HomeMy WebLinkAboutPermit Correspondence 2006-6-29
,
,
~ HIGA.BURKHOLDER
If .:.----- .
~ I . . ~ I ,
; ;, LANO USE PLANNING f CIVIL ENGINEERING
June 29, 2006
Mr. Dave Puent
City of Springfield
Development Services Department
225 Fifth Street
Springfield, OR 97477
Re: Glacier View Final Geotechnical Summary
(P30453)
Dear Dave:
This letter summarizes the earthwork and associated fill completed for the Glacier View
Subdivision during project construction on August 18,2005 through September 27,2005.
Per the attached letter from PSI, Inc. dated June 28, 2006 the earthwork performed by Wildish
Sand and Gravel and inspected and observed by PSI, Inc. has been successfully completed in
accordance with the project requirements, plans, specifications, the PSI Geotechnical Report
dated July 22,2005, and applicable workmanship provisions of the State Building Code and
Standards.
The minimum allowable soil bearing capacity of 1,500 pounds per square foot has been met for
Lots 5 through 12. Lots 1,2,3, 13, and 14 are native cut lots and Lot 4 will be addressed at a
later date. Please note that this letter and the attached PSI, Inc. letter covers the construction of
the single family residence lots up to finished sub-grade and does not include footing excavations,
which have not yet been performed, and the placement of crushed rock.
Please do not hesitate to call me with any questions at 988-1862 or Ray Aliperti from PSI, Inc. at
746-9649.
Sincerely,
Higa Burkholder Associates, LLC
~<Df1/
Todd Powell, P.E.
Project Engineer
Cc: Joe Harris / Jeff Sindt, 2J, LLC
Ray Aliperti, PSI, Inc.
EVERETT. 1721 Hewitt Avenue. Suite 401 . Everett, Washington 88201 . [425) 252-2826 . fax: (425) 252-8551
SPRINGFIELD. 150 North 7th Street. Springfield, Oregon 87477 . [541) 988-1862 . fax: (541) 888-1863