Loading...
HomeMy WebLinkAboutPermit Building 1996-2-20 (2) SPRINGFIELD ~- Page 1 COMMERCIAL/INDUSTRIAL PERMIT APPLICATION CITY OF SPRINGFIELD Job Number: 951870A COMMUNITY SERVICES DIVISION BUILDING SAFETY 225 North Fifth Street Springfield, OR 97477 Office: 726-3759 Inspection Line: 726-3769 Location of Proposed Work: 1045 GATEWAY LP Assessors Map #: 17032220 Tax Lot #: 02300 OWner: RAYKO SPEC ADVERTISI Address: 1045 GATEWAY LOOP Phone #: City/State/zip: SPRINGFIELD, OREGON 97477 Description Of Work: PHASE 2 REMODEL REMODEL Value: 18,000,00 Contractor Const. Contractor # Expires Phone General: HOOVER 0054077 PO Box 7341 Eugene OR 974010000 Plumbing: CONTRACTORS PLU 0101624 1590 Bogart Lane Eugene OR 97401000 Mechanical: CRYSTAL CLEAN 0096878 197B Wallis Eugene OR 974020000 Electrical: EAGLE ELECTRIC 0027112 07/30/96 345-3319 08/15/96 343-0975 02/17/96 484-2286 04/02/97 343-3673 --- PLUMBING --- No, 1 Fee Charge 10,00 Single Fixture TOTAL PERMIT 15.00 --- MECHANICAL --- No, Fee Charge 15,00 10,00 ALTER DUCTWORK Permit Issuance TOTAL PERMIT 25.00 HANDICAP ACCESS: Y - - OFFICE USE QUAD AREA: 1CNW LAND USE: 5300 Item LEAN-TO ADDITION REMODEL EXISTING Square Feet 703 3640 x $/Square Feet Value 7,500,00 7,500,00 TOTAL VALUE OF PROJECT 15,000.00 BUILDING Surcharge/Admin. MECHANICAL Surcharge/Admin PLUMBING Surcharge/Admin 110,50 8,85 25,00 1.20 15,00 1.20 Job Number: 951870A Page 2 SUBTOTAL PERMITS SYSTEMS DEVELOPMENT 161,75 865,97 TOTAL PERMIT FEES EXCLUDING ELECTRICAL 1;027.72 REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time, To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection, Requests received before 7:00 a,m, will be made the same working day, requests made after 7:00 a,m will be made the following work day, Special Inspections: In accordance with a special inspector shall be employed by construction of any following 11*" work. shall be furnished to Building Safety. Section 306 of the State Specialty Code the Owner/Contractor during A copy of the special testing reports In addition to the inspections specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code, FOOTING - After trenches are excavated, FOUNDATION - After forms are erected but prior to concrete placement. ROUGH PLUMBING - Prior to cover, ROUGH MECHANICAL - Prior to cover, ROUGH ELECTRICAL - Prior to cover, FRAMING - Prior to cover. DRYWALL - Prior to taping, FIREWALL - Located and constructed according to plans, FINAL PLUMBING - When all plumbing work is complete, FINAL MECHANICAL - When all mechanical work is complete, FINAL ELECTRICAL - When all electrical work is complete, FINAL FIRE - When all Fire Department requirements have been met. been met, FINAL BUILDING - When all required inspections have been approved and the building is complete, - - - ADDITIONAL COMMENTS - - - GREG FERSCHWEILER TO VERIFY EFFECT OF NEW FOOTING EXCAVATION ON EXISTING A ARBORVITAE HEDGE ON NEIGHBORING PROPERTY TO THE SOUTH, IF HEDGE WILL NOT SURVIVE, IT IS TO BE REPLACED AS PER THE ARCHITECTS NOTES,~ Plans Reviewed By: LORNE PLEGER Building Site Reviewed By: LISA HOPPER Date: 02/16/96 By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety, I further certify that only contractors and employees who are in compliance with ORS 701,055 will be used on this project, I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. ~^ ~I\I,)~OVlIJ /"'i.:(nature r1 -;:)t) -g ( D Date Job Number: 951870A f\~,r VALIDATION --- Receipt Number: rJ V:::T 30 Date Paid: . ,I 0'h Received By: l[~ ~ Page 3 CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE (COMMERCIAL / INDUSTRIAL) Name or Company: RAYKO SPEC ADVERTISI Location: 1045 GATEWAY LP Developement Type: C Building Size: Job No,: 951870A Lot Size: 1. STORM DRAINAGE Impervious Sq Ft 1,0 X 564 0,210 Per Sq Ft = X 2. SANITARY SEWER Number Of PFUs (see Page 2) - CITY 1.0 X 0 43.43 Per PFU X 3. TRANSPORTATION Number Of Units 1,0 X ,720 X X Trip Rate 2,240 X X Cost Per Trip 437,93 $706,29 Transportation Total 4. SANITARY SEWER - MWMC Number Of PFUs o X X Per PFU + MWMC Admin Fee 18.750 MWMC CREDIT If Applicable (see Page 2) TOTAL - MWMC SDC SUBTOTAL - (Add Itema 1, 2, 3 & 4) 5. ADMINISTRATIVE FEES Base Charge (Subtotal Above) X 0,50 TOTAL SDC Reviewed By: TROY MCALLISTER Date: 02/02/96 Page 1 Sq Ft $118,44 $0,00 $706,29 $0,00 $0,00 f $0,00 $824.73 $41. 24 $865.97 SPRINGFIELD ~*' , Job Number: 951870A . ~, Page 2 FIXTURE UNIT CALCULATION TABLE Fixture Type Bathtub Drinking Fountain Floor Drain Interceptors For Grease/Oil/Solids/Etc Inteceptors For Sand/Auto Wash/Etc Laundry Tub/Clotheswasher Clotheswasher - 3 Or More Receptor For Refrigerator/water Station/Etc Receptor for Commercial Sink/Dishwasher/Etc Shower, Single Stall Shower, Gang Sink, Bar, Commercial, Residential Kitchen Urinal, Stall/Wall Wash Basin/Lavatory, Single Water Closet, Public Installation Water Closet, Private Miscellaneous TOTAL FIXTURE UNITS = Number of New Fixture Unit Equivalent o o o o o o o o o o o o o o o o o 2 1 2 3 6 2 6 1 3 2 2 2 1 6 4 CREDIT CALCULATION TABLE: Based on assessed value. If improvements occured after annexation date, credits are calculated separately. (calculations are by $1000) Year Annexed: Credit For Parcel Or Land Only If Applicable: Improvement (if after annexation date) : o x 0,00 Fixture Units o o o o o o o o o o o o o o o o o o 0,00 0,00 $0.00 (If land value is multiplied by 1 then the parcel/land credit is not accurate,) o x 0,00 CREDIT TOTAL =