Loading...
HomeMy WebLinkAboutPermit Correspondence 2006-6-29 , , ~ HIGA.BURKHOLDER If .:.----- . ~ I . . ~ I , ; ;, LANO USE PLANNING f CIVIL ENGINEERING June 29, 2006 Mr. Dave Puent City of Springfield Development Services Department 225 Fifth Street Springfield, OR 97477 Re: Glacier View Final Geotechnical Summary (P30453) Dear Dave: This letter summarizes the earthwork and associated fill completed for the Glacier View Subdivision during project construction on August 18,2005 through September 27,2005. Per the attached letter from PSI, Inc. dated June 28, 2006 the earthwork performed by Wildish Sand and Gravel and inspected and observed by PSI, Inc. has been successfully completed in accordance with the project requirements, plans, specifications, the PSI Geotechnical Report dated July 22,2005, and applicable workmanship provisions of the State Building Code and Standards. The minimum allowable soil bearing capacity of 1,500 pounds per square foot has been met for Lots 5 through 12. Lots 1,2,3, 13, and 14 are native cut lots and Lot 4 will be addressed at a later date. Please note that this letter and the attached PSI, Inc. letter covers the construction of the single family residence lots up to finished sub-grade and does not include footing excavations, which have not yet been performed, and the placement of crushed rock. Please do not hesitate to call me with any questions at 988-1862 or Ray Aliperti from PSI, Inc. at 746-9649. Sincerely, Higa Burkholder Associates, LLC ~<Df1/ Todd Powell, P.E. Project Engineer Cc: Joe Harris / Jeff Sindt, 2J, LLC Ray Aliperti, PSI, Inc. EVERETT. 1721 Hewitt Avenue. Suite 401 . Everett, Washington 88201 . [425) 252-2826 . fax: (425) 252-8551 SPRINGFIELD. 150 North 7th Street. Springfield, Oregon 87477 . [541) 988-1862 . fax: (541) 888-1863