Package No.
0624-03450-DFO - Connection
RDE-l and RDE-3 for panels SPl
and SP3 (west elevation) (APS) .
Approved with Notes to Inspector
Structural Review 07/0112006 07/17/2006 APP AC Deferred Submittal Package No.
0557-03450-DFO-l - Parapet and
Bay Windows - Hospital (APS) -
Approved with Notes to Inspector
Structural Review 07/0112006 07/17/2006 APP AC Deferred Submittal Package No.
0675-03450-DFO - Corner Window
sills reinforcing, Level 4 Hospital -
including shop drawings (APS) -
Approved with Notes to Inspector
Structural Review 07/01/2006 07/17/2006 APP AC Deferred Submittal Package No.
0676-03450-DFO - Precast Window
Sills Reinforcing - OHVI - shop
drawings (APS) - Approved with
Notes to Inspector
Structural Review 07/01/2006 07/17/2006 APP AC Deferred Submittal Package No.
0632-15000-DFl - Seismic Bracing-
Level 2. (Previously submitted plans
for this submittal were taken and
stamped by KPFF and returned to
CLAIR 7/11/06 for the back check t(
our first review of this submittal) -
Approved with Notes to Inspector
Structural Review 07/01/2006 07/17/2006 APP AC Proposal Request #37 - Approved
Structural Review 07/01/2006 07/17/2006 APP AC Proposal Request #97 - Approved
Structural Review 07/01/2006 07/17/2006 APP AC Construction Change Directive #52 .
Approved with Conditions
Structural Review 07/01/2006 07/17/2006 APP AC Construction Change Directive #10 .
Approved
Structural Review 07/01/2006 07/17/2006 APP AC Construction Change Directive #53 .
Approved with Notes to Inspector
Pa2e 6 of27
. . CITY OF SPRINGFIELD
Building/Combination Permit
Status Issued PERMIT NO: COM2004-01488
225 Fifth Street, Springfield, OR ISSUED: 05/18/2006
54 I -726.3753 Phone APPLIED: 12/06/2004
541-726-3676 Fax EXPIRES: 01/11/2008
541-726-3769 Inspection Line VALUE: $ 212,434,907.00
Structural Review 07/01/2006 07/17/2006 APP AC Construction Change Directive #70 -
Approved with Conditions
Structural Review 07/01/2006 07/17/2006 APP AC Construction Change Directive
#55R2 - Approved.
Structural Review 07/01/2006 07/17/2006 APP AC ASI #111 - Approved
Structural Review 07/01/2006 07/17/2006 APP AC ASI #61 - Approved
Structural Review 07/31/2006 08/01/2006 APP AC ASI #62 approved 7/31/06
Structural Review 07/3i/2006 08/01/2006 APP AC ASI #115Rl, 115R3, adn 115R4-
Approved on 7/31/06
Structural Review 07/31/2006 08/01/2006 APP AC ASI 120 - Approved 7/31/06
Structural Review 07/31/2006 08/01/2006 APP AC ASI130 - Approved 7/31/06
Structural Review 07/31/2006 08/01/2006 APP AC ASI 134 - Approved 7/31/06
Structural Review 07/31/2006 08/01/2006 APP AC ASI 133. Approved 7/31/06
Structural Review 07/31/2006 08/01/2006 APP AC CCD 12 . Approved 7/31/06
Structural Review 07/31/2006 08/01/2006 APP AC CCD 13 - Approved 7/31/06
Structural Review 07/31/2006 08/01/2006 APP AC CCD 71 - Approved with notes to
inspector 7/31/06
Structural Review 07/31/2006 08/01/2006 APP AC CCD 48 - Approved 7/31/06
Structural Review 07/31/2006 08/01/2006 APP AC CCD 28 - Approved 7/31/06
Structural Review 07/31/2006 08/01/2006 APP AC PR 65 - Approved 7/31/06
Structural Review 07/31/2006 08/01/2006 APP AC PR 34 - Approved 7/31/06
Structural Review 07/31/2006 08/01/2006 APP AC Deferred Submittal
#0704-03450-DFO - 1st Floor Precast
Sills (plan and reinforcing) - OHVI .
Approved 7/31/06
Structural Review 08/01/2006 08/03/2006 APP AC Deferred Submittal
#0777-08810-DFO - West Elevation
Window Systems Floors 1-3 -
Approved with conditions
Structural Review 08/01/2006 08/09/2006 APP AC ASI122 - Approved
Structural Review 08/01/2006 08/09/2006 APP AC AS! 91 - Approved with Notes to
Inspector
Structural Review 08/01/2006 08/09/2006 APP AC ASI 123 . Approved
Structural Review 08/01/2006 08/09/2006 APP AC CCD 46 - Approved
Structural Review 08/01/2006 08/09/2006 APP AC CCD 81 - Approved
Structural Review 08/01/2006 08/09/2006 APP AC PR #21 - Approved
Structural Review 08/01/2006 08/09/2006 APP AC PR 42 - Approved
Structural Review 08/01/2006 08/09/2006 APP AC Deferred Submittal Package No.
0373-I5000-DFl - Larsen VR-I818
Fire Hose Valve Cabinet - product
data/cut sheets - Approved
Structural Review 08/01/2006 08/09/2006 APP AC Deferred Snbmittal Package No.
0553-15000-DFO - Interior
Accoustical Caulking for Non
Fire-rated Wall Penetrations-
Tremco Product Data.
(Lane-Douglas) - Approved
Paee 7 of27
. . CITY OF SPRIN{d<U,LU
Building/Combination Permit
Status Issued PERMIT NO: COM2004-01488
225 Fifth Street, Springfield, OR ISSUED: 05/18/2006
541-726-3753 Phone APPLIED: 12/06/2004
541-726-3676 Fax EXPIRES: 01/1112008
541-726.3769 Inspection Line VALUE: $ 212,434,907.00
Structural Review 08/01/2006 08/0912006 APP , AC Deferred Submittal Package No.
0558-I5000-DFO - Seismic Pipe
Bracing - Calculations (JH Kelly).
Including Structural Calculations b)
Miller Consulting dated 3/21/06 and
Supplemental Structural
Calculations by Miller Consulting
dated 4/26/06 - Approved with Notes
to Inspector
Structural Review 08/01/2006 08/14/2006 APP AC ASI 116 - Approved
Structural Review 08/01/2006 08/14/2006 APP AC ASI121 - Approved
Structural Review 08/01/2006 08/14/2006 APP AC ASl 69R2 - Conditions of Approval
Structural Review 08/01/2006 08/14/2006 APP AC ASI 141 - Approved
Structural Review 08/01/2006 08/14/2006 APP AC CCD 16 - Approved
Structural Review 08/01/2006 08/14/2006 APP AC CCD 3 - Approved
Structural Review 08/01/2006 08/14/2006 APP AC CCD 75 - Approved
Structural Review 08/01/2006 08/14/2006 APP AC CCD 2 - Approved
Structural Review 08/01/2006 08/14/2006 APP AC CCD 78 - Notes to inspector
Structural Review 08101/2006 08/14/2006 APP AC CCD 67 - Approved
Structural Review 08/01/2006 08/14/2006 APP AC CCD 15 - Condition of Approval
Structural Review 08/01/2006 08/14/2006 APP AC CCD 11 - Notes to Inspector
Structural Review 08/01/2006 08/14/2006 APP AC CCD 20 - Approved
Structural Review 08/01/2006 08/14/2006 APP AC CCD 48RI - Approved
Structural Review 08/01/2006 08/14/2006 APP AC CCD 25 - Approved
Structural Review 08/01/2006 08/14/2006 APP AC Deferred Submittal 0899-15000-DFO
- Seismic Anchorage and Restraints
Hilti Kwik Bolt TZ Wedge Anchor-
Product Data/Cut Sheets - Approved
with Notes to Inspector
Structural Review 08/01/2006 08/14/2006 APP AC Deferred Submittal -
0843-15000-DFO - OHVI- Seismic
Bracing of Suspended Utilities (Twin
Rivers) - calculations (ISA T)-
Approved with Notes to Inspector
Structural Review 08/01/2006 08/14/2006 APP AC Deferred Submittal 0613-15000-DFO
- Seismic Bracing - Levell (JH
Kelley) - including shop drawings
and calculations - Approved with
Notes to Inspector
Structural Review 08/01/2006 08/2112006 APP AC ASI #119 - Approved
Structural Review 08/01/2006 08/21/2006 APP AC ASI 91R - Approved
Structural Review 08/01/2006 08/21/2006 APP AC ASI142 - Approved
Structural Review 08/01/2006 08/21/2006 APP AC CCD 45 - Approved
Structural Review 08/01/2006 08/21/2006 APP AC CCD 27 - Approved
Structural Review 08/01/2006 08/21/2006 APP AC CCD 24 - Approved
Paee 8 of27
. . CITY OF SPK11~ut<lELD
Building/Combination Permit
Status Issued PERMIT NO: COM2004-01488
225 Fifth Street, Springfield, OR ISSUED: 05/18/2006
541-726-3753 Phone APPLIED: 12/06/2004
541-726-3676 Fax EXPIRES: 01/11/2008
541-726-3769 Inspection Line VALUE: $ 212,434,907.00
Structural Review 08/01/2006 08/21/2006 APP AC Deferred Submittal 0779-1 5900-DFO
- Parking Garage Ventilation
Controls Deferred Submittal -
including product data/cut sheets
and shop drawings (Johnson
Controls) - Approved with notes to
inspector
Structural Review 08/27/2006 08/28/2006 APP AC ASI I23Rl - Approved
Structural Review 08/27/2006 08/28/2006 APP AC ASI 139 - Approved
Structural Review 08/27/2006 08/28/2006 APP AC ASI 147 - Approved
Structural Review 08/27/2006 08/28/2006 APP AC CCD 9Rl - Approved
Structural Review 08/27/2006 08/28/2006 APP AC CCD 6 - Approved
Structural Review 08/27/2006 08/28/2006 APP AC CCD 8 - Approved
Structural Review 09/11/2006 09/11/2006 APP AC ASI 118 - Approved with Notes to
Inspector
Structural Review 09/11/2006 09/11/2006 APP AC ASI 44 - Approved with conditions
Structural Review 09/11/2006 09/11/2006 APP AC CCD 43 - Approved with conditions
Structural Review 09111/2006 09/11/2006 DEN AC Deferred Submittal 0684-15000-DFO
- Seismic Anchorage and Restraint
(Superior Air Handling) - Shop
Drawings - Not Approved
Structural Review 09/11/2006 09/11/2006 APP AC Deferred Submittal 0814-08600-DFO
- Skylights - Lobby Atrium and
Entry Vestibule - including shop
drawings and calculations -
Approved with conditions
Structural Review 09/11/2006 09111/2006 APP AC Deferred Submittal 0836-03450.DFO
- Hospital - Bay column, windows,
and sills reinforcing - shop
drawings. (APS) - Approved with
conditions
Structural Review 09/10/2006 09/11/2006 APP AC Deferred Submittal 0677-15000-DFO
- OHVI - HV AC Seismic Bracing for
Suspended Equipment - Product
Data Only (FM Sheet Metal) (ISA T)
- Approved with conditions
Structural Review 09/10/2006 09/11/2006 . DEN AC Deferred Submittal 0902-15000-DFO
- Hospital - HV AC Ductwork
Seismic Bracing - SMACNAIlBC
Comparison - Not Approved
Structural Review 09/10/2006 09/1112006 APP AC Deferred Submittal 0845-15000-DFO
- Hospital - Seismic Bracing - Level
3 (Less Keyplan Areas C, G, K & Q)
(JH Kelly) - including shop
drawings and calculations -
Approved with conditions
Paee 9 of27
. . CITY OF SPRINLl'lJ'.LD
Building/Combination Permit
Status Issued PERMIT NO: COM2004-01488
225 Fifth Street, Springfield, OR ISSUED: 05/18/2006
541-726-3753 Phone APPLIED: 12/06/2004
541-726-3676 Fax EXPIRES: 01/11/2008
541-726-3769 Inspection Line VALUE: $ 212,434,907.00
Structural Review 09/10/2006 09/11/2006 DEN AC Deferred Submittal 0379-15000-DFO
- HV AC Dry Side - Seismic Product
Data - responses and submittals to
CLAIR's 1st plan review of
submittal #0379-15000-DFO
including (5) sets of original
submittal, (5) sets oflSA T Quality
Assurance Plan, (5) sets ISA T
Technical Bulletin with Oregon
Stamp on cover page, and (5) sets of
missing sheets of ISA T seismic
bracing as indicated in the 1st plan
review. - Not Approved
Structural Review 09/01/2006 09/25/2006 APP AC Deferred Submittal 0839-15000-DFO
- Fire Department Valve Cabinet. -
Approved
Structural Review 09/01/2006 09/25/2006 APP AC Deferred Submittal - 1st Back Ched
- 0376-I5000-DFO. Seismic Product
Data Only - Medical Gas Systems.
(Mason Industries) - Approved with
conditions
Structural Review 09/01/2006 09/25/2006 APP AC Deferred Submittal - 1st Back Ched
- 0538-15000-DFl - Response to 1st
plan review of submittal no.
0538-15000-DFO (Seismic Locations
and Details on the 1st Floor Key
Plan Drawings "Q" and "T" (JH
Kelly) - Approved with Notes to
Inspector
Structural Review 09/01/2006 09/25/2006 APP AC Deferred Submittal - 1st Back Ched
- 0581-15000-DFI - Response to 1st
plan review of submittal no.
0581-15000-DFO (Seismic Bracing-
Parking Level (JH Kelly) -
Approved with Notes to Inspector
Structural Review 09/01/2006 09/18/2006 APP AC Deferred Submittal 0792-14210-DFO
- Final Drawings for Elevators 5-6
and 18-19 - including shop drawings
and procedures/qualifications -
Approved with Conditions
Structural Review 09/0112006 09/18/2006 APP AC Deferred Submittal 0339-142IO-DFO
- Electric Elevators 3, 4, 10, 11, 12,
Car, Machine Room and Hoistway
plans with !BC Calculations -
Approved with Conditions
Pa2e 10 of27
. . CITY OF SPRINGFIELD
Building/Combination Permit
Status Issued PERMIT NO: COM2004-01488
225 Fifth Street, Springfield, OR ISSUED: 05/18/2006
541-726-3753 Phone APPLIED: 12/06/2004
54 I -726.3676 Fax EXPIRES: 01111/2008
541-726-3769 Inspection Line VALUE: $ 212,434,907.00
Structural Review 09/01/2006 09/18/2006 APP AC Deferred Submittal 0335-14240-DFO
- Hosp - Hydraulic Elevators - Cars,
Machine Room, Hoistway and
Entrance - Drawings with IDC
Calculations - Elevators 1,2,7,22 &
23 - Approved with Conditions
Structural Review 09/01/2006 09/18/2006 APP AC Deferred Submittal 0781-14240-DFO
- Hosp - Hydraulic Roped Elevators
#8 and #9 IBC Hoist, Car and
Machine Room - Approved with
Conditions
Structural Review 09/01/2006 09/25/2006 APP AC ASI #63R - Approved
Structural Review 09/01/2006 09/25/2006 APP AC ASI #73R2 - Approved
Structural Review 09/01/2006 09/25/2006 APP AC ASI #68 - Approved
Structural Review 09/01/2006 09/25/2006 APP AC ASI 148Rl - Approved
Structural Review 09/01/2006 09/25/2006 APP AC ASI 137 - Approved
Structural Review 09/01/2006 09/25/2006 APP AC ASI 151 - Approved
Structural Review 09/01/2006 09/25/2006 APP AC ASI 143 - Approved
Structural Review 09/01/2006 09/25/2006 APP AC CCD 7 - Approved
Structural Review 09/01/2006 09/25/2006 APP AC CCD 41 - Approved
Structural Review 09/01/2006 0912512006 APP AC CCD 76 - Approved
Structural Review 09/01/2006 09/25/2006 APP AC CCD 85 - Approved
Structural Review 10/01/2006 10/01/2006 APP AC ASI 145 - Approved
Structural Review 10/01/2006 10/01/2006 APP AC ASI 11 5R I - Approved
Structural Review 10/01/2006 10/01/2006 APP AC CCD 21 - Approved
Structural Review 10/01/2006 10/01/2006 APP AC PR 12 - Approved wi Notes to
Inspector
Structural Review 10/01/2006 10/01/2006 APP AC Deferred Submittal-
0382-14240-DFO - Hydraulic
Elevators 7, 22, 23 & 32 - Panels,
Hoistway and Cab Details-
Approved wi Notes to Inspector
Structural Review 10/01/2006 10/01/2006 APP AC Deferred Submittal-
0435-14210-DFO - Cab Interiors
Electric Elevators 3, 4, 5-6, 18-19,
20-21, 24-25, 26-27 - Approved wi
Notes to Inspector
Structural Review 10/01/2006 10/01/2006 APP AC Deferred Submittal -
0532-14240-DFO - Hydraulic
Elevator #1,2, Entrance, Cab,
Controls, Lanterns - Approved wi
Notes to Inspector
Structural Review 10/01/2006 10/0112006 APP AC Deferred Submittal -
0564-I4240-DFO - Elevators 8-9,
Cab, Control Panel and HaU Signal
Drawings - Approved wi Notes to
Inspector
Paee 11 of 27
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
Structural Review
Structural Review
Structural Review
Structural Review
Structural Review
Structural Review
Structural Review
Structural Review
.
10/01/2006
10/01/2006
10/01/2006
10/01/2006
10/01/2006
10/01/2006
10/01/2006
10/01/2006
10/01/2006
10/01/2006
10/01/2006
10/01/2006
10102/2006
10102/2006
10/0212006
10/0212006
.
CITY OF SPRINGFIELD
Building/Combination Permit
PERMIT NO: COM2004-01488
ISSUED: 05/18/2006
APPLIED: 12/06/2004
EXPIRES: 01/11/2008
VALUE: $ 212,434,907.00
APP AC
Deferred Submittal -
0830-16000-DFO - Seismic Bracing
of Center Hung Cable Tray (EC)
(ISA T) - Approved wi Conditions
Deferred Submittal -
0830-16000-DFO - Seismic Bracing
of Center Hung Cable Tray (EC)
(ISA T) - Approved wi Conditions
Deferred Submittal-
0833-16000-DFO - Single Anchorage
of Electrical Seismic Bracing (EC)
(ISA T) - Approved wi Conditions
Deferred Submittal-
08.91-15000-DFO - Seismic
Calculations for Pipe Shaft Riser
Supports (Mason) - Approved with
Conditions
Deferred Submittal -
0373-15000-DF2 - Parking Level
Fire Sprinkler Seismic Bracing -
Calculations (Western StatesIWDY)
- Approved wi Conditions
Deferred Submittal -
0384-14210-DFO - Electric Elevator
Car, Hall and Panel Drawings -
including Elevator #3, 4,10, II, 12,
14,15,18,19,20,21,24,25,26,27 -
Approved wi Notes to Inspector
Deferred Submittal -
0386-14210-DFO - Electric Elevator
Power Requirements - Elevators 3,
4,5,6,10-12,14-14,18-19,20-21,
24-25, and 26-27. (Traction
Elevator Power Form) - Approved
Deferred Submittal -
0459-15000-DFI - Fire Protection
Hospital and OHVI Standpipe
Submittal (WSFP) - including Shop
Drawings (Sheets FP-OO, 0.0, 0.1,
FP _I-SPN, FP _I-SPS, FP _ISO-SP,
FP _ROOF-SP, FP _SUPPLY)
Hydraulic Calculations (Class #3,
CSP #1, #2, #3, and #4), Standpipe
Seismic Bracing Calculations, and
responses to CLAIR's 1st plan
review - Approved wi Conditions
APP AC
APP AC
APP AC
APP AC
APP AC
APP AC
APP AC
Paee 12 of 27
. . CITY OF SPRI~\_d<lJ'.LIJ
Building/Combination Permit
Status Issued PERMIT NO: COM2004-01488
225 Fifth Street, Springfield, OR ISSUED: 05/18/2006
541-726-3753 Phone APPLIED: 12/06/2004
541-726-3676 Fax EXPIRES: 01/11/2008
541-726-3769 Inspection Line VALUE: $ 212,434,907.00
Structural Review 10/01/2006 10/0212006 APP AC Deferred Submittal -
0655-15000-DFI - Fire Protection-
Hospital Levell - including Seismic
Bracing - Shop drawings, Hydraulic
Calculations, Structural
Calculations for Seismic Bracing
(WSFP) - Approved wi Conditions
Structural Review 10/01/2006 10/03/2006 APP AC Deferred Submittal- 853-08810-DFO
- Window Systems Shop Drawings
and Calculations (Eugene Mirror
and Glass) - Shop drawings and
calculations - Approved wi
Conditions
Structural Review 10/01/2006 10/09/2006 APP AC ASI 71 - Approved wi Notes to
Inspector
Structural Review 10/01/2006 10/09/2006 APP AC ASI144 - Approved
Structural Review 10/01/2006 10/09/2006 APP AC ASI 149 - Approved
Structural Review 10/01/2006 10/09/2006 APP AC CCD 91 - Approved
Structural Review 10/01/2006 10/09/2006 APP AC CCD 32 - Approved wi Conditions
Structural Review 10/01/2006 10/09/2006 APP AC CCD 74RI - Approved
Structural Review 10/01/2006 10/09/2006 APP AC PR 93 and 93AI - Approved
Structural Review 10/01/2006 10/0212006 APP AC CCD 31RI - Approved
Structural Review 10/01/2006 10/0212006 APP AC CCD 35 - Approved
Structural Review 10/01/2006 10/0212006 APP AC CCD 36 - Approved
Structural Review 10/01/2006 10/02/2006 APP AC CCD 77 - Approved
Structural Review 10/01/2006 10/02/2006 APP AC CCD 4 - Approved
Structural Review 10/01/2006 10/02/2006 APP AC CCD 79 - Approved
Structural Review 10/01/2006 10/02/2006 APP AC CCD 14 - Approved
Structural Review 10/01/2006 10/16/2006 APP AC ASI 162 - Approved
Structural Review 10/01/2006 10/16/2006 APP AC ASI 125 - Approved
Structural Review 10/01/2006 10/16/2006 APP AC ASI160 - Approved
Structural Review 10/01/2006 10/16/2006 APP AC ASI163 - Approved
Structural Review 10/01/2006 10/16/2006 APP AC ASI146 - Approved
Structural Review 10/01/2006 10/16/2006 APP AC ASI 166 - Approved
Structural Review 10/01/2006 10/16/2006 APP AC CCD 60 - Approved wi Notes to
Inspector
Structural Review 10/01/2006 10/16/2006 APP AC CCD 47 - Approved
Structural Review 10/01/2006 10/16/2006 APP AC CCD 50 - Approved
Structural Review 10101/2006 10/16/2006 APP AC CCD 96 - Approved wi Notes to
Inspector
Structural Review 10/01/2006 10/16/2006 APP AC CCD 8RI - Approved
Structural Review 10/01/2006 10/16/2006 APP AC Proposal Request 94 - Approved
Structural Review 10/01/2006 10/16/2006 APP AC Deferred Submittal 0872-15000-DFO
- OHVllst floor HV AC Seismic
Layout - Shop drawings (FM Sheet
Metal) - Approved wi Conditions
Paee 13 of27
.
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
Structural Review
10/01/2006
Structural Review
10/01/2006
Structural Review
10/01/2006
Structural Review
10/01/2006
Structural Review
10/01/2006
Structural Review
10/01/2006
10/16/2006
10/16/2006
10/23/2006
10/16/2006
10/23/2006
10123/2006
. CITY OF SPRINGFIELD
Building/Combination Permit
PERMIT NO: COM2004-01488
ISSUED: 05/18/2006
APPLIED: 12/06/2004
EXPIRES: 01/11/2008
VALUE: $ 212,434,907.00
APP AC
Deferred Submittal 0811-03450-DFO
- Level 2 Parapets (north elevation
at stair #1) - Hospital- Layout and
reinforcing drawings (APS) -
Approved wi Notes to Inspector
Deferred Submittal 0908-15730-DFO
- Seismic Structural Analysis Report
for Fabricated Custom Air Handlin~
Units by 9/5/06 Turner Logistics -
Approved wi Conditions
Proposal Request 26 - Approved wi
Notes to Inspector
Deferred Submittal - 1st Back Ched
- 0399-16000-DFI - Resubmittal for
Seismic Restraint of Suspended
Electrical Conduit and Cable Tray -
including responses to CLAIR's first
plan review with copies of ISA T
Technical Bulletin, ISA T QA Plan,
EC QA Plan, and letter of
Responsibility from EC - Approved
wi Notes to Inspector
Deferred Submittal 0513-16000-DFl
- Resubmittal for Seismic Restraint
of Fixed Electrical Equipment -
including responses to CLAIR's first
plan review with copies of ISA T
Technical Bulletin, ISA T QA Plan,
EC QA Plan, and letter of
Responsibility from EC - Approved
wi Conditions
Deferred Submittal -
0666-15000-DFl - Fire Protection
Systems - Level 2 (WSFP) -
including shop drawings, Hydraulic
Calculations (RA 1,2,3,4: CSP 1,2,
3, 4). Also includes cover sheet to
seismic calculations, however, see
submittal 655 for actual calculations
- Approved wi Conditions
APP AC
APP AC
APP AC
APP AC
APP AC
Paee 14 of 27
~~.::1..IN.caP:~.. ;.'
.. " .
"'".!' ,,'
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
Structural Review
Structural Review
Structural Review
Structural Review
Structural Review
Structural Review
Structural Review
Structural Review
.
10/01/2006
10/01/2006
10/01/2006
10/01/2006
10/01/2006
10/01/2006
10/01/2006
10/01/2006
10/23/2006
10123/2006
10/23/2006
10/23/2006
10/23/2006
10/23/2006
10/23/2006
10/23/2006
.
CITY OF SPRI~t..1<mLD
Building/Combination Permit
PERMIT NO: COM2004-01488
ISSUED: 05/18/2006
APPLIED: 12/06/2004
EXPIRES: 01/11/2008
VALUE: $ 212,434,907.00
APP AC
Deferred Submittal-
0756-15000-DFO - Fire Protection
Level 3 (WSFP) - including Shop
Drawings (sheets FP-OO, 0.0, 0.14,
SPRINK, 03-A, 03-B, 03-C, 03-D,
03-E, 03-F, 03-G, 03-H, 03-J, 03-K,
03-N, 0-3-P, 03-Q, 03-R, 03-S, 03-T)
hydraulic calculations including
Standpipe Supply CSP 1, 2, 3, 4 and
Level3RA 1,2,3,4 and Fire
Protection Seismic Bracing Levels
3-9 - Approved wi Conditions
Deferred Submittal 0777-08810-DFO
- received electronic copy of
responses to 1st plan review -
Approved wi Notes to Inspector
Deferred Submittal 0812-03450-DFO
- Level 4 Parapet - Hospital - Layout
and reinforcing drawings (APS) -
Approved wi Notes to Inspector
Deferred Submittal 0813-03450-1 -
Level 5 Parapet - Hospital (APS).
(see submittal#955 for calcs) -
Approved wi Conditions
Deferred Submittal 0836-03450-DFO
- Received structural calculations
(submittal no. 0643-03450-0) in
reference to our plan review
comment #168 for above referenced
submittal (Hospital - Bay column,
windows, and sills reinforcing - shop
drawings - Approved wi Notes to
Inspector
Deferred Submittal 0877-03450-DFO
- OHVI Project Bay Panels - Sheet
OB5 missing from original submittal
(APS) - Approved
Deferred Submittal 0955-03450-DFO
- HospitaVOHVI Parapet Panel
Calculations, Bay Window
Connection Calculations
(APSlBright) - Approved wi
Conditions
Deferred Submittal 0969-03450-DFI
- Hosp - DEI8 and DE18A Precast
Connections - Top of Bay Windows
(APS) - Approved wi Notes to
Inspector
APP AC
APP AC
APP AC
APP AC
APP AC
APP AC
APP AC
Paee 15 of 27
. . CITY OF SPRINGFIELD
Building/Combination Permit
Status Issued PERMIT NO: COM2004-01488
225 Fifth Street, Springfield, OR ISSUED: 05/18/2006
541-726-3753 Phone APPLIED: 12/06/2004
541-726-3676 Fax EXPIRES: 01/11/2008
541-726-3769 Inspection Line VALUE: $ 212,434,907.00
Structural Review 10/01/2006 10/23/2006 APP AC Deferred Submittal 0987-15000-DFO
- Seismic Bracing (JHK) - Level 3
(Key Plan Areas C, G, K, Q and T) -
Approved wi Conditions
Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - Submittal Package No.
0989-15000-DFO - Seismic Bracing-
Level 4 (Complete) (JHK) - Shop
drawings - Approved with Notes to
Inspector
Structural Review 12/01/2006 12/01/2006 APP AC Submittal Package No.
1040-03450-DFO - Hospital Precast-
Soffit panels and connections
(DE-24) - detailslcalcs (APSlBright)
- Approved with Conditions
Structural Review 12101/2006 12/01/2006 APP AC Submittal Package No.
0918-15000-DFO - OHVI- Seismic
for Ductwork - Shop drawings (FM
Sheet Metal) - Approved with Notes
to Inspector
Structural Review 12101/2006 12/01/2006 APP AC 11/20/06 - Submittal Package No.
0884-03450-DFO - Revised DE-16
Connection (Bracket Panels - 3rd
floor, west elev., bottom connection)
(APSlBright) - Approved with
Conditions
Structural Review 12101/2006 12/01/2006 APP AC 11/20/06 - Submittal Package No.
1062-14580-DFO - Pneumatic Tube
Systems Seismic Restraint Level 3 -
shop drawings (Swiss Log) -
Approved with Notes to Inspector
Structural Review 12101/2006 12/01/2006 APP AC 11/20/06 - Submittal Package No.
0853-08810-DFOI - Hospital-
Window Systems - Splice Joint
details for QI-Q9 Curtain Walls-
Shop Drawings - Approved with
Notes to Inspector
Structural Review 12/01/2006 12101/2006 APP AC 11/20/06 - Submittal Package No.
1072-15000-DFI - Hosp. - Structural
Calcs for Shaft Support (Superior I
AZH) - Approved with Notes to
Inspector
Structural Review 12101/2006 12/01/2006 APP AC 11/20/06 - Submittal Package No.
0845-15000-DFO - Responses to 1st
plan review for Hospital - Seismic
Bracing - Level 3 (Less Keyplan
Areas C, G, K & Q) (JH Kelly)-
Approved with Notes to Inspector
Paee 16 of 27
. . CITY OF SPRINGFIELD
Building/Combination Permit
Status Issued PERMIT NO: COM2004-0I488
225 Fifth Street, Springfield, OR ISSUED: 05/18/2006
541-726-3753 Phone APPLIED: 12/06/2004
541-726-3676 Fax EXPIRES: 01/11/2008
541-726'3769 Inspection Line VALUE: $ 212,434,907.00
Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - Submittal Package No.
0376-15000-DFl - response to
CLAIR's 1st back check for
submittal Seismic Product Data
Only - Medical Gas Systems (Twin
Rivers) - Approved with Conditions
Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - Submittal Package No.
0792-14210-DFO - response to
CLAIR's 1st plan review for
submittal Final Drawings for
Elevators 5-6 and 18-19 - including
responses, copy of ASI #134, email
from TKE, and letter from Lerch,
Bates & Associates - Approved with
Notes to Inspector
Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - Submittal Package No.
0853-08810-DFI - Response to
CLAIR's 1st plan review of
submittal Window Systems Shop
Drawings wi Calculations (Eugene
Mirror and Glass) - Approved with
Notes to Inspector
Structural Review 12101/2006 12/01/2006 APP AC 11/27/06 - Submittal Package No.
0987-15000-DFI - 1st Back check for
Seismic Bracing (JHK) - Level 3
(key plan areas C, G, K, Q & T) -
Notes to Inspector
Structural Review 12/04/2006 12/04/2006 APP . AC Submittal Package No.
0379-15000-DFI - Seismic Producat
Data Only - HV AC Dry Side -
response to CLAIR's 2nd review
including responses,
reviewlapproval transmittals from
A+A, KPFF, and AEI, ISA T Tech.
Bulletin, cover page wi Oregon
stamp, QA Plan, and product data -
Approved with Notes
Structural Review 12104/2006 12/04/2006 APP AC Submittal Package No.
0684-15000-DFI - Seismic
Anchorage and Restraint - Superior
Air - response to CLAIR's 1st
review including responses,
reviewlapproval transmittals from
A+A, KPFF and AEI, ISA T Tech.
Bulletin, cover page wi Oregon
stamp, QA Plan, and product data -
Approved with Notes
Paee 17 of27
_as:'AiNcarlDoD .' . . CITY OF SPRINGFIELD
.~.
Building/Combination Permit
,
Status Issued PERMIT NO: COM2004-01488
225 Fifth Street, Springfield, OR ISSUED: 05/18/2006
APPLIED: 12/06/2004
541-726-3753 Phone EXPIRES: 01/11/2008
541-726-3676 Fax
541-726-3769 Inspection Line VALUE: $ 212,434,907.00
Structural Review 12/04/2006 12/04/2006 APP AC Submittal Package No.
0795-15000-DFO - Hospital Fire
Protection - Level 4 (WSFP) -
including shop drawings, seismic
bracing calculations (levels 3-9 dated
8/16/06) , hydraulic CSP calculation!
1,2,4, and hydraulic calculations
Level 4 RA #1, 2, 3 - Approved with
Conditions
Structural Review 12104/2006 12/04/2006 APP AC Submittal Package No.
0902-15000-DF02 - responses to 1st
plan review for Hosp - HV AC
Ductwork Seismic Bracing -
SMACNA - IBC Comparison.
Including responses, review
transmittals from KPFF, A+A, and
AEI, letter wi stamp from Miller
Engineers dated 9/11/06, and
stamped copy of the SMACNA
comparison - Approved with
Conditions
Structural Review 12/04/2006 12/04/2006 APP AC Submittal Package No.
1011-15400-DFO - OHVI- Seismic
Plumbing Coordination - Shop
drawings including 1st floor/2nd
floor slab, 2nd floor/3rd floor slab,
3rd floor/4th floor slab (Twin
Rivers) - Approved with Conditions
Structural Review 12/04/2006 12104/2006 APP AC Submittal Package No.
1092-15510-DFO - Cryovent Seismic
and Thermal Expansion Joints -
Shop drawings and calculations
(JHKellylMason) - Approved with
Notes
Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - ASI179 - Approved with
notes
Structural Review 12101/2006 12/0112006 APP AC 11/20/06 - AS1181 - Approved
Structural Review 12101/2006 12/01/2006 APP AC 11/20/06 - AS1170 - Approved
Structural Review 12101/2006 12/01/2006 APP AC 11/20/06 - AS1157 - Approved
Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - AS1158 - Approved
Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - ASI124revised -
Approved
Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - ASI187 - Approved
Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - ASI175R I - Approved
Structural Review 12/01/2006 12101/2006 APP AC 11/20/06 - ASI171 - Approved
Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - CCD 104 - Approved
Structural Review 12/01/2006 12101/2006 APP AC 11/20/06 - CCD 040 - Approved
Structural Review 12/01/2006 12101/2006 APP AC 11/20/06 - CCD 099 - Approved with
notes
Structural Review 12101/2006 12/01/2006 APP AC 11/20/06 - CCD 103 - Approved
Paee 18 of 27
. . CITY OF ::'rKll'iL1<mLIJ
Building/Combination Permit
Status Issued PERMIT NO: COM2004-01488
225 Fifth Street, Springfield, OR ISSUED: 05/18/2006
541-726-3753 Phone APPLIED: 12/06/2004
541-726-3676 Fax EXPIRES: 01/11/2008
541-726-3769 Inspection Line VALUE: $ 212,434,907.00
Structural Review 12101/2006 12101/2006 APP AC 11/20/06 - CCD 141 - Approved
Structural Review 12/01/2006 12101/2006 APP AC 11/20/06 - CCD 143 - Approved
Structural Review 12101/2006 12/01/2006 APP AC 11/27/06 - ASI161 - Approved
Structural Review 12101/2006 12/01/2006 APP AC 11/27/06 - ASI 184 - Approved
Structural Review 12101/2006 12101/2006 APP AC 11/27/06 - ASI190 - Approved
Structural Review 12101/2006 12101/2006 APP AC 11127106 - CCD 101 - Approved
Structural Review 12101/2006 12/01/2006 APP AC 11/27/06 - CCD 088R2 - Approved
with notes
Structural Review 12101/2006 1210112006 APP AC 11/27/06 - CCD III - Approved
Structural Review 12/0112006 12101/2006 APP AC 11/27/06 - PR 25R2 - Approved with
notes
Structural Review 12/01/2006 12/11/2006 APP AC ASI123R2 - Approved with Notes to
Inspector
Structural Review 12101/2006 12/1112006 APP AC ASI126RI - Approved with Notes to
inspector
Structural Review 12101/2006 12111/2006 APP AC ASI180 - Approved with conditions
Structural Review 12/01/2006 12/11/2006 APP AC ASI174R2 - Approved with
conditions
Structural Review 12101/2006 12/11/2006 APP AC ASI187Rl - Approved
Structural Review 12101/2006 1211112006 APP AC CCD 127 - Approved wtih Notes to
Inspector
Structural Review 12101/2006 1211112006 APP AC CCD 132 - Approved with Notes to
inspector
Structural Review 12101/2006 1211112006 APP AC Deferred Submittal Package No.
0373-15000-DF3 - Fire Protection -
Victaulic V38 Concealed OR
Sprinkler -product datalcut sheets-
Approved with Conditions
Structural Review 12101/2006 1211112006 APP AC Deferred Submittal Package No.
0373-15000-DF4 - Fire Protection -
TYCO Model PRV-I Pressure
Reducing Valve - product data -
Approved with Conditions
Structural Review 12101/2006 12/1112006 APP AC Deferred Submittal Package No.
0565-09510-DFOOI - Accoustical
Ceilings and Grid Systems -
including product datalcut sheets
and structural calculations and
letter from Armour Undsderfer Eng
dated 10/12/06. - Approved with
Conditions
Structural Review 12101/2006 1211112006 APP AC Deferred Submittal Package No.
1042-15300-DFO - Fire Supression
System FM-200 - Hospital MDF
Room (RFI) - including shop
drawings, structural and seismic
calculations, and product datalcut
sheets - Approved with Conditions
Paee 19 of27
-Wi"4'I . . CITY OF SPRINGFIELD
Building/Combination Permit
Status Issued PERMIT NO: COM2004-01488
225 Fifth Street, Springfield, OR ISSUED: 05/18/2006
541-726-3753 Phone APPLIED: 12/06/2004
541-726-3676 Fax EXPIRES: 01/11/2008
541-726-3769 Inspection Line VALUE: $ 212,434,907.00
Structural Review 12/01/2006 1211112006 APP AC Deferred Submittal Package No.
0505-15000-DFI - Responses to
CLAIR's review of Hospital -
Seismic for Vacuum Equipment-
including responses, Mason
certificate of compliance, QA Plan,
and detailslcalculations - Approved
with Conditions
Structural Review 12/01/2006 1211112006 APP AC Deferred Submittal Package No.
1073-16000-DFO - Seismic Restraint
of Suspended Electrical Conduit and
Cable Tray (Levels 3 and 4) (EC) -
Shop drawings - Approved with
Conditions
Structural Review 12/01/2006 1211112006 APP AC Deferred Submittal Package No.
0509-07810-DF03 - Sprayed On
Fireproofing Thickness Schedule I
Shop Drawings for the Stair Towers
(PCS) - including product data
(Tremco 300) and shop drawings -
Approved with Conditions
Structural Review 12101/2006 1211112006 APP AC Deferred Submittal Package No.
0814-08600-DFO - Responses to
CLAIR's 1st review of Skylights-
Lobby Atrium and Entry Vestibule-
including responses, letter dated
10/27/06 from Evergreen House,
letter dated 10/5106 from ENW, and
1 sketch - Approved with Conditions
Structural Review 12/01/2006 12/11/2006 APP AC Deferred Submittal Package No.
1083-15000-DFO - OHVI- Riser
Supports for Insulated Piping (Twin
Rivers) - Product datalcut sheets -
Aproved with Notes to Inspector
Structural Review 12/01/2006 12/18/2006 APP AC Deferred Submittal Package No.
1064-16000-DFO - Seismic Restraint
of Suspended Electrical Conduit and
Cable Tray (Levels Parking, I, and
2) (EC) - Shop drawings - Approved
with COnditions of Approval
Structural Review 12/01/2006 12/11/2006 APP AC ASrt41RI - Approved with Notes to
Inspector
Structural Review 12/01/2006 12/18/2006 APP AC ASI188 - Approved with Notes to
Inspector
Structural Review 01/01/2007 01/08/2007 APP AC AS1187R2 - Approved
Structural Review 01/01/2007 01/08/2007 APP AC ASII3I - Approved with Conditions
Structural Review 01/01/2007 01/08/2007 APP AC CCD 192 - Approved
Structural Review 01/01/2007 01/08/2007 APP AC CCD 183R2 - Approved
Structural Review 01/01/2007 01/08/2007 APP AC PR 102 - Approved with Conditions
Paee 20 of27
. . CITY OF ::'rKll'lhHJ'.LU
Building/Combination Permit
Status Issued PERMIT NO: COM2004-01488
225 Fifth Street, Springfield, OR ISSUED: 05/18/2006
541-726-3753 Phone APPLIED: 12/06/2004
541-726-3676 Fax EXPIRES: 01/11/2008
541-726-3769 Inspection Line VALUE: $ 212,434,907.00
Structural Review 01/01/2007 01/08/2007 APP AC Submittal Package No.
0339-14210-DFO - Response to
submittal Electric Elevators 3, 4,10,
II, 12, Car, Machine Room and
Hoistway plans with IBC
Calculations - including comments
from 1st plan review, revised shop
drawings, shop drawings for
elevators 24, 25, 26, and 27, and
copies of CCD 50 and CCD 53.
Approved with Conditions
Structural Review 01/01/2007 01/08/2007 APP AC Submittal Package No.
0373-15000-DF5 - (response to
CLAIR's review of0373-15000-DF2)
Parking Level Fire Sprinkler
Seismic Bracing - including
comments, transmittals sheet from
WSFP addressing KPFF comments,
and calculations dated 10/27/06.
Approved with Notes to Inspector
Structural Review 01/01/2007 01/0812007 APP AC Submittal Package No.
0655-15000-DF2 - Responses to Fire
Protection Systems Seismic Bracing
- Levell (WSFP). Including
responses to CLAIR's 1st review,
responses to KPFF comments, and
calculations.
Approved with Conditions
Structural Review 01/01/2007 01/08/2007 APP AC Submittal Package No.
0459-15000-DF2 - 2nd response to
Fire Protection Hospital and OHVI
Standpipe Submittal (WSFP) -
including responses to I st back
check, response to KPFF's
comments dated 8/19/06, standpipe
seismic calculations, and product
data.
Approved with Conditions
Structural Review 01/01/2007 01/08/2007 APP AC Submittal Package No.
0833-16000-DFO - Response to 1st
review of Single Anchorage of
Electrical Seismic Bracing (EC)
(ISA T) - including responses.
Approved with Notes to Inspector
Paee 21 of 27
~Wi~ . . CITY OF SPRINGFIELD
Building/Combination Permit
Status Issued PERMIT NO: COM2004-01488
225 Fifth Street, Springfield, OR ISSUED: 05/18/2006
541-726-3753 Phone APPLIED: 12/06/2004
541-726-3676 Fax EXPIRES: 01/11/2008
541-726-3769 Inspection Line VALUE: $ 212,434,907.00
Structural Review 01/01/2007 01/08/2007 APP AC Submittal Package No.
0677-15000-DFOIDFI - Response to
1st review ofOHVI- HVAC Seismic
Bracing for Suspended Equipment-
Product Data Only (FM Sheet
Metal) (ISA T) - including responses,
memorandums/review comments
from KPFF, AEI.
Approved with Conditions
Structural Review 01/01/2007 01/08/2007 APP AC Submittal Package No.
1037-15000-DFI - Hospital-
Fabrication Support Shoe (JH Kelly
I EISI) - including calculations, and
product datalcut sheets.
(review/approval transmittals from
KPFF, AEI and A+A)
Approved with Notes to Inspector
Structural Review 01101/2007 01/15/2007 APP AC CCD 94RI - Approved with
Conditions
Structural Review 01/01/2007 01/15/2007 APP AC CCD 105 - Approved
Structural Review 01/01/2007 01/15/2007 APP AC CCD 121 - Approved
Structural Review 01/01/2007 01/15/2007 APP AC CCD 190 - Approved
Structural Review 01/01/2007 01/15/2007 APP AC CCD 193 - Approved
Structural Review 01/01/2007 01/15/2007 APP AC CCD 13RI - Approved
Structural Review 01/01/2007 01/15/2007 APP AC CCD 184 - Approved
Structural Review 01/01/2007 01/15/2007 APP AC Submittal Package No.
1120-15000-DFO - Fire Protection
Systems - Level 5 (WSFP) -.
including Hydraulic cales
(Standpipe Supply CSP I, 3, 4, and
RA #1,2, 3), cover sheet for seismic
calcs for levels 1, 2 and 5-9) and
shop drawings.
Approved with Conditions
Structural Review 01/01/2007 01/15/2007 APP AC Submittal Package No.
0756-15000-DFOIDF1 - Response to
Fire Protection Level 3 (WSFP) -
including responses, revised
calculations, and product data.
Approved with Conditions
Structural Review 01/01/2007 01/15/2007 APP AC Submittal Package No.
0884-03450-DFO - Response to
submittal Revised DE-16
Connection (Bracket Panels - 3rd
floor, west elev., bottom connection)
(APSlBright) - including responses,
sketch.
Approved with Notes to Inspector
Paee 22 of27
. . CITY OF SPRINGFIELD
Building/Combination Permit
Status Issued PERMIT NO: COM2004-01488
225 Fifth Street, Springfield, OR ISSUED: 05/18/2006
541-726-3753 Phone APPLIED: 12/06/2004
541-726-3676 Fax EXPIRES: 01/11/2008
541-726-3769 Inspection Line VALUE: $ 212,434,907.00
Structural Review 01/01/2007 01/15/2007 APP AC Submittal Package No.
0666-15000-DF1(DFI) - Response to
1st review of Fire Protection
Systems - Level 2 (WSFP) -
including responses, cover sheet of
cales, memorandumlcomments from
A+A, KPFF, and AEI.
Approved with Conditions
Structural Review 01/01/2007 01/15/2007 APP AC Submittal Package No.
0795-15000-DFO(DFI) - Response to
1st review of Hospital Fire
Protection - Level 4 (WSFP) -
Including responses, copy of cover 01
cales, and memorandumlcomments
from A+A, KPFF, and AEI.
Approved with Conditions
Structural Review 01/01/2007 01/15/2007 APP AC Submittal Package No.
1011-15400-DFO(DFI) - Responses
to 1st review of OHVI - Seismic
Plumbing Coordination Shop
drawings (Twin Rivers) - Including
responses, ISA T Manual.
Approved with Notes to Inspector
Structural Review 01/0 1/2007 01/15/2007 APP AC Submittal Package No.
0373-15000-DF6 - Fire Protection
Data and Garage Level Drawings
and Calculations - Product data onl)
Aurora Fire Pumps.
Approved with Conditions
Structural Review 01/01/2007 01/1512007 APP AC Submittal Package No.
0781-14240-DFI - Response to
submittal Hosp - Hydraulic Roped
Elevators #8 and #9 IBC Hoist, Car
and Machine Room - including final
shop drawings incorporating
clarifications based on 1st
reviewlKPFF comments, and RFI
2046 wi sketches addressing hoist
beam requirements.
Approved with Notest to Inspector
Structural Review 02108/2007 02/08/2007 APP AC Submittal Package No.
1117-16740-DFO - Seismic Support
of Telecom Racks (AZH) - Approved
with Conditions
Structural Review 02108/2007 02108/2007 APP AC Submittal Package No.
1l03-15000-DFO - Seismic Bracing-
Level 6, all areas (JHK) - including
shop drawings, seismic calculations,
and product data - Approved with
Conditions
Paee 23 of 27
~~~ . . CITY OF SPRIN&1< IJ'.LIJ
Building/Combination Permit
Status Issued PERMIT NO: COM2004-01488
225 Fifth Street, Springfield, OR ISSUED: 05/18/2006
541-726-3753 Phone APPLIED: 12/06/2004
541-726-3676 Fax EXPIRES: 01/11/2008
541-726-3769 Inspection Line VALUE: $ 212,434,907.00
Structural Review 02/08/2007 02/08/2007 APP AC Submittal Package No.
1123-15000-DFO - Fire Protection
Systems - Level 6 (WSFP) -
including shop drawings,
calculations cover sheet, supply calc!
level 6 zones 1; 2, 3, and standpipe
supply calcs level 6, CPS I, 3, 4 -
Approved with Conditons
Structural Review 02/08/2007 0210812007 APP AC Submittal Package No.
1130-15000-DFO - Fire Protection
Systems - Level 8 (WSFP) -
including shop drawings, hydraulic
calcs (standpipe supply CSP 1,3,3
and level 8 RA #1, 2, 3), and cover
sheet to seismic calculations -
Approved with notes to inspector
Structural Review 02/08/2007 02/08/2007 APP AC Submittal Package No.
1081-15000-DFO - OHVI MDF
Room - Fire Supression System
FM-200 (RFI) - including product
datalcut sheets and shop drawings.
(piping over 1" and supply tank
seismic will be submitted seperately)
- Approved with Conditions
Structural Review 02108/2007 02108/2007 APP AC Submittal Package No.
0509-07810-DF2 - Response to
submittal Sprayed On Fireproofing
Thickness SchedulelShop Drawings.
including responses only (PCS) -
Approved with Conditions
Structural Review 02108/2007 02/08/2007 APP AC Submittal Package No.
1102-16000-DFO - Seismic Restraint
of Level 4 Suspended Electrical
Systems - including shop drawings
(EC). (anchorage detail DI.1TZ to
be forwarded seperately) -
Approved with Conditions
Structural Review 02108/2007 02/08/2007 APP AC Submittal Package No.
1098-16000-DFO - OHVI - Seismic
Restraint of Level 2 Suspended
Electrical Conduit and Cable Tray -
including shop drawings (EC).
(Anchorage Detail DI.1TZ to be
submitted seperately) - Approved
with Conditions
Structural Review 02/08/2007 02/08/2007 APP AC CCD 224 - Alpproved with
Conditions
Structural Review 02/08/2007 0210812007 APP AC CCD 154 - Approved
Structural Review 02108/2007 02108/2007 APP AC CCD 161 - Approved
Paee 24 of27
. . CITY OF SPRINt.1<mLIJ
Building/Combination Permit
Status Issued PERMIT NO: COM2004-01488
225 Fifth Street, Springfield, OR ISSUED: 05/18/2006
541-726-3753 Phone APPLIED: 12/06/2004
541-726-3676 Fax EXPIRES: 01/11/2008
541-726-3769 Inspection Line VALUE: $ 212,434,907.00
Structural Review 02108/2007 02/08/2007 APP AC CCD 56 - Approed with notes to
inspector
Structural Review 02108/2007 02/08/2007 APP AC CCD 152 - Approved with notes to
inspector
Structural Review 0210812007 02/08/2007 APP AC CCD 203 - Approved
Structural Review 02/08/2007 0210812007 APP AC CCD 216 - Approved with
conditions
Structural Review 02/08/2007 0210812007 APP AC CCD 182 - Approved with Notes to
inspector
Structural Review 06/02/2005 06/03/2005 10 LLH Forwarded revised structural fill
drawings to Clair
Structural Review 06/03/2005 06/08/2005 APP AC Approved for Structural fill Only
Structural Review 06/30/2005 06/30/2005 APP AC Approved for foundation, shell and
core only. See attached documents
for plan review comments and or
conditions
Structural Review 06/1212006 06/12/2006 APP AC ASI 87 plan review - approved
6/12106
Structural Review 0611212006 06/12/2006 APP AC ASI 100 plan review - approved
6/12106
Structural Review 06/1212006 06/1212006 APP AC ASI 60R.4 plan review - approved.
Structural Review 06/1212006 06/12/2006 APP AC ASI 97 plan review - approved
6/12106
Structural Review 0611212006 06/1212006 APP AC ASI 109 plan review - approved
6/12106
Structural Review 06/12/2006 06/12/2006 APP AC ASI 099R.1 plan review - approved
6/12/06
Structural Review 06/11/2006 06/12/2006 APP AC ASI104 plan review - approved
6/12106
Structural Review 06/1212006 06/1212006 APP AC Proposal Request #24 plan review -
approved 6/12/06
Structural Review 06112/2006 06/1212006 APP AC Proposal Request #22 plan review -
approved 6/12106
Structural Review 06/12/2006 06/1212006 APP AC Proposal Request #32 plan review -
approved 6/12/06
Structural Review 0611212006 06/12/2006 APP AC Proposal Request #67 plan review
approved 6/12/06
Structural Review 0611212006 06/1212006 APP AC Proposal Request #90 plan review
approved 6/12/06
Stru'ctural Review 06/12/2006 06/1212006 APP AC Proposal Request #36 plan review
approved 6/12/06
Structural Review 06/1212006 06/1212006 APP AC Proposal Request #77 plan review
approved 6/12/06
Structural Review 06112/2006 0611212006 APP AC Deferred Submittal
#0623-15900-DFO - Levell and 2
Reheat Control Valves - plan review
- approved 6/12/06
Paee 25 of27
.
.
CITY OF SPRINLJ< IJ'.LIJ
Status
Issued
Building/Combination Permit
PERMIT NO: COM2004-01488
ISSUED: 05/18/2006
APPLIED: 12/0612004
EXPIRES: 01/11/2008
VALUE: $ 212,434,907.00
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
Structural Review 06/1212006 06/1212006 APP AC Deferred Submittal 0536-15000-DFO
- Tremco Firestopping
(Lane-Douglas) - plan review -
approved 6/12/06
Structural Review 06112/2006 06/12/2006 APP AC Deferred Submittal 0645-03450-DFO
- Connection Detail DE-II - plan
review - approved with notes to
inspector 6/12106
Structural Review 06/19/2006 06/19/2006 WE AC Deferred Submittal 0581-15000-DFO
- Seismic Bracing - Parking Level
(JH Kelly) - 1st plan review-
Conditions of Approval
Structural Review 06/19/2006 06/19/2006 APP AC Deferred Submittal 0598-15000-DFO
- Seismic Bracing Parking Level
Rev. #2 (JH Kelly) - 1st plan review
- conditions of approval
Structural Review 06/19/2006 06/19/2006 DEN AC Deferred Submittal 0632-15000-DFO
- Seismic Bracing Level 2 (JH Kelly)
- 1st plan review - NOT
APPROVED
Structural Review 06/19/2006 06/19/2006 APP AC ASII08 - Approved
To Request an inspection call the 24 hour recording at 726-3769. All inspections requested before 7:00
a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following
work day.
Ueollirerunsnections I
Water Line: Prior to filling trench and including required testing.
Storm Sewer Line: Prior to filling trench.
Backflow Device: Prior to covering and provide a copy of the test report on site at the time of inspection.
Special: See Plan Review andlor Inspector Notes.
Footing: After trenches are excavated.
Foundation: After forms are erected but prior to concrete placement.
Slab: To be made after all inslab building service equipment, conduit piping and other equipment items are in
place but prior to concrete.
Bolts Installed in Concrete: To be done by a State Certified Special Inspector. Provide inspection test reports to
City Building Inspector.
Structural Concrete: In excess of 2500 psi. To be done during construction by a State Certified Inspector.
Provide results to City Buiding Inspector
High Strength Bolting: To be done during construction by a State Certified Special Inspector. Provide inspection
results to City Building Inspector.
Special Inspection: Weld Inspection: To be done during construction by a State Certified Special Inspector with
approval from the City of Springfield. Copies of inspection results shall be provided to the City of Springfield.
Paee 26 of 27.
.
.
CITY OF SPRINGFIELD
Building/Combination Permit
Status
Issued
PERMIT NO: COM2004-01488
ISSUED: 05/18/2006
APPLIED: 12/06/2004
EXPIRES: 01/11/2008
VALUE: $ 212,434,907.00
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
Special Inspection: Reinforcing Steel Mill Certificate Inspection: To be done during construction by a State
Certified Special Inspector with approval from the City of Springfield. Copies of inspection results shall be
provided to the City of Springfield.
Special Inspection: Masonry, Mortar, Grout, and Reinforcing Steel Certificates Inspection: To be done during
construction by a State Certified Special Inspector with approval from the City of Springfield. Copies of
inspection results shall be provided to the City of Springfield.
Structural Welds: To be done during construction by State Certified Special Inspector. Provide inspection test
results to City Building Inspector.
Epoxy Anchors: To be done by Certified Spciallnspector. Provide Inspection results to City Building Inspector.
Low Voltage: Prior to cover.
Low Voltage: Prior to cover.
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that an
information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with
the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and
that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety.
I further certify that only contractors and employees who are in compliance with ORS 701.005 will be used on this project. I
further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the
street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all
times during construction.
Owner or Contractors Signature
Date
Paee 27 of 27
t!lectrical Authorization To Begin wor~
E-mailedTo:RMARTlN@RFI.COM
.City of Springfield
~
~....
Receipt # RC514594
7/26120072:29:29 PM
Check on status of permit
By Phone: (541)726-3753 or Email: permitcenter@ci.springfield.or.us
TYPE OF WORK
I [K] New construction
D Addition/alteration/replacement
CATEGORY OF CONSTRUCTION
I D I or 2 family dwelling D Multi-family [K] Commercial/Industrial
I JOB SITE INFORMATION AND LOCATION
IJob no.: 305970054 IJob addrtS5: 3333 GAME FARM RD
ICitylStaleJZlP: SPRINGFIELD, OR 97477-7521
ISuitelbldgJapl.no.:
I Project name: PeaceHealth Security
Cross sired/directions to job silt:
I Subdivision:
ITax map/partel no.:
I Lot no.:
1703220001000
DESCRIPTION OF WORK
Install security system
SITE CONTACT
I Name: Jon Thompson
I Phone: (503) 682-9900 Ext: 3038
I Email: rmartin@rfi.com
I Fax: (503) 682-9500
CONTRACTOR
I EL 11(. no.: 34.174CLE IceD lie. no.: 67147
I Business Name: RFI ENTERPRISES INC OREGON
I Contact: Jon Thompson
IAdd.....: 6195 SW 112TH AVE
ICitylSta,eJZlP: BEAVERTON OR 97008
I Phone: (503)6266387 I Fax: None
I Email: RMARTIN@RFI.COM
I Metro lie. no.: 4551 I City lie. no.:
I Supervising tltdriclan's lie. no.:
I Suptrvlsing electrician's name: 8TH DAY AUDIO & VIDEO INC
Upon review and approval by your local Jurisdiction, your
penn It will be e-malled or faxed within one business day,
with Instructions on how to schedule your Inspection.
NOTE: This Authorization To Begin Work expires within 180
days if a pennlt Is not obtained.
The local building department may detennlne that an
Authorization To Begin Work Is null and void if It does not
meet applicable land use laws and local ordinances.
I FEE SCHEDULE
J}e,criptinn I Qty. J Ea. I Total
I Residential SINGLE. OR multi-family d",'elUng unit. Includes
attacbtd garagt
I 1,000 sq. n. or less
Ea. addl 500 sq. ft. or portion
I-Limited energy, residential
(with above SQ. ft.)
I-Limited energy. multifamily
residential (with above SQ. ft.)
I Sen'lces OR feeders installation, alteration, AND/OR relocation
I 200 amps or less
1 20 I amps to 400 amps
1401 amps to 599 amps
I TEMPORARY services OR feeders i.nstallati~D, alteration,
AND/OR relocation
1200 amps or less
j 20 I amps to 400 amps
1401 amps to 599 amps.
I Branch circuits - NEW, alteration, OR eltension, per panel
I A. Fee for branch circuits with
above service or feeder fee,
each branch circuit.
lB. Fee for branch circuits
without service or feeder fee,
first branch circuit:
I each addl branch circuit
I Miscellaneous
Service reconnect only
Each manufactured or modular
dwell ing. service and/or feeder
I Pump or irrigation circle
Sign or outline lighting
Signal circuit(s) or Iimited-
energy panel, alteration, or
extension.
1
rlct))c5V
ELECTRICAL PERMIT FEES I .~
Subtotal $55~ 'f'JU
State Surchar~e ~8%of~nnit feel $4.40 I SO
City Ofs~rin.Jtfield fees. $8.25 L.. \ 1
TOTALPERMITFEE $67.91T/.fI.'"
I 0% Local Admm Fee; 5% Local Technology 5te \JI
J a~
\f (jG
$55.00
I
I
I
I
I
. City Of Springfield
This Authorization To Begin Work must be posted at the job site until replaced by a Permit.
225 Fifth Street
Sp,ringfield, Oregon 97477
541-726-3759 Phone
.
.~
Wit
Av of Springfield Official Receipt
'~elopment Services Department
Public Works Department
RECEIPT #:
2200700000000001194
Date: 07/27/2007
9:17:42AM
Paid By
Item Total:
Check Number Authorization
Received By Batch Number Number How Received
Amount Due
50.00
2.50
4.00
5.00
$61.50
Job/Journal Number
COM2004-01488
COM2004-01488
COM2004-01488
COM2004-01488
Description
Low Voltage - Commercial Indus
+ 5% Technology Fee
+ 8% State Surcharge
+ 10% Administrative Fee
Payments:
Type of Payment
Amount Paid
ONLINE CHGS ONLINE PERMIT CHGS
ddk
ONLINE RFI Online
Enterprises
Payment Total:
$61.50
$61.50
cReceintl
Page I of I