Loading...
HomeMy WebLinkAboutPermit Building 1996-5-10 (;'- <~ , COMMERCIAL/INDUSTRIAL (~ PERMIT APPLICATION JOB NUMBER C\\oOtcf{-L INSPECTION LINE: 726-3769 OFFICE:' 726-3759 . . TAX LOT: O(A \~S PHONE:l~~o-~44 \. STATE tO~ti~ ZIP: l\'-11'11 NEW REMODEL. DEMOLISH OTHER VA LU E: NAME ADDRESS PHONE ARCHITECT: CONTRACT?f',S NAM,E '~. 'A~RESS GENERA~Q1(\M f\ _ J\~,m PLUMBING: CONST. (\ ffO NT RACTO R # . \\)~~?~ - EX~RES 'Pr:R~ 1L,A.. L\.(f,! Y.\/> llb :L~ MECHANICAL: ELECTRICAL: PLUMBING MECHANICAL NO. Single Fixture Relocated Bldg. (new fix. addtl) Water Service fl. Sanitary Sewer ft. Storm Sewer. fl. Backflow Device FEE I CHARGE NO I ~~~ I J rl-lll Q/":1=1 I I I .J Furnace/burner & vent < 100,000 BTUs I_ Furnace/burner & vent >100,000 BTUs 1 I I I 'I I 1 I Floor furnace and vent Suspended walloI' floor mounted ,unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent System apart from AC or htg. Mechanical exhaust hood and duct Permit Issuance $10.00 TOTAL PERMIT TOTAL PERMIT OUAD AREA' ,# OF BLDGS: - OFFICE USE - LAND USE: HANDICAP ACCESS: FLOOD PLAIN: 1/ OF UNITS: ZONING: OCCY GROUP: CONSTR. TYPE: LIGHTING POWER BUDGET: , # OF STORIES: HEAT SOURCF' WATER HEATER: SO. FT. $/SO. FT. VALUE SO. FTG MAIN SO. FTG ACCESS SO. FTG OTHER x X X TOTAL VALUE OF P,ROJECT ~0S\ q :0 PLAN CH ECK FI=I= RCPT# DATF BY I BUILDING PERMIT I '\~.~, 15% State I - () nt1. SurcharQe,~.' I ~') ~~%I c]J,~4 5% State I SurcharQe I PAVING 1 I PLUMBING 15% State Surcharge FENCE VALUE $ SIDEWALK DEMOLITION I I FT. SUBTOTAL PERMITS, I SYSTEMS DEVELOPMENT I CURBCUT FT. TOTAL PERMIT FEES EXCLUDING ELECTRICAL- E~~J ~ ~ REQUIRED INSPECTIONS ~ It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, ,call 726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m: will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be made after excavation, but prior to: setup .of forms. UNDERSLAB PLUMBING, . ELECTRICAL & MECHANICAL: To be made before any work is covered. ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work is to be covered until these inspections have been made and approved. . PAVING: After gravel is in place but prioUo placing asphalt or concrete. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel in place, but prior to placing concrete. FIREPLACE: Prior to placing facing materials and before framing inspection. SP~CIAL INSPECTIONS: In accordance Section 306 of.the State Specialty Code a special inspector shall be employed by the Owner/ Contractor durin'g construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. ATTIC DRAFT STOPS & CURTAIN WALLS CONCRETE SLAB: To be made after all inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are in 'pI ace but before any concrete is placed. FRAMING: To be made after the roof, all f~ami ng, fi re blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are aPl?roved. STRUCTURAL CONCRETE: In excess of 2500 P.S.1. (306 a.1) STRUCTURAL WELDS: Performed on the job. (2722 f) UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. INSULATION & VAPOR BARRIER: To be made after all insulation and required vapor barriers are in place but before any lath or gypsum board interior wall covering is applied. HIGH STRENGTH BOLTING: During all bolt installation and ti ghteni ng operations. (306 a.6) SPRAYED ON FIREPROOFING: U.B.C. Standards 43-8. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or floor sheathing. FIRE & SEPARATION WALL: Located and constructed according to plans. I SPECIAL GRADING, EXCAVATION AND FILLING: Du ri ng earthwork. (306 a.11 & Chapter 29) FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. \ LATH AND/OR GYP$UM BOARD: To be made after all lathing and gypsum board, interior and exterior, is in place but before any plastering is applied or before gypsum board joints and fasteners are taped and finished. GLU.LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.B.C. STDS. 25-10,11). POST & BEAM: To be made prior to installation of floor, i nsu lation, decking or floor sheathing. STRUCTURAL MASONRY: (306 a.7) MASONRY: Steel location, bond beams grouting or ~erticalS in accordance with '\ UBC 2415, ROOF SHEATHING AND NAILING: Prior to installing any roof covering. SIDEWALK & DRIVEWAY: RElQuired for all concrete paving within street right of way, to\ be made after all excavating complete and form work and sub-base material in place: CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. .In addition to the inspec- tions specified, the Building Official may make or require oth.er inspections of any construction work ,to ensure compliance with the Building, City or Development Code. FINAL FIRE DEPARTME~ ADDITIONAL COMM~J~\f\.\ t .{Jl" \. l)~- SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this ins'pection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Divis.ion .~~and :~~~~c1[{;~\.-W\.OJQV(o ~_j)' FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL PLANS REVIEWED BY (DATE: By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to thework described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required Inspections are requested at the proper time, that project address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all f;m" d,,;ng f0:~~M-;:;;~ Date s--/O 9{- VALlDhION:' AMOUNT RECE'>)ED: ,-m.d{) DATE PAID: \ rR~() .\~ ~ RECEIPT 1/: (Y(4:?)L- RECEIVED BY:rJ~~~~I1,)