HomeMy WebLinkAboutPermit Building 1997-9-4
'V
COMMERCIAL/INDUSTRIAL
PERMIT APPLICATION
JOB NUMBER '?? I~ =='
INSPECTION LINE: 726-3769
OFFICE:' 726-3759
225 Fifth Street, Springfield, Oregon 97471
~'
LOCATION OF PROPOSED WORK: ~ ?~..,- ~
,. -
XASSESSORS MAP' /7~"":?~--'3/ .
.-s'~r-
-, ,
''\
\ ;
TAX LOT: ~:?/~S-
OWNER: In..\fy'1 e fY\(A, \ ~'^ V K:j
ADDRESS: ;}$ S"" lQ, >' r.. .
CITY' 9-') ~ 1 ~ ( cP
,v ~
DESCRIPTION OF WORK: IY'~P..S',.~
,
~(/~
PHONE: scr/"'" 74",( -f?tL~ (
J
REMODEL
O,.r~~ t!
ADDITION ~JOLlSH
STATE: ~
5" rfav 4"'f''''
I I L
OTHER
ZIP: q 7</ 7 7
I
NEW
VALUE: ~>t::>
r ,
NAME
ADDRESS
PHONE
ARCHITECT'
o
CONTRACTOR'S NAME . . ADDRESS
GENERAL: VV\.. (/ i /?t-P, ( I....{ ~lA (' Ie
- . I - I
C>
o
o
.J CONST.
76S v~At~C~JTRACTOR 1/
fi"~f~~" ~. 97~
EXPIRES
PHONE
;$''7.2. 6fl7
PLUMBING:
MECHANICAl'
ELECTRICAl'
PLUMBING
. MECHANICAL
NO. .
FEE
CHARGE
!\In
FFF
r.I-IA~j
Sanitary Sewer
fl.
fl.
fl.
Furnace/burner & vent
<: 100,000 BTUs
Furnace/burner & vent
> 100,000 BTUs
Floor furnace and vent
Suspended wall or floor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent System apart
from AC or htg.
Mechanical exhaust
hood and duct
Single Fixture
Relocated Bldg.
(new fix. addtl)
Water Service
Storm Sewer
Backflow Device
Permit Issuance
$10.00
TOTAL PERMIT
TOTAL PERMIT
- OFFICE USE -
HANDICAP ACCESS:
FLOOD PLAIN:
ZONING:
aUAD AREA-
# OF BLDGS:
LAND USE:
# OF UNITS:
OCCY GROUP:
CONSTR, TYPF'
LIGHTING POWER BUDGET:
# OF STORIES:
HEAT SOURCF"
WATER HEATER:
sa. FT.
$/sa. FT.
VALUE
SQ. FTG MAIN
SQ. FTG ACCESS
sa. FTG OTHER,
X
X
.X
TOTAL VALUE OF .PROJECT
PLAN CHECK F~ 2./,,/3
RCPT#
DATF
BY
I BUILDING PERMIT
15% State -r'b',
Surcharge r-~
I MECHANICAL
15% State
SurcharQe
I PAVING
?2~
I'~ :?
..~~
PLUMBING
DEMOLITION
'. -J.
I
5% State
Surcharge'
FENCE
VALUE $
SIDEWALK
CURBCUT
FT.
FT.
SUBTOTAL
PERMITS' .,
SYSTEMS.
DEVELOPMENT
I
1,'3~//
.1 ~
. .,',
" ~ .
~.
TOTAL PERM'IT FEES'
EXCLUDING ELECTRICAl
?6.~
/r_
REQUIRED INSPECTIONS
It is t~'e respo~sibility of the permit holder to see that all Inspections are made at the proper time. To request an inspection, call
726.3769 (recorder), state your City designated job number, job address, type of Inspection requested and when you will be ready
for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the following work day.
SITE INSPECTION: To be
made after excavation, but
prior. to setup of forms.
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information
herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I. further certify that only contractorsand employees
who are in compliance with ORS 701.055 will be used on this project. . '
I further agree to ensure that all required Inspections are requested at the proper time, tha'tp[oject addrel:!s')'s readable from the
street, that the permit card Is located at the front of the property, and the approved set of plims will remain on the site at all
times during c"on. / ~ ' ' , '
Slgnatu,{ l' ~~~ /JtlI11, Date~1 tj1;7 .
AMOUNT RECEIVED: ~- -:2 ~ DATE PAID: 9- S>9 "::>
~.~ RECEIPT #: L-./ -::U:1> "7 RECEIVED BY: 0~~
UNDERSLAB PLUMBING,
. ELECTRICAL: &':. .
ME'CHArincAL: To be made
before any work Is covered.
FOOTlNG$' &' FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel In place, but
. prior to placing concrete,
t'" ~
CONCRETE SLAB: To be
made after all Inslab building
service equipment, conduit,
pi ping, accessories and other
ancillary equipment items are
in place but before any
conc~~te !.~ placed.
~... "
.>, '.
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
floor insulation, decking or
floor sheathing.
POST &'BEAM: To be made
prior to installation of floor
Insulation, decking or floor
sheathing.
FLOOR .INSULATION &
VAPOR BARRIERS: To be
made prior to Installation of
decking or floor sheathing,
MASONRY: Steel location,
bond beams grouting or
verticals In accordance with
USC 2415.
ROOF SHEATHING AND
NAILING: Prior to Installing
any roof covering.
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTS'
/
VALIDATION:
"
, ROUGH PLUMBING': ,
. ELECTRICAL &
MECHANICAL: No work Is to
be covered until these .
inspections have been made
and approved, . ': . ;
".. '. . t- .,~',
PAVING: After gravel is in
place but prior to placing
asphalt or concrete.
SPECIAL INSPECTIONS: In accordance
. Section 306 of the $tate Sp'ecialty Code
) a special'. inspector shall be employed
by the Ownerl Contractor during
construction of the folfow"ing. work, A
copy of the sp~cial testing reports shall
be furnished.tO the Building Division,
ATTIC DRAFT STOPS &
, CURTAIN WALLS
FIREPLACE: Prior to placing
facing materials and before
',' _...Jraming.I,nspecti,~n.,.. \ ..',
~. '.. if' FRAMI~G: To be ni'~lde.'af.;er
. the roof, all framing, fire ~,
blocking and bracing are In
place and all pipes, chimneys
and vents are complete and
the 'rough electrical, plumbing
and meqhanlcal are approved.
,
I..... . MStlL.ATlON ,&'''APOR
I" .;<: \ BARRIER:.To:.be made "after.all(' :
Insulation and required' vapor
barriers are in place but
before any lath or gypsum
board Interior wal.1 covering is
applied.
STRUCTURAL CONCRETE: In
excess of 2500 P.S.1. (306 a.1)
STRUCTURAL WELDS:
Performed on the job. (2722 f)
HIGH STRENGTH BOLTING:.
During all bolt Installation and
tightening operations. (306
a.6).
\
, \
.i:i
;o..~,', .
SPRAYED ON
FIREPROOFING: U.B.c.
Standards 43.-8,
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. (306 a.11 &
Chapter 29)
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
V.
/
GLU.LAM BEAMS: Inspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.B.C.
STDS. 25.10,11).
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
Interior and exterior, Is In
place but before any
plastering Is applied or before
gypsum board joints and
fasteners are taped and
finished.
STRUCTURAL MASONRY: (306
a,7)
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub.base material In
place,
* In addition to the Inspec.
tions specified, the Building
Official may make or require
other Inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
A"
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting this Inspection.
FINAL BUI,LDING: Requested after the final plumbing, electrical,
mechanical and Fire Department Inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division'
and posted on the premises.
--
PLANS REVIEWED BY
.---.
/ /....,~
{ ~/ -- -
DATF
~9'-~
~ -