Loading...
HomeMy WebLinkAboutCorrespondence ENG 2/1/2006 . ~---- \- Db Goebel Engineering & Surveying, Inc. Engineering Surveying Planning TRANSMITTAL LETTER PROJECT NAME: Legacy Estates Subdivision. GES PROJECT NO.: TO: FROM: 02414-2004-C CITY'PROJECT NO.: Jim Donovan /lJ& - t;J.~. ~ DATE: 1 February 2006 Scott/Pamela Goebel TRANSMITTED IS THE FOLLOWING: ~ enclosed Cl under separate cover Via: er' delivery FOR YOUR: (y .er Cl-- er- THE.FOLLOWING: p.~. (Y V'ry "t:>-' ~ ~ v~ ~ ~ COMMENTS: review comment approval use Submittal To Do's (Checklist) Hydrology Study (narrative) 24" x 36" Pre-Development Basin Hydrology 24" x 36" Basin Drainage Swale & Bio-Swale Letter from attorney regarding completeness Suggested Conditions of Approval for Adjacent Well Verification of meeting with agencies (minutes) Verification of filing with agencies Memo regarding meeting with neighbors 'No. of CODies 3 3 6 (2 sh/set) 6 (1 shlset) 3 3 3 3 3 19 December 2005 19 December 2005 Plot Date 310 Garfield 5treel#17 Eugene, Oregon 97402 Phone: (541) 687-0542 Fax: (541) 687-0739 E-mail: scottt6lQeseuoene.com Date Received: Planner: ''''<- v ,F~. 'J '.'-\ r:: '1,"'1~'.1 ro;';;~ (<}7'11-l.JTro'~.<',~i;l-"'tS (..t:ir:;~, !.....)1 ....p1 . . LAW OFFICE OF BILL KLOOS, PC OREGON LAND USE LAW 375 W. 4TH STREET, SUITE 204 EUGENE, OR 97401 TEL (541) 343-8596 FAX (541) 343-8702 E-MAIL BILLKLOOS@LANDUSEOREGON.COM January 31, 2006 Jim Donovan, Planner Springfield Dev't Services Dept. 225 Fifth Street Springfield, OR 97477 Re: Legacy Estates Subdivision City File: SUB2005-00047 " t; Dear Mr. Donovan: I will be helping the applicant and his engineer with this application during the balance of the local proceeding, Please add my name to the notice list. Accompanying this letter is a compilation ofmateria1s, prepared by Goebel Engineering and Surveying, as promised in Goebel's letter dfagreement with you dated December I, 2005. Based on this submittal, please restart the processing of this application on this date. Thank you. /c- Ene!. Supplemental information from GES C: Client re "21' IO~ . . Legacy Estates Subdivision UTa Don/Submittal List .I Updated Hydrology Study: Narrative (3 copies) Drawing (6 copies) .I Hydrology Plan Set for off site improvements (Includes notation of line sizes, flow lines, easements, etc.) .I Proof of application to agencies .I Suggested Conditions of Approval for adjacent water well protection .I Wellhead protection information: Structural Integrity Aquifer protection measures .I Interpretation of law/requirements Review of DEQ requirements for ground water protection Review of setbacks and other measures that accrue to a (well) water right .I Verification of meeting with DEQ, DSL, Corps, etc. .I Minutes/notes/information from meeting with neighbors, attorney, etc. M 'Pers-DlrV\ - C\COfey\legacy Estates (02414)\Submittal Checkshee1.\Submrttal TO DO list ..-pd p:c 2-/ rob " . . APPLICANT'S PROPOSED CONDITION OF APPROVAL for Legacy Estates Tentative Subdivision (SUB 2005-00008/00047) for PROTECTION for ADJACENT WATER WELL (c 2 - /-ofo ,:1 . . " Applicant shall protect the existing water well, located on Tax Lot 300 of Assessors map 17-03- 24 31. All improvements and activities shall comply with state rules relative t60 wellhead protection. Relative Oregon Administrative Rules (OARs) are as follows: 1. OAR 690-210-0030. No sewer pipes (storm or sanitary) shall be placed within 50' of the wellhead. Lots 5 and 8, as well as the right-of-way of North l6t11 Street, are encumbered by this rule. A 50' radius wellhead protection easement shall be shown on 5the final plat and on all engineering documents. 2. OAR 690-210-0250. The well casing is to be at least 12" above all adjacent ground. All new construction associated with this subdivision shall be graded so as to drain surface water away from the well. 3. OAR 690-21-0050. The existing well shall not be altered in any manner as to alter the casing integrity from being securely covered to prevent any foreign substance from entering the well. This condition does not require the applicant to reconstruct the well to comply with this rule. However, the applicant is restricted from constructing any improvements (public or private) that would introduce any foreign substance from entering the well (which might contaminate the ground water). . 22 December 2005 Goebel Engineering & Surveying, Inc. Engineering Surveying Planning 310 GarfleId Street #17 Eugene, Oregon 97402 Phone: (541) 687'()542 Fax: (541) 687.()739 Internet: scott@oeseUQene.com The purpose of this memo is to document contact with the neighbors (Kopperud) by the developer (David Corey). In a meeting held on 30 November 2005, City Staff, the Developer/Applicant and the Design Team agreed upon certain criteria for submittal of data to the city, One of the items listed involved a listing or documentation of contact (or attempted contact/meetings) betwetm the developer and/or his representative and the owner of the adjacent water well. The following information is noted to satisfY that criteria. Since the above-noted meeting, David Corey has contacted (and attempted contact) as noted below: · 19 December 2005 (afternoon) Mr. Corey calls and speaks with Mrs. Kopperud After a brief discussion, Mrs. Koppet"Ud advises Mr. Corey that Mr. Kopperud will be home at 7:00 that evening. Mr, Corey calls at approximately 8:30 p,m. No one picks up/answers, so he leaves 0 message, · 20 December 2005 Mr. Corey calls, no one answers/picks up. Mr. Corey leaves another message. · 21 December 2005 Mr. Corey calls during the day and again speaks with Mrs. Kopperud. She indicates that, because it is Christmas soon, it is more difficult for them to meet. Mr. Corey exploins that he will be leaving town soon for several weeks. He gives her information about current finds/data regarding the well. He tells her he, and the engineer (Goebel) will be happy to meet with them to discuss ways to protect their well, as'well as other issues of concern. He further informs her that Goebel plans to re-submit information to the city in 2005. He tells her if they would like to meet to please contact him. He has heard nothing further from her. We believe this clearly documents the efforts to communicate and work with the neighbors. ~~ Pamela G. Goebel M\Pers.OiM. C\Corey\Legacy Estates {(2414)\$ubmlttal Checksh~t\Neighbor contact mamo wpd ft 2-1-~ 12/07/2005 07:01 FAX . . f COYOTE CREEK ENVIRONMENTAL SERVICES, INC. 1(\ B - !O r- . ~ Z ~ t. a .. ii m m .. ~ l 2 8. (!. 27661 Crow Road Eugene, OR 91402 Tel. (541) 4S4-7336 Mobile (541) 521-2806 Fax. (541) 4S4-1233 CoyoleCreelcES@peoplepc.com 141001 . December 6, 2005 To; David Corey Re; Minutes from Meeting Held September 15, 2005 Legacy Estates Project, Springfield, Oregon In Attendance: David Corey, Project Developer; Scott and Pamela Goebel (Goebel Engineering and Surveying); 10hn Otsyula (Oregon Dept. of State Lands); Shelley Hanson (US Army Corps of Engineers); Alex Cyril and Bill Perry (Oregon Dept. of Environmental Quality); Matt Stouder and Eric Walter (City of Springfield); Mike Shippey (Coyote Creek Environmental Services, Inc.). Lane County Planning office and Oregon Department of Fish and Wildlife were invited, but declined to send staffmembers. . Mike began the meeting with a draft agenda and introductions. Discussion began with Scott Goebell'resenting the project and schedule. He explained the dual nature of the project: the Legacy Estates subdivision that David intends to build, and the storm drainage system that is being required by the City of Springfield. Most of the discussion was focused on the storm channel system. The anticipated annexation agreement was discussed. The stormwater channel is required in order to annex to the City. Approximately 34 to 40 acres of this north Springfield area will be served by the proposed storm system; some of the area is already developed as residential, and approximately 15 - 20% is currently unimproved. The existing storm system empties into a low orchard and spreads across the well-drained soils at that location. As the group examined the aerial photography and contour mapping, Mike described the landscape for the subdivision and the storm channel and proposed outfall. The subdivision site is presently a fLlbert orchard, gently rolling terrain and pretty well drained soils. Probably no jurisdictional issues there. The storm channel will travel through lower terraces of orchards and grass fields, passing via culvert beneath Harvest Lane and outfalling into a slough I old meander channel that is separated from the McKenzie River by a linear upland area. Scott discussed the size of the pipe, the preliminary channel section and how storm water quality will be treated. Alex emphasized the sequence of treatments ("treatment train'') should be well-considered and the primary issue for DEQ. She also suggested the Washington Dept. of Ecology has new methods I standards that represent best science for water fC 2-~ (-c>(p 12/07/2005 07:01 FAX \" . 14J002 . quality treatment. Scott presented the draft proposal; retrofitting oil- separating catch basins in some of the presently-developed areas, use of oil-separating "stormceptor" manholes at current outfall locations, and bioswaIes for the anticipated load. The outfall will be located in the slough and not the River. All storm facilities will be sized to handle the eventual fully-developed basin. Shelley mentioned that there may be issues of not only 404 wetlands / waters, but perhaps Section 10 waters as well. She offered to review the designation of the McKenzie area The subdivision will be annexed to the City of Springfield. The stormwater facility will extend beyond the City limits and Urban Growth Boundary. Shelley recommended revieweing the "SLOPES" information " on the Corps website for outfall designs and Best Management Practices. Some concern was expressed that the design needs to consider and avoid entrapment offish within the low storm channel following a flood of the area. Mike also offered to coordinate with the Oregon Department ofFish and Wildlife, particularly in regards to issues of protected fish species. The City of Springfield and DEQ staff discussed the MS4 permit process, issues and schedule. This is apparently going to be in place in the near future and planning for this project to meet the MS4 agreements should be occurring. More discussion occurred about opportunities for the treatment train, including storm water quality ponds, trash racks, sediment ponds, bioswales, baffles... Alex recommended focusing on first flush of pollutants, including hydrocarbons, into the storm system. Maintaining capacity in the system by diverting relatively clean roof-runoff away from the storm system to perforated pipes / dry wells would be effective with the very permeable soils. Mike suggested the storm features could also contribute to the aesthetics of the development with a little design care. David thought there was " ample land within and nearby to accommodate the proposed storm features. Mike also described the character of the slough as frequently dry, potentially connected to the MeKenzie at the ends of the slough during high water events. City of Springfield staff mentioned the City is updating their storm water master plan and intend to develop upgrades over the next 5 to 10 years. Date Received: j/I'b~ Planner: JD ~ ",tt, 12/07/2005 07:02 FAX . I . 141003 . Scott then summarized the dual processes that would be required. The subdivision will require land use actions, no wetland permits, typical subdivision processes. The stormwater channel will! may require wetland permits, potentially land use actions with the County, and other issues. Matt opined that the storm channel will be built for eventual build-out of the drainage basin, and the channel treatment train will be over-built until that time. Discussion ensued regarding who will be the actual applicant, and the roles to be played by David and the City. David will be the applicant for the subdivision, and will pay to develop the storm channel, but the storm facility will belong to the City. The City is contributing some funding and design input. Maintenance may belong to City as well, even if in the County. Davids' annexation agreement states how much he is required to . maintain, and he will be receiving SDC funds back as the area develops and connects to the system. David will hire the contractor to build the storm channel per city specifications. The City will monitor the construction. Additional discussions occurred regarding flood events and the impacts to the storm facility. The storm channel is within the floodplain of the McKenzie River. The subdivision is beyond the 100 year floodplain. Alex offered to send a copy of the guidelines and checklist for DEQ subnrission. . Mike closed the meeting. Respectfully submitted. ~. ~IWsm:~ Principal! Landscape Ecologist Date Received: Z ~ I '~0 Planner: J 1) 1i [""" 'm ~ US Army Corps . . J~~~ ~I" '. JY \. (... '. .....) ........ Joint Permit Application Form Of Enaineers (Portland District) , AGENCIES WILL ASSIGN NUMBERS I J Corns Action ID Number Oregon Department of State Lands No. SEND ONE SIGNED COpy OF yOUR APPLICATION TO EACH AGENCY District Engineer State of Oregon A1TN: CENWP-OP-GP Department of State Lands PO Box 2946 775 Summer Street NE Suite 100 Portland, OR 97208-2946 Salem, OR 97301-1279 503-808-4373 503-378-3805 Q) Applicant Name David Corey Business Phone # (541) 338-3316 and Address 3956 Mirror Pond Way Cellular Phone# (541) 954-5817 - Eugene, Oregon 97408 FAX # (541) 338-3370 E-mail: david({j)leamcorev.com o Authorized Agent o Consultant o Contractor Business Phone # Name and Address Home Phone # (signature required in Block 9) FAX # E-mail: Property Owner Joe & Patricia Proden Business Phone # (if different than applicant) 2290 Hayden Bridge Rd. Home Phone # Name and Address Springfield, OR 97478 FAX # E-mail: ~ PROJECT LOCATION Street, Road or other descriptive location Legal Description North of 16th and Yolanda Streets, and near Harvest Quarter/Quarter Section Township Range Lane in north SDrinmeld 31 24 17s 03w In or Near (City or County Tax Map # Tax Lot # Town) Sorinmeld Lane 17-03-24-31 -00300, -00500 WetlandlWaterway Name River Mile (if known) Latitude Longitude I Unnamed slough near McKenzie River, RM 12 44004'15" N 122059'50" W Do you consent to allow Corps or Dept. of Stat~ Lands staff to enter into the above-described property? X Yes aNo Q) PROPOSED PROJECT INFORMATION Activity Type: XFill XExcavation (removal) a In-Water Structure a MaintainlRepair an Existing Structure Brief Description: 5 acre subdivision with all infrastructure: storm water drainafle extension to slouflh near River Fill will involve cubic yards annually arid/or 500 0' for the total project 2.0 cubic yards in wetlands or below the ordinary high water or high tide line. Fill will be X Riprap a Rock a Gravel a Sand a Silt a Clay a Organics K Other native backfill over 48" Dive Fill Impact Area is 54 sf /0.001 Acres; 2.:.....length; Lwidth; ~depth Removal will involve cubic yards annually and/or 444 cv oermanent / 980 cv temp for the total project 2.0 temo cubic yards is wetlands or below the ordinary high water or high tide line. Removal will be a Riprap a Rock a Gravel a Sand KSilt KClay K Organics K Other sub-excavation Removal Impact Area is 36sf/0.001 Acres; 2.:.....length; Lwidth; ~depth Is the disposal area: Upland? X Yes aNo Wetland / Waterway? aYes XNo Are you aware of any state or federal Endangered Species on the project site? a Yes KNo If yes, please explain in the Are you aware of any Cultural Resources on the project site? aYes KNo project description (on page Is the project site within a national Wild and Scenic River? 0 Yes KNo 2, block 4) Is the project site within a State Scenic Waterway? a Yes KNo This project is near the McKenzie River, which is known to support a number of protected fish species. However, the outfall from this storm sewer will open to an intermittently wet meander scar that does not support protected fish species. Coyote Creek Environmental Services, Inc Ft2- {-Ob Legacy Estates Project .@) PROPOSED PROJECT PURPOSE SCRIPTION Project Purpose and Need: This project proposes to provide needed housing within the growing city of Springfield. as well as to retrofit and integrate the storm sewer system that serves approximately 40 acres of drainage shed in this area. The storm drainage system in this area is presently not well connected and storm water is not well treated The proposal will result in improved urban storm water treatment for this area. The area is zoned appropriately for this development. Project Description: (Include volumes and acreages of all fill and removal activities in waterway or wetland separately, permanent and temponuy impacts, types of materials, staging areas, access routes and general construction methods.) This project includes all infrastructure (roads, utilities) required for a 5 acre subdivision in the desirable north Springfield / Hayden Bridge area. The subdivision area is within the Urban Growth Boundary and will be soon annexed to the City of Springfield A second component to the project is the integration and extension of storm sewer facilities to service this new subdivision and a larger urbanizing drainage shed approximately 40 acres in size. The existing system will be retrofined with water quality improvement structures and connected to a new bioswales and piped extension that will flow north to an old. dry meander along the McKenzie River. The subdivision project will not impact jurisdictional areas; the storm sewer extension will include the temporary sub- excavation and permanent fill required for armoring around the outfall in the meander. a portion of which will be below the established Ordinary High Water line in the'meander. Approximately 2 cubic yards of rock and riprap will be placed around the outfall and along the bed of the meander as protection from erosion. Approximately 0.001 acres of jurisdictional area will be impacted. Construction will utilize existing roads. such as HaydenBridge Road, North ](!h Avenue and Harvest Lane. Harvest Lane will be temporarily closed during installation of the 48" pipe. Project Drawings: How many project drawing sheets are included with this application? (must be on separate 8\1, X II sheets) ~ Note: A complete application must include a location map, site plan and cross-section drawings: Location map (must be legible with street names) Site pIan (include project footprint, proposed contours, ordinary high water or wetland boundary, proposed impacts, staging areas, temponuy impacts, location of cross section(s), as applicable) Cross section(s) (include existing and proposed elevations, ordinary high water or wetland boundary) _ Will any.construction.debris.runoff..etc., .enter a.wetland.or.waterway?~.o.Yes, 4Nl1- If yes, describe the type of discharge and show the discharge locatiOli on the site plan. Estimated Start Date Mav 1. 2006 Estimated Completion Date October 1. 2006 @ PROJECT IMPACTS AND ALTERNATIVES Describe alternative sites and project designs that were considered to avoid impacts to the waterway or wetland. The no-build alternative is not an option for this project. The Springfield area is experiencing moderately rapid growth This project will resolve existing problems related to storm drainage for a large area. The alignment of the storm sewer system is dictated by property ownership and the location of existing outfalls, The alignment ollows the shortest possible distance. and does not impact jurisdictional resources other than the outfall. Design alternatives continue to be explored to further reduce impocts at the outfall. However. the outfall must be armored for long-term stability. The depth of the pipe' is required to maintain a positive flow to the outfall; the size of the pipe is designed to handle full-build of the drainage shed / . ~-I-Ol.,lJ Describe any changes the proposed project may have on the direction of steamflow, .etc. (~ydrological characteristics) of the waterway. . Date ReceIVea. an ::So -~--- Coyote Creek Environmental Services, 1n '., Legacy Estates Project . The meander is dry most of the year, other than high water events in the McKenzie River. The outfall location is very permeable, cobbly soils. Water quantity in the meander will be increased by this project, and water quality will be high from the outfall. Describe what measures you will use (before and after construction) to minimize impacts to the waterway or wetland. (Include an erosion control plan, storm water management plan to manage post construction storm water, work area isolation plan or description of other best management practices (BMP's) as appropriate.) This project will comply with the highest City of Springfield erosion control standards, and will comply with all DEQ requirements for short-term and long-term storm water management. Erosion and access control fencing will be installed early. Construction access will be strictly managed to avoid impacts to nearby jurisdictional resources. Disturbed ground will be quickly re-seeded with sterile ryegrass and native seed mixes. NOTE: If necessary, use additional sheets. @ ADDmONAL INFORMATION Adjoining Property Owners and Their Address and Phone Numbers (if more than 5, at,tach printed labels) 17-03-24-00-01100 200 S. Mill Street, Springfield, Or. 97477 17-03-24-31-00200 3238 N. 16th Street, Sorinl!field, Or. 97477 17-03-24-31-00400 2290 Hayden Bridge Road, Sprinl!field, Or. 97477 17-03-24-31-00600 3287 N. 16th Street, Sorinl!field, Or. 97477 17-03-24-31-00701 POBox 717, Springfleld, Or. 97477 17-03-24-31-00705 PO Box 717, Spri~l!field, Or. 97477 I 17-03-24-31-00800 2580 Grand Vista Drive, Sorinl!field, Or. 97477 17-03-24-3\-00900 2572 Grand Vista Drive, . Sprinl!field, Or. 97477 17-03-24-31-01000 2566 Grand Vista Drive, Sorinl!field, Or. 97477 17-03-24-31-01l00 2558 Grand Vista Drive, Sprinl!field, Or. 97477 17-03-24-31-01200 2546 Grand Vista Drive, Soringfield, Or. 97477 17-03-24-34-00103 2583 N. 16th Street, Sprinl!field, Or. 97477 17-03-24-34-00104 2588 N. 16th Street, Sorinllfield, Or. 97477 .17-03-24-34-00129 2587 N. 17th Street, Springfield, Or. 97477 l'z,,03-24.-34--00130- 00 0- . .-- --- .2588-N. 17th Street, . . . leld,Or, 97477 Has the proposed activity or any related activity received the attention of the Corps of Engineers or the Department of State Lands in the past, e.g., wetland delineation, violation, permit, lease request, etc.? o Yes XNo If yes, what identification number(s) were assigned by the respective agencies: Corps # State of Oregon # . . Date Received: Planner: 2/t~b0 (JD .......-...itl Coyote Creek Environmental Services, Inc Legacy Estates Project ,0 City/County Planning DepartoAAffidavit (to be completed by local planning .ial) I have reviewed the project outlined Ris application and have determined that o This project is not regulated by the comprehensive plan and land use regulations, o This project is consistent with the comprehensive plan and land use regulations. . This project will be consistent with the comprehensive plan and land use regulations when the following local approval(s) are obtained. o Conditional Use Approval . . Development Permit , Other Su ;;Vi (J IS'lll~ f. FL~e>V P4,).; o This project is not consistent with the comprehensive plan. Consistency requires a o Plan Amendment 0 Zone Change o An application Q,) has 0 has not been filed for local ap~ checked above. . /;1.( ba.-.--\-1a..tt\.t.R..- ture of local planning official Title City om/~1.47((;C 5u..e;J)1VIS('t)N; ROdell/alII #r"';{--"'/l- IN5;)e @ COASTAL ZONE CERTIFICATION If the proposed activity described in your permit application is within the Oregon coastal zone, the following certification is required before your application can be processed. A public notice will be issued with the certification statement, which will be forwarded to the Oregon Department of Land Conservation and Development for its concurrence or objection. For additional information on the Oregon Coastal Zone Management Program, contact the department at 635 Capitol Street NE, Suite 150, Salem, Oregon 97301 or call 503-373-0050. CERTIFICATION STATEMENT I certify that, to the best of my knowledge and belief, the proposed activity described in this application complies with the approved Oregon Coastal Zone Management Program and will be completed in a manner consistent with the program. o Other 'FIef-V /~~ ~/tJ:; D te IL 6.-/3. nla Print !Type Name Title nla Applicant Signature Date @ SIGNATURE FOR JOINT APPLICATION Application is hereby made for the activities descn1led herein. I certify that 1 am fumiliar with the information contained in the application, and, to the best of my knowledge and belief, this information is true, complete, and accurate. I further certify that I possess the authority to undertake the proposed activities. I understand that the graotingof other permits by local, county, state or federal agencies does not release me JtQl!l.!!!e regyirem.em9f gJ:>!ajnjn~th..e.pennjts I'.\;g,,~te.4J'1et:o[e_cg!l1!!1.enj:ing lh..e-PtojertlJIDderstand.thal paymentill. the. required stalL processing fee does not guarantee permit issuance. The fee for the state application must accompany the application for completeness. Amount enclosed $ Title /j., -.,2.J -OS Date . act as the duly authorized agent of the applicant. Print !Type Name Title Anthorized Agent Signature Date I certify that the applicant has my permission to conduct the project on my property. ltrj~tiType Name -,n L Pl2na! EII)-----P~_1_PIC!.(,4 P.roo~ny Owner Signature Pit:m-/;:1 Title -ria;" 1-b<.-oS- .,.' .--::;;.--- ~e ?-e ~~a\\\\er. Legacy Estates Project Coyote Creek Emironmental Services, Inc r;;. '@ SUPPLEMEN IMPACT AND RESOURCE REPLA Site Conditions of impact area Impact area is 0 Ocean 0 Estuary o River o Lake X Stream o Freshwater Wetland Has a wetland delineation been completed for this site? " X Yes 0 No If yes, by whom: Coyote Creek Environmental Services, Inc., has conducted an investigation of both the subdivision and the storm sewer extension components of this project. That document is submitted with this permit application. Has the wetland delineation been approved by DSL or the COE? (If yes, attach concurrence letter.) o Yes X No Currently being reviewed Describe the existing physical and biological character of the wetland/waterway site by area 'and type of resource. (Use separate sheets and photos, if necessary.) No wetlands are present within the subdivision area, or within the proposed alignment of the storm water system alignment. The only jurisdictional areas identified lie within the old meander, and very minor impacts wi/l occur at the new outfall for the storm drainage system. The Ordinary High Water line,s identifiable by the change of vegetation that occurs approximately 1.5 ee above the meander bed The meander bed is typically cobbles and sand, unvegetated and used heavily by pedestrians and 2- wheeled vehicles (motOrized and non-motorized). Vegetation below the OHW is typically herbaceous species, including pockets of Slough Sedge (Carex obnupta), Reed Canarygrass (Phalaris arundinacea) or other grasses. Vegetation above the OHW is typically Armenian Blackberry (Rubus armeniacus), Indian Plum (Oem/aria cerasiformis), Black Cottonwood (populus balsamifera), Oregon Maple (Acer macrophylla) and SWord Ferns (polystichum munitum). No standing water was present in the old meander during the time of the delineation visits. Hydrology is provided primarily by groundwater discharge to the meander and by floodingfrom the McKenzie River, Describe the existing navigation, fishing and recreational use of the waterway or wetland. The meander has been and is currently utilized for a variety of recreational activities. There is much evidence of use of the meander as a trail for hikers, bikers, motorcyclists and anglers. Several fishing and picnicking locations along the McKenzie River are accessible from this trail. Just upstream from the meander is the Harvest Boat Launch into the McKenzie River. No navigational or fishing uses are ssible within the meander itself Wetland Feature Wetland Impacts Classification (Cowardin) -H6MSetting- Wetland Impacts Below OHW Meander Scar Palustrine Forested, Seasonally Inundated Flow-Through 0.00 1 acres Total Wetland Areas 0,001 acres Resource Replacement Mitigation Describe measures to be taken to replace wetland/waterWay resources where reasonably expected adverse impacts including wetland functions cannot otherwise be avoided or minirrlized. See list below for required information. i, Given the very small amount of impacts expected to result from this project, the Applicant proposes to replantl reseed any temporarily impacted areas, utilizing seeds and bare root whips of native plant species. ' Date ReceiVed: 2' I ' ()~ Planner; ;:1])........ J:LFonns'ApplicatUoint Penn. Application west annotated.doc Coyote Creek Environmental Services, lnc Legacy Estates Project r !' i- _ ,,,~JI'L~.. : '[":-.-J " "~J I ~i.j"r~lrli'-'" u "c U G -WAY-t,._, 4"'6 t; }-fA YDEN ~~'J"':....m. 47,";:;~'1[ ',i- -\"Mile ;.9 - '" \. . " .7(1 : 76 '" ..} , c I , i (-..Radio Tower (KPIRI , , -i "'''''~''''--'''\, " " # C' ,. "-:, I "1>... I . T: ~:~./ 75 -, 23 I r~~L ,~ vA~' \~ I '~1\'\> ~_ 1>-' 19 -<- .v. Mile 12 .... ~-24--- i ~ Wells ~ L' ..-P r" ......\.\~ -0. i BRIDe ~ 452 CORl>- "~r I,DD ~~ Ill: ~:J-""'''' '" '<< _-;;,,,,-,,-~,::qBlJrner . . " .= .81 R' . .~..! ," . 8"'1 t b" h ,l"fl!' '~'~i . it li''-\': L-_. -J.. .._.f.- -,..,,,~- o ~ ...~ I -Park I n~!~ '! ;t of:! 58:: SP;t~~jGFllrlDP:i-~~U~j\l;: ~ . I! ;,;; )1"9 i! ~i !i :1 II d: ~I! It---) J):I ~I ,'" ,,-. II '~,,>rl '-"'-.-': t',' I '1:1 lV( II . i Ii ii . J i: il:1 I. j rli hea ~ - Ili'-~ ji:,;~ i: 1\ \1 ~ll L;;.g 11 ~.: ~ '!!i)I:! ~! 57 '~;'N~' :., ji i!!~~.l_,~:' 'I ! ii 'I' r- 11 ~\!. -~1i'-'~~'-~: ~'i! ~O;' j:~,:t-t":r.~t~~ ---~" . ~'~" ..~.. he, :',tl . . ..- ~._- , -- _ ... ___~_'~ _"_ l> :'., -.i .' I T P'R'VATP'h.---U_". tF<=~_. . VICINITY MAPI USGS MAP Springfield Quad Legacy Estates Project Figure 1 Coyote Creek Environmental Services, Inc, Ddt~ ReceIVed" 2' I'""D ~ Planner; j\) ,. 17 03 24 & INDEX NAD 83/91 . SECTION 24 T.17S.R.3.W.W.M. LANE COUNTY . I:;:~,:n;;;;%:..,".", "~ -38 004-34 t ,~.~ V4e. ..~ ",'IJ' ~'.'~:'''' II t. ~~{ .:.,;>,,;:. If -!~'; "::'J~t=~ .. .. ;""{ 2500 6 53 .>c ~ ;:;')';~~, " \, \i ';; ,.~ t ~\ ~ ., . 'i \" . 13~"18-,~::r:...... ------.---...----T-----~-------"-: 24 19 TAX LOTTED ON I MAP ':: 17-03-13 ".; t. . IS ~ J"T.,t 't. . " .' ~ 6 ""..11 l;'" ~\~ i.~~~:2:'f;. I ~ 2209 ~ ~ ~I:~ -,,,HI' . _ ."// ."..ff 15 2209 t "'. ~ H~ LOT 2 44.40 ....~ (I) ~ ..... '\ 2210, ,,:.,r 14 l 2207 ~ ~ I ;!" l' 019-34 ,2206~ ~ ~ is l 0 'l: .~ "zeool !~~ FJ'&'-:~ ~",.t}~:.( L; l ~ ~ \1 f'~} !:J ~!2 I \" ~. ...... ~ ;,;....... ,J.<'" 'i+.u.-1 ..,.,.' #:... . ~ . "'-,,,.,... -"f' . "I:'I~ 4 45 .,~~ '~~J #.11 .-. 00 - -";~ ... 'I ~~ "'plveR' .-.......c . . .JlU"'~---L-I---;:~---~- .~~~E.~t.No51 ~...~ ,,------ -- ;;=~ :..>7.............. ./' --0-<..... L__;' .- L.I-.::e-~~""""" ~'..P-' '..,.:" ~NWCorner 401 j'b\:.c Na.5! 504 BOS ~ 004-92 sCAlEi' ..400' SEEt#f'170313 004-01 2202 ON MAP 17 O~ ,~ ~31O -~N~ N,e> ~I-\ ~~ I I I I' I. ~ " ~'O 1PrrJJ"fJ rJiY~ ~ :!!-...."'''' , 705 .O.Jl!1C. '" O.27/C.. '" I KO.'B1J;. I '04 0.70M;. " '" 0.49N:. ~, ~ <f5j~ ,AI' ~Jr 1) ~ 3MENT \"..\00' o~ <? "fj;\f;; nON , \1 LY 105 1PrrJJlf[f; 1000 O.lJ4.M;. .""'. rJiY"7t -. ~.- 0 I- 1200' \1 VI I- O.S2K;. ~, PAACELJ (f) ::r: l- I'- :r: ~ ~~104 1.Q.9 I- <J) Z ~ nrl nr\rr '.0~4\~ ~PARCtL 1 /.-.:r.... ....._~ <( U) 1700 >'lo.4111C. ,-, o z <( () 1600 O.4JIIC. . 'PAACEl ~ ....;.::::. " " 1.12 &..117 "ii';,.- i"",., :U8 TAX LOT I PARCEL MAP 17-03-24- Index, -31 and -34 Legacy Estates Project Figure 2 Coyote Creek Environmental Services, Inc. .. . '2-~I~O" Date Rec,-,vcltt Planner. CJ1) ''If -j I u:ii ,,' ~, ___..._,-,-~R, 3 W. I, R. 2 W. ~~JO~.". . '. ". .... 29. . ...... ,'. ','108e I ,.,.......-95 :8, ',' , RIVER '--- ". 85 : 22.-- .' r..... r-~.L'<'NZd' i l"(U\.o' '" , ~ 29 :A'O ....: 95 29 95 96 29 85 tA~ 119 75 76 i 1118 119 r-;5- , . ::::::J >2 ~~I~'> \. 119 ~.' --'\. ........'-- ';!,,:~ .... Series 26 - Chehalis silty clay loam Series 29 - Cloquato silt loam Series 48 - Fluvents Series 75 - Malabon silty clay loam Series 79 - McBee silty clay loam Series 95 - Newberg Fine Sandy Loam Non-Hydric Non-Hydric Majority is Hydric Inclusions Non-Hydric Hydric Inclusions Non-hydric & I'-!D P'fl-\ Coyote Creek Environmental Services, Inc. SOIL SURVEY OF [THE] LANE COUNTY AREA, OREGON MAP Map Sheet 75 Legacy Estates Project Figure 3 1--' I ~O~ ._4J7 Date Recc;veci: Planner. ~ , .' ~'lC-I,.I'U~;. '...;...,.:,.. +~. '"~.l,,,;-,,~~"'~Il r r (:.~::-~,~\ 11f,K' -r- :-"\, ~-;;::-.:~:;~~-C~.....~~-~~-: ;.~/. ~I<:";'~~ , phd _._-......';'".,;;~~l.......' -':.1'(; \~-:l", ~\'i\"0'" "~-''''''. "'.'\ ;-:-~;:=;,. .... '~j,' . , l,tQ. ~'-~ , " s::::::" J ' .---.,~ ',' "'I^' \ ,,--' ..... ..- ~~ ""'J '.'\ ~:-- -.: /(1" I> .: 1/1 '.'1' , \ ;..' sc." =-'.>, Pf=OA. , ' "'<: ~ ..- .. _ __.~.:" , ~ l\ K~'\' . -... - .ii,il,'lf/,', \ -:: ~ f .. I ,~.,. . ~5!l - -. _... . .. ' 'PEIIl! ,'" ,.",~<,.. ~ .1..'-', ,~.;//I." ') I, , ." J" , , 1. SO fF:' '. - .ii \.'" ~P~M"':"";"S'i:,j5':::;;:P-::---'~.~"':')"i>ssC/~' '", 'I", '~' ,"PEMC '~ o ,l!o . rrqc . . '- . ~'\'\\' - - r ~,;S .. ,.. I . I, \' }.' ~-; ", \l,;"n I '--'1)/ ~ ~..,. . f.r~ i/o,' \ U .... ~:F. RZU~1'l rEM~d"'. !~\~.(~~'<~' ..~_";fY:'::,.,' ~". I ,f. . . P5,C-. ' t :.' '.'0".\,;.~.,,,,,,,,,,,>, .- PEMt-' ., ,: ,.'/' ,': :w_RZlJ$1;;,. _1 ~ I /;~ r:f~~g~;'.'t::C:,,;'':::'-'''~=l:~r'',: "-~';',1":-'" :'" uq~_:" k 75 ' ,J / U if "\~:'?=!<':'''~''J,c:,:~:.r'f;;;\...,J;;, .~. -r< '.',..,.....~. I ~., PFOC ');1" r',.' ~~'i-. :'_..',,..:-K';'~:"''' ,'" '''r'':'''.... ...... 'PU~f PEr~',~ " , .d" .. 'i""<.:::-o".':""(.:. .. ,':. ",oc .. ?~Mt.' .:."-.......-- ..--'--- - '" '- .j ;~ . ~ .. . '. I PJj);A' . '.: PFOA '''~__.J>Ssc . J ... "!, .' ". . .. ~. ,; -\ ... .1 ~ _;' i': , ',' ". ". NATIONAL WETLANDS INVENTORY MAP Springfield Quadrangle Legacy Estates Project Figure 4 Coyote Creek Environmental Services, Inc. Date Re~""':"",,:, Planner: ' '.,.. ),;1-'0(0 oQ ... /' '/' I i::> ~rt . STA + ~ 4 .6 ~--- -~ l ~ : ,-.' , ~ " ~ I . ~ : ~ , . , .,...... J.. " ./ , / ., , i , ;h ~ l: ~ . ~ -: ~. ~ f ~ " ~ , ...". .'/ , , , , .,. , , ~ ~ ~ . .. ~ ~ ~ t '; ~,~ . , , . , i ~ "".f'~"'''''''I' . ~ I I I I :' ~~~l'>.t~ .J ..,~ '- . 0' . .~as..,;E?>.ii? . . '!i .. " ., .' ,~ :. :~ ,. i ~ 1::;:.._ '''~.O'II - . . . . ~ p.c.,_!,>~~ ......iI. . ,,:~. -~ '.~' ! ~ ~ ~a~~~~i/ ~ 1 ~ ~ ~... , , 1 1 1 , 1 , / ~. '~~.O'I~ Il,ll..__q I 1 . " ~!:<>~~l;L~ ,,, ,/ Coyote Creek Environmental Services, Inc. . o So 6 / 0'" I de /' del 2 00 00 , 00 1 1 1 , , , , , , , 1 , , 1 1 , , , , 1 , , , 1 1 , , , , 1 1 , , , / '/ :, , , / / '. 5 00 15 .,1 ~ P1"~ /1 \ / / / / / / / / I / i \ Site Plan With Wetland Impacts Legacy Estates Project Figure 6 Date Received: Planner: ~" I " OJ, <11) . ,---- ..,. I I I I I I I I I I I I I I I I I I I . Goebel Engineering & Surveying, ,Inc. Engineering Surveying Planning 310 Garfield Street Eugene, Oregon 97402 " Phone: (541) 687-0542 Fax: (541) 687-0739 E-mail. scotttliideseuoene com Revised Hydrologic Study for Legacy Estates Subdivision 17-03-2431 TL #500 Prepared for: City of Springfield \ ;1'1' r< December 2005 re. 2--1-66 ~(7Pf~ I I . I I I I I I I I I I I I I . I I . Goebel Engineering & Surveying, Inc. Engineering Surveying Planning 310 Garf~ld Slree! Eugene, Oregon 97402 Phone: (541) 687-0542 Fax: (541) 687-0739 E.mail: scott@1QeseuQene.com Narrative EXImNG DRAINAGE BASIN The Legacy Subdivision (Tax Lot 500) is located between North 16th and North 17th Streets (on the east and west) and the Urban Growth Boundary (on the north). The JUNE, 1983 WEST SPRINGFIELD DRAINAGE MASTER PLAN notes the location to be within the McKenzie River Drainage Basin. This basin is located in the central portion of the published drainage basin. The existing drainage flows from the southeast, 'turns and then flows in a westerly, then northerly, direction to the McKenzie River. The existing drainage basin is calculated to be 52 acres. This is based on The Drainage Master Plan(listed in the alternatives section in the back of the report). The report indicates that there are different means of intercepting the existing ditch and draining it to the McKenzie River. The drainage basin is bordered by 19th Street on the east, Yolanda Avenue and Harlow Drive on the south, and the study area boundary to the north. This area is zoned as Low Density Residential. The existing piped storm system in this sub- basin terminates just north of the subdivision boundary and drain into an orchard. One of the objectives of this study is to design a swale that will convey the runoff from this 52 acre drainage basin (and the subdivision) to the McKenzie. The peak flows for this area are: 6.4 cfs for a 2-year event, 35,6 cfs for a 25-year event, and 47.4 cfs for a 100- year event. Please refer to the computer printouts that are a part of this study for the existing conditions model. The stormwater quality storm for this sub-basin produces a 0.19 cfs flow rate. M:\Pers-DlM - C\Corey\Legacy Estates (02414)\Hydro\Narrative.wpd . . . . . . I I I . I . I I I I I I I . . Hydrology Narrative legacy Estates Subdivision December 2005 Page 2 of 2 Within this 52 acre drainage basin is the proposed Legacy Subdivision. There is a low area at the south end of the site where the stormwater is retained. The northern portion of the site drains toward north into tax lot #400. The existing ground cover is grass and filbert orchard. The ground slopes from 0.04 ft/ft to 0.10 ft/ft. The existing flows for the site are 1.22 cfs for a 2-year event, and 3.46 cfs for a 25-year event. POST-DEVELOPED DRAINAGE BASIN The post-developed storm drainage system for site will collect the stormwater runoff from the site and route to the northeast. The pipe system sizing and capacity are shown on the computer printouts (included as a part of this study). The subdivision runoff will flow into the existing pipe in tax lot #400, then into a new swale (to be constructed as a part of this subdivision). The swale will provide the stormwater quality for the subdivision and the entire 52 acre drainage basin, as well as storm conveyance. The swale proposed in the Drainage Master Plan calls for a 2 ditch with 2:1 side slopes. Since this swale will be used for stormwater quality, the bottom width must be 4' wide and have maximum side slopes of 4:1. The swale design is based upon both stormwater conveyance (quantity) and quality treatment. The stormwater quality event for the entire 52 acre basin produces 0.19 cfs flow rate, creating 0.26' flow depth. (Please refer to the section labeled 'Stormwater Quality Swale andHydralics.) The peak flows from the project will not influence the performance of the ditch during a lOO-year event. The peak flows from the subdivision are: 2.38 cfs for a 2-year event, 5.04 cfs for a 25-year event, and 6.52 cfs for a lOQ-year event. The peak flows from the 52 acre basin are 33.6 cfs for a 25year event and 47.4 cfs for a 100-year event, which is significantly greater than the flow produced by the subdivision. M:'Pers~DjM - C\Corey\legacy Estates (02414)\Hydro\Narrative.wpd I I I I I I I I I . . I I I I I I I I . . Drainage Sub-Basin of McKenzie River Drainage Basin I I I I I I I I I I I I I I I _I I I I . . 0NDUWId - MIlUAIllB - OHDIIDDOJII' ...- ..... ..., ..... .. ..... --- -- -- -- -- t; ~N-~ = 0 [/) nvo-UV/nv IOt'LB lIo1ug 'eadna pac lDI. ~I OHWIAIIJIS If OJ/lllllJlHIOHll 'lllRXCIO ~ HOISlAJGIIllS =o:n No.1 AOOloaam HISVU ,lQ]ldO'I:WIQ-38d " ~ I;l ~ " <> ~ e iil _h- e ~ '" ., ..., I ~ '" I ci I " Q. ~ ~ i:J '" '" << . . . . . [BASIN INFORMATION] . . . I I . . . I I [Unit Hydrograph Flow Values: Time vs. Flow] pl_ ___ _ [The .time interval is 60.00 minI Time Interval Time (mill) Flow (cfs) I I I . . Hydrograph Number:2 Name: EXISTING BASIN Type: SCS Curvilinear [UNIT HYDROGRAPH INFORMATION] Peak Flow (Op) = 111.87 (cfs) Time to Peak (Tp) = 21.16 (min) Time of Base (Tb) = 105.80 (min) Volume = 4.356 (ac-It) Shape Factor = 484.00 Time Step = 1.00 (min) Excess Rain = 1.00 (in) Storm Duration = 4.22 (min) Lag Time = 19.04 (min) [WEIGHTED WATERSHED AREA] Description Area CN <None> Overall Approximation 52.17 77 [TIME CONCENTRATION - TR-55] SHEET FLOW Manning's Roughness Coef. (n) 2-yr 24-hr Rainfall (R) Flow Length (L) Land Slope (S) Travel Time of Sheet Flow = = 0.01 3.36 (in) 300.00 (ft) 0.04 (flIft) = 2.58 (min) = = SHALLOW FLOW K_ Coefficient (I<) Flow Length (L) Watercourse Slope (S) Travel Time of Shallow Flow Velocity M = 0.90 2083.00 (ft) = 0.02 (flIft) = 29.16 (min) 1.19 (fils) = = CHANNEL FLOW Hydraulic Radius (R) Manning's Roughness Coef. (n) Flow length (l) Channel Slope (S) Travel Time of Channel Flow Channel Velocity M = 0.50 (ft) = 0.01 0.00 (It) 0.10 (flIft) = 0.00 (min) - 22.83 (fils) = = :rIME OF CONCENTRATION] Time of Concentration (Tc) = 31.74 (min) 1 60.00 8.18 I I I I I I I I I I I I I I 0 0 20 40 60 80 I Time (min) EXISTING BASIN - Unit I. ______ -- -__-_____ -------- .- -- -- ---~ ~ 80. ~ ~ ~ () G: 1 1 1 . . Hydro graph Time vs Flow 120 100 . 60 . 40 . 20 . ........... 100 120 140 I I I I I I I I I I . I I I I _In. I I I . Hydrograph Number: 4 Name: EXISTING BASIN 2-YEAR Type: Computed Flood [HYDROGRAPH INFORMATION] Peak Flow (Qp) Time to Peak (Tp) Time of Base (Tb) Volume Time Step Flow Multiplier = 4.43 (cfs) = 496.00 (min) = 1541.12 (min) = 2.799 (ac-fl) = 1.00 (min) = 1.00 [UNIT HYDROGRAPH INFORMATION] Number = 2 Type = SCS Curvilinear Peak Flow (Qp) = 111.87 (cfs) Time to Peak (Tp) = 21.16 (min) Time of Base (Tb) = 105.80 (min) Volume = 4.356 (ac-fl) Shape Factor = 484.00 Time Step: = 1.00 (min) Excess Rain = 1.00 On) Lag Time = 19.04 (min) [BASIN INFORMATION] [WEIGHTED WATERSHED AREA] Description Area CN <None> Overall Approximation 52.17 77 [TIME CONCENTRATION - User Defined] Time of Concentration (Tc) = 31.74 (min) [RAINFALL DESCRIPTION] Distribution Type Total Precipitation Return Period Storm Duration = SCS IA = 2.36 On) = 2 (yr) = 24.00 (hr) [Hydrograph Flow Values: Time vs. Flow] [TIME CONCENTRATION - 60.00] Time Incremental Cumulative Incremental Rainfall Rainfall Outflow Outflow On) (in) (cfs) (cfs) Time Interval (min) Design . 7 420.00 0.00 2.36 0.00 0.01 3 480.00 0.00 2.36 0.14 3.11 ~ 540.00 0.00 2.36 -0.02 3.14 10 600.00 0.00 2.36 -0.00 2.39 11 660.00 0.00 2.36 0.00 2.26 12 --720:00~0_00-2.36~0:01 - - 2.11 -- -- _, __0.- 13 780.00 0.00 2.36 0.00 1.97 14 840.00 0.00 2.36 -0.00 2.00 15 900.00 0.00 2.36 0.00 2.01 16 960.00 0.00 2.36 0.00 1.99 17 1020.00 0.00 2.36 0.00 1.95 18 1080.00 0.00 2.36 -0.00 1.91 19 1140.00 0.00 2.36 -0.00 1.85 10 1200.00 0.00 2.36 0.00 1.79 )1 1 ?Rn nn nnn ?~R nnn 171 o o 250 500 750 . 1000 1250 Time (min) EXISTING BASIN 2- YEAR - Flood I I I I I I I I I I I I I I I -- - - - 6 5 . ~ 4... ~ ~ J . . ~ () :-- l( 2. . . Hydrogroph Time vs Flow 1 . 1500 1750 Hydrograph Number: 10. Name: EXISTING BASIN 10-YEAR Type: Computed Flood I I I I I I I I I I I I I I I [HYDROGRAPH INFORMATION) Peak Flow (Op) Time to Peak (Tp) Time of Base (Tb) Volume Time Step Flow Multiplier = = 23.00 (cfs) = 492.00 (min) = 1541.12 (min) 9.714 (ac-ft) 1.00 (min) 1.00 = = [UNIT HYDROGRAPH INFORMATION] Number = 2 Type = SCS Curvilinear Peak Flow (Op) = 111.87 (Cfs) Time to Peak (Tp) = 21.16 (min) Time of Base (Tb) = 105.80 (min) Volume = 4.356 (ac-ft) Shape Factor = 484.00 Time Step: = 1.00 (min) Excess Rain = 1.00 Qn) Lag Time = 19.04 (min) [BASIN INFORMATION) [WEIGHTED WATERSHED AREA) Description Area CN <None> Overall Approximation 52.17 77 [TIME CONCENTRATION - User Defined) Time of Concentration (Tc) = 31.74 (min) [RAINFALL DESCRIPTION) Distribution Type Total Precipnation Return Period Storm Duration = SCSIA 4.56 Qn) User Defined (yr) 24.00 (hr) = = = [Hydrograph Flow Values: Time vs. Flow] [TIME CONCENTRATION - 60.00] Time Interval (min) Time Incremental .Cumulative Incremental Rainfall Rainfall Outflow Outflow (in) (in) (Cfs) (Cfs) ) 300.00 0.01 ) 360.00 0.00 r 420.00 0.00 I l 480.00 0.00 l 540.00 0.00 ~10~600.00- -0.00 11 660.00 0.00 12 720.00 0.00 13 780.00 0.00 14 840.00 0.00 15 . 900.00 0.00 16 960.00 0.00 17 1020.00 0.00 18 1080.00 0.00 IQ 11Annn nnn 4.28 4.56 4.56 4.56. 4.56 4.56 4.56 4.56 4.56 4.56 4.56 4.56 4.56 4.56 4"R I I I 0.02 0.03 0.04 0.53 -0.13 - -0:01 -0.00 -0.02 0.00 -0.01 0.00 0.00 -0.00 -0.01 _n n1 0.26 1.75 3.93 19.67 12.43 8:41- 7.47 6.69 6.04 5.99 5.87 5.70 5.51 5.30 "n7 Design . I I I I I I I I 1 I I 1 I 1 1 _1_.. 1 1 1 . . Hydrogroph 7/.me vs Flow 30 25 . ~ 20. ~. ~ 15 :s: () :---. L.t::: 1 0 . 5 . o o 250 500 750 1000 1250 1500 1750 Time (min) . _EXISIING_BASIN_10~YEAR_ -u Flood I I I I I I I I I I I I I I I _I. I I I . Hydrograph Number: 5 Name: EXISTING BASIN 25-YEAR Type: Computed Flood [HYDROGRAPH INFORMATION] Peak Flow (Qp) Time to Peak (Tp) Time of Base (Tb) Volume = Time Step = Flow Multiplier = = 31.44 (cfs) = 492.00 (min) = 1541.12 (min) 12.739 (ac-f!) 1.00 (min) 1.00 [UNIT HYDROGRAPH INFORMATION] Number = 2 Type = SCS Curvilinear Peak Flow (Qp) = 111.87 (Cfs) Time to Peak (Tp) = 21.16 (min) Time of Base (Tb) = 105.80 (min) Volume = 4.356 (ac-f!) Shape Factor = 484.00 Time Step: = 1.00 (min) Excess Rain = 1.00 On) Lag Time = 19.04 (mini [BASIN INFORMATION] [WEIGHTED WATERSHED AREA] Description Area CN <None> Overall Approximation 52.17 77 [rIME CONCENTRATION - User Defined] Time of Concentration (Tc) = 31.74 (min) [RAINFALL DESCRIPTION] Distribution Type Total Precipitation Return Period Storm Duration = SCS IA = 5.40 On) = 25 (yr) = 24.00 (hr) [Hydrograph Flow Values: Time vs. Flow] [rIME CONCENTRATION - 60.00] Time Interval (min) Time Incremental Cumulative Incremental Rainfall Rainfall Outflow Outflow On) On) (Cfs) (cfs) II Design . I 240.00 0.01 4.47 0.00 0.00 5 300.00 0.01 5.07 0.03 1.09 l 360.00 0.00 5.40 0.04 3.17 7 420.00 0.00 5.40 0.05 6.01 I 480.00 0.00 5.40 0.69, 27.31 -.-- --------- '- - -- I 540.00 0.00--- . 5~40 -0.18 16.42 10 600.00 0.00 5.40 -0.02 10.92 11 660.00 0.00 5.40 -0.00 9.62 12 720.00 0.00 5.40 -0.03 8.56 13 780.00 0.00 5.40 0.00 7.69 14 840.00 0.00 5.40 -0.02 7.59 15 900.00 0.00 5.40 0.00 7.41 16 960.00 0.00 5.40 0.00 7.18 17 1020.00 0.00 5.40 -0.00 6.92 III 1 nlln nn nnn <;.4n _n n1 IHI~ I I I I I I I I I I I I I I I I I I I 60 . . Hydro graph Time vs Flow 50 ... . ~ 40 . ... . ~ ~ 30 ~ () c: 20 10 . ........ o o 250 500 750 1000 1250 1500 1750 Time (min) -eXISTING-BASIN 25- YEAR - Flood . 0- .. Hydrograph Number: 12 . Name: EXISTING BASIN 100-YEAR J Type: Computed Flood ] ] ] :I :1 I I I I I I I I -\ [HYDROGRAPH INFORMATION] Peak Flow (Qp) Time to Peak (Tp) Time of Base (Tb) Volume Time Step Flow Multiplier = = 42.82 (cfs) = 491.00 (min) = 1541.12 (min) 16.797 (ac-fl) 1.00 (min) 1.00 = = [UNIT HYDROGRAPH INFORMATION] Number = 2 Type = SCS Curvilinear Peak Flow (Qp) = 111.87 (cfs) Time to Peak (Tp) = 21.16 (min) Time of Base (Tb) = 105.80 (min) Volume = 4.356 (ac-fl) Shape Factor = 484.00 Time Step: = 1.00 (min) Excess Rain = 1.00 (in) Lag Time = 19.04'(min) [BASIN INFORMATION] [WEIGHTED WATERSHED AREA] Description Area CN <None> Overall Approximation 52.17 77 [TIME CONCENTRATION - User Defined] Time of Concentration (Tc) = 31.74 (min) [RAINFALL DESCRIPTION] Distribution Type Total Precipitation Return Period Storm Duration SCSIA = 6.48 (in) 100 (yr) 24.00 (hr) = = = [Hydrograph Flow Values: Time vs. Flow] [TIME CONCENTRATION - 60.00] Time Interval (min) Time Incremental Cumulative Incremental Rainfall Rainfall Outfiow Outfiow (in) (in) (cfs) (cfs) ~ 240.00 0.01 5.36 0.03 0.49 :; 300.00 0.01 6.09 0.04 2.41 ) 360.00 0.00 6.48 0.06 5.25 I r 420.00 0.00 6.48 0.06 8.96 3 480.00 0.00 6.48 0.90 37.69 n .-~-~ - -540.00'- 0.00 .- --6~48------:0:24-2nO 10 600.00 0.00 6.48 -0.03 14.22 11 660.00 0.00 6.48 -0.01 12.42 12 720.00 0.00 6.48 -0.04 10.99 13 780.00 0.00 6.48 0.00 9.83 14 840.00 0.00 6.48 -0.02 9.66 15 900.00 0.00 6.48 0.00 9.40 16 960.00 0.00 6.48 0.01 9.08 17 1020.00 0.00 6.48 -0.00 8.73 III 1nllnnn nnn flAil -fin? Il':\<; I I I . Design I I I I I I I I I I I I I I I I I I I . . Hydrogroph Time vs F/o w 60 50 . . ~ 40. '-I-:. ~ 30 . s () I:-- ~ 20. 10 . o o 250 500 750 1000 1250 1500 1750 Time (min) -E-NIS-T-ING BASIN 1 oo~ YE-AR~-F1ood I I I I I I I I I I I I I I o I I I I I . . Existing Subdivision Drainage I I I I I I I I I I I I I I I I I I I . . ....... ... ........ ... . -- - -- ..... IOr_ --- - ~- " ~- 4 ~- ""-.' -- __:7"~ IDIIIMII tIOIElWCIJftltA:JftJII 8111 .IlIaIIlIIIWI_ -.. ---- JlVa1Dil.1U' ftIIIllU.Dftfil: It ~JII1IIIIOD~ ~ ~ ~ ~ '" '- :3 9 ~ ~ i;! 12 In " I 1;5 i!; ~ [;l ~ ~ I ~ I::i _ '" ~ii ,,~~ "'"v '" <0 .."'.. lli~"i II II ~.~ v;~~ ~ '" ~~~ 12",,,, z !! ~~ "e ~~ ~'" " !! W15 ..t~ W15 "Y~ ~ , . W8a VJ,SIA t:l~~ ","- ~~~ ..<;< ~ II II ~B " lJ~~ ",- " So l'- .....:\ I:-< o o '""""' '""""' .....:\ I:-< en N '""""' o C':I '""""' .....:\ I:-< C':I o '""""' .....:\ I:-< - SUA - STtvt .....:\ I:-< IN~ J,338J,S HU I 'N _ J J,338JS HJ,91 'N <:> I'I1S "tZ :il ~ 1RlJr~Wt~~~.:B~ca'" .;:J.:N'~U:l,>W.i0.!oUW.E."~.' , I -t~~.i~ 0 I ("'iJi~ 0 .J ~- .,. - C\l .... o '""""' 00/ Z; .....:\ I:-< .....:\ I:-< '- <:> ~ ~ ;:; I .. '" I cl I " <l :i ~ ~ '" '" I I I I I I I I I I I I I I I I I I II Hydrograph Number:4 . . Name: EXISTING NORTH BASIN Type: SCS Curvilinear [UNIT HYDROGRAPH INFORMATION] Peak Flow (Qp) = 32.01 (cfs) Time to Peak (Tp) = 3.66 (min) Time of Base (Tb) = 18.29 (min) Volume = 0.215 (ac-ft) Shape Factor = 484.00 Time step = 1.00 (min) Excess Rain = 1.00 (in) Storm Duration = 0.73 (min) lag Time = 3.29 (min) [BASIN INFORMATION] [WEIGHTED WATERSHED AREA] Description Area CN <None> Overall Approximation 2.58 74 [TIME CONCENTRATION - TR-55] SHEET FLOW Manning's Roughness Coef. (n) 2-yr 24-hr Rainfall (R) = Flow length (l) = land Slope (S) = Travel Time of Sheet Flow = 0.01 3.36 (in) 150.00 (ft) 0.04(flfft) = 1.48 (min) SHAllOW FLOW K_Coefficient (K) Flow length (l) Watercourse Slope (S) Travel Time of Shallow Flow Velocity (V) = 0.90 = 286.00 (ft) = 0.02 (llIft) = 4.00 (min) = 1.19 (Ills) CHANNEL FLOW Hydraulic Radius (R) Manning's Roughness Coef. (n) Flow Length (l) = Channel Slope (S) Travel Time of Channel Flow Channel Velocity (V) = 0.50 (ft) = 0.01 0.00 (It) = 0.10 (llIft) = 0.00 (min) = 22.83 (Ills) TIME OF CONCENTRATION] Time of Concentration (Tc) = 5.49 (min) [Unit Hydrograph Flow Values: Time vs. Flow] [The time interval is 10.00 minI Time Interval--Time.(mint-Flow (cfs) 1 10.00 2.78 I I I I I I I I I I I I I I I _1- . I I I 60 50 . ~ 40 . ~ ~ 30 ~ C) . :---- l( 20 10 . . . Hydrogroph Time vs Flow I I I I I I I I I I I I I I I Hydrograph Number: 15. Name: PRE-DEVELOPMENT 2-YEAR NORTH BASIN Type: Computed Flood [HYDROGRAPH INFORMATION] Peak Flow (Op) Time to Peak (Tp) Time of Base (Tb) Volume Time Step Flow Multiplier = = 0.19 (cfs) = 481.00 (min) = 1457.94 (min) 0.073 (ac-ft) 1.00 (min) 1.00 = = [UNIT HYDROGRAPH INFORMATION] Number = 4 Type = SCS Curvilinear Peak Flow (Op) = 32.01 (Cfs) Time to Peak (Tp) = 3.66 (min) Time of Base (Tb) = 18.29 (min) Volume = 0.215 (ac-II) Shape Factor = 484.00 Time Step: = 1.00 (min) Excess Rain = 1.00 (in) lag Time = 3.29 (min) [BASIN INFORMATION] [WEIGHTED WATERSHED AREA] Description Area CN <None> Overall Approximation 2.58 74 [rIME CONCENTRATION - User Defined] Time of Concentration (Tc) = 5.49 (min) [RAINFAll DESCRIPTION] Distribution Type Total Precip~ation Return Period Storm Duration = SCS IA 2.36 (in) 2 (yr) 24.00 (hr) = = = [Hydrograph Flow Values: Time vs. Flow] [rIME CON CENTRA TION - 60.00J Time Interval (min) Time Incremental Cumulative Incremental Rainfall Rainfall Outflow Outflow (in) (in) (cfs) (cfs) Design B 480.00 0.00 9 540.00 0.00 10 600.00 0.00 I 11 660.00 0.00 12 720.00 0.00 --13----780.00- 0.00 14 840.00 0.00 15 900.00 0.00 16 960.00 0.00 17 1020.00 0.00 0.47 0.00 0.19 0.57 -0.00 0.10 0.69 0.00 0.09 1.01 -0.00 0.09 1.19 0.00 0.08 UO. -0.00 0.08" ._--~- 1.39 -0.00 0.08 1.47 0.00 0.08 1.54 0.00 0.08 1.61 0.00 0.08 I I I . ~ <...t-....:. ~ 0.30 0.25 0.20 0.15 ~ () I:- L....I...... . 0.10 I I I 0.05 . . Hydrogroph Time vs Flow ......... ......... .......... . ........ 1750 I I I I I I I I I I I I I I I ~ 7 I ~ ~~. -10- I 11 12 13 14 "I 15 16 \7 I Hydrograph Number: 16 . Name: PRE-DEVELOPMENT 25-YEAR NORTH BASIN Type: Computed Flood . [HYDROGRAPH INFORMATION) Peak Flow (Qp) Time to Peak (Tp) Time of Base (Tb) Volume Time Step Flow Multiplier = = 1 ~64 (cfs) = 478.00 (min) = 1457.94 (min) 0.434 (ac-ft) 1.00 (min) 1.00 = [UNIT HYDROGRAPH INFORMATION) Number = 4 Type = SCS Curvilinear Peak Flow (Qp) = 32.01 (cfs) Time to Peak (Tp) = 3.66 (min) Time of Base (Tb) = 18.29 (min) Volume = 0.215 (ac-ft) Shape Factor = 484.00 Time Step: = 1.00 (min) Excess Rain = 1.00 0n) lag Time = 3.29 (mJn) [BASIN INFORMATION) [WEIGHTED WATERSHED AREA] Description Area CN <None> Overall Approximation 2.58 74 [TIME CONCENTRATION - User Defined] Time of Concentration (Tc) = 5.49 (min) [RAINFAll DESCRIPTION] Distribution Type Total Precipitation Return Period Storm Duration = SCSIA 5.40 0n) 25 (yr) 24.00 (hr) = = = {Hydrograph Flow Values: Time vs. Flow) [TIME CONCENTRATION - 60.00) Time Interval (min) Time Incremental Cumulative Incremental Rainfall Rainfall Outflow Outflow (in) (in) (cfs) (cfs) Design 300.00 0.00 0.56 0.00 0.04 360.00 0.00 0.70 0.00 0.14 420.00 0.00 0.87 0.00 0.29 480.00 0.00 1.06 -0.00 1.63 540.00 0.00 1.30 -0.00 0.61 (SOO".OO - '0.01 1.57 --0:00" 0.47 --. - --- 660.00 0.01 2.32 -0.00 0.42 720.00 0.01 2.71 0.00 0.36 780.00 0.00 2.97 0.00 0.36 840.00 0.00 3.17 0.00 0.34 900.00 0.00 3.36 --0.00 0.34 960.00 0.00 3.52 0.00 0.33 1020.00 0.00 3.67 0.00 0.32 I I I I I I I I I I I I I I I I I I I 3.0 2.5 ~ 2.0 ~ ~ 1.5 S;: () ~ '---L- 1. 0 0.5 0.0 o . . Hydro graph T/me vs Flow 250 500 750 1000 1250 T/me (m/n) RRE=DEVELORMENT 25= YfAR-NORTH-BASIN---rlood . 1500 1750 Hydrograph Number:3 . . Name: EXISTING SOUTH BASIN Type: SCS Curvilinear [UNIT HYDROGRAPH INFORMATION] Peak Flow (Op) = 35.23 (cfs) Time to Peak (Tp) = 3.66 (min) Time of Base (Tb) = 18.29 (min) Volume = 0.237 (ac-It) Shape Factor = 484.00 Time Step = 1.00 (min) Excess Rain = 1.00 (in) Storm Duration = 0.73 (min) Lag Time = 3.29 (min) I I I I I I I I I I I I I I I I I I I [BASIN INFORMATION] [WEIGHTED WATERSHED AREA] Description Area CN <None> Overall Approximation 2.84 74 /TIME CONCENTRATION - TR-55] SHEET FLOW Manning's Roughness Coef. (n) 2-yr 24-hr Rainfall (R) = Flow Length (L) = Land Slope (S) = Travel Time of Sheet Flow = 0.01 3.36 On) 150.00 (It) 0.04 (It!ft) = 1.48 (min) SHALLOW FLOW K_ Coefficient (K) Flow Length (L) Watercourse Slope (S) Travel Time of Shallow Flow Velocity (V) = 0.90 = 286.00 (It) = 0.02 (It!ft) = 4.00 (min) = 1.19 (ftIs) CHANNEL FLOW Hydraulic Radius (R) Manning's Roughness Coef. (n) Flow Length (L) = Channel Slope (S) Travel Time of Channel Flow . Channel Velocity (V) = 0.50 (It) = 0.01 0.00 (It) = 0.10(1t!ft) = 0.00 (min) = 22.83 (ftIs) :TIME OF CONCENTRATION] Time of Concentration (Te) = 5.49 (min) [Unit Hydrograph Flow Values: Time vs. Flow] /The time interval is 10.00 minJ Time Interval--fime" tmin) ." " Flow (cfs) 1 10.00 3.06 I . . I I I Hydrogroph I I Time vs Flow 60 I I 50 . I ~ 40 . I ~ ~ I 30 ~ I () c: 20 . I I 10. I I 0 0 5 10 15 20 I Time (min) I EX/STING SQUTflBAS/N - I I 25 30 35 Unit Hydrograph Number: 13 . Name: PRE-DEVELOPMENT 2-YEAR SOUTH BASIN Type: Computed Flood I I I I I I I I I I I I I I I 8 480.00 0.00 9 540.00 0.00 10 600.00 0.00 I 11 660.00 0.00 12 720.00 0.00 - --13~780:00- -'0:00- I 14 840.00 0.00 15 900.00 0.00 16 960.00 0.00 17 1020.00 0.00 I I [HYDROGRAPH INFORMATION] Peak Flow (Op) Time to Peak (Tp) Time of Base (Tb) Volume Time Step Flow Multiplier = = 0.21 (cfs) = 481.00 (min) = 1457.94 (min) 0.080 (ac-It) 1.00 (min) 1.00 = = [UNIT HYDROGRAPH INFORMATION] Number = 3 Type = SCS Curvilinear Peak Flow (Op) = 35.23 (cfs) Time to Peak (Tp) = 3.66 (min) Time of Base (Tb) = 18.29 (min) Volume = 0.237 (ae-It) Shape Factor = 484.00 Time Step: = 1.00 (min) Excess Rain = 1.00 (in) Lag Time = 3.29 (min) [BASIN INFORMATION] Description [WEIGHTED WATERSHED AREA] Area CN <None> Overall Approximation 2.84 74 [TIME CONCENTRATION - User Defined] Time of Concentration (Tc) = 5.49 (min) [RAINFALL DESCRIPTION] Distribution Type Total Precipitation Return Period Storm Duration = SCSIA 2.36 (in) 2 (yr) 24.00 (hr) = = = [Hydrograph Flow Values: Time vs. Flow] [TIME CONCENTRATION - 60.00] Time Interval (min) Time Incremental Cumulative Incremental Rainfall Rainfall Outflow Outflow (in) (in) (cfs) (cfs) 0.47 0.57 0.69 1.01 1.19 '1.30 1.39 1.47 1.54 1.61 0.00 -0.00 0.00 -0.00 0.00 0.00 0.00 -0.00 -0.00 0.00 0.20 0.11 0.10 0.09 0.09 0:09- - 0.09 0.09 0.09 0.09 Design . I I I I I I I I I I I I I I I I I I I ~ '-I-.:. ~ :s o Cl: 0.30 0.25 0.20 0:15 O. 10 0.05 0.00 o . . Hydro graph Time vs Flow 250 500 750 1000 1250 1500 1750 Time (min) PRE-DEVELOPMENT 2- YEAR SOUTH BASIN - Flood I I I I I I I I I I I I I I I I I I I Hydrograph Number: 14. Name: PRE-DEVELOPMENT 25- YEAR SOUTH BASIN Type: Computed Flood [HYDROGRAPH INFORMATION] Peak Flow (Op) Time to Peak (Tp) Time of Base (Tb) Volume Time Step Flow Multiplier = 1.81 (cfs) = 478.00 (min) = 1457.94 (mln) = 0.478 (ac-ft) = 1.00 (min) = 1.00 [UNIT HYDROGRAPH INFORMATION] Number = 3 Type = SCS Curvilinear Peak Flow (Op) = 35.23 (cfs) Time to Peak (Tp) = 3.66 (min) Time of Base (Tb) = 18.29 (min) Volume = 0.237 (ac-f!) Shape Factor = 484.00 Time Step: = 1.00 (min) Excess Rain = 1.00 On) Lag Time = 3.29 (min) [BASIN INFORMATION] [WEIGHTED WATERSHED AREA] Description Area CN <None> Overall Approximation 2.84 74 [TIME CONCENTRATION - User Defined] Time of Concentration (Tc) = 5.49 (min) [RAINFALL DESCRIPTION] Distribution Type Total Precipitation Return Period Storm Duration = SCS IA = 5.40 On) = 25 (yr) = 24.00 (hr) [Hydrograph Flow Values: Time vs. Flow] [TIME CONCENTRATION - 60.00] Time Time Incremental Cumulative Incremental Design Interval Rainfall Rainfall Outflow Outflow (min) On) On) (cfs) (cfs) ; 300.00 0.00 0.56 0.00 0.04 ) 360.00 0.00 0.70 0.00 0.16 7 420.00 0.00 0.87. 0.01 0.32 l 480.00 0.00 1.06 -0.00 1.80 l 540.00 0.00 1.30 -0.01 0.67 10- 600.00 - 0.01 1.57 . . --0:00 --0:52 11 660.00 0.01 2.32 -0.00 0.46 12 720.00 0.01 2.71 0.00 0.40 13 780.00 0.00 2.97 -0.00 0.39 14 840.00 0.00 3.17 0.00 0.38 15 900.00 0.00 3.36 -0.00 0.37 16 960.00 0.00 3.52 -0.00 0.36 17 1020.00 0.00 3.67 0.00 0.35 . I I I I I I I I I I I I I I I I I I I 3.0 2.5 ~ 2.0 ~ ~ 1.5 S;: () ~ '-.I..-. 1.0 0.5 . . Hydro graph Time vs Flow 0.0 o 250 500 750 1000 1250 Time (min) . fJRE -DEVELOPMENT 25- YEAR .SOUTH BASL/'f. -= Flood 1500 1750 I.. I I I I I Post-Developed I Basin I I I I I I I I I I I I I I I I I I I I I I I I I I . . DfrIDDD'Jd - CNWL\BllS - 0-- ...... ........... ...... .. ..... """""'" ,""'..... .- .- .- ... .. [;jM'll'<l' '" BKO-.at/lt9 BOt.c.l 1IOINo 'MJdna pq lA& nL' !>NlA3ABnS " !>Nl1\DNl!)NlI 1lIB1OO~ NOJSIAJClIllS A:mXl1 UQ.t AOOIOBllAH JiISY8 ~l1JXA:IO-JSOd <> <> '" --~ <> ~ ~ 7 ~ " I 8 I I ~ "- ~ '" I :5: t:J !!J I Hydrograph Number:5 Name: . EXISTING BASIN POST DEVELOPED Type: SCS Curvilinear I I I I I I I I I I I I I I . . [UNIT HYDROGRAPH INFORMATION] Peak Flow (Qp) = 111.87 (cfs) Time to Peak (Tp) = 21.16 (min) Time of Base (Tb) = 105.80 (min) Volume = 4.356 (ac-ft) Shape Factor = 484.00 Time Step = 1.00 (min) Excess Rain = 1.00 (in) Storm Duration = 4.22 (min) Lag Time = 19.04 (min) [BASIN INFORMATION] Description Area CN [WEIGHTED WATERSHED AREA] <None> 52.17 80 Overall Approximation :TIME CONCENTRATION ~ TR-55] SHEET FLOW Manning's Roughness Coet. (n) 2-yr 24-hr Rainfall (R) Flow Length (L) Land Slope (S) . Travel Time of Sheet Flow SHALLOW FLOW K_Coefficient (K) Flow Length (L) Watercourse Slope (S) Travel Time of Shallow Flow Velocity (V) . CHANNEL FLOW Hydraulic Radius (R) Manning's Roughness Coef. (n) Flow Length (L) Channel Slope (S) Travel Time of Channel Flow Channel Velocity (V) TIME OF CONCENTRATION] Time of Concentration (T c) = 0.01 = 3.36 (in) = 300.00 (ft) = 0.04 (ftlft) = 2.58 (min) = = 0.90 = 2083.00 (ft) = 0.02 (ftIft) = 29.16 (min) 1.19 (ftls) = 0.50 (fl) = 0.01 = 0.00 (ft) = 0.10(ftIft) = 0.00 (min) = 22.83 (ftIs) = 31.74 (min) [Unit Hydrograph Flow Values: Time vs. Flow] I [The time interval is 15.00 min] -. ---,Time Interval-Time (iTiin)-Flow (cfS) I 1 15.00 92.82 2 30.00 85.27 3 45.00 26.15 I 4 60.00 8.18 5 75.00 2.60 6 90.00 0.89 7 105.00 0.04 I I I I I I I I I I I I I I I I I- I I I --c;; '-.....::. ~ ~ () G: . . Hydrogroph Time vs Flow 120 100 . 80 .... 60 40 ... 20 .. o o 20 40 60 80 100 120 140 Time (min) EX/STING BASIN POST DEVELOPED - Unit I I I I I I I I I I I I I I I Hydrograph Number: 23 . Name: EXISTING BASIN 2-YEAR POST-DEVELOPED Type: Computed Flood . [HYDROGRAPH INFORMATION] Peak Flow (Qp) Time to Peak (Tp) Time of Base (Tb) Volume Time Step Flow Multiplier = 6.40 (cfs) = 494.00 (min) = 1541.12 (min) = 3.401 (ac-It) 1.00 (min) 1.00 = = [UNIT HYDROGRAPH INFORMATION] Number = 5 Type = SCS Curvilinear Peak Flow (Qp) = 111.87 (cfs) Time to Peak (Tp) = 21.16 (min) Time of Base (Tb) = 105.80 (min) Volume = 4.356 (ac-It) Shape Factor = 484.00 Time Step: = 1.00 (min) Excess Rain = 1.00 On) Lag Time = 19.04 {min) [BASIN INFORMATION] [WEIGHTED WATERSHED AREA] Description Area CN <None> Overall Approximation 52.17 80 !TIME CONCENTRATION - User Defined] Time of Concentration (Tc) = 31.74 (min) [RAINFALL DESCRIPTION] Distribution Type Total Precipitation Return Period Storm Duration = SCS IA = 2.36 (in) = 2 (yr) = 24.00 (hr) [Hydrograph Flow Values: Time vs. Flow] [TIME CONCENTRATION - 60.00] Time Time Incremental Cumulative Incremental Interval Rainfall Rainfall Outflow Outflow (min) (in) (in) (cfs) (cfs) Design I I I 7 420.00 0.00 2.36 0.01 ~ 480.00 0.00 2.36 0.18 ~ 540.00 0.00 2.36 -0.03 I 10 600.00 0.00 2.36 -0.00 11 660.00 0.00 2.36 0.00 -, 12-720:00-0:00-2:36'- '-0:01- 13 780.00 0.00 2.36 0.00 14 840.00 0.00 2.36 -0.00 15 900.00 0.00 2.36 0.00 16 960.00 0.00 2.36 0.00 17 1020.00 0.00 2.36 -0.00 18 1080.00 0.00 2.36 -0.00 19 1140.00 0.00 2.36 -0.00 20 1200.00 0.00 2.36 0.00 '1 1?Fmnn nnn ?'U'l _nnn 0.41 4.99 4.06 2.95 2.73 --2.51" -- ~ 2.31 2.33 2.32 2.28 2.23 2.16 2.09 2.01 1 Q? I I I I I I I I I I I I I I I _I I I I ~8 "-i-....: ~ S: () c: 4 . . Hydrogroph Time vs Flow 12 10 6. 2 o o 250 500 750 1000 1250 Time (min) EXISTING BASIN 2- YEAR POST-DEVELOPED - Flood 1500 1750 . :-iydrograph Number: 22 . I/ame: EXISTING BASIN la-YEAR POST-DEVELOPED Type: Computed Flood = 26.73 (cfs) = 492.00 (min) = 1541.12 (min) 10.811 (ac-fl) 1.00 (min) 1.00 I I I I I I I I I I I I I I I [HYDROGRAPH INFORMATION) Peak Flow (Qp) Time to Peak (Tp) Time of Base (Tb) Volume Time Step Flow Multiplier = = = :UNIT HYDROGRAPH INFORMATION) Number = 5 Type = SCS Curvilinear Peak Flow (Qp) = 111.87 (cfs) Time to Peak (Tp) = 21.16 (min) Time of Base (Tb) = 105.80 (min) Volume = 4.356 (ac-fl) Shape Factor = 484.00 Time Step: = 1.00 (min) Excess Rain = 1.00 ~n) Lag Time = 19.04 (min) [BASIN INFORMATION) [WEIGHTED WATERSHED AREA) Description Area CN <None> . Overall Approximation 52.17 80 [TIME CONCENTRATION - User Defined) , Time of Concentration (Tc) = 31.74 (min) [RAINFALL DESCRIPTION] Distribution Type Total Precipitation Return Period Storm Duration = SCS IA = 4.56 ~n) = User Defined (yr) = 24.00 (hr) (Hydrograph Flow Values: Time vs. Flow) [TIME CONCENTRATION - 60.00) Time Time Incremental Cumulative Incremental Interval Rainfall Rainfall Outflow Outflow (min) ~n) ~n), (cfs) (cfs) Design 240.00 0.01 3.77 0.00 300.00 0.01 4.28 0.02 ) 360.00 0.00 4.56 0.04 .1_;____:~g:ggJ:gg___:;;~~:~~ I 540.00 0:00 4.56 -0.15 10 600.00 0.00 4.56 -0.02 11 660.00 0.00 4.56 -0.00 12 720.00 0.00 4.56 -0.03 13 780.00 0.00 4.56 0.00 '4 840.00 0.00 4.56 -0.01 5 900.00 0.00 4.56 0.00 6 960.00 0.00 4.56 0.00 17 1020.00 0.00 4.56 -0.00 IR 1nRnnn nnn A.;R ..nn1 I I I 0.01 0.95 2.73 5.14 23.23 13.94---~_n - 9.26 8.15 7.26 6.52 6.43 6.28 6.08 5.86 " R1 I I I I I I I I I I I I I I I ~I I I I ~ 20 '-i-.:: ~ . 30 25 . . Hydrogroph 7ime vs Flo w 15 .............. . ................ ~ () Cl: 10. . . . . . . . 5 ............ o o 250 500 750 1000 1250 1500 1750 Time (min) EXISTING BASIN fO-YEAR POST-DEVELOPED - Flood I I I I I I I I I I I I I I I Hydrograph Number: 20 . Name: EXISTING BASIN 25-YEAR POST-DEVELOPED Type: Computed Flood [HYDROGRAPH INFORMATION] Peak Flow (Qp) Time to Peak (Tp) Time of Base (Tb) Volume Time Step Flow Multiplier = = 35.59 (cfs) = 491.00 (min) = 1541.12 (min) 13.968 (ae-fl) 1.00 (min) 1.00 = = [UNIT HYDROGRAPH INFORMATION] Number = 5 Type = SCS Curvilinear Peak Flow (Qp) = 111.87 (cfs) Time to Peak (Tp) = 21.16 (min) Time of Base (Tb) = 105.80 (min) Volume = 4.356 (ae-fl) Shape Factor = 484.00 Time Step: = 1.00 (min) Excess Rain = 1.00 On) Lag Time = 19.04 (min) [BASIN INFORMATION] [WEIGHTED WATERSHED AREA] Description Area CN <None> Overall Approximation 52.17 80 [TIME CONCENTRATION - User Defined] Time of Concentration (Te) = 31.74 (min) [RAINFALL DESCRIPTION] Disllibution Type Total Precipitation Return Period Storm Duration = SCS IA = 5.40 On) = 25 (yr) = 24.00 (hr) (Hydrograph Flow Values: Time vs. Flow] [TIME CONCENTRATION - 60.00] Time Incremental Cumulative Incremental Rainfall Rainfall Outflow Outflow On) On) (cfs) (cfs) Design Time Interval (min) 4 240.00 0.01 5 300.00 0.01 6 360.00 0.00 ._I_~ - - ___~~~~~~ ~:~~ g 540.00 0.00 10 600.00 0.00 11 660.00 0.00 12 720.00 0.00 13 780.00 0.00 14 840.00 0.00 15 900.00 0.00 16 960.00 0.00 17 1020.00 0.00 111 1nlln nn n nn . 4.47 0.02 0.39 5.07 0.03 1.99 5.40 0.05 4.35 5.40 0.05 7.43 5.40 0.75 _.}.1~~1_ 5.40 -0.20 18.05 --- -~ --- - 5.40 -0.03 11.83 5.40 -0.00 10.33 5.40 -0.03 9.15 5.40 0.00 8.18 5.40 -0.02 8.04 5.40 0.00 7.83 5.40 0.00 7.56 5.40 -0.00 7.27 ",m _n n? fl Q" I I I I I I I I I I I I I I I I I I I I I I 50 ~ 40 ~ ~ 30 :s: () c: 20 . . Hydrogroph Time vs Flow 60 10 o o 250 500 750 1000 1250 1500 1750 rime (min) EXISTING BASIN 25- '(E,4,ReOST -DEVELOEED--=-E1ood______ __ _ _ . _~ I I I I I I I I I I I I I I I Hydrograph Number: 21 . Name: EXISTING BASIN 100-YEAR POST-DEVELOPED Type: Computed Flood [HYDROGRAPH INFORMATION] Peak Flow (Qp) Time to Peak (Tp) Time of Base (Tb) Volume Time Step Flow Multiplier = = 47.38 (cfs) = 491.00 (min) = 1541.12 (min) 18.165 (ac-ft) 1.00 (min) 1.00 = = [UNIT HYDROGRAPH INFORMATION) Number = 5 Type = SCS Curvilinear Peak Flow (Qp) = 111.87 (cfs) Time to Peak (Tp) . = 21.16 (min) Time of Base (Tb) = 105.80 (min) Volume = 4.356 (ac-ft) Shape Factor = 484.00 Time Step: = 1.00 (min) Excess Rain = 1.00 Qn) Lag Time = 19.04 (min) [BASIN INFORMATION) [WEIGHTED WATERSHED AREA) DesCription Area CN <None> Overall Approximation 52.17 80 [TIME CONCENTRATION - User Defined) Time of Concentration (Tc) c 31.74 (min) [RAINFAlL DESCRIPTION] Distribution Type Total Precipitation Return Period Storm Duration c SCS IA = 6.48 Qn) 100 (yr) = 24.00 (hr) c [Hydrograph Flow Values: Time vs. Flow) [TIME CONCENTRATION - 60.00) Time Time Incremental Cumulative Incremental Interval Rainfall Rainfall Outflow Outflow (min) Qn) Qn) (cfs) (cfs) Design ~ ~ 180.00 0.02 4.46 0.00 0.01 240.00 0.01 5.36 0,03 1.35 300.00 0,01 6.09 0,04 3.54 360.00 0.00 6,48 0.06 6,66 420.00 0.00 6.48 0.07 10.60 480:00~0:00-6:-48-0:-9f' --4:[12 540.00 0,00 6.48 -0.27 23.42 600.00 0.00 6.48 -0.04 15.16 660,00 0.00 6.48 -0,01 13.15 720.00 0.00 6.48 -0.04 11.59 780.00 0.00 6.48 0.00 10.32 840,00 0.00 6.48 -0.03 10.12 900.00 0.00 6.48 0.00 9.82 960.00 0.00 6.48 0.00 9.46 in?nnn nnn RAil _nnn a nil 5 .I_~ ~ 10 11 12 13 14 15 16 17 . I I I . . . 1 1 I 1 1 1 1 1 1 1 1 1 I I 0 O. 250 500 750 1000 1250 I 77me (min) _1_ ______E~/~T1NG BASIN 100- YEAR POS.~"~-pEVELOPED - Flood Hydrogroph Time vs Flow 60 50 ~ ~. ~ 40 ... 30 ... ~ C) I:- '-L.. 20 10 1 1 1 1500 1750 I I I I I I I I I I I I I I I I I I I . . ..... ... ..... - ..........,... ..... -- ... 111& _. ftuu.&IIClI1t "lIIIIlIIIuntIBI 'DIIIOD~ - -- -- -..- IlImm~l)8 A:JmI1 lllW _ CIIoIIJllAllhlllOol -- ~ ~ ~ '" ~ ~ e '" l! ~ 8 '" II ~ ~ ~ ~a It ~ <r !Q lil ~e 1;i "- It Z ~'5 I 1 J !:Sf.> I " OJ,,, I I ! I t I I I II W1S "VZ W15 "t~ STM - 511.4 ~ . . :!/AIl/a VJ,SIA ........ <:) t- ~ E-< <:) <:) 1t'2'r"" .LH:Jl/J,S HU l 'N ~ E-< I;; ~ ;';1;):;; m~a;j :::j","; .L:J:Jl/.LS H.L9l fV15..YG \ <:) <:) N ~.l;;~~~ 'C-t~ t;;~ :go;", till U ,,~ .<><> '" "- ~~Ol ~~~ :!;.~" Q::I."~ ~i-U~ "" .. l:,:aC)3;u ~<t<t~ ~....~~ L.Jr-..-u ~ E-< ,<0<> '}[g "' .... c ~ 1! ::; I .. " J ti J " "- J ~ !;J OJ '< I I I I I I I I I I I I I I I ~I I I I Hydrograph Number:l . f . Name: POST-DEVELOPEMENT AREA 1 Type: SCS Curvilinear [UNIT HYDROGRAPH INFORMATION] Peak Flow (Qp) = 6.94 (cfs) Time to Peak (Tp) = 6.67 (min) Time of Base (Tb) = 33.33 (min) Volume = 0.085 (ac-ft) Shape Factor = 484.00 Time Step = 1.00 (min) Excess Rain = 1.00 (in) Storm Duration = 1.33 (min) Lag Time = 6.00 (min) [BASIN INFORMATION] [WEIGHTED WATERSHED AREA] Description Area CN <None> Overall Approximation 1.02 84 JIME CONCENTRATION - User Defined] . Time of Concentration (Tc) = 10.00 (min) [Untt Hydrograph Flow Values: Time vs. Flow] [The time interval is 5.00 minI Time Interval Time (mill) Flow (cfs) 1 2 3 4 5 6 5.00 10.00 15.00 20.00 25.00 30.00 6.07 4.72 1.33 0.38 0.11 0.03 , I I I I I I I I~ I~ I I I I I I _I I I I ~ () c: . . . Hydrogroph Time vs Flow 12 10 .. 8 ...... 4 6 ... 2 o o 5 10 15 20 25 30 Time (min) POSf f)t:'VctOPcMENT--;4REA-ut~=-1J nit 35 I I I I I I I I I I I I I I I _I I I I Hydrograph Number: 1 . Name: POST DEVELOPMENT 2-YEAR AREA 1 Type: Computed Flood [HYDROGRAPH INFORMATION] Peak Flow (Qp) Time to Peak (Tp) Time of Base (Tb) Volume Time Step Flow Multiplier = 0.44 (crn) = 480.00 (min) = 1472.39 (min) = 0.149 (ac-ft) = 1.00 (min) = 1.00 [UNIT HYDROGRAPH INFORMATION] Number = 1 Type = SCS Curvilinear Peak Flow (Qp) = 6.94 (cis) Time to Peak (Tp) = 6.67 (min) Time of Base (Tb) = 33.33 (min) Volume = 0.085 (ac-ft) Shape Factor = 484.00 Time Step: = 1.00 (min) Excess Rain = 1.00 (in) Lag Time = 6.00 (min) [BASIN INFORMATION] [WEIGHTED WATERSHED AREA) Description Area CN <None> Overall Approximation 1.02 84 [TIME CONCENTRATION - User Defined] Time of Concentration (Tc) = 10.00 (min) [RAINFAll DESCRIPTION] Distribution Type Total Precipitation Retum Period Stonn Duration = SCS IA = 3.36 (in) " 2 (yr) = 24.00 (hr) [Hydrograph Flow Values: Time vs. Flow] [TIME CONCENTRATION - 30.00) Time Interval (min) Time Incremental Cumulative Incremental Rainfall Rainfall Outfiow Outfiow (in) (in) (cis) (cis) Design . 10 300.00 0.00 0.83 0.00 0.02 11 330.00 0.01 0.98 0.00 0.03 12 360.00 0.02 1.41 0.00 0.04 13 390.00 0.01 1.66 0.00 0.06 14 420.00 0.00 1.81 0.00 0.08 '15 -----450.00 0.00 .- 1.93 0.00 0.13 -~~~---- 16 480.00 0.00 2.04 0.00 0.44 17 510.00 0.00 2.14 -0.00 0.20 18 540.00 0.00 2.23 -0.00 0.16 19 570.00 0.00 2.31 -0.00 0.13 ~o 600.00 0.00 2.39 0.00 0.12 ~1 630.00 0.00 2.47 -0.00 0.11 !2 660.00 0.00 2.54 -0.00 0.11 !3 690.00 0.00 2.62 0.00 0.10 >A 7?n nn nnn ?RO nnn nno I I I I I I I I I I I I I I I I I I I ~ '-!-..:: ~ ~ () c: 0.450 0.375 0.300 0.225 0.150 0.075 0.000 o . . Hydrogroph Time vs Flow .................................... . 250 500 750 1000 1250 1500 1 750 Time (min) POST DEVELOPMENT 2- YEAR AREA 1 - Flood . . . . . . . . . . . . I I I __I . . . . Hydrograph Number:2 Name: POST-DEVELOPMENT AREA 2 Type: SCS Curvilinear [UNIT HYDROGRAPH INFORMATION] Peak Flow (Qp) = 6.53 (cfs) Time to Peak (Tp) = 6.67 (min) Time of Base (Tb) = 33.33 (min) Volume = 0.080 (ac-II) Shape Factor = 484.00 Time Step = 1.00 (mfn) Excess Rain = 1.00 On) Storm Duration = 1.33 (min) Lag Time = 6.00 (min) [BASIN INFORMATION] [WEIGHTED WATERSHED AREA] Description Area CN <None> Overall Approximation 0.96 . 84 :TIME CONCENTRATION - User Defined] Time of Concentration (Tc) = 10.00 (min) [Unit Hydrograph Flow Values: Time vs. Flow] [The time interval is 5.00 minI Time Interval Time (mln) Flow (cfs) 5.00 10.00 15.00 20.00 25.00 30.00 1 2 3 4 5 6 5.72 4.44 1.25 0.36 0.11 0.03 . I I I I I I I I I I I I I I I _I I I I . . Hydrogroph T/me vs Flow 12 10 .. ~ 8.... ~ ~ ~ C) G:: 4 6 ........... .................... ..... . ...................................... ............... .... .......... 2 ........ o o 5 10 15 20 25 30 35 7/'me .( m/n) POST -DEVELOPMENT AREA 2 - Unit Hydrograph Number: 3 . Name: POST-DEVELOPMENT 2-YEAR AREA 2 Type: Computed Flood I I I I I I I I I I I I I I I [HYDROGRAPH INFORMATION) Peak Flow (Qp) Time to Peak (Tp) Time of Base (Tb) Volume Time Step Flow Multiplier = 0.42 (cfs) = 480.00 (min) = 1472.39 (min) " 0.140 (ac-ft) = 1.00 (min) = 1.00 [UNIT HYDROGRAPH INFORMATION) Number = 2 Type = SCS Curvilinear Peak Flow (Qp) = 6.53 (cfs) Time to Peak (Tp) = 6.67 (min) Time of Base (Tb) = 33.33 (min) Volume " 0.080 (ac-ft) Shape Factor = 484.00 Time Step: = 1.00 (min) Excess Rain = 1.00 ~n) Lag Time = 6.00 (min) [BASIN INFORMATION] [WEIGHTED WATERSHED AREA) Description Area CN <None> 0.96 84 Overall Approximation [TIME CONCENTRATION - User Defined] Time of Concentration (Tc) = 10.00 (min) !RAINFALL DESCRIPTION] Distribution Type T otal Precip~ation Return Period Storm Duration = SC$ IA = 3.36 (in) = 2 (yr) = 24.00 (hr) [Hydrograph Flow Values: Time vs. Flow] [TIME CONCENTRATION - 30.00) Time Time Incremental Cumulative Incremental Interval Rainfall Rainfall Outflow Outflow (min) (in) (in) (cfs) (cfs) 0.83 0.00 0.01 0.98 0.00 0.03 1.41 0.00 0.04 1.66 0.00 0.06 1.81 0.00 0.07 -1.93-0:00-0:13 2.04 0.00 0.42 2.14 -0.00 0.18 2.23 -0.00 0.16 2.31 -0.00 0.12 2.39 -0.00 0.12 2.47 0.00 0.11 2.54 -0.00 0.10 2.62 0.00 0.10 ?AQ _nnn nnQ 10 300.00 0.00 11 330.00 0.01 12 360.00 0.02 I 13 390.00 0.01 14 420.00 0.00 ~15- --450.00-'0.00 . 16 480.00 0.00 17 .510.00 0.00 18 540.00 0.00 19 570.00 0.00 10 600.00 0.00 11 630.00 0.00 12 660.00 0.00 13 690.00 0.00 ).1 7?n nn n nn I I I Design . 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 _1__- _ 1 1 1 '0;' ~ ~ ~ C) G: 0.450 0.375 0.300 0.225. . 0.150 . . Hydrogroph Time vs Flow 0.075 ...... 0.000 o 250 500 750 1000 1250 1500 Time (min) POST-DEVELOPMENT 2-YEAR AREA 2 - Flood 1750 . I I I I I I I I I I I I I I I Hydrograph Number: 4 . Name: POST-DEVELOPMENT 25-YEAR AREA 2 Type: Computed Flood [HYDROGRAPH INFORMATION] Peak Flow (Qp) Time to Peak (Tp) Time of Base (Tb) Volume Time Step Flow Multiplier " 0.89 (cfs) " 478.00 (min) " 1472.39 (min) " 0.286 (ac-ft) 1.00 (min) 1.00 " " [UNIT HYDROGRAPH INFORMATION] Number " 2 Type " SCS Curvilinear Peak Flow (Qp) " 6.53 (cfs) Time to Peak (Tp) " 6.67 (min) Time of Base (Tb) " 33.33 (min) Volume " 0.080 (ac-ft) Shape Factor " 484.00 Time Step: " 1.00 (min) Excess Rain " 1.00 On) Lag Time " 6.00 (min) [BASIN INFORMATION] [WEIGHTED WATERSHED AREA] Description Area CN <None> Overall Approximation 0.96 84 [TIME CONCENTRATION - User Defined] Time of Concentration (Tc) "10.00 (min) lRAINFALL DESCRIPTION] Distribution Type Total Precipitation Return Period Storm Duration " SCS IA " 5.40 On) " 25 (yr) " 24.00 (hr) (Hydrograph Flow Values: Time vs. Flow] [TIME CONCENTRATION - 30.00] Time Tim~ Incremental Cumulative Incremental Interval Rainfall Rainfall Outflow Outflow (min) (in) On) (cfs) (cfs) Design 3 180.00 0.00 0.62 0.00 0.00 r 210.00 0.00 0.76 0.00 0.02 l 240.00 0.01 0.92 0.00 0.03 I l 270.00 0.01 1.11 0.00 0.05 10 300.00 0.01 1.33 0.00 0.07 -11- .-- 330.00-0:01~1~58-0:00-0:10--------- 12 360.00 0.03 2.27 0.00 0.13 13 390.00 0.01 2.66' 0.00 0.17 14 420.00 0.01 2.91 0.00 0.19 15 450.00 0.01 3.11 0.01 0.30 16 480.00 0.01 3.28 -0.00 0.89 17 510.00 0.00 3.44 -0.01 0.37 18 540.00 0.00 3.58 -0.00 0.31 19 570.00 0.00 3.71 --0.00 0.24 >n Rnnnn nnn ~R4 -"nn n?~ I I I . I 1 1 I 1 I I I I 1 I 1 1 1 I 1_- ___. ___ I I I 1.2 1.0 . . . 0.6 . ~ () I:- '-l... 0.4 Hydrogroph Time vs Flow ~ 0.8. '-h.:: ~ 0.2 .. 0.0 o 250 500 750 fOOO 1250 1500 Time (min) POST-DEVELOPMENT 25-YEAR AREA 2 - Flood 1750 I I I I I I I I I I I I I I I 1_ ~__u__ I I I Hydrograph Number:3 . Name: POST-DEVELOPMENT AREA 3 Type: SCS Curvilinear . [UNIT HYDROGRAPH INFORMATION] Peak Flow (Qp) " 7.08 (cfs) Time to Peak (Tp) " 6.67 (min) TIme of Base (Tb) = 33.33 (min) Volume = 0.087 (ac-fl) Shape Factor = 484.00 TIme Step = 1.00 (min) Excess Rain = 1.00 (in) .Storm Duration = 1.33 (min) Lag Time = 6.00 (min) (BASIN INFORMATION] [WEIGHTED WATERSHED AREA] Description Area CN <None> Overall Approximation 1.04 84 :rIME CONCENTRATION - User Defined] TIme of Concentration (Tc) = 10.00 (min) [Unit Hydrograph Flow Values: Time vs. Flow] [The time interval is 5.00 minI TIme Interval Time (m!n) Flow (cfs) 1 2 3 4 5 6 5.00 10.00 15.00 20.00 25.00 30.00 6.19 4.81 1.36 0.39 0.12 0.04 I 1 1 I 1 1 1 1 ~ 8..... ~ I~ 1 1 1 1 I 0 o 5 10 15 20 25 30 1 Time (min) _1_________ __ POST-DEVELOPMENT ARfA._3 - Unit ~ () G: 4 I I I -. . Hydro graph 77me vs Flow 12 10 ................... 2 6 . 35 I I I I I I I I I I I I I I I Hydrograph Number: 5 . Name: POST-DEVELOPMENT 2-YEAR AREA 3 Type: Computed Flood [HYDROGRAPH INFORMATION) Peak Flow (Qp) Time to Peak (Tp) Time of Base (Tb) Volume Time Step Flow Multiplier . = 0.45 (cfs) = 480.00 (min) = 1472.39 (min) = 0.152 (ac-fl) = 1.00 (min) = 1.00 [UNIT HYDROGRAPH INFORMATION] Number = 3 Type = SCS Curvilinear Peak Flow (Qp) = 7.08 (cfs) Time to Peak (Tp) = 6.67 (min) Time of Base (Tb) = 33.33 (min) Volume = 0.087 (ac-fl) Shape Factor = 484.00 Time Step: = 1.00 (min) Excess Rain = 1.00 On) Lag Time = 6.00 (min) [BASIN INFORMATION] [WEIGHTED WATERSHED AREA) Description Area CN <None> Overall Approximation 1.04 84 [rIME CONCENTRATION - User Defined) Time of Concentration (Tc) = 10.00 (min) [RAINFALL DESCRIPTION] Distribution Type Total Precipttation Return Period Storm Duration = SCS IA = 3.36 On) = 2 (yr) = 24.00 (hr) (Hydrograph Flow Values: Time vs. Flow] [rIME CONCENTRATION - 30.00] Time Interval (min) Time Incremental Cumulative Incremental Rainfall Rainfall Outflow Outflow On) (in) (cfs) (cfs) Design 10 300.00 11 330.00 12 360.00 I 1.3 390.00 14 420.00 - -15-450.00 \6 480.00 17 510.00 18 540.00 19 570.00 10 600.00 11 630.00 12 660.00 23 690.00 14 7?n nn I I I 0.00 0.83 0.00 0.02 0.01 0.98 0.00 0.03 0.02 1.41 0.00 0.04 0.01 1.66 0.00 0.07 0.00 1.81 0.00 0.08 -O~OO 1.93 - - -- {)::14- --- -_.- ---- 0.00 0.00 2.04 0.00 0.45 0.00 2.14 -0.00 0.20 0.00 2.23 -0.00 0.17 . 0.00 2.31 -0.00 0.13 0.00 2.39 0.00 0.13 0.00 2.47 -0.00 0.11 0.00 2.54 -0.00 0.11 0.00 2.62 0.00 0.10 nnn ?IlQ nnn n1n I I I I I I I I I I I I I I - -- - I I 0.6 0.5 . ~ 0.4 '-I-.:: ~ 0.3 . . ~ () I:- "--l... 0.2..... 0.1 . . Hydrogroph T/me vs Flow 0.0 o 250 500 750 1000 1250 1500 T/me (m/n) POST-DEVELOPMENT 2- YEAR AREA 3 - Flood 1750 I I I I I I I I I I I I I I I . Hydrograph Number: 6 Name: POST-DEVELOPMENT 25-YEAR AREA 3 Type: Computed Flood [HYDROGRAPH INFORMATION] Peak Flow (Qp) Time to Peak (Tp) Time of Base (Tb) Volume Time Step Flow Multiplier = = 0.97 (cfs) = 478.00 (min) = 1472.39 (min) 0.310 (ac-ft) 1.00 (min) 1.00 = = [UNIT HYDROGRAPH INFORMATION] Number = 3 Type = SCS Curvilinear Peak Flow (Qp) = 7.08 (cfs) Time to Peak (Tp) = 6.67 (min) Time of Base (Tb) = 33.33 (min) Volume = 0.087 (ac-ft) Shape Factor = 484.00 Time Step: = 1.00 (min) Excess Rain = 1.00 (in) Lag Time = 6.00 (min) [BASIN INFORMATION] [WEIGHTED WATERSHED AREA] Description Area CN <None> Overall Approximation 1.04 84 [TIME CONCENTRATION - User Defined] Time of Concentration (Tc) = 10.00 (min) . [RAINFALL DESCRIPTION] Distribution Type Total Precipitation Return Period Storm Duration = SCSIA 5.40 (in) 25 (yr) 24.00 (hr) = = = [Hydrograph Flow Values: Time vs. Flow] [TIME CONCENTRATION - 30.00] Time Interval (min) Time Incremental Cumulative Incremental Rainfall Rainfall Outflow Outflow (in) (in) (cfs) (cfs) Design 5 7 3 I ~o - -11 12 13 14 15 16 17 18 19 'n 180.00 0.00 210.00 0.00 240.00 0.01 270.00 0.01 300.00 0.01 - --'330:00-0:01 360.00 0.03 390.00 0.01 420.00 0.01 450.00 0.01 480.00 0.01 510.00 0.00 540.00 0.00 570.00 0.00 Rnn nn n nn 0.62 0.76 0.92 1.11 1.33 - 1:58 2.27 2.66 2.91 3.11 3.28 3.44 3.58 3.71 ~R,t I I I 0.00 0.00 0.00 0.02 0.00 0.04 0.00 0.06 0.00 0.08 --0:00~0:11~- 0.00 0.14 0.00 0.18 0.00 0.21 0.01 0.33 -0.00 0.96 -0.01 0.41 -0.00 0.33 -G.OO 0.26 J1 nn n ?,t . I I I I I I I I I I I 1 I 1 1 _I. d _ .__ __ 1 1 I ~ '-l-.:: ~ ~ () c: 1.2 1.0 0.8 . 0.6 0.4 0.2 0.0 o . . Hydrogroph Time vs Flow 250 500 750 1000 1250 1500 Time (min) POST -DEVELOPMENT. 25-~.yEAR ARf/1 .~. =-_ Flood 1750 I I I I I I I I I I I I I I I I I I I . . Hydrograph Number:4 Name: POST-DEVELOPMENT AREA 4 Type: SCS Curvilinear [UNIT HYDROGRAPH INFORMATION] Peak Flow (Qp) = 16.40 (ets) Time to Peak (Tp) = 6.67 (min) Time of Base (Tb) = 33.33 (min) Volume = 0.201 (ae-ft) Shape Factor = 484.00 Time Step = 1.00 (min) Excess Rain = 1.00 (in) Storm Duration = 1.33 (min) Lag Time = 6.00 (min) [BASIN INFORMATION) [WEIGHTED WATERSHED AREA) Description Area CN <None> Overall Approximation 2.41 84 [TIME CONCENTRATION - User Defined) Time of Concentration (Tc) = 10.00 (min) [Un~ Hydrograph Flow Values: Time vs. Flow) [The time interval is 5.00 minI Time Interval Time (mjn) Flow (ets) 1 2 3 4 5 6 5.00 10.00 15.00 20.00 25.00 30.00 14.35 11.15 3.15 0.90 0.27 0.08 I I I I I I I I ~ 20 ~ I~ I 15 ~ I :-2 ~ 10............. I I I I I ___~ I I I 30 25 5- . o o . . Hydrogroph Time vs Flo w 5 10 15 20 25 30 35 _ __ ____ T(f!l e __( m in 1 ____._. _ _________ POST -DEVELOPMENT AREA 4 - Unit I I I I I I I I I I I I I I I ~O 11 I 12 13 - ---r4 I 15 16 17 18 I 19 20 21 22 I 1~ . Hydrograph Number: 7 Name: POST-DEVELOPMENT 2- YEAR AREA 4 Type: Computed Flood [HYDROGRAPH INFORMATION] Peak Flow (Qp) Time to Peak (Tp) Time of Base (Tb) Volume Time Step Flow Multiplier = 1.06 (cfs) = 480.00 (min) = 1472.39 (min) = 0.360 (ac-ft) 1.00 (min) = 1.00 = [UNIT HYDROGRAPH INFORMATION] Number = 4 Type = SCS Curvilinear . Peak Flow (Qp) = 16.40 (cfs) Time to Peak (Tp) = 6.67 (min) Time of Base (Tb) = 33.33 (min) Volume = 0.201 (ac-ft) Shape Factor = 484.00 Time Step: = 1.00 (min) Excess Rain = 1.00 (in) Lag Time = 6.00 (min) [BASIN INFORMATION] [WEIGHTED WATERSHED AREA] Description Area CN <None> Overall Approximation 2.41 84 [TIME CONCENTRATION - User Defined] Time of Concentration (Tc) = 10.00 (min) [RAINFALL DESCRIPTION] Distribution Type Total Precipitation Return Period Storm Duration SCSIA = 3.36 (in) = 2 (yr) = 24.00 (hr) = [Hydrograph Flow Values: Time vs. Flow] [TIME CONCENTRATION - 30.00] Time Time. Incremental Cumulative Incremental Interval Rainfall Rainfall Outflow' Outflow (min) (in) (in) (cfs) (cfs) Design 270.00 0.00 0.69 300.00 0.00 0.83 330.00 0.01 0.98 360.00 0.02 1.41' 390.00 _O,OL_. _1..66 420.00- 0.00 1.81 450.00 0.00 1.93 480.00 0.00 2.04 510.00 0.00 2.14 540.00 0.00 2.23 570.00 0.00 2.31 600.00 0.00 2.39 630.00 0.00 2.47 660.00 0.00 2.54 . Rannn nnn ?R? 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 -0.01 -0.00 -0.00 -0.00 0.00 -0.00 nnn 0.01 0.04 0.07 0.10 0.16 0.19 0.32 1.06 0.47 0.39 0.31 0.30 0.27 0.26 n?<; . . . . . . . . . . . . . I I . -. . . I 1.2 1.0 .. . ~ 0.8 '-i--.:: ~ 0.6. . ~ () c: 0.4 0.2 . . Hydrogroph Time vs Flow 0.0 o 250 500 750 1000 1250 1500 Time (min) POST-DEVELOPMENT 2- YEAR AREA 4 - Flood 1750 I I I I I I I I I I I I I I I Hydrograph Number: 8 . Name: POST-DEVELOPMENT 25-YEAR AREA 4 Type: Computed Flood [HYDROGRAPH INFORMATION] Peak Flow (Qp) Time to Peak (Tp) Time of Base (Tb) Volume Time Step Flow Multiplier " 2.24 (cfs) = 478.00 (min) " 1472.39 (min) = 0.726 (ac-ft) 1.00 (min) 1.00 = = [UNIT HYDROGRAPH INFORMATION] Number " 4 Type " SCS Curvilinear Peak Flow (Qp) " 16.40 (cfs) Time to Peak (Tp) " 6.67 (min) Time of Base (Tb) = 33.33 (min) Volume " 0.201 (ac-ft) Shape Factor " 484.00 Time Step: " 1.00 (min) Excess Rain " 1.00 vn) Lag Time = 6.00 (min) [BASIN INFORMATION) [WEIGHTED WATERSHED AREA] Description Area CN <None> Overall Approximation 2.41 84 [TIME CONCENTRATION - User Defined] Time of Concentration (Tc) = 10.00 (min) [RAINFALL DESCRIPTION] Distribution Type Total Precipitation Return Period Storm Duration = SCS IA = 5.40 vn) " 25 (yr) " 24.00 (hr) [Hydrograph Flow Values: Time vs. Flow) [TIME CONCENTRATION - 30.00] Time Time Incremental Cumulative Incremental Interval Rainfall Rainfall Outflow Outflow (min) vn) vn) (cfs) (cfs) 3 180.00 0.00 0.62 0.00 0.02 7 210.00 0.00 0.76 0.00 0.05 ~ 240.00 0.01 0.92 0.00 0.09 I l 270.00 0.01 1.11 0.00 0.13 10 300.00 0.01 1.33 0.00 0.19 - -'1"' --"330:00-0:01"-- --1'.58--0:00-0.26 12 360.00 0.03 2.27 0.00 0.32 13 390.00 0.01 2.66 0.00 0.43 14 420.00 0.01 2.91 0.01 0.49 15 450.00 0.01 3.11 0.01 0.76 16 480.00 0.01 3.28 -0.00 2.24 17 510.00 0.00 3.44 -0.02 0.94 18 540.00 0.00 3.58 -0.01 0.78 19 570.00 0.00 3.71 -0.00 0.61 m F;nn nn n nn ~ RA _n nn n <;7 I I I Design . I I I I I I I I I I I I I I I _I- I I I 1.2 1.0 . . ~ 0.8 ~ ~ 0.6 ~ () G: 0.4 0.2 . . . Hydrogroph Time vs Flow 0.0 o 250 500 750 tOOO 1250 7/'me (min) POST-DEVELOPMENT 25-YEAR AREA 1 - Flood 1500 1750 I I I I I I I I I I I I I I I I I I I . . Stormwater Quality Swale & Hydraulics Hydrograph Number: 9 . Name: WATER QUALITY BASIN Type: Computed Flood I I I I I I I I I I I I I I I [HYDROGRAPH INFORMATION] Peak Flow (Qp) Time to Peak (Tp) Time of Base (Tb) Volume Time Step Flow Multiplier = = 0.19 (cfs) = 1256.00 (min) = 1541.12 (min) 0.158 (ac-ft) 1.00 (min) 1.00 = = [UNIT HYDROGRAPH INFORMATION] Number = 3 Type = SCS Curvilinear Peak Flow (Qp) = 111.87 (cfs) Time to Peak (Tp) = 21.16 (min) Time of Base (Tb) = 105.80 (min) Volume = 4.356 (ac-ft) Shape Factor = 484.00 Time Step: = 1.00 (min) Excess Rain = 1.00 (in) Lag Time = 19.04(min) [BASIN INFORMATION] [WEIGHTED WATERSHED AREA] Description Area CN <None> Overall Approximation 52.17 80 [TIME CONCENTRATION - User Defined] Time of Concentration (T c) = 31.74 (min) [RAINFALL DESCRIPTION] Distribution Type Total Precipitation Return Period Storm Duration = SCSIA 0.83 (in) 2 (yr) 24.00 (hr) = = = [Hydrograph Flow Values: Time vs. Flow] [TIME CONCENTRATION - 30.00] Time Interval (min) Time Incremental Cumulative Incremental Rainfall Rainfall Outflow Outflow (in) (in) (cfs) (cfs) 22 660.00 0.00 23 690.00 0.00 24 720.00 0.00 I 25 750.00 0.00 26 780.00 0.00 -27-'-810.00- 0.00- 28 840.00 0,00 29 870.00 0.00 ~O 900.00 0.00 31 930.00 0.00 ~2 960.00 0.00 n 990.00 0.00 ~4 1020,00 0.00 ~5 1050.00 0,00 ~R 1nRn nn n nn 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0,83 0,83 0,83 0.83 0,83 0.83 n R~ I I I 0,00 0.01 0.00 0.03 -0.00 0.05 -0,00 0.07 0,00 0.08 -. 0:00--0:-10 0,00 0.11 0.00 0.12 -0.00 0.13 0.00 0.14 0.00 0,15 0.00 0.16 0,00 0,17 0,00 0.17 n nn n 1R Design . I I I I I I I I I I I I I I I _I_- I I I 0.450 0.375 . ~ 0.300. J2 ~ 0.225. . ~ () I:- ~ O. 150 . . . Hydrogroph Time vs Flow 0.075 ......... 0.000 o 250 500 750 1000 1250 1500 1750 Time (min) WA TER QUALITY BASIN - Flood I Hydrograph Number: 3 . . Name: WATER QUALITY SUBDIVISION I Type: Computed Flood [HYDROGRAPH INFORMATION] Peak Flow (Op) = 0.04 (cfs) I Time to Peak (Tp) = 482.00 (min) Time of Base (Tb) = 1472.39 (min) Volume = 0.018 (ac-ft) Time Step = 1.00 (min) I Flow Multiplier = 1.00 [UNIT HYDROGRAPH INFORMATION] I Number = 2 Type = SCS Curvilinear Peak Flow (Op) = 8.64 (cfs) Time to Peak (Tp) = 6.67 (min) I Time of Base (Tb) = 33.33 (min) Volume = 0.106 (ac-ft) Shape Factor = 484.00 Time Step: = 1.00 (min) I Excess Rain = 1.00 Qn) lag Time = 6.00 (min) I [BASIN INFORMATION] [WEIGHTED WATERSHED AREA] I Description Area CN <None> I Overall Approximation 1.27 90 [TIME CONCENTRATION - User Defined] I Time of Concentration (Tc) = 10.00 (min) [RAINFAll DESCRIPTION] Distribution Type = SCSIA I Total Precipitation = 0.83 Qn) Return Period = 2 (yr) Storm Duration = 24.00 (hr) I (Hydrograph Flow Values: Time vs. Flow] [TIME CONCENTRATION - 30.00] I Time Time Incremental Cumulative Incremental Design Interval Rainfall Rainfall Outflow Outflow (min) (in) Qn) (cfs) (cfs) I 16 480.00 0.00 0.50 0.00 0.04 17 510.00 0.00 0.53 -0.00 0.02 18 540.00 0.00 0.55 -0.00 0.02 I .19 570.00 0.00 0.57 -0.00 0.02 20 600.00 0.00 0.59 0.00 0.02 u-21 --630.00 0.00 . - 0:61---':0:00~0:Or - . .._- .- - _..- -.-- I 22 660.00 0.00 0.63 -0.00 0.01 23 690.00 0.00 0.65 0.00 0.01 24 720.00 0.00 0.66 -0.00 0.01 25 750.00 0.00 0.68 0.00 0.01 I 26 780.00 0.00 0.70 -0.00 0.01 17 810.00 0.00 0.71 -0.00 0.01 28 840.00 0.00 0.73 -0.00 0.01 29 870.00 0.00 0.74 -0.00 0.01 I ~n ann nn nnn n7R nnn nn1 I I I I I I I I I I I I I I I I I I I ~ '-+-:. ~ ~ () G: 0.0450 . . Hydrogroph Time vs Flow 0.0375 ................. . 0.0300 . 0.0225 0.0150 0.0075 0.0000 o 250 500 750 toOO 1250 Time (min) WA TER QUALITY SUBDIVISION - Flood 1500 1750 I I I I I I I I I I I I I I I I I I I . WATER QUALITY BASI. Worksheet for Trapezoidal Channel Project Description Worksheet Flow Element Method Solve For WATERQW Trapezoidal ( Manning's Fe Channel Dep Input Data Mannings Cot 0.250 Slope J5000 flIIl Left Side SIo~ 4.00 H: \ Right Side SI, 4.00 H: \ Bottom Width 4.00 ft Discharge 0.19 cfs Results Depth 0.26 ft Flow Area 1.3 fP Wetted Per 6.10 ft . Top Width 6.04 ft Critical De~ 0.04 ft Critical SIoI 690907 flIIl Veloc.y 0.15 ft/s VelocKy He 3.42e-4 ft Specific En 0.26 11: Froude NUl 0.06 Flow Type Ibcrilical Project Engineer: Scott Goebel FfowMaster v6.0 [614b] Page 1 of 1 n:\pub-data\02414-04\hydro\project1.fm2 Goobel Engineering Surveying, Inc. 12/19/05 12:57:04 PM @HaestadMethods;lnc. 37 Brookside Road Waterbury, CT06708 USA (203) 755-1666 I I I I I I I I I I I I I I I I I I I . Project Description Worksheet Flow Element Method SaNe For WATER QUALlT Trapezoidal Chal Manning's t-orrr,~ Channel Depth Input Data Mannings COl 0.250 Slope J5000 flIft Left Side Slo~ 4.00 H: \ Right Side SI, 4.00 H: \ Bottom Width 4.00 1t Discharge 0.04 cfs Results Depth 0.10 ft Flow Area 0.5 ft2 Wetted Per 4.86 ft: ToP Width 4.83 ft Critical De~ 0.Q1 ft Critical SIOI 753543 flIft Velocity 0.09 fl1s Velocity He 1.18e-4 ft SpecfficEn 0.10 'It Froude NUl 0.05 Flow Type Ibcriticat NATER QUALITY SUBDIVI. Worksheet for Trapezoidal Channel n:\pub-dataI()2414-04\hydro\project1.fm2 Geobel Engineering Surveying, Inc. 12119/05 12:57:26 PM cC Haestad Methods. Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Project Engineer: Scott Goebel FlowMaster v6.0 [614bl Page 1 of 1 1- . 48" FLOW @ 25 -YEAR EVe Worksheet for Circular Channel 1 Project Description 1 Worksheet Flow Element Method Solve For 48" OFF-SITE Circular Chan Manning's Fo Channel Dept 1 1 Input Data Mannings Co. 0.013 Slope J2000 ftIII Diameter 48 in DIscharge 35.59 cfs 1 1 Results Depth 2.13 11 Flow Area 6.8 ft:2 Wetted Perl 6.54 11 Top WIdth 3.99 11 CrItical Dep' 1.78 11 Percent Ful 53.2 % CrItical Slop 003713 ftIII Velocily 5.24 fils Velocity He' 0.43 11 Specific Ell< 2.55 11 Froude Nun 0.71 Maximum C 69.10 cis Discharge F 64.24 eta Slope Full 000614 ftIII Flow Type ,bcrltical 1 1 I 1 1 I I 1 _I 1 I n:\pub-data'D2414-04\hydro'flroject1.fm2 Goebel Engineering & Surveying Inc 11120105 05:45:33 PM @ Haestad Methods, Inc. 37 8rookside Road Waterbury. CT 06708 USA (203) 755-1666 Project Engineer: Scott Goebel FlowMasterv6.1 [6140] Page 1 of 1 I 1 1 Projeot Description Worksheet 48" OFF-SITE Flow Element Circular Chant Method Manning's For Solve For Channel Deptl 1 1 Input Data Manning. Co< 0.013 Slope J2000 Ml Diameter 48 in Discharge 47.38 cfs 1 1 1 Results Depth 2.55 fl Flow Area 8.5 fl' Welted Perl 7.41 fl Top Width 3.84 fl Critical Dep. 2.06 fl Percent Ful 63.9 % Critical Slop 003822 Ml Velocity 5.59 flIs Velocity He, 0.49 fl Specific En< 3.04 ft Froude Nun 0.66 Maximum C 69.10 cfs Discharge f 84.24 cfs Slope Full 001088 Ml Flow Type tbcritical 1 1 I 1 I 1 I I _I 1 1 . 48" FLOW@ 100 -YEAR ever Worksheet for Circular Channel n:~ub-data'D2414-04\hydro\project1.fm2 Goebel Engineering & Surveying lne 11120105 05:45:05 PM C Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 1 Project Engineer. Scott Goebel FlowMasterv6.1 (6140] Page 1 of 1 I I I I I I I I I I I I I I I I~- ~ I I I . 48" PIPE CAPACITY . Worksheet for Circular Channel Project Description Worksheet Flow Element Method Solve For 48" PIPE Circular Cha Manning's F. Full Flow Ca Input Data Manning. Co< 0.013 Slope J2000 ftIfl Diameter 48 in Results Depth 4.00 11 Discharge 64.24 cfs Flow Area 12.6 11' Wetted Peri 12.57 11 Top Width 0.00 11 Critical Oep. 2.42 11 Pe~nl Ful 100.0 % Critical Slop J4327 ftIfl Velocity 5.11 1lIs Velocity He. 0.41 11 Specific En< 4.41 11 Froude Nun 0.00 Maximum C 69.10 cfs Discharge F 64.24 eft> Slope Full J2000 ftIfl Flow Type N1A Project Engineer: Scott Goebel Fk)wMasterv6.1 [6140] Page 1 of1 n:\pulKfata\02414-04\hydro\project1.fm2 Goebel Engineering & Surveying loe 11f20105 04:22:58 PM @ Haeslad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 I I I I I I I I I I I I I I I I I I I . .